ROADWORKS SUMMARY
Garendon Park, LOUGHBOROUGH, LE11 4SH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Garendon Park, LE11 4SH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Garendon Park, LOUGHBOROUGH, LE11 4SH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Garendon Park are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leicestershire County Council logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Footpath L13

Leicestershire County Council are carrying out Highway improvement works on Footpath L13, Shepshed.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2023 at 09:19 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 13 Mar 2024 at 16:56.

Leicestershire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Footpath L67a

Leicestershire County Council are carrying out Highway improvement works on Footpath L67a, Kegworth.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2023 at 15:47 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 27 Aug 2024 at 15:56.

Severn Trent Water logo
LONG TERM
Until
29 Dec 2024
Details
View Map
Share
Follow
Snarrows Road

Severn Trent Water are carrying out roadworks on Snarrows Road, Osgathorpe.

These works are categorised as Major.

The works started on 27 November 2023 at 08:00 and could run through until 29 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Aug 2024 at 12:46.

Severn Trent Water logo
LONG TERM
Until
29 Dec 2024
Details
View Map
Share
Follow
Church Lane

Severn Trent Water are carrying out Utility asset works on Church Lane, Osgathorpe.

These works are categorised as Major.

The works started on 22 January 2024 at 08:00 and could run through until 29 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Aug 2024 at 12:46.

Leicestershire County Council logo
LONG TERM
Between
31 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Holly Hayes Road

Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 23 May 2024 at 11:56.

Leicestershire County Council logo
LONG TERM
Between
31 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Oakley Drive

Leicestershire County Council are proposing to carry out Highway improvement works on Oakley Drive, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 23 May 2024 at 11:56.

Leicestershire County Council logo
LONG TERM
Between
19 Aug 2024 and 27 Jun 2025
Details
View Map
Share
Follow
Footpath Botat K77

Leicestershire County Council are proposing to carry out Highway improvement works on Footpath Botat K77, Hathern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 27 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 17 Sep 2024 at 12:36.

Leicestershire County Council logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Footpath Botat K77

Leicestershire County Council are carrying out Highway improvement works on Footpath Botat K77, Hathern.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 00:00 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 17 Sep 2024 at 13:36.

Leicestershire County Council logo
LONG TERM
Between
1 Sep 2024 and 30 Sep 2026
Details
View Map
Share
Follow
Footpath K74

Leicestershire County Council are proposing to carry out Highway improvement works on Footpath K74, Hathern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 30 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 30 May 2024 at 09:26.

Severn Trent Water logo
LONG TERM
Until
2 Mar 2025
Details
View Map
Share
Follow
Layby Off B5324 Westbound Ashby Road

Severn Trent Water are carrying out Utility asset works on Layby Off B5324 Westbound Ashby Road, Belton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:30 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Sep 2024 at 09:57.

National Highways logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Ashby Road

National Highways are proposing to carry out Works for road purposes on Ashby Road, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 28 Mar 2024 at 13:37.

National Highways logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Ashby Road

National Highways are carrying out Works for road purposes on Ashby Road, Castle Donington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2024 at 20:00 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Nov 2024 at 14:02.

Severn Trent Water logo
LONG TERM
Between
30 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Loughborough Road

Severn Trent Water are proposing to carry out Utility asset works on Loughborough Road, East Leake.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Severn Trent Water on 16 Jul 2024 at 15:53.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Ingleberry Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Ingleberry Road, Shepshed.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 7 Aug 2024 at 14:06.

Electricity Network Company logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Terry Yardley Way

Electricity Network Company are carrying out Statutory Infrastructure Works on Terry Yardley Way, Loughborough.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 October 2024 at 07:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 15 Oct 2024 at 08:41.

Severn Trent Water logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Loughborough Road

Severn Trent Water are carrying out Utility asset works on Loughborough Road, East Leake.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 13:56.

Electricity Network Company logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
High Street

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on High Street, Quorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 4 Oct 2024 at 13:07.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
21 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Ingleberry Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Ingleberry Road, Shepshed.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 20 Aug 2024 at 15:46.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Ingleberry Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Ingleberry Road, Shepshed.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 12:46 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Nov 2024 at 09:36.

Network Rail logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Shooting Close Lane

Network Rail are proposing to carry out Works for Rail Purposes on Shooting Close Lane, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 7 Aug 2024 at 14:06.

Network Rail logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Shooting Close Lane

Network Rail are carrying out Works for Rail Purposes on Shooting Close Lane, Barrow Upon Soar.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Nov 2024 at 13:56.

Severn Trent Water logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Ashby Road

Severn Trent Water are carrying out Utility asset works on Ashby Road, Belton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 09:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 15 Nov 2024 at 10:17.

Electricity Network Company logo
Finishing
Sunday
Details
View Map
Share
High Street

Electricity Network Company were proposing to carry out Statutory Infrastructure Works on High Street, Quorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2024 and run through until 24 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 12 Aug 2024 at 08:20.

LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Terry Yardley Way

GTC Pipelines are proposing to carry out Utility asset works on Terry Yardley Way, Loughborough.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 24 Sep 2024 at 14:30.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
28 Oct and 22 Dec 2024
Details
View Map
Share
Follow
William Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on William Street, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 24 Sep 2024 at 09:26.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Footpath L65

Cadent Gas are proposing to carry out Utility asset works on Footpath L65, Kegworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway only.

This roadwork event was last updated by Cadent Gas on 16 Feb 2024 at 15:36.

Electricity Network Company logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Leicester Road

Electricity Network Company are carrying out Utility asset works on Leicester Road, Quorn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 09:00 and could run through until 30 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 29 Oct 2024 at 09:50.

Electricity Network Company logo
LONG TERM
Between
4 Nov 2024 and 23 Feb 2025
Details
View Map
Share
Loughborough Road

Electricity Network Company were proposing to carry out Statutory Infrastructure Works on Loughborough Road, Quorn.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 23 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 8 Oct 2024 at 13:03.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
4 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Burfield Avenue

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Burfield Avenue, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 24 Sep 2024 at 09:26.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
4 Nov and 7 Dec 2024
Details
View Map
Share
Follow
William Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on William Street, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Sep 2024 at 15:06.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
7 Dec 2024
Details
View Map
Share
Follow
William Street

Western Power Distribution (East Midlands) are carrying out Utility asset works on William Street, Loughborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 17:13 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 5 Nov 2024 at 08:35.

Electricity Network Company logo
Until
1 Dec 2024
Details
View Map
Share
Follow
Pavilion Way

Electricity Network Company are carrying out Utility asset works on Pavilion Way, Loughborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 10:15 and could run through until 1 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 4 Nov 2024 at 10:17.

Severn Trent Water logo
Finishing
Tomorrow
Details
View Map
Share
From Gelscoe Lane To Mill Lane

Severn Trent Water were proposing to carry out Utility asset works on From Gelscoe Lane To Mill Lane, Belton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 22 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 14:13.

Electricity Network Company logo
Finishing
Tuesday
Details
View Map
Share
Follow
Terry Yardley Way

Electricity Network Company are carrying out Statutory Infrastructure Works on Terry Yardley Way, Quorn.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 17:00 and could run through until 26 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 6 Nov 2024 at 17:02.

Cadent Gas logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Woodgate Road

Cadent Gas are proposing to carry out Utility asset works on Woodgate Road, East Leake.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 11:41.

Cadent Gas logo
Between
11 and 28 Nov 2024
Details
View Map
Share
Follow
Cedar Avenue

Cadent Gas are proposing to carry out Utility asset works on Cedar Avenue, East Leake.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 11:41.

Severn Trent Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Farnham Road

Severn Trent Water are carrying out Utility repair and maintenance works on Farnham Road, Loughborough.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 08:52 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 11:56.

Leicestershire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Melton Road

Leicestershire County Council are proposing to carry out Highway improvement works on Melton Road, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 24 Sep 2024 at 12:46.

Leicestershire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Melton Road

Leicestershire County Council are proposing to carry out Highway improvement works on Melton Road, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 24 Sep 2024 at 15:06.

Leicestershire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Melton Road

Leicestershire County Council are proposing to carry out Highway improvement works on Melton Road, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 21 Oct 2024 at 15:56.

Leicestershire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Melton Road

Leicestershire County Council are proposing to carry out Highway improvement works on Melton Road, Barrow Upon Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 29 Oct 2024 at 15:56.

Cadent Gas logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Gracedieu Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Gracedieu Road, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 14:31.

Cadent Gas logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Gracedieu Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Gracedieu Road, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 16:56.

Severn Trent Water logo
Finishing
Wednesday
Details
View Map
Share
Snarrows Road

Severn Trent Water were proposing to carry out Utility asset works on Snarrows Road, Osgathorpe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 26 Sep 2024 at 12:23.

Leicestershire County Council logo
Finishing
Wednesday
Details
View Map
Share
Prestwold Lane

Leicestershire County Council were proposing to carry out Highway improvement works on Prestwold Lane, Prestwold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 29 Oct 2024 at 11:56.

Network Rail logo
LONG TERM
Between
25 Nov 2024 and 30 Jul 2025
Details
View Map
Share
Rempstone Road

Network Rail were proposing to carry out Works for Rail Purposes on Rempstone Road, Sutton Bonington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 30 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Sep 2024 at 13:43.

Cadent Gas logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Mulberry Way

Cadent Gas are proposing to carry out Utility asset works on Mulberry Way, East Leake.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 11:46.

Leicestershire County Council logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Stanford Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Stanford Lane, Cotes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 28 Aug 2024 at 12:06.

Leicestershire County Council logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Stanford Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Stanford Lane, Cotes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 3 Sep 2024 at 12:56.

Severn Trent Water logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Far Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Far Lane, Normanton On Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Aug 2024 at 15:03.

Severn Trent Water logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Far Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Far Lane, Normanton On Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2024 at 15:50.

Severn Trent Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Gracedieu Road

Severn Trent Water were proposing to carry out New service connection on Gracedieu Road, Coalville.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 2 Oct 2024 at 13:13.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Charley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Charley Road, Ulverscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 12:36.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Charley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Charley Road, Ulverscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 16:16.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Charley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Charley Road, Ulverscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 12:36.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Charley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Charley Road, Ulverscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 16:16.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Beacon Road

Leicestershire County Council are proposing to carry out Highway improvement works on Beacon Road, Ulverscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 12:36.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Beacon Road

Leicestershire County Council are proposing to carry out Highway improvement works on Beacon Road, Ulverscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 16:16.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Charley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Charley Road, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 18 Nov 2024 at 16:46.

Leicestershire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Charley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Charley Road, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 12:36.

Connect Fibre (Fibre Assets) logo
Between
4 and 20 Dec 2024
Details
View Map
Share
Follow
The Green

Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on The Green, Diseworth, Long Whatton And Diseworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 12 Nov 2024 at 16:01.

Leicestershire County Council logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Whitwick Road

Leicestershire County Council are proposing to carry out Highway improvement works on Whitwick Road, Copt Oak, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 21 Nov 2024 at 14:36.

Leicestershire County Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Greenhill Road

Leicestershire County Council are proposing to carry out Highway improvement works on Greenhill Road, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 21 Aug 2024 at 10:56.

Leicestershire County Council logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Warren Hills Road

Leicestershire County Council are proposing to carry out Highway improvement works on Warren Hills Road, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 21 Nov 2024 at 14:36.

Leicestershire County Council logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Leicester Road

Leicestershire County Council are proposing to carry out Highway improvement works on Leicester Road, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 21 Nov 2024 at 14:36.

Leicestershire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hathern Road

Leicestershire County Council are proposing to carry out Highway improvement works on Hathern Road, Hathern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Aug 2024 at 17:26.

Leicestershire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hathern Road

Leicestershire County Council are proposing to carry out Highway improvement works on Hathern Road, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Aug 2024 at 17:26.

Leicestershire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Turvey Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Turvey Lane, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Aug 2024 at 17:26.

Leicestershire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Green

Leicestershire County Council are proposing to carry out Highway improvement works on The Green, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Aug 2024 at 17:27.

Leicestershire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Main Street

Leicestershire County Council are proposing to carry out Highway improvement works on Main Street, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Aug 2024 at 17:26.

Leicestershire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Smithy Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Smithy Lane, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Aug 2024 at 17:26.

Leicestershire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
West End

Leicestershire County Council are proposing to carry out Highway improvement works on West End, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Aug 2024 at 17:26.

Electricity Network Company logo
LONG TERM
Between
6 Jan and 30 Mar 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Loughborough Road, Quorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 28 Oct 2024 at 15:28.

Electricity Network Company logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Allendale Road

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Allendale Road, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 17 Jul 2024 at 14:47.

LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Ingleberry Road

GTC Pipelines are proposing to carry out Utility asset works on Ingleberry Road, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 29 Oct 2024 at 06:56.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
6 Jan and 23 Feb 2025
Details
View Map
Share
Follow
William Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on William Street, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Sep 2024 at 14:06.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Belton Road West

Cadent Gas are proposing to carry out Utility asset works on Belton Road West, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:16.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Bishop Meadow Road

Cadent Gas are proposing to carry out Utility asset works on Bishop Meadow Road, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:16.

Electricity Network Company logo
Between
7 and 21 Jan 2025
Details
View Map
Share
Follow
Farley Way

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Farley Way, Quorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 21 January 2025. The works will impact the verge and cycleway.

This roadwork event was last updated by Electricity Network Company on 24 Oct 2024 at 10:43.

Nottinghamshire County Council logo
Between
7 and 15 Jan 2025
Details
View Map
Share
Butt Lane

Nottinghamshire County Council were proposing to carry out Works for road purposes on Butt Lane, Normanton On Soar.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 20 Nov 2024 at 08:36.

Leicestershire County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Breedon Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Breedon Lane, Osgathorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 7 Nov 2024 at 15:16.

Leicestershire County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Breedon Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Breedon Lane, Osgathorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 11 Nov 2024 at 13:06.

Severn Trent Water logo
Between
13 and 22 Jan 2025
Details
View Map
Share
Shepshed Road

Severn Trent Water were proposing to carry out Utility asset works on Shepshed Road, Charley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 10:29.

Severn Trent Water logo
Between
13 and 22 Jan 2025
Details
View Map
Share
Follow
Shepshed Road

Severn Trent Water are proposing to carry out Utility asset works on Shepshed Road, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:56.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Bakewell Road

Cadent Gas are proposing to carry out Utility asset works on Bakewell Road, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:16.

Cadent Gas logo
Between
13 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Summerpool Road

Cadent Gas are proposing to carry out Utility asset works on Summerpool Road, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 07:56.

Network Rail logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Marle Pit Hill

Network Rail are proposing to carry out Works for Rail Purposes on Marle Pit Hill, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Oct 2024 at 13:52.

Severn Trent Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Melton Lane

Severn Trent Water were proposing to carry out New service connection on Melton Lane, Sutton Bonington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 16 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 3 Oct 2024 at 07:52.

Leicestershire County Council logo
Between
20 and 25 Jan 2025
Details
View Map
Share
Follow
Whitwick Road

Leicestershire County Council are proposing to carry out Highway improvement works on Whitwick Road, Copt Oak, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 13:06.

Leicestershire County Council logo
Between
20 and 25 Jan 2025
Details
View Map
Share
Follow
Greenhill Road

Leicestershire County Council are proposing to carry out Highway improvement works on Greenhill Road, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 13:06.

Leicestershire County Council logo
Between
20 and 25 Jan 2025
Details
View Map
Share
Follow
Warren Hills Road

Leicestershire County Council are proposing to carry out Highway improvement works on Warren Hills Road, Coalville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 13:06.

Leicestershire County Council logo
Between
20 and 25 Jan 2025
Details
View Map
Share
Follow
Leicester Road

Leicestershire County Council are proposing to carry out Highway improvement works on Leicester Road, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 13:06.

Leicestershire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Hathern Road

Leicestershire County Council are proposing to carry out Highway improvement works on Hathern Road, Hathern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 16:16.

Leicestershire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Hathern Road

Leicestershire County Council are proposing to carry out Highway improvement works on Hathern Road, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 14:46.

Leicestershire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Turvey Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Turvey Lane, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 14:36.

Leicestershire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
The Green

Leicestershire County Council are proposing to carry out Highway improvement works on The Green, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 14:46.

Leicestershire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Main Street

Leicestershire County Council are proposing to carry out Highway improvement works on Main Street, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 14:46.

Leicestershire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Smithy Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Smithy Lane, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 14:46.

Leicestershire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
West End

Leicestershire County Council are proposing to carry out Highway improvement works on West End, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 14:46.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Marle Pit Hill

Network Rail are proposing to carry out Works for Rail Purposes on Marle Pit Hill, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Oct 2024 at 14:29.

Cadent Gas logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Woodgate Road

Cadent Gas are proposing to carry out Utility asset works on Woodgate Road, East Leake.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:30.

Cadent Gas logo
Between
20 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Cedar Avenue

Cadent Gas are proposing to carry out Utility asset works on Cedar Avenue, East Leake.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:29.

Cadent Gas logo
Between
27 Jan and 18 Feb 2025
Details
View Map
Share
Follow
Bishop Meadow Road

Cadent Gas are proposing to carry out Utility asset works on Bishop Meadow Road, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:28.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Bishop Meadow Road

Cadent Gas were proposing to carry out Utility asset works on Bishop Meadow Road, Loughborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 18:07.

Network Rail logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Butt Lane

Network Rail are proposing to carry out Works for Rail Purposes on Butt Lane, Normanton On Soar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Oct 2024 at 12:00.

Leicestershire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Swithland Road

Leicestershire County Council are proposing to carry out Highway improvement works on Swithland Road, Woodhouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 3 Sep 2024 at 12:46.

Leicestershire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Swithland Road

Leicestershire County Council are proposing to carry out Highway improvement works on Swithland Road, Woodhouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 11 Sep 2024 at 14:36.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Snarrows Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Snarrows Road, Osgathorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 13:16.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Snarrows Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Snarrows Road, Osgathorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 12:46.

Electricity Network Company logo
LONG TERM
Between
2 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Loughborough Road

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Loughborough Road, Mountsorrel.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 29 Oct 2024 at 09:22.

Electricity Network Company logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Barrow Road

Electricity Network Company are proposing to carry out Utility asset works on Barrow Road, Quorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 8 Nov 2024 at 14:47.

Severn Trent Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Ashby Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Ashby Road, Loughborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 10:04.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Bishop Meadow Road

Cadent Gas are proposing to carry out Utility asset works on Bishop Meadow Road, Loughborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:28.

Cadent Gas logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Mulberry Way

Cadent Gas are proposing to carry out Utility asset works on Mulberry Way, East Leake.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:21.

Leicestershire County Council logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Oaks Road

Leicestershire County Council are proposing to carry out Highway improvement works on Oaks Road, Charley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Oct 2024 at 15:56.

Electricity Network Company logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Farley Way

Electricity Network Company are proposing to carry out Statutory Infrastructure Works on Farley Way, Quorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the verge and cycleway.

This roadwork event was last updated by Electricity Network Company on 30 Oct 2024 at 09:30.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Derby Road

Cadent Gas are proposing to carry out Utility asset works on Derby Road, Loughborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 07:56.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Brookside Avenue

Cadent Gas are proposing to carry out Utility asset works on Brookside Avenue, East Leake.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:20.

Leicestershire County Council logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Holly Hayes Road

Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 09:26.

Leicestershire County Council logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Holly Hayes Road

Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 09:26.

Leicestershire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Belton Street

Leicestershire County Council are proposing to carry out Highway improvement works on Belton Street, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 15 Nov 2024 at 14:56.

Leicestershire County Council logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Oakley Drive

Leicestershire County Council are proposing to carry out Highway improvement works on Oakley Drive, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 09:26.

Leicestershire County Council logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Oakley Drive

Leicestershire County Council are proposing to carry out Highway improvement works on Oakley Drive, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 09:26.


Roadworks Map near to Garendon Park, LOUGHBOROUGH, LE11 4SH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 20:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Garendon Park, LOUGHBOROUGH, LE11 4SH (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Leicestershire County Council logo
MAJOR
  
BUCKINGHAM DRIVE 
(0.6 miles)
Leicestershire County Council
Highway improvement works - Carriageway - Give and take
Planned
Scheduled: 4 Nov 2024 - 29 Nov 2024
0.6
Details
Share
Follow
2
Leicestershire County Council logo
MAJOR
  
BUCKINGHAM DRIVE 
(0.6 miles)
Leicestershire County Council
Highway improvement works - Carriageway - Give and take
Planned
Scheduled: 4 Nov 2024 - 29 Nov 2024
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.