ROADWORKS SUMMARY
Canning Way, LOUGHBOROUGH, LE11 5YA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Canning Way, LE11 5YA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Canning Way, LOUGHBOROUGH, LE11 5YA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Canning Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leicestershire County Council logo
LONG TERM
Until
22 Apr 2026
Details
View Map
Share
Follow
Footpath L13

Leicestershire County Council are carrying out Highway improvement works on Footpath L13, Shepshed.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2023 at 09:19 and could run through until 22 April 2026. The works will impact the footpath only.

This roadwork event was last updated by Leicestershire County Council on 30 Apr 2025 at 12:16.

Severn Trent Water logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Church Lane

Severn Trent Water are carrying out Utility asset works on Church Lane, Osgathorpe.

These works are categorised as Major.

The works started on 22 January 2024 at 08:00 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 May 2025 at 09:42.

Leicestershire County Council logo
LONG TERM
Until
30 Apr 2026
Details
View Map
Share
Follow
Footpath Botat K77

Leicestershire County Council are carrying out Highway improvement works on Footpath Botat K77, Hathern.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 00:00 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Apr 2025 at 15:26.

Leicestershire County Council logo
LONG TERM
Between
19 Aug 2024 and 27 Jun 2025
Details
View Map
Share
Follow
Footpath Botat K77

Leicestershire County Council are proposing to carry out Highway improvement works on Footpath Botat K77, Hathern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 27 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 17 Sep 2024 at 12:36.

Leicestershire County Council logo
LONG TERM
Between
1 Sep 2024 and 30 Sep 2026
Details
View Map
Share
Follow
Footpath K74

Leicestershire County Council are proposing to carry out Highway improvement works on Footpath K74, Hathern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 30 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 30 May 2024 at 09:26.

Severn Trent Water logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Layby Off B5324 Westbound Ashby Road

Severn Trent Water are carrying out Utility asset works on Layby Off B5324 Westbound Ashby Road, Belton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:30 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 May 2025 at 17:56.

Network Rail logo
LONG TERM
Between
25 Nov 2024 and 30 Jul 2025
Details
View Map
Share
Rempstone Road

Network Rail were proposing to carry out Works for Rail Purposes on Rempstone Road, Sutton Bonington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 30 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Sep 2024 at 13:43.

Severn Trent Water logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
From Gelscoe Lane To Mill Lane

Severn Trent Water are proposing to carry out Utility asset works on From Gelscoe Lane To Mill Lane, Belton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Severn Trent Water on 31 Jan 2025 at 17:26.

Severn Trent Water logo
LONG TERM
Until
1 Aug 2025
Details
View Map
Share
Follow
From Gelscoe Lane To Mill Lane

Severn Trent Water are carrying out Utility asset works on From Gelscoe Lane To Mill Lane, Belton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 07:30 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Feb 2025 at 15:45.

Severn Trent Water logo
LONG TERM
Between
11 Apr and 13 Jun 2025
Details
View Map
Share
Follow
Ingleberry Road

Severn Trent Water are proposing to carry out Statutory Infrastructure Works on Ingleberry Road, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Severn Trent Water on 17 Mar 2025 at 11:12.

LONG TERM
Until
26 Jun 2025
Details
View Map
Share
Follow
Ingleberry Road

GTC Pipelines are carrying out Utility asset works on Ingleberry Road, Shepshed.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:00 and could run through until 26 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 14 Apr 2025 at 09:22.

Leicestershire County Council logo
LONG TERM
Between
28 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Cradock Street

Leicestershire County Council are proposing to carry out Highway improvement works on Cradock Street, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 21 May 2025 at 12:26.

Leicestershire County Council logo
LONG TERM
Between
28 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Cradock Street

Leicestershire County Council are proposing to carry out Highway improvement works on Cradock Street, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 6 May 2025 at 16:46.

Severn Trent Water logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Ingleberry Road

Severn Trent Water are carrying out Statutory Infrastructure Works on Ingleberry Road, Shepshed.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 April 2025 at 08:30 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 1 May 2025 at 08:34.

Leicestershire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
B591 From Copt Oak Road To Nanpantan Road

Leicestershire County Council are proposing to carry out Highway improvement works on B591 From Copt Oak Road To Nanpantan Road, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 Apr 2025 at 12:06.

Leicestershire County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Charley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Charley Road, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 Apr 2025 at 12:06.

Leicestershire County Council logo
LONG TERM
Between
10 May and 10 Jun 2025
Details
View Map
Share
Follow
Terry Yardley Way

Leicestershire County Council are proposing to carry out Highway improvement works on Terry Yardley Way, Loughborough.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 23 Apr 2025 at 14:16.

Leicestershire County Council logo
LONG TERM
Between
10 May and 10 Jun 2025
Details
View Map
Share
Follow
Ling Road

Leicestershire County Council are proposing to carry out Highway improvement works on Ling Road, Loughborough.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 23 Apr 2025 at 14:16.

Leicestershire County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Footpath I33

Leicestershire County Council are proposing to carry out Highway improvement works on Footpath I33, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the footpath only.

This roadwork event was last updated by Leicestershire County Council on 12 May 2025 at 14:16.

Leicestershire County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Footpath I33

Leicestershire County Council are carrying out Highway improvement works on Footpath I33, Barrow Upon Soar.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 09:00 and could run through until 8 June 2025. The works will impact the footpath only.

This roadwork event was last updated by Leicestershire County Council on 16 May 2025 at 16:56.

Leicestershire County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
North Street

Leicestershire County Council are carrying out Highway improvement works on North Street, Barrow Upon Soar.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 09:00 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 12 May 2025 at 13:36.

Leicestershire County Council logo
LONG TERM
Between
12 May and 20 Jul 2025
Details
View Map
Share
Follow
Main Street

Leicestershire County Council are proposing to carry out Highway improvement works on Main Street, Woodthorpe, Loughborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 20 July 2025. The works will impact the verge only.

This roadwork event was last updated by Leicestershire County Council on 6 May 2025 at 16:36.

Leicestershire County Council logo
LONG TERM
Until
20 Jul 2025
Details
View Map
Share
Follow
Main Street

Leicestershire County Council are carrying out Highway improvement works on Main Street, Woodthorpe, Loughborough.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 00:00 and could run through until 20 July 2025. The works will impact the verge only.

This roadwork event was last updated by Leicestershire County Council on 19 May 2025 at 08:16.

Leicestershire County Council logo
LONG TERM
Between
14 May and 14 Jun 2025
Details
View Map
Share
Follow
The Green

Leicestershire County Council are proposing to carry out Highway improvement works on The Green, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 Apr 2025 at 12:06.

Leicestershire County Council logo
LONG TERM
Between
14 May and 14 Jun 2025
Details
View Map
Share
Follow
West End

Leicestershire County Council are proposing to carry out Highway improvement works on West End, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 Apr 2025 at 12:06.

Leicestershire County Council logo
LONG TERM
Between
14 May and 14 Jun 2025
Details
View Map
Share
Follow
Main Street

Leicestershire County Council are proposing to carry out Highway improvement works on Main Street, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 Apr 2025 at 12:06.

Leicestershire County Council logo
LONG TERM
Between
15 May and 15 Jun 2025
Details
View Map
Share
Follow
Hathern Road

Leicestershire County Council are proposing to carry out Highway improvement works on Hathern Road, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 Apr 2025 at 12:06.

Leicestershire County Council logo
LONG TERM
Between
15 May and 15 Jun 2025
Details
View Map
Share
Follow
Hathern Road

Leicestershire County Council are proposing to carry out Highway improvement works on Hathern Road, Hathern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Apr 2025 at 14:36.

Leicestershire County Council logo
LONG TERM
Between
15 May and 15 Jun 2025
Details
View Map
Share
Follow
Hathern Road

Leicestershire County Council are proposing to carry out Highway improvement works on Hathern Road, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 Apr 2025 at 12:07.

Electricity Network Company logo
Between
26 May and 20 Jun 2025
Details
View Map
Share
Follow
Belton Road

Electricity Network Company are proposing to carry out Utility asset works on Belton Road, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 18 Mar 2025 at 11:45.

Electricity Network Company logo
Between
26 May and 13 Jun 2025
Details
View Map
Share
Follow
Jubilee Drive

Electricity Network Company are proposing to carry out Utility asset works on Jubilee Drive, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 18 Mar 2025 at 16:35.

Electricity Network Company logo
Between
29 May and 15 Jun 2025
Details
View Map
Share
Follow
Epinal Way

Electricity Network Company are proposing to carry out Utility asset works on Epinal Way, Loughborough.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 15 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 13 Mar 2025 at 12:31.

Electricity Network Company logo
Until
27 Jun 2025
Details
View Map
Share
Follow
Belton Road West Extension

Electricity Network Company are carrying out Utility asset works on Belton Road West Extension, Loughborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 08:00 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 3 Jun 2025 at 08:14.

Electricity Network Company logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Belton Road West Extension

Electricity Network Company are proposing to carry out Utility asset works on Belton Road West Extension, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 27 May 2025 at 15:05.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Wysall Lane

Cadent Gas are carrying out Disconnection or alteration of supply on Wysall Lane, Rempstone.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:12 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 09:13.

Electricity Network Company logo
Until
27 Jun 2025
Details
View Map
Share
Follow
Jubilee Drive

Electricity Network Company are carrying out Utility asset works on Jubilee Drive, Loughborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:30 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 10:33.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Wysall Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wysall Lane, Rempstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 15:15.

Electricity Network Company logo
Until
27 Jun 2025
Details
View Map
Share
Follow
Belton Road

Electricity Network Company are carrying out Utility asset works on Belton Road, Loughborough.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:15 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 10:26.

Electricity Network Company logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Follow
Ling Road

Electricity Network Company are proposing to carry out Utility asset works on Ling Road, Loughborough.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 18 Mar 2025 at 14:27.

Electricity Network Company logo
Between
4 and 29 Jun 2025
Details
View Map
Share
Follow
Epinal Way

Electricity Network Company are proposing to carry out Utility asset works on Epinal Way, Loughborough.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 29 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 25 Apr 2025 at 12:16.

Electricity Network Company logo
Between
5 and 27 Jun 2025
Details
View Map
Share
Follow
Terry Yardley Way

Electricity Network Company are proposing to carry out Utility asset works on Terry Yardley Way, Quorn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 18 Mar 2025 at 14:05.

Electricity Network Company logo
Between
7 and 29 Jun 2025
Details
View Map
Share
Follow
Leicester Road

Electricity Network Company are proposing to carry out Utility asset works on Leicester Road, Quorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 9 Apr 2025 at 13:54.

Electricity Network Company logo
Between
7 and 29 Jun 2025
Details
View Map
Share
Follow
High Street

Electricity Network Company are proposing to carry out Utility asset works on High Street, Quorn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 29 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 9 Apr 2025 at 14:00.

Leicestershire County Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Drypot Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Drypot Lane, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 17 Mar 2025 at 12:06.

Leicestershire County Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Woodhouse Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the verge only.

This roadwork event was last updated by Leicestershire County Council on 30 Apr 2025 at 09:36.

Leicestershire County Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Woodhouse Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the verge only.

This roadwork event was last updated by Leicestershire County Council on 30 Apr 2025 at 15:56.

Leicestershire County Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Drypot Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Drypot Lane, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 14 Mar 2025 at 11:46.

Leicestershire County Council logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Hallamford Road

Leicestershire County Council are proposing to carry out Highway improvement works on Hallamford Road, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 11 Apr 2025 at 11:16.

Leicestershire County Council logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Hallamford Road

Leicestershire County Council are proposing to carry out Highway improvement works on Hallamford Road, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 May 2025 at 16:30.

Electricity Network Company logo
LONG TERM
Between
17 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Ling Road

Electricity Network Company are proposing to carry out Utility asset works on Ling Road, Loughborough.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 14:43.

Leicestershire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Judges Street

Leicestershire County Council are proposing to carry out Highway improvement works on Judges Street, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 23 Apr 2025 at 16:26.

Leicestershire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Judges Street

Leicestershire County Council are proposing to carry out Highway improvement works on Judges Street, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 16 Apr 2025 at 16:46.

Severn Trent Water logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Follow
Tanners Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Tanners Lane, Hathern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Apr 2025 at 09:36.

Severn Trent Water logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Follow
Tanners Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Tanners Lane, Hathern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 May 2025 at 12:16.

BT logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Leicester Road

BT are proposing to carry out Utility repair and maintenance works on Leicester Road, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 23 Apr 2025 at 17:56.

Electricity Network Company logo
LONG TERM
Between
25 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Terry Yardley Way

Electricity Network Company are proposing to carry out Utility asset works on Terry Yardley Way, Quorn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 29 May 2025 at 16:57.

Leicestershire County Council logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Zouch Road

Leicestershire County Council are proposing to carry out Highway improvement works on Zouch Road, Hathern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 3 Jun 2025 at 11:16.

Western Power Distribution (East Midlands) logo
Between
26 Jun and 8 Jul 2025
Details
View Map
Share
Follow
West Leake Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on West Leake Lane, Kingston On Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 8 July 2025. The works will impact the verge only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 May 2025 at 14:30.

Western Power Distribution (East Midlands) logo
Between
26 Jun and 8 Jul 2025
Details
View Map
Share
Follow
West Leake Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on West Leake Lane, Kingston On Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 8 July 2025. The works will impact the verge only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 May 2025 at 16:05.

Electricity Network Company logo
LONG TERM
Between
30 Jun and 7 Aug 2025
Details
View Map
Share
Follow
High Street

Electricity Network Company are proposing to carry out Utility asset works on High Street, Quorn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 7 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 27 May 2025 at 16:49.

Electricity Network Company logo
LONG TERM
Between
30 Jun and 7 Aug 2025
Details
View Map
Share
Follow
Leicester Road

Electricity Network Company are proposing to carry out Utility asset works on Leicester Road, Quorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 27 May 2025 at 16:43.

Severn Trent Water logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Trowell Lane

Severn Trent Water are proposing to carry out New service connection on Trowell Lane, West Leake.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 2 Apr 2025 at 15:11.

Severn Trent Water logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Trowell Lane

Severn Trent Water are proposing to carry out New service connection on Trowell Lane, West Leake.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 2 Apr 2025 at 10:27.

Network Rail logo
LONG TERM
Between
7 Jul 2025 and 27 Aug 2026
Details
View Map
Share
Nottingham Road

Network Rail were proposing to carry out Works for Rail Purposes on Nottingham Road, Loughborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 27 August 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Oct 2024 at 10:26.

Leicestershire County Council logo
LONG TERM
Between
7 Jul and 14 Nov 2025
Details
View Map
Share
Follow
Ashby Road West

Leicestershire County Council are proposing to carry out Highway improvement works on Ashby Road West, Shepshed.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 3 Jun 2025 at 15:56.

Leicestershire County Council logo
LONG TERM
Between
7 Jul and 20 Aug 2025
Details
View Map
Share
Follow
Ashby Road West

Leicestershire County Council are proposing to carry out Highway improvement works on Ashby Road West, Shepshed.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 20 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 3 Jun 2025 at 16:46.

Nottinghamshire County Council logo
Between
10 and 23 Jul 2025
Details
View Map
Share
Follow
Gotham Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Gotham Road, Kingston On Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 25 Mar 2025 at 12:59.

Nottinghamshire County Council logo
Between
10 and 23 Jul 2025
Details
View Map
Share
Follow
Gotham Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Gotham Road, Kingston On Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 2 Apr 2025 at 10:26.

Electricity Network Company logo
Between
12 Jul and 8 Aug 2025
Details
View Map
Share
Follow
High Street

Electricity Network Company are proposing to carry out Utility asset works on High Street, Quorn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 16:09.

Electricity Network Company logo
Between
12 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Road, Quorn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 15:55.

Electricity Network Company logo
Between
14 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Leicester Road

Electricity Network Company are proposing to carry out Utility asset works on Leicester Road, Quorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 29 May 2025 at 11:08.

Cadent Gas logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Bishop Meadow Road

Cadent Gas are proposing to carry out Utility asset works on Bishop Meadow Road, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 16:56.

Cadent Gas logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Derby Road

Cadent Gas are proposing to carry out Utility asset works on Derby Road, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 16:56.

Network Rail logo
LONG TERM
Between
21 Jul 2025 and 30 Mar 2026
Details
View Map
Share
Follow
Rempstone Road

Network Rail are proposing to carry out Works for Rail Purposes on Rempstone Road, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 5 Mar 2025 at 10:21.

Severn Trent Water logo
LONG TERM
Between
21 Jul and 5 Sep 2025
Details
View Map
Share
Abbey Road

Severn Trent Water were proposing to carry out Statutory Infrastructure Works on Abbey Road, Charley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Apr 2025 at 15:02.

Leicestershire County Council logo
Between
21 and 28 Jul 2025
Details
View Map
Share
Follow
Beveridge Street

Leicestershire County Council are proposing to carry out Highway improvement works on Beveridge Street, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 6 May 2025 at 16:36.

Leicestershire County Council logo
Between
21 and 28 Jul 2025
Details
View Map
Share
Follow
Beveridge Street

Leicestershire County Council are proposing to carry out Highway improvement works on Beveridge Street, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 20 May 2025 at 17:26.

Network Rail logo
LONG TERM
Between
21 Jul 2025 and 30 Mar 2026
Details
View Map
Share
Follow
Butt Lane

Network Rail are proposing to carry out Works for Rail Purposes on Butt Lane, Normanton On Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 5 Mar 2025 at 10:21.

Network Rail logo
LONG TERM
Between
21 Jul 2025 and 30 Mar 2026
Details
View Map
Share
Follow
Hungary Lane

Network Rail are proposing to carry out Works for Rail Purposes on Hungary Lane, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 5 Mar 2025 at 10:21.

Nottinghamshire County Council logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Soar Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Soar Lane, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 26 Mar 2025 at 10:21.

Network Rail logo
LONG TERM
Between
21 Jul 2025 and 30 Mar 2026
Details
View Map
Share
Follow
Landcroft Lane

Network Rail are proposing to carry out Works for Rail Purposes on Landcroft Lane, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 5 Mar 2025 at 10:21.

Severn Trent Water logo
Between
22 and 24 Jul 2025
Details
View Map
Share
Follow
Sharpley Drive

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sharpley Drive, East Leake.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Apr 2025 at 10:08.

Severn Trent Water logo
Between
22 and 24 Jul 2025
Details
View Map
Share
Follow
Sharpley Drive

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sharpley Drive, East Leake.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Apr 2025 at 15:56.

Cadent Gas logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Bakewell Road

Cadent Gas are proposing to carry out Utility asset works on Bakewell Road, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 13:46.

Cadent Gas logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Bishop Meadow Road

Cadent Gas are proposing to carry out Utility asset works on Bishop Meadow Road, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 16:56.

Leicestershire County Council logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Garendon Road

Leicestershire County Council are proposing to carry out Highway improvement works on Garendon Road, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 2 Jun 2025 at 16:36.

Leicestershire County Council logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Garendon Road

Leicestershire County Council are proposing to carry out Highway improvement works on Garendon Road, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 3 Jun 2025 at 09:36.

Nottinghamshire County Council logo
Between
4 and 11 Aug 2025
Details
View Map
Share
Follow
Kegworth Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Kegworth Road, Kingston On Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 23 Apr 2025 at 12:15.

BT logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Abbey Road

BT were proposing to carry out Utility asset works on Abbey Road, Charley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 August 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Jun 2025 at 11:14.

Nottinghamshire County Council logo
Between
4 and 11 Aug 2025
Details
View Map
Share
Follow
Kegworth Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Kegworth Road, Kingston On Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 23 May 2025 at 16:08.

Cadent Gas logo
Between
4 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Belton Road West

Cadent Gas are proposing to carry out Utility asset works on Belton Road West, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 16:56.

Leicestershire County Council logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
B591 From Copt Oak Road To Nanpantan Road

Leicestershire County Council are proposing to carry out Highway improvement works on B591 From Copt Oak Road To Nanpantan Road, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 12 May 2025 at 14:16.

Leicestershire County Council logo
LONG TERM
Between
11 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Long Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Long Lane, Kegworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 May 2025 at 16:56.

Severn Trent Water logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Park Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Park Avenue, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 May 2025 at 13:25.

Severn Trent Water logo
Between
14 and 16 Aug 2025
Details
View Map
Share
Follow
High Street

Severn Trent Water are proposing to carry out New service connection on High Street, Quorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 May 2025 at 15:31.

BT logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Cumbrian Way

BT are proposing to carry out Utility repair and maintenance works on Cumbrian Way, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 May 2025 at 15:30.

Severn Trent Water logo
LONG TERM
Between
18 Aug and 5 Oct 2025
Details
View Map
Share
Follow
Abbey Road

Severn Trent Water are proposing to carry out Statutory Infrastructure Works on Abbey Road, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 May 2025 at 17:26.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
23 Aug and 27 Sep 2025
Details
View Map
Share
Follow
Hospital Way

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Hospital Way, Loughborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 27 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 21 May 2025 at 15:16.

Severn Trent Water logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Packe Street

Severn Trent Water are proposing to carry out New service connection on Packe Street, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 May 2025 at 08:05.


Roadworks Map near to Canning Way, LOUGHBOROUGH, LE11 5YA (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 18:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Canning Way, LOUGHBOROUGH, LE11 5YA (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
BUCKINGHAM DRIVE 
(0.6 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 3 Jun 2025 11:40
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.6
Details
Share
Follow
2
BT logo
LAMPORT CLOSE 
(0.6 miles)
BT
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.6
Details
Share
Follow
3
BT logo
KENILWORTH AVENUE 
(0.6 miles)
BT
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.6
Details
Share
Follow
4
BT logo
ALTHORPE DRIVE 
(0.8 miles)
BT
Utility repair and maintenance works - Footway, Verge - Give and take
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.8
Details
Share
Follow
5
Cadent Gas logo
KERNAN DRIVE 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 31 May 2025 - 3 Jun 2025)
0.9
Details
Share
6
Electricity Network Company logo
MAJOR
  
ALAN MOSS ROAD 
(0.9 miles)
Electricity Network Company
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 28 May 2025 - 22 Jun 2025
0.9
Details
Share
Follow
7
Electricity Network Company logo
MAJOR
  
ALAN MOSS ROAD 
(0.9 miles)
Electricity Network Company
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 27 Jun 2025
0.9
Details
Share
Follow
8
Electricity Network Company logo
MAJOR
  
EPINAL WAY 
(0.9 miles)
Electricity Network Company
Utility asset works - Carriageway, Verge - Lane closure
Planned
Scheduled: 29 May 2025 - 15 Jun 2025
0.9
Details
Share
Follow
9
Electricity Network Company logo
MAJOR
  
EPINAL WAY 
(0.9 miles)
Electricity Network Company
Utility asset works - Carriageway, Verge - Lane closure
Planned
Scheduled: 4 Jun 2025 - 29 Jun 2025
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.