ROADWORKS SUMMARY
Bull Ring, LOUGHBOROUGH, LE12 9QD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Bull Ring, LE12 9QD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Bull Ring, LOUGHBOROUGH, LE12 9QD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bull Ring are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leicestershire County Council logo
LONG TERM
Until
22 Apr 2026
Details
View Map
Share
Follow
Footpath L13

Leicestershire County Council are carrying out Highway improvement works on Footpath L13, Shepshed.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2023 at 09:19 and could run through until 22 April 2026. The works will impact the footpath only.

This roadwork event was last updated by Leicestershire County Council on 30 Apr 2025 at 12:16.

Severn Trent Water logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Snarrows Road

Severn Trent Water are carrying out roadworks on Snarrows Road, Osgathorpe.

These works are categorised as Major.

The works started on 27 November 2023 at 08:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Aug 2025 at 14:26.

Leicestershire County Council logo
LONG TERM
Until
30 Apr 2026
Details
View Map
Share
Follow
Footpath Botat K77

Leicestershire County Council are carrying out Highway improvement works on Footpath Botat K77, Hathern.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 00:00 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Apr 2025 at 15:26.

Leicestershire County Council logo
LONG TERM
Between
1 Sep 2024 and 30 Sep 2026
Details
View Map
Share
Follow
Footpath K74

Leicestershire County Council are proposing to carry out Highway improvement works on Footpath K74, Hathern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 30 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 30 May 2024 at 09:26.

Severn Trent Water logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Layby Off B5324 Westbound Ashby Road

Severn Trent Water are carrying out Utility asset works on Layby Off B5324 Westbound Ashby Road, Belton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:30 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Jul 2025 at 12:13.

National Highways logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Ashby Road

National Highways are carrying out Works for road purposes on Ashby Road, Castle Donington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2024 at 20:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Aug 2025 at 14:25.

Severn Trent Water logo
LONG TERM
Until
27 Nov 2025
Details
View Map
Share
Follow
From Main Street To Moor Lane

Severn Trent Water are carrying out Utility asset works on From Main Street To Moor Lane, Breedon On The Hill.

These works are categorised as Major.

The works started on 9 December 2024 at 08:00 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Aug 2025 at 13:26.

Severn Trent Water logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
From Gelscoe Lane To Mill Lane

Severn Trent Water are carrying out Utility asset works on From Gelscoe Lane To Mill Lane, Belton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 07:30 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Jul 2025 at 12:11.

Leicestershire County Council logo
LONG TERM
Between
28 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Cradock Street

Leicestershire County Council are proposing to carry out Highway improvement works on Cradock Street, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 6 May 2025 at 16:46.

Leicestershire County Council logo
LONG TERM
Between
28 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Cradock Street

Leicestershire County Council are proposing to carry out Highway improvement works on Cradock Street, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 21 May 2025 at 12:26.

Leicestershire County Council logo
LONG TERM
Between
16 Jun and 31 Oct 2025
Details
View Map
Share
Follow
From A453 Walton Hill To Hill Top

Leicestershire County Council are proposing to carry out Highway improvement works on From A453 Walton Hill To Hill Top, Castle Donington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 6 Jun 2025 at 11:56.

Leicestershire County Council logo
LONG TERM
Between
30 Jun and 24 Sep 2025
Details
View Map
Share
Follow
Ingleberry Road

Leicestershire County Council are proposing to carry out Highway improvement works on Ingleberry Road, Shepshed.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 24 September 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 30 Jun 2025 at 11:56.

Leicestershire County Council logo
LONG TERM
Between
7 Jul and 14 Nov 2025
Details
View Map
Share
Follow
Ashby Road West

Leicestershire County Council are proposing to carry out Highway improvement works on Ashby Road West, Shepshed.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 4 Jun 2025 at 17:26.

Network Rail logo
LONG TERM
Between
7 Jul 2025 and 27 Aug 2026
Details
View Map
Share
Nottingham Road

Network Rail were proposing to carry out Works for Rail Purposes on Nottingham Road, Loughborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 27 August 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Oct 2024 at 10:26.

Nottinghamshire County Council logo
LONG TERM
Between
10 Jul and 1 Oct 2025
Details
View Map
Share
Follow
Station Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Station Road, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 1 Jul 2025 at 10:32.

Nottinghamshire County Council logo
LONG TERM
Between
14 Jul and 1 Oct 2025
Details
View Map
Share
Follow
Station Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Station Road, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 1 Jul 2025 at 15:12.

Nottinghamshire County Council logo
LONG TERM
Between
14 Jul and 1 Oct 2025
Details
View Map
Share
Follow
Station Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Station Road, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 8 Jul 2025 at 15:34.

Severn Trent Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Abbey Road

Severn Trent Water were proposing to carry out Statutory Infrastructure Works on Abbey Road, Charley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Apr 2025 at 15:02.

Leicestershire County Council logo
LONG TERM
Between
21 Jul and 12 Oct 2025
Details
View Map
Share
Follow
Ingleberry Road

Leicestershire County Council are proposing to carry out Highway improvement works on Ingleberry Road, Shepshed.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 17 Jul 2025 at 10:19.

Leicestershire County Council logo
LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Ingleberry Road

Leicestershire County Council are carrying out Highway improvement works on Ingleberry Road, Shepshed.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 11:57 and could run through until 12 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 21 Jul 2025 at 12:06.

Network Rail logo
LONG TERM
Between
21 Jul 2025 and 30 Mar 2026
Details
View Map
Share
Follow
Butt Lane

Network Rail are proposing to carry out Works for Rail Purposes on Butt Lane, Normanton On Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 5 Mar 2025 at 10:21.

Network Rail logo
LONG TERM
Between
21 Jul 2025 and 30 Mar 2026
Details
View Map
Share
Follow
Rempstone Road

Network Rail are proposing to carry out Works for Rail Purposes on Rempstone Road, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 5 Mar 2025 at 10:21.

Network Rail logo
LONG TERM
Between
21 Jul 2025 and 30 Mar 2026
Details
View Map
Share
Follow
Hungary Lane

Network Rail are proposing to carry out Works for Rail Purposes on Hungary Lane, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 5 Mar 2025 at 10:21.

Network Rail logo
LONG TERM
Between
21 Jul 2025 and 30 Mar 2026
Details
View Map
Share
Follow
Landcroft Lane

Network Rail are proposing to carry out Works for Rail Purposes on Landcroft Lane, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 5 Mar 2025 at 10:21.

Leicestershire County Council logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
From A453 Walton Hill To Hill Top

Leicestershire County Council are carrying out Highway improvement works on From A453 Walton Hill To Hill Top, Castle Donington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 July 2025 at 10:00 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 31 Jul 2025 at 09:27.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Bishop Meadow Road

Cadent Gas are carrying out Utility asset works on Bishop Meadow Road, Loughborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 August 2025 at 08:00 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Aug 2025 at 08:04.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bakewell Road

Cadent Gas are carrying out Utility asset works on Bakewell Road, Loughborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2025 at 18:00 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 12:06.

Leicestershire County Council logo
LONG TERM
Between
13 Aug and 13 Sep 2025
Details
View Map
Share
Follow
Loughborough Road

Leicestershire County Council are proposing to carry out Highway improvement works on Loughborough Road, Quorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 13 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 11 Jun 2025 at 15:56.

Severn Trent Water logo
LONG TERM
Between
18 Aug and 5 Oct 2025
Details
View Map
Share
Follow
Abbey Road

Severn Trent Water are proposing to carry out Statutory Infrastructure Works on Abbey Road, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 May 2025 at 17:26.

Severn Trent Water logo
LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Abbey Road

Severn Trent Water are carrying out Statutory Infrastructure Works on Abbey Road, Charley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:45 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Aug 2025 at 10:03.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
23 Aug and 27 Sep 2025
Details
View Map
Share
Follow
Hospital Way

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Hospital Way, Loughborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 27 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 21 May 2025 at 15:16.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
27 Sep 2025
Details
View Map
Share
Follow
Hospital Way

Western Power Distribution (East Midlands) are carrying out Utility asset works on Hospital Way, Loughborough.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 August 2025 at 09:00 and could run through until 27 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 26 Aug 2025 at 11:06.

Leicestershire County Council logo
Between
26 Aug and 20 Sep 2025
Details
View Map
Share
Follow
Shaw Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Shaw Lane, Bardon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 15 Apr 2025 at 16:16.

Leicestershire County Council logo
Until
20 Sep 2025
Details
View Map
Share
Follow
Shaw Lane

Leicestershire County Council are carrying out Highway improvement works on Shaw Lane, Bardon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2022 at 20:01 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 27 Aug 2025 at 09:06.

Leicestershire County Council logo
Between
26 Aug and 20 Sep 2025
Details
View Map
Share
Follow
Layby Off A511 South East Bound Bardon Road

Leicestershire County Council are proposing to carry out Highway improvement works on Layby Off A511 South East Bound Bardon Road, Bardon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 15 Apr 2025 at 16:16.

Leicestershire County Council logo
Until
20 Sep 2025
Details
View Map
Share
Follow
Layby Off A511 South East Bound Bardon Road

Leicestershire County Council are carrying out Highway improvement works on Layby Off A511 South East Bound Bardon Road, Bardon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 20:00 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 27 Aug 2025 at 09:06.

Leicestershire County Council logo
Between
26 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Bardon Road

Leicestershire County Council are proposing to carry out Highway improvement works on Bardon Road, Bardon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 15 Apr 2025 at 16:16.

Leicestershire County Council logo
Until
19 Sep 2025
Details
View Map
Share
Follow
Bardon Road

Leicestershire County Council are carrying out Highway improvement works on Bardon Road, Bardon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 08:57 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 27 Aug 2025 at 09:06.

Leicestershire County Council logo
Until
10 Sep 2025
Details
View Map
Share
Follow
Derby Road

Leicestershire County Council are carrying out Highway improvement works on Derby Road, Hathern.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 09:44 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 26 Aug 2025 at 09:46.

Cadent Gas logo
Until
16 Sep 2025
Details
View Map
Share
Follow
Belton Road West

Cadent Gas are carrying out Utility asset works on Belton Road West, Loughborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 09:05 and could run through until 16 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 09:06.

Leicestershire County Council logo
Until
21 Sep 2025
Details
View Map
Share
Follow
Snells Nook Lane

Leicestershire County Council are carrying out Highway improvement works on Snells Nook Lane, Loughborough.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:55 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 1 Sep 2025 at 09:56.

Leicestershire County Council logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Ashby Road West

Leicestershire County Council are carrying out Highway improvement works on Ashby Road West, Shepshed.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 00:00 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 2 Sep 2025 at 11:06.

Leicestershire County Council logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Priory Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Priory Lane, Ulverscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 Jul 2025 at 16:29.

Leicestershire County Council logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Priory Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Priory Lane, Ulverscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 15 Jul 2025 at 08:30.

Electricity Network Company logo
LONG TERM
Between
15 Sep and 28 Oct 2025
Details
View Map
Share
Follow
Kenilworth Avenue

Electricity Network Company are proposing to carry out Utility asset works on Kenilworth Avenue, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 30 Jul 2025 at 11:53.

Electricity Network Company logo
LONG TERM
Between
15 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Kenilworth Avenue

Electricity Network Company are proposing to carry out Utility asset works on Kenilworth Avenue, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 1 Aug 2025 at 16:01.

Leicestershire County Council logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Derby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Derby Road, Hathern.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 11 Jun 2025 at 15:26.

Leicestershire County Council logo
Between
18 and 20 Sep 2025
Details
View Map
Share
Follow
A453 From Moor Lane To Moor Lane

Leicestershire County Council are proposing to carry out Highway improvement works on A453 From Moor Lane To Moor Lane, Tonge, Breedon On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 18 Jun 2025 at 14:46.

Leicestershire County Council logo
Between
18 and 20 Sep 2025
Details
View Map
Share
Follow
A453 From Moor Lane To Moor Lane

Leicestershire County Council are proposing to carry out Highway improvement works on A453 From Moor Lane To Moor Lane, Tonge, Breedon On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 27 Jun 2025 at 14:36.

Leicestershire County Council logo
LONG TERM
Between
22 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Broadway

Leicestershire County Council are proposing to carry out Highway improvement works on Broadway, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 19 Jun 2025 at 13:56.

Leicestershire County Council logo
LONG TERM
Between
22 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Broadway

Leicestershire County Council are proposing to carry out Highway improvement works on Broadway, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 25 Jun 2025 at 15:36.

Leicestershire County Council logo
LONG TERM
Between
22 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Willow Road

Leicestershire County Council are proposing to carry out Highway improvement works on Willow Road, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 1 Jul 2025 at 07:06.

Severn Trent Water logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Packe Street

Severn Trent Water are proposing to carry out New service connection on Packe Street, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 8 Jul 2025 at 11:32.

Leicestershire County Council logo
Between
23 and 27 Sep 2025
Details
View Map
Share
Follow
High Street

Leicestershire County Council are proposing to carry out Highway improvement works on High Street, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 17 Jun 2025 at 16:46.

Leicestershire County Council logo
Between
23 and 28 Sep 2025
Details
View Map
Share
Follow
High Street

Leicestershire County Council are proposing to carry out Highway improvement works on High Street, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2025 at 16:46.

Leicestershire County Council logo
Between
23 and 27 Sep 2025
Details
View Map
Share
Follow
Belvoir Road

Leicestershire County Council are proposing to carry out Highway improvement works on Belvoir Road, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 17 Jun 2025 at 16:46.

Leicestershire County Council logo
Between
23 and 28 Sep 2025
Details
View Map
Share
Follow
Belvoir Road

Leicestershire County Council are proposing to carry out Highway improvement works on Belvoir Road, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2025 at 16:46.

Leicestershire County Council logo
Between
23 and 27 Sep 2025
Details
View Map
Share
Follow
Ashby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Ashby Road, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 17 Jun 2025 at 16:46.

Leicestershire County Council logo
Between
23 and 28 Sep 2025
Details
View Map
Share
Follow
Ashby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Ashby Road, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 27 Aug 2025 at 10:56.

Leicestershire County Council logo
Between
23 and 27 Sep 2025
Details
View Map
Share
Follow
Memorial Square

Leicestershire County Council are proposing to carry out Highway improvement works on Memorial Square, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 17 Jun 2025 at 16:46.

Leicestershire County Council logo
Between
23 and 28 Sep 2025
Details
View Map
Share
Follow
Memorial Square

Leicestershire County Council are proposing to carry out Highway improvement works on Memorial Square, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2025 at 16:56.

Leicestershire County Council logo
Between
23 and 27 Sep 2025
Details
View Map
Share
Follow
Market Street

Leicestershire County Council are proposing to carry out Highway improvement works on Market Street, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 17 Jun 2025 at 16:46.

Leicestershire County Council logo
Between
23 and 28 Sep 2025
Details
View Map
Share
Follow
Market Street

Leicestershire County Council are proposing to carry out Highway improvement works on Market Street, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2025 at 16:56.

Cadent Gas logo
Between
24 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Broom Leys Road

Cadent Gas are proposing to carry out Utility asset works on Broom Leys Road, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Aug 2025 at 12:40.

Cadent Gas logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Broom Leys Road

Cadent Gas are proposing to carry out Utility asset works on Broom Leys Road, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 14:30.

BT logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Church Lane

BT are proposing to carry out Utility repair and maintenance works on Church Lane, Swannington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 4 Aug 2025 at 14:24.

BT logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Cricket Lane

BT are proposing to carry out Utility repair and maintenance works on Cricket Lane, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Aug 2025 at 13:40.

BT logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Cricket Lane

BT are proposing to carry out Utility repair and maintenance works on Cricket Lane, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Aug 2025 at 16:21.

Cadent Gas logo
Between
1 and 7 Oct 2025
Details
View Map
Share
Follow
Rosslyn Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Rosslyn Road, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Aug 2025 at 16:36.

Electricity Network Company logo
LONG TERM
Between
2 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Knightthorpe Road

Electricity Network Company are proposing to carry out Utility asset works on Knightthorpe Road, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 15 Jul 2025 at 14:19.

Electricity Network Company logo
LONG TERM
Between
2 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Knightthorpe Road

Electricity Network Company are proposing to carry out Utility asset works on Knightthorpe Road, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 30 Jul 2025 at 11:15.

Electricity Network Company logo
LONG TERM
Between
2 Oct and 2 Dec 2025
Details
View Map
Share
Follow
Knightthorpe Road

Electricity Network Company are proposing to carry out Utility asset works on Knightthorpe Road, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 2 December 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 1 Aug 2025 at 16:02.

Cadent Gas logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Derby Road

Cadent Gas are proposing to carry out Utility asset works on Derby Road, Hathern.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 18:10.

Network Rail logo
LONG TERM
Between
6 Oct 2025 and 17 Jul 2026
Details
View Map
Share
Follow
Butt Lane

Network Rail are proposing to carry out Works for Rail Purposes on Butt Lane, Normanton On Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 31 Jul 2025 at 14:26.

Network Rail logo
LONG TERM
Between
6 Oct 2025 and 17 Jul 2026
Details
View Map
Share
Follow
Butt Lane

Network Rail are proposing to carry out Works for Rail Purposes on Butt Lane, Normanton On Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 26 Aug 2025 at 15:39.

Nottinghamshire County Council logo
Between
6 and 13 Oct 2025
Details
View Map
Share
Follow
Butt Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Butt Lane, Normanton On Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 26 Aug 2025 at 12:14.

Nottinghamshire County Council logo
Between
6 and 13 Oct 2025
Details
View Map
Share
Follow
Butt Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Butt Lane, Normanton On Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 2 Sep 2025 at 12:13.

Network Rail logo
LONG TERM
Between
6 Oct 2025 and 17 Jul 2026
Details
View Map
Share
Follow
Rempstone Road

Network Rail are proposing to carry out Works for Rail Purposes on Rempstone Road, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 31 Jul 2025 at 14:26.

Network Rail logo
LONG TERM
Between
6 Oct 2025 and 17 Jul 2026
Details
View Map
Share
Follow
Rempstone Road

Network Rail are proposing to carry out Works for Rail Purposes on Rempstone Road, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Aug 2025 at 09:45.

Network Rail logo
LONG TERM
Between
6 Oct 2025 and 17 Jul 2026
Details
View Map
Share
Follow
Hungary Lane

Network Rail are proposing to carry out Works for Rail Purposes on Hungary Lane, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 31 Jul 2025 at 14:26.

Network Rail logo
LONG TERM
Between
6 Oct 2025 and 17 Jul 2026
Details
View Map
Share
Follow
Hungary Lane

Network Rail are proposing to carry out Works for Rail Purposes on Hungary Lane, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Aug 2025 at 09:45.

Network Rail logo
LONG TERM
Between
6 Oct 2025 and 17 Jul 2026
Details
View Map
Share
Follow
Landcroft Lane

Network Rail are proposing to carry out Works for Rail Purposes on Landcroft Lane, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 31 Jul 2025 at 14:05.

Network Rail logo
LONG TERM
Between
6 Oct 2025 and 17 Jul 2026
Details
View Map
Share
Follow
Landcroft Lane

Network Rail are proposing to carry out Works for Rail Purposes on Landcroft Lane, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Aug 2025 at 09:45.

Leicestershire County Council logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Sideley

Leicestershire County Council are proposing to carry out Highway improvement works on Sideley, Kegworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 8 Aug 2025 at 14:36.

BT logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Dulverton Close

BT are proposing to carry out Utility repair and maintenance works on Dulverton Close, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 Aug 2025 at 16:26.

Severn Trent Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
From Gelscoe Lane To Mill Lane

Severn Trent Water are proposing to carry out Utility asset works on From Gelscoe Lane To Mill Lane, Belton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Aug 2025 at 12:43.

Severn Trent Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
From Gelscoe Lane To Mill Lane

Severn Trent Water are proposing to carry out Utility asset works on From Gelscoe Lane To Mill Lane, Belton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Sep 2025 at 16:26.

Leicestershire County Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Abbotts Oak Drive

Leicestershire County Council are proposing to carry out Highway improvement works on Abbotts Oak Drive, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Jun 2025 at 17:56.

Leicestershire County Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Abbotts Oak Drive

Leicestershire County Council were proposing to carry out Highway improvement works on Abbotts Oak Drive, Coalville.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 15 Aug 2025 at 14:16.

Severn Trent Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Cademan Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cademan Street, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2025 at 12:59.

Severn Trent Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Parsonwood Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Parsonwood Hill, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 26 Aug 2025 at 16:12.

Severn Trent Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Parsonwood Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Parsonwood Hill, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2025 at 13:01.

Leicestershire County Council logo
Between
20 and 25 Oct 2025
Details
View Map
Share
Follow
Ashby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Ashby Road, Thringstone, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 11 Jun 2025 at 17:56.

Leicestershire County Council logo
Between
20 and 25 Oct 2025
Details
View Map
Share
Follow
Stordon Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Stordon Lane, Osgathorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 11 Jun 2025 at 17:56.

Severn Trent Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Church Lane

Severn Trent Water are proposing to carry out Utility asset works on Church Lane, Osgathorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Aug 2025 at 16:24.

Severn Trent Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Church Lane

Severn Trent Water are proposing to carry out Utility asset works on Church Lane, Osgathorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Sep 2025 at 16:20.

Severn Trent Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Derby Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Derby Road, Kegworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 12 Aug 2025 at 08:39.

Leicestershire County Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Sideley

Leicestershire County Council are proposing to carry out Highway improvement works on Sideley, Kegworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 8 Aug 2025 at 14:36.

BT logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Leicester Road

BT are proposing to carry out Utility repair and maintenance works on Leicester Road, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 18 Jun 2025 at 15:06.

Electricity Network Company logo
Between
27 Oct and 11 Nov 2025
Details
View Map
Share
Follow
Coe Avenue

Electricity Network Company are proposing to carry out Utility asset works on Coe Avenue, Loughborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 30 Jul 2025 at 11:20.

Electricity Network Company logo
Between
28 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Coe Avenue

Electricity Network Company are proposing to carry out Utility asset works on Coe Avenue, Loughborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 1 Aug 2025 at 16:02.

Leicestershire County Council logo
Between
28 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Loughborough Road

Leicestershire County Council are proposing to carry out Highway improvement works on Loughborough Road, Hathern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 16 Jul 2025 at 09:29.

Leicestershire County Council logo
Between
28 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Loughborough Road

Leicestershire County Council are proposing to carry out Highway improvement works on Loughborough Road, Hathern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 23 Jul 2025 at 18:12.

Leicestershire County Council logo
Between
30 Oct and 1 Nov 2025
Details
View Map
Share
Ashby Road

Leicestershire County Council were proposing to carry out Highway improvement works on Ashby Road, Castle Donington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2025 and run through until 1 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 3 Jun 2025 at 08:46.

Severn Trent Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Cademan Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cademan Street, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 26 Aug 2025 at 15:49.

Leicestershire County Council logo
Between
3 and 22 Nov 2025
Details
View Map
Share
Follow
Loughborough Road

Leicestershire County Council are proposing to carry out Highway improvement works on Loughborough Road, Coleorton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 10 Jul 2025 at 16:08.

Leicestershire County Council logo
Between
3 and 22 Nov 2025
Details
View Map
Share
Follow
Loughborough Road

Leicestershire County Council are proposing to carry out Highway improvement works on Loughborough Road, Coleorton, Swannington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 10 Jul 2025 at 16:08.

Leicestershire County Council logo
Between
3 and 15 Nov 2025
Details
View Map
Share
Follow
Ashby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Ashby Road, Thringstone, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 10 Jul 2025 at 16:05.

Leicestershire County Council logo
Between
3 and 15 Nov 2025
Details
View Map
Share
Follow
Stordon Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Stordon Lane, Osgathorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 10 Jul 2025 at 16:07.

BT logo
Between
4 and 6 Nov 2025
Details
View Map
Share
Follow
Cumbrian Way

BT are proposing to carry out Utility repair and maintenance works on Cumbrian Way, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Aug 2025 at 10:56.

BT logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Main Street

BT were proposing to carry out Utility repair and maintenance works on Main Street, Woodthorpe, Loughborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2025 and run through until 7 November 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 14 Aug 2025 at 14:49.

Between
10 and 18 Nov 2025
Details
View Map
Share
Follow
Newstead Way

UK Power Distribution are proposing to carry out New service connection on Newstead Way, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Distribution on 22 Aug 2025 at 14:48.

BT logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Empress Road

BT are proposing to carry out Utility repair and maintenance works on Empress Road, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 Aug 2025 at 15:08.

Leicestershire County Council logo
Between
10 and 22 Nov 2025
Details
View Map
Share
Follow
From A453 Walton Hill To Hill Top

Leicestershire County Council are proposing to carry out Highway improvement works on From A453 Walton Hill To Hill Top, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 22 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 29 Jul 2025 at 16:16.

Leicestershire County Council logo
Between
11 and 15 Nov 2025
Details
View Map
Share
Follow
Derby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Derby Road, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Jul 2025 at 18:05.

Leicestershire County Council logo
Between
11 and 15 Nov 2025
Details
View Map
Share
Follow
Derby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Derby Road, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 23 Jul 2025 at 16:13.

BT logo
Between
12 and 14 Nov 2025
Details
View Map
Share
Follow
Dulverton Close

BT are proposing to carry out Utility repair and maintenance works on Dulverton Close, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Aug 2025 at 15:50.

Leicestershire County Council logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Ashby Road West

Leicestershire County Council are proposing to carry out Highway improvement works on Ashby Road West, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 25 Jun 2025 at 15:36.

Leicestershire County Council logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Ashby Road West

Leicestershire County Council are proposing to carry out Highway improvement works on Ashby Road West, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 8 Jul 2025 at 16:16.

Leicestershire County Council logo
LONG TERM
Between
17 Nov 2025 and 15 Feb 2026
Details
View Map
Share
Follow
Holt Drive

Leicestershire County Council are proposing to carry out Highway improvement works on Holt Drive, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 15 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 25 Jun 2025 at 15:36.

Leicestershire County Council logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
From A453 Walton Hill To Hill Top

Leicestershire County Council are proposing to carry out Highway improvement works on From A453 Walton Hill To Hill Top, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 5 Aug 2025 at 16:30.

Severn Trent Water logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Derby Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Derby Road, Kegworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Aug 2025 at 09:15.

Severn Trent Water logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Newlands Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Newlands Avenue, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Aug 2025 at 10:51.


Roadworks Map near to Bull Ring, LOUGHBOROUGH, LE12 9QD (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Bull Ring, LOUGHBOROUGH, LE12 9QD (12 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
THE LANT 
(0.1 miles)
BT
New service connection - Footway - Some carriageway incursion
Cancelled
(Scheduled: 3 Sep 2025 - 5 Sep 2025)
0.1
Details
Share
2
BT logo
CUMBRIAN WAY 
(0.3 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 2 Sep 2025 16:40
(Scheduled: 1 Sep 2025 - 4 Sep 2025)
0.3
Details
Share
Follow
3
BT logo
COUNTRYMANS WAY 
(0.3 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 4 Sep 2025 - 8 Sep 2025
0.3
Details
Share
Follow
4
Severn Trent Water logo
URGENT
  
LEICESTER ROAD 
(0.3 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - Give and take
Cancelled
(Scheduled: 3 Sep 2025 - 5 Sep 2025)
0.3
Details
Share
5
Western Power Distribution (East Midlands) logo
URGENT
  
ST JAMES ROAD 
(0.3 miles)
Western Power Distribution (East Midlands)
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 30 Aug 2025 15:50
(Scheduled: 30 Aug 2025 - 5 Sep 2025)
0.3
Details
Share
Follow
6
Western Power Distribution (East Midlands) logo
FAIRWAY ROAD 
(0.4 miles)
Western Power Distribution (East Midlands)
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
In Progress
Since: 1 Sep 2025 13:15
(Scheduled: 1 Sep 2025 - 14 Sep 2025)
0.4
Details
Share
Follow
7
Western Power Distribution (East Midlands) logo
FAIRWAY ROAD 
(0.4 miles)
Western Power Distribution (East Midlands)
Remedial works - Footway - Give and take
Cancelled
(Scheduled: 2 Sep 2025 - 5 Sep 2025)
0.4
Details
Share
8
BT logo
BLACKSMITHS AVENUE 
(0.4 miles)
BT
New service connection - Footway - No carriageway incursion
In Progress
Since: 3 Sep 2025 10:21
(Scheduled: 3 Sep 2025 - 5 Sep 2025)
0.4
Details
Share
Follow
9
Severn Trent Water logo
OAKLEY ROAD 
(0.4 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 3 Sep 2025
0.4
Details
Share
Follow
10
Western Power Distribution (East Midlands) logo
URGENT
  
COOMBE CLOSE 
(0.6 miles)
Western Power Distribution (East Midlands)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 1 Sep 2025 14:00
(Scheduled: 1 Sep 2025 - 4 Sep 2025)
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.