ROADWORKS SUMMARY
Swan Street, LOUGHBOROUGH, LE12 7NL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Swan Street, LE12 7NL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Swan Street, LOUGHBOROUGH, LE12 7NL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Swan Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leicestershire County Council logo
LONG TERM
Until
30 Oct 2025
Details
View Map
Share
Follow
Footpath I56

Leicestershire County Council are carrying out Highway improvement works on Footpath I56, Cossington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 April 2024 at 12:26 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 2 Oct 2024 at 14:46.

Leicestershire County Council logo
LONG TERM
Between
13 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Loughborough Road

Leicestershire County Council are proposing to carry out Highway improvement works on Loughborough Road, Grimston.

These works are categorised as Major.

The works will start on or after 13 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 22 May 2025 at 11:36.

Leicestershire County Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Loughborough Road

Leicestershire County Council are carrying out Highway improvement works on Loughborough Road, Grimston.

These works are categorised as Major.

The works started on 13 June 2025 at 00:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Jun 2025 at 15:36.

Network Rail logo
LONG TERM
Between
7 Jul 2025 and 27 Aug 2026
Details
View Map
Share
Nottingham Road

Network Rail were proposing to carry out Works for Rail Purposes on Nottingham Road, Loughborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 27 August 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Oct 2024 at 10:26.

Leicestershire County Council logo
LONG TERM
Between
11 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Cossington Road

Leicestershire County Council are proposing to carry out Highway improvement works on Cossington Road, Sileby.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 9 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 17 Jul 2025 at 10:23.

Leicestershire County Council logo
LONG TERM
Until
9 Oct 2025
Details
View Map
Share
Follow
Cossington Road

Leicestershire County Council are carrying out Highway improvement works on Cossington Road, Sileby.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 11:15 and could run through until 9 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 18 Aug 2025 at 11:26.

Severn Trent Water logo
Finishing
Today
Details
View Map
Share
Highgate Road

Severn Trent Water were proposing to carry out Utility asset works on Highgate Road, Sileby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 May 2025 at 10:51.

Severn Trent Water logo
Finishing
Today
Details
View Map
Share
Heathcote Drive

Severn Trent Water were proposing to carry out Utility asset works on Heathcote Drive, Sileby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 May 2025 at 10:50.

Leicestershire County Council logo
LONG TERM
Between
8 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Park Hill Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Park Hill Lane, Seagrave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Jul 2025 at 08:36.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Sileby Road

Cadent Gas are carrying out Utility repair and maintenance works on Sileby Road, Barrow Upon Soar.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2025 at 15:30 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 11:16.

Western Power Distribution (East Midlands) logo
Between
15 and 28 Sep 2025
Details
View Map
Share
Follow
Allington Drive

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Allington Drive, Birstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Jun 2025 at 14:26.

Western Power Distribution (East Midlands) logo
Until
28 Sep 2025
Details
View Map
Share
Follow
Allington Drive

Western Power Distribution (East Midlands) are carrying out Utility asset works on Allington Drive, Birstall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:00 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Sep 2025 at 09:24.

Leicestershire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Montsoreau Way

Leicestershire County Council are proposing to carry out Highway improvement works on Montsoreau Way, Mountsorrel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 Jul 2025 at 12:45.

Leicestershire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Montsoreau Way

Leicestershire County Council are carrying out Highway improvement works on Montsoreau Way, Mountsorrel.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 07:31 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 16 Sep 2025 at 07:36.

Leicestershire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Fillingate

Leicestershire County Council are proposing to carry out Highway improvement works on Fillingate, Wanlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 2 Apr 2025 at 15:27.

Leicestershire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Fillingate

Leicestershire County Council are proposing to carry out Highway improvement works on Fillingate, Wanlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 4 Apr 2025 at 15:56.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
22 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Millstone Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Millstone Lane, Syston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 9 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 14 Jul 2025 at 13:46.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
22 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Millstone Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Millstone Lane, Syston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 9 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Aug 2025 at 12:52.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
22 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Millstone Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Millstone Lane, Syston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 9 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Sep 2025 at 16:16.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
22 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Melton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Melton Road, Syston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 14 Jul 2025 at 13:46.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
22 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Melton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Melton Road, Syston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Sep 2025 at 16:16.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
22 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Melton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Melton Road, Queniborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 14 Jul 2025 at 13:46.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
22 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Melton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Melton Road, Queniborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Sep 2025 at 16:16.

Severn Trent Water logo
Between
22 and 30 Sep 2025
Details
View Map
Share
Seagrave Road

Severn Trent Water were proposing to carry out Utility asset works on Seagrave Road, Sileby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 30 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 May 2025 at 10:47.

Leicestershire County Council logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Melton Road

Leicestershire County Council are proposing to carry out Highway improvement works on Melton Road, Burton On The Wolds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 5 Aug 2025 at 15:46.

Leicestershire County Council logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Melton Road

Leicestershire County Council are proposing to carry out Highway improvement works on Melton Road, Burton On The Wolds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 15 Aug 2025 at 09:54.

National Highways logo
Between
24 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Loughborough Road

National Highways are proposing to carry out Works for road purposes on Loughborough Road, Wanlip.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 18 Aug 2025 at 12:46.

National Highways logo
Between
24 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Loughborough Road

National Highways are proposing to carry out Works for road purposes on Loughborough Road, Wanlip.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 18 Aug 2025 at 15:26.

National Highways logo
Between
24 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Glebe Way

National Highways are proposing to carry out Works for road purposes on Glebe Way, Syston.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 5 Aug 2025 at 17:26.

National Highways logo
Between
24 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Glebe Way

National Highways are proposing to carry out Works for road purposes on Glebe Way, Syston.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 26 Aug 2025 at 14:46.

Leicestershire County Council logo
LONG TERM
Between
1 Oct and 30 Nov 2025
Details
View Map
Share
Follow
Haddon Close

Leicestershire County Council are proposing to carry out Highway improvement works on Haddon Close, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 12 Aug 2025 at 12:31.

Leicestershire County Council logo
LONG TERM
Between
1 Oct and 30 Nov 2025
Details
View Map
Share
Follow
Chatsworth Drive

Leicestershire County Council are proposing to carry out Highway improvement works on Chatsworth Drive, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 12 Aug 2025 at 12:52.

Leicestershire County Council logo
LONG TERM
Between
1 Oct and 30 Nov 2025
Details
View Map
Share
Follow
Cranmer Drive

Leicestershire County Council are proposing to carry out Highway improvement works on Cranmer Drive, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 12 Aug 2025 at 12:33.

Leicestershire County Council logo
LONG TERM
Between
1 Oct and 30 Nov 2025
Details
View Map
Share
Follow
Abbotts Close

Leicestershire County Council are proposing to carry out Highway improvement works on Abbotts Close, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 12 Aug 2025 at 12:32.

Leicestershire County Council logo
LONG TERM
Between
1 Oct and 30 Nov 2025
Details
View Map
Share
Follow
Farriers Way

Leicestershire County Council are proposing to carry out Highway improvement works on Farriers Way, East Goscote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 12 Aug 2025 at 12:54.

Leicestershire County Council logo
Between
6 and 18 Oct 2025
Details
View Map
Share
Follow
Loughborough Road

Leicestershire County Council are proposing to carry out Highway improvement works on Loughborough Road, Wanlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 7 Jul 2025 at 14:33.

Leicestershire County Council logo
Between
6 and 18 Oct 2025
Details
View Map
Share
Follow
Quorn Mountsorrel Bypass

Leicestershire County Council are proposing to carry out Highway improvement works on Quorn Mountsorrel Bypass, Wanlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 7 Jul 2025 at 14:25.

Leicestershire County Council logo
Between
6 and 18 Oct 2025
Details
View Map
Share
Follow
Link Road From Cossington Lane To A6 Loughborough Road

Leicestershire County Council are proposing to carry out Highway improvement works on Link Road From Cossington Lane To A6 Loughborough Road, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Jul 2025 at 15:33.

Leicestershire County Council logo
Between
6 and 18 Oct 2025
Details
View Map
Share
Follow
Quorn Mountsorrel Bypass

Leicestershire County Council are proposing to carry out Highway improvement works on Quorn Mountsorrel Bypass, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 7 Jul 2025 at 14:32.

Leicestershire County Council logo
Between
6 and 18 Oct 2025
Details
View Map
Share
Follow
Slip Road From A6 Loughborough Road To Roundabout

Leicestershire County Council are proposing to carry out Highway improvement works on Slip Road From A6 Loughborough Road To Roundabout, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 7 Jul 2025 at 14:27.

Leicestershire County Council logo
Between
6 and 18 Oct 2025
Details
View Map
Share
Follow
Slip Road Onto Southbound A6 From Link Road

Leicestershire County Council are proposing to carry out Highway improvement works on Slip Road Onto Southbound A6 From Link Road, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 7 Jul 2025 at 14:26.

Leicestershire County Council logo
Between
6 and 18 Oct 2025
Details
View Map
Share
Follow
Slip Road Onto Southbound A6 From Link Road

Leicestershire County Council are proposing to carry out Highway improvement works on Slip Road Onto Southbound A6 From Link Road, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 23 Jul 2025 at 18:13.

Leicestershire County Council logo
Between
6 and 18 Oct 2025
Details
View Map
Share
Follow
Slip Road Onto Northbound A6 From Link Road

Leicestershire County Council are proposing to carry out Highway improvement works on Slip Road Onto Northbound A6 From Link Road, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Jul 2025 at 15:34.

Leicestershire County Council logo
Between
6 and 18 Oct 2025
Details
View Map
Share
Follow
Slip Road From A6 Loughborough Road To Link Road

Leicestershire County Council are proposing to carry out Highway improvement works on Slip Road From A6 Loughborough Road To Link Road, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 7 Jul 2025 at 14:24.

Leicestershire County Council logo
Between
6 and 18 Oct 2025
Details
View Map
Share
Follow
Slip Road From Mountsorrel Lane To A6 Northbound

Leicestershire County Council are proposing to carry out Highway improvement works on Slip Road From Mountsorrel Lane To A6 Northbound, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 7 Jul 2025 at 14:28.

Leicestershire County Council logo
Between
6 and 18 Oct 2025
Details
View Map
Share
Follow
Slip Road From A6 To Mountsorrel Lane Southbound

Leicestershire County Council are proposing to carry out Highway improvement works on Slip Road From A6 To Mountsorrel Lane Southbound, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 7 Jul 2025 at 14:27.

Leicestershire County Council logo
Between
6 and 18 Oct 2025
Details
View Map
Share
Follow
Quorn Mountsorrel Bypass

Leicestershire County Council are proposing to carry out Highway improvement works on Quorn Mountsorrel Bypass, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Jul 2025 at 15:34.

Leicestershire County Council logo
Between
6 and 18 Oct 2025
Details
View Map
Share
Follow
Quorn Mountsorrel Bypass

Leicestershire County Council are proposing to carry out Highway improvement works on Quorn Mountsorrel Bypass, Mountsorrel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Jul 2025 at 15:34.

Leicestershire County Council logo
Between
6 and 18 Oct 2025
Details
View Map
Share
Follow
Quorn Mountsorrel Bypass

Leicestershire County Council are proposing to carry out Highway improvement works on Quorn Mountsorrel Bypass, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 11 Jun 2025 at 13:36.

Cadent Gas logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Grove Lane

Cadent Gas are proposing to carry out Remedial works on Grove Lane, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 15:27.

Cadent Gas logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Grove Lane

Cadent Gas are proposing to carry out Remedial works on Grove Lane, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 17:26.

Leicestershire County Council logo
Between
10 and 12 Oct 2025
Details
View Map
Share
Follow
Cossington Road

Leicestershire County Council are proposing to carry out Highway improvement works on Cossington Road, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 5 Aug 2025 at 16:56.

Leicestershire County Council logo
Between
10 and 12 Oct 2025
Details
View Map
Share
Follow
Cossington Road

Leicestershire County Council are proposing to carry out Highway improvement works on Cossington Road, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 12 Aug 2025 at 17:26.

Severn Trent Water logo
Between
11 and 19 Oct 2025
Details
View Map
Share
Seagrave Road

Severn Trent Water were proposing to carry out Utility asset works on Seagrave Road, Sileby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 October 2025 and run through until 19 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 26 Aug 2025 at 12:57.

Leicestershire County Council logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Melton Road

Leicestershire County Council are proposing to carry out Highway improvement works on Melton Road, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 27 Aug 2025 at 14:27.

Leicestershire County Council logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Melton Road

Leicestershire County Council are proposing to carry out Highway improvement works on Melton Road, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 1 Sep 2025 at 13:34.

Severn Trent Water logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Brook Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brook Street, Wymeswold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Aug 2025 at 16:25.

Western Power Distribution (East Midlands) logo
Between
18 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Rearsby Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Rearsby Lane, Gaddesby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2025 and could run through until 2 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Jul 2025 at 14:06.

Severn Trent Water logo
Between
18 and 26 Oct 2025
Details
View Map
Share
Follow
Seagrave Road

Severn Trent Water are proposing to carry out Utility asset works on Seagrave Road, Sileby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 2 Sep 2025 at 16:56.

Leicestershire County Council logo
Between
20 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Loughborough Road

Leicestershire County Council are proposing to carry out Highway improvement works on Loughborough Road, Wanlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:29.

Leicestershire County Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Wanlip Road

Leicestershire County Council are proposing to carry out Highway improvement works on Wanlip Road, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 5 Aug 2025 at 16:26.

Leicestershire County Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Wanlip Road

Leicestershire County Council are proposing to carry out Highway improvement works on Wanlip Road, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 18 Aug 2025 at 13:56.

Leicestershire County Council logo
Between
20 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Quorn Mountsorrel Bypass

Leicestershire County Council are proposing to carry out Highway improvement works on Quorn Mountsorrel Bypass, Wanlip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:29.

Leicestershire County Council logo
Between
20 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Link Road From Cossington Lane To A6 Loughborough Road

Leicestershire County Council are proposing to carry out Highway improvement works on Link Road From Cossington Lane To A6 Loughborough Road, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:29.

Leicestershire County Council logo
Between
20 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Quorn Mountsorrel Bypass

Leicestershire County Council are proposing to carry out Highway improvement works on Quorn Mountsorrel Bypass, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:30.

Leicestershire County Council logo
Between
20 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Slip Road From A6 Loughborough Road To Roundabout

Leicestershire County Council are proposing to carry out Highway improvement works on Slip Road From A6 Loughborough Road To Roundabout, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:30.

Leicestershire County Council logo
Between
20 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Slip Road Onto Northbound A6 From Link Road

Leicestershire County Council are proposing to carry out Highway improvement works on Slip Road Onto Northbound A6 From Link Road, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:30.

Leicestershire County Council logo
Between
20 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Slip Road From A6 Loughborough Road To Link Road

Leicestershire County Council are proposing to carry out Highway improvement works on Slip Road From A6 Loughborough Road To Link Road, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:30.

Leicestershire County Council logo
Between
20 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Slip Road From Mountsorrel Lane To A6 Northbound

Leicestershire County Council are proposing to carry out Highway improvement works on Slip Road From Mountsorrel Lane To A6 Northbound, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:29.

Leicestershire County Council logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Slip Road From A6 To Mountsorrel Lane Southbound

Leicestershire County Council are proposing to carry out Highway improvement works on Slip Road From A6 To Mountsorrel Lane Southbound, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:29.

Leicestershire County Council logo
Between
20 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Quorn Mountsorrel Bypass

Leicestershire County Council are proposing to carry out Highway improvement works on Quorn Mountsorrel Bypass, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:29.

Leicestershire County Council logo
Between
20 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Quorn Mountsorrel Bypass

Leicestershire County Council are proposing to carry out Highway improvement works on Quorn Mountsorrel Bypass, Mountsorrel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:29.

Leicestershire County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Soar Road

Leicestershire County Council are proposing to carry out Highway improvement works on Soar Road, Quorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 5 Aug 2025 at 16:06.

Leicestershire County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Soar Road

Leicestershire County Council are proposing to carry out Highway improvement works on Soar Road, Quorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 18 Aug 2025 at 13:56.

Severn Trent Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Brook Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brook Street, Wymeswold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Aug 2025 at 16:26.

Severn Trent Water logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Clay Street

Severn Trent Water are proposing to carry out New service connection on Clay Street, Wymeswold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Aug 2025 at 13:26.

Severn Trent Water logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Clay Street

Severn Trent Water are proposing to carry out New service connection on Clay Street, Wymeswold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 26 Aug 2025 at 10:06.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Quenby Crescent

BT are proposing to carry out Utility repair and maintenance works on Quenby Crescent, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Aug 2025 at 17:26.

Severn Trent Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Seagrave Road

Severn Trent Water were proposing to carry out Utility asset works on Seagrave Road, Sileby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Jul 2025 at 10:37.

Leicestershire County Council logo
LONG TERM
Between
27 Oct and 26 Dec 2025
Details
View Map
Share
Follow
Park Hill Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Park Hill Lane, Seagrave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 26 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 11 Aug 2025 at 16:16.

Leicestershire County Council logo
LONG TERM
Between
27 Oct and 26 Dec 2025
Details
View Map
Share
Follow
Park Hill Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Park Hill Lane, Seagrave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 26 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Sep 2025 at 07:46.

BT logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Main Street

BT were proposing to carry out Utility repair and maintenance works on Main Street, Woodthorpe, Loughborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2025 and run through until 7 November 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 14 Aug 2025 at 14:49.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
10 Nov 2025 and 1 Feb 2026
Details
View Map
Share
Follow
Barkby Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Barkby Road, Syston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Sep 2025 at 14:16.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
10 Nov 2025 and 1 Feb 2026
Details
View Map
Share
Follow
College Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on College Road, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Sep 2025 at 14:16.

Leicestershire County Council logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
High Street

Leicestershire County Council are proposing to carry out Highway improvement works on High Street, Syston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 26 Aug 2025 at 15:56.

BT logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Empress Road

BT are proposing to carry out Utility repair and maintenance works on Empress Road, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Sep 2025 at 14:06.

Leicestershire County Council logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Old Parsonage Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Old Parsonage Lane, Hoton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 10 Sep 2025 at 15:56.

Nottinghamshire County Council logo
Between
14 and 24 Nov 2025
Details
View Map
Share
Follow
Wysall Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Wysall Lane, Rempstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 11 Jul 2025 at 09:53.

Nottinghamshire County Council logo
Between
14 and 24 Nov 2025
Details
View Map
Share
Follow
Wysall Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Wysall Lane, Rempstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 15 Jul 2025 at 10:27.

Cadent Gas logo
Between
2 and 4 Dec 2025
Details
View Map
Share
Follow
Grove Lane

Cadent Gas are proposing to carry out Remedial works on Grove Lane, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 18:39.

BT logo
Between
8 and 19 Dec 2025
Details
View Map
Share
Follow
Empress Road

BT are proposing to carry out Utility repair and maintenance works on Empress Road, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Sep 2025 at 15:27.

Leicestershire County Council logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Wymeswold Road

Leicestershire County Council were proposing to carry out Highway improvement works on Wymeswold Road, Hoton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 11 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 11 Aug 2025 at 11:46.

Leicestershire County Council logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Follow
Wymeswold Road

Leicestershire County Council are proposing to carry out Highway improvement works on Wymeswold Road, Hoton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 15 Aug 2025 at 18:31.

Leicestershire County Council logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Follow
Wymeswold Road

Leicestershire County Council are proposing to carry out Highway improvement works on Wymeswold Road, Hoton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 26 Aug 2025 at 12:13.

Leicestershire County Council logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Hoton Road

Leicestershire County Council were proposing to carry out Highway improvement works on Hoton Road, Wymeswold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 11 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 11 Aug 2025 at 11:46.

Leicestershire County Council logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Follow
Hoton Road

Leicestershire County Council are proposing to carry out Highway improvement works on Hoton Road, Wymeswold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 15 Aug 2025 at 18:32.

Leicestershire County Council logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Follow
Hoton Road

Leicestershire County Council are proposing to carry out Highway improvement works on Hoton Road, Wymeswold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 26 Aug 2025 at 11:57.

Leicestershire County Council logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Link Road From Cossington Lane To A6 Loughborough Road

Leicestershire County Council are proposing to carry out Highway improvement works on Link Road From Cossington Lane To A6 Loughborough Road, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the verge only.

This roadwork event was last updated by Leicestershire County Council on 9 Jul 2025 at 13:56.

Leicestershire County Council logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Slip Road Onto Southbound A6 From Link Road

Leicestershire County Council are proposing to carry out Highway improvement works on Slip Road Onto Southbound A6 From Link Road, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the verge only.

This roadwork event was last updated by Leicestershire County Council on 9 Jul 2025 at 13:57.

Leicestershire County Council logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Slip Road Onto Northbound A6 From Link Road

Leicestershire County Council are proposing to carry out Highway improvement works on Slip Road Onto Northbound A6 From Link Road, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the verge only.

This roadwork event was last updated by Leicestershire County Council on 9 Jul 2025 at 13:56.

Leicestershire County Council logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Slip Road From A6 Loughborough Road To Link Road

Leicestershire County Council are proposing to carry out Highway improvement works on Slip Road From A6 Loughborough Road To Link Road, Rothley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the verge only.

This roadwork event was last updated by Leicestershire County Council on 9 Jul 2025 at 13:56.


Roadworks Map near to Swan Street, LOUGHBOROUGH, LE12 7NL (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 19 Sep 2025 01:43
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Swan Street, LOUGHBOROUGH, LE12 7NL (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Leicestershire County Council logo
MAJOR
  
PARK HILL LANE 
(0.3 miles)
Leicestershire County Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 8 Sep 2025 - 7 Nov 2025
0.3
Details
Share
Follow