ROADWORKS SUMMARY
Wolvey Road, HINCKLEY, LE10 3FS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wolvey Road, LE10 3FS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wolvey Road, HINCKLEY, LE10 3FS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wolvey Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leicestershire County Council logo
LONG TERM
Until
11 Jun 2025
Details
View Map
Share
Follow
Footpath T53

Leicestershire County Council are carrying out Highway improvement works on Footpath T53, Hinckley And Bosworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 10:09 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 24 Oct 2024 at 10:16.

Warwickshire County Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Higham Lane

Warwickshire County Council are carrying out Highway improvement works on Higham Lane, Nuneaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 09:00 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 19 May 2025 at 10:54.

Leicestershire County Council logo
LONG TERM
Between
6 May and 23 Aug 2025
Details
View Map
Share
Follow
Footpath T55

Leicestershire County Council are proposing to carry out Highway improvement works on Footpath T55, Sutton Cheney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 23 August 2025. The works will impact the footpath only.

This roadwork event was last updated by Leicestershire County Council on 25 Apr 2025 at 13:46.

Leicestershire County Council logo
LONG TERM
Until
23 Aug 2025
Details
View Map
Share
Follow
Footpath T55

Leicestershire County Council are carrying out Highway improvement works on Footpath T55, Sutton Cheney.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 00:00 and could run through until 23 August 2025. The works will impact the footpath only.

This roadwork event was last updated by Leicestershire County Council on 15 May 2025 at 15:06.

Leicestershire County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Hinckley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Hinckley Road, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 25 Apr 2025 at 14:26.

Leicestershire County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Hinckley Road

Leicestershire County Council are carrying out Highway improvement works on Hinckley Road, Burbage.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 00:00 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 15 May 2025 at 08:56.

Warwickshire County Council logo
LONG TERM
Between
16 May and 20 Jun 2025
Details
View Map
Share
Follow
Bladon Close

Warwickshire County Council are proposing to carry out Highway improvement works on Bladon Close, St Nicolas Park, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 5 Mar 2025 at 15:00.

Warwickshire County Council logo
LONG TERM
Between
16 May and 20 Jun 2025
Details
View Map
Share
Follow
Woodcote Avenue

Warwickshire County Council are proposing to carry out Highway improvement works on Woodcote Avenue, St Nicolas Park, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 5 Mar 2025 at 14:59.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Hill Farm Avenue

Cadent Gas are carrying out Utility asset works on Hill Farm Avenue, Whitestone, Nuneaton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 12:33 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 13:17.

Leicestershire County Council logo
LONG TERM
Between
21 May and 21 Nov 2025
Details
View Map
Share
Follow
Lutterworth Road

Leicestershire County Council are proposing to carry out Highway improvement works on Lutterworth Road, Burbage.

These works are categorised as Major.

The works will start on or after 21 May 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 May 2025 at 11:26.

Leicestershire County Council logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Lutterworth Road

Leicestershire County Council are carrying out Highway improvement works on Lutterworth Road, Burbage.

These works are categorised as Major.

The works started on 21 May 2025 at 13:24 and could run through until 21 November 2025. The works will impact the verge only.

This roadwork event was last updated by Leicestershire County Council on 21 May 2025 at 13:26.

Cadent Gas logo
Between
26 May and 20 Jun 2025
Details
View Map
Share
Hill Farm Avenue

Cadent Gas were proposing to carry out Utility asset works on Hill Farm Avenue, Whitestone, Nuneaton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 20 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jan 2025 at 09:08.

Cadent Gas logo
Between
27 May and 16 Jun 2025
Details
View Map
Share
Follow
Dugdale Street

Cadent Gas are proposing to carry out Utility asset works on Dugdale Street, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 14:29.

Cadent Gas logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Dugdale Street

Cadent Gas are carrying out Utility asset works on Dugdale Street, Nuneaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 10:07.

Severn Trent Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Woodland Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodland Road, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Mar 2025 at 13:16.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Strathmore Road

Severn Trent Water are carrying out Utility repair and maintenance works on Strathmore Road, Hinckley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 13:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 May 2025 at 12:42.

Warwickshire County Council logo
Between
1 and 22 Jun 2025
Details
View Map
Share
Follow
Old Hinckley Road

Warwickshire County Council are proposing to carry out Highway improvement works on Old Hinckley Road, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 20 Jan 2025 at 12:37.

Warwickshire County Council logo
Between
1 and 22 Jun 2025
Details
View Map
Share
Old Hinckley Road

Warwickshire County Council were proposing to carry out Highway improvement works on Old Hinckley Road, Nuneaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 June 2025 and run through until 22 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 2 Jun 2025 at 07:44.

Warwickshire County Council logo
Until
22 Jun 2025
Details
View Map
Share
Follow
Weddington Road

Warwickshire County Council are carrying out Highway improvement works on Weddington Road, Weddington, Nuneaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 09:00 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 2 Jun 2025 at 08:15.

Cadent Gas logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Thornhill Drive

Cadent Gas were proposing to carry out Utility asset works on Thornhill Drive, Whitestone, Nuneaton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jan 2025 at 09:09.

Cadent Gas logo
LONG TERM
Between
2 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Golf Drive

Cadent Gas are proposing to carry out Utility asset works on Golf Drive, Whitestone, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 15:20.

Cadent Gas logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Golf Drive

Cadent Gas are carrying out Utility asset works on Golf Drive, Whitestone, Nuneaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:15 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 11:08.

Murphy Power Distribution logo
Between
2 and 22 Jun 2025
Details
View Map
Share
Follow
Vicarage Street

Murphy Power Distribution are proposing to carry out Utility asset works on Vicarage Street, Nuneaton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 2 Apr 2025 at 15:08.

Leicestershire County Council logo
Between
2 and 15 Jun 2025
Details
View Map
Share
Follow
Lutterworth Road

Leicestershire County Council are proposing to carry out Highway improvement works on Lutterworth Road, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 28 Apr 2025 at 13:06.

Leicestershire County Council logo
Between
2 and 15 Jun 2025
Details
View Map
Share
Lutterworth Road

Leicestershire County Council were proposing to carry out Remedial works on Lutterworth Road, Burbage.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 15 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 28 Apr 2025 at 09:36.

Murphy Power Distribution logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Leicester Road

Murphy Power Distribution are proposing to carry out Utility asset works on Leicester Road, Nuneaton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 2 Apr 2025 at 15:09.

Murphy Power Distribution logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Hinckley Road

Murphy Power Distribution are proposing to carry out Utility asset works on Hinckley Road, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 2 Apr 2025 at 15:10.

Murphy Power Distribution logo
LONG TERM
Between
4 Jun and 3 Aug 2025
Details
View Map
Share
Follow
Higham Lane

Murphy Power Distribution are proposing to carry out Utility asset works on Higham Lane, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 20 May 2025 at 14:44.

Warwickshire County Council logo
Between
5 and 11 Jun 2025
Details
View Map
Share
Follow
Weddington Road

Warwickshire County Council are proposing to carry out Highway improvement works on Weddington Road, Weddington, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 20 Jan 2025 at 12:27.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Elgar Close

BT are proposing to carry out Utility repair and maintenance works on Elgar Close, Whitestone, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Mar 2025 at 14:19.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Elgar Close

BT are proposing to carry out Utility repair and maintenance works on Elgar Close, Whitestone, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Jun 2025 at 09:57.

Severn Trent Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Crowhill Road

Severn Trent Water are proposing to carry out Utility asset works on Crowhill Road, Whitestone, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 25 Mar 2025 at 13:27.

Severn Trent Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Crowhill Road

Severn Trent Water are proposing to carry out Utility asset works on Crowhill Road, Whitestone, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 1 Apr 2025 at 08:46.

Leicestershire County Council logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Britannia Road

Leicestershire County Council are proposing to carry out Highway improvement works on Britannia Road, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 18 Mar 2025 at 15:16.

Warwickshire County Council logo
Between
13 Jun and 11 Jul 2025
Details
View Map
Share
Wentworth Drive

Warwickshire County Council were proposing to carry out Highway improvement works on Wentworth Drive, Whitestone, Nuneaton.

These works were categorised as Major.

The works were originally planned to start 13 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 29 Apr 2025 at 08:53.

Warwickshire County Council logo
Between
13 Jun and 11 Jul 2025
Details
View Map
Share
Crowhill Road

Warwickshire County Council were proposing to carry out Highway improvement works on Crowhill Road, Whitestone, Nuneaton.

These works were categorised as Major.

The works were originally planned to start 13 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 29 Apr 2025 at 08:53.

Severn Trent Water logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Edward Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Edward Road, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Mar 2025 at 13:15.

Severn Trent Water logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Edward Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Edward Road, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Apr 2025 at 08:22.

Severn Trent Water logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Chapel Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Mar 2025 at 13:16.

Severn Trent Water logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Chapel Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Apr 2025 at 08:22.

Cadent Gas logo
Between
18 Jun and 8 Jul 2025
Details
View Map
Share
Sketchley Lane

Cadent Gas were proposing to carry out Utility asset works on Sketchley Lane, Burbage.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 June 2025 and run through until 8 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 12:36.

Severn Trent Water logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Lutterworth Road

Severn Trent Water were proposing to carry out New service connection on Lutterworth Road, Burbage.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 26 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 26 Mar 2025 at 15:04.

Leicestershire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Britannia Road

Leicestershire County Council are proposing to carry out Highway improvement works on Britannia Road, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 19 Mar 2025 at 11:26.

Warwickshire County Council logo
Between
29 Jun and 27 Jul 2025
Details
View Map
Share
Follow
Garrett Street

Warwickshire County Council are proposing to carry out Highway improvement works on Garrett Street, Attleborough, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 11 Feb 2025 at 11:12.

Warwickshire County Council logo
Between
29 Jun and 27 Jul 2025
Details
View Map
Share
Garrett Street

Warwickshire County Council were proposing to carry out Highway improvement works on Garrett Street, Attleborough, Nuneaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 June 2025 and run through until 27 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 27 May 2025 at 14:31.

Warwickshire County Council logo
Between
29 Jun and 27 Jul 2025
Details
View Map
Share
Follow
Eastboro Way

Warwickshire County Council are proposing to carry out Highway improvement works on Eastboro Way, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 7 Feb 2025 at 16:12.

Warwickshire County Council logo
Between
29 Jun and 27 Jul 2025
Details
View Map
Share
Eastboro Way

Warwickshire County Council were proposing to carry out Highway improvement works on Eastboro Way, Nuneaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 June 2025 and run through until 27 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 27 May 2025 at 14:20.

Severn Trent Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Bottrill Street

Severn Trent Water are proposing to carry out New service connection on Bottrill Street, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 1 Apr 2025 at 14:00.

Severn Trent Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Bottrill Street

Severn Trent Water are proposing to carry out New service connection on Bottrill Street, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 8 Apr 2025 at 08:56.

Warwickshire County Council logo
LONG TERM
Between
5 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Temple Hill

Warwickshire County Council are proposing to carry out Highway improvement works on Temple Hill, Wolvey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 10 Apr 2025 at 09:18.

Warwickshire County Council logo
LONG TERM
Between
5 Jul and 5 Aug 2025
Details
View Map
Share
Bazzard Road

Warwickshire County Council were proposing to carry out Highway improvement works on Bazzard Road, Wolvey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 July 2025 and run through until 5 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 31 Mar 2025 at 10:39.

Warwickshire County Council logo
LONG TERM
Between
5 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Bazzard Road

Warwickshire County Council are proposing to carry out Highway improvement works on Bazzard Road, Wolvey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 10 Apr 2025 at 09:20.

Warwickshire County Council logo
LONG TERM
Between
5 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Gipsy Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Gipsy Lane, Whitestone, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 10 Apr 2025 at 09:08.

Warwickshire County Council logo
LONG TERM
Between
5 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Eastboro Way

Warwickshire County Council are proposing to carry out Highway improvement works on Eastboro Way, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 10 Apr 2025 at 09:05.

Cadent Gas logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Regent Street

Cadent Gas are proposing to carry out New service connection on Regent Street, Hinckley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 12:46.

Cadent Gas logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Regent Street

Cadent Gas are proposing to carry out New service connection on Regent Street, Hinckley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 10:46.

Leicestershire County Council logo
LONG TERM
Between
9 Jul and 25 Aug 2025
Details
View Map
Share
Brookside

Leicestershire County Council were proposing to carry out Highway improvement works on Brookside, Burbage.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 July 2025 and run through until 25 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 1 May 2025 at 13:16.

Warwickshire County Council logo
LONG TERM
Between
13 Jul and 7 Sep 2025
Details
View Map
Share
Follow
Garrett Street

Warwickshire County Council are proposing to carry out Highway improvement works on Garrett Street, Attleborough, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 30 May 2025 at 14:40.

Cadent Gas logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Lower Road

Cadent Gas are proposing to carry out New service connection on Lower Road, Barnacle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 15:15.

Cadent Gas logo
LONG TERM
Between
14 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Fairway

Cadent Gas are proposing to carry out Utility asset works on Fairway, Whitestone, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 13:20.

Cadent Gas logo
LONG TERM
Between
14 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Fairway

Cadent Gas are proposing to carry out Utility asset works on Fairway, Whitestone, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 09:48.

Warwickshire County Council logo
LONG TERM
Between
14 Jul and 29 Dec 2025
Details
View Map
Share
Follow
Justice Walk

Warwickshire County Council are proposing to carry out Highway improvement works on Justice Walk, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:11.

Warwickshire County Council logo
LONG TERM
Between
14 Jul and 29 Dec 2025
Details
View Map
Share
Follow
Bond Gate

Warwickshire County Council are proposing to carry out Highway improvement works on Bond Gate, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:11.

Warwickshire County Council logo
LONG TERM
Between
14 Jul and 29 Dec 2025
Details
View Map
Share
Follow
Wheat Street

Warwickshire County Council are proposing to carry out Highway improvement works on Wheat Street, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:07.

Leicestershire County Council logo
Between
14 and 27 Jul 2025
Details
View Map
Share
Follow
Lutterworth Road

Leicestershire County Council are proposing to carry out Highway improvement works on Lutterworth Road, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leicestershire County Council on 30 Apr 2025 at 16:26.

Warwickshire County Council logo
LONG TERM
Between
14 Jul and 29 Dec 2025
Details
View Map
Share
Follow
Leicester Road

Warwickshire County Council are proposing to carry out Highway improvement works on Leicester Road, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:13.

Warwickshire County Council logo
LONG TERM
Between
14 Jul and 29 Dec 2025
Details
View Map
Share
Follow
Bond Street

Warwickshire County Council are proposing to carry out Highway improvement works on Bond Street, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:12.

Warwickshire County Council logo
LONG TERM
Between
14 Jul and 29 Dec 2025
Details
View Map
Share
Follow
Vicarage Street

Warwickshire County Council are proposing to carry out Highway improvement works on Vicarage Street, Nuneaton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:08.

Cadent Gas logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out New service connection on London Road, Hinckley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 15:26.

Cadent Gas logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out New service connection on London Road, Hinckley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 May 2025 at 14:56.

Severn Trent Water logo
Between
14 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Butt Lane

Severn Trent Water are proposing to carry out Utility asset works on Butt Lane, Hinckley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 23 Apr 2025 at 12:06.

Cadent Gas logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Kirkby Road

Cadent Gas are proposing to carry out Utility asset works on Kirkby Road, Barwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 12:36.

Cadent Gas logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Kirkby Road

Cadent Gas are proposing to carry out Utility asset works on Kirkby Road, Barwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 12:56.

Cadent Gas logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Kirkby Road

Cadent Gas were proposing to carry out Utility asset works on Kirkby Road, Barwell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 13:20.

Western Power Distribution (East Midlands) logo
Between
15 and 18 Jul 2025
Details
View Map
Share
Follow
Seaforth Drive

Western Power Distribution (East Midlands) are proposing to carry out Disconnection or alteration of supply on Seaforth Drive, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Apr 2025 at 11:56.

Severn Trent Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Rugby Road

Severn Trent Water were proposing to carry out New service connection on Rugby Road, Burbage.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 May 2025 at 11:15.

Leicestershire County Council logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Brookside

Leicestershire County Council are proposing to carry out Highway improvement works on Brookside, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 1 May 2025 at 13:46.

Leicestershire County Council logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Brookside

Leicestershire County Council are proposing to carry out Highway improvement works on Brookside, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leicestershire County Council on 23 May 2025 at 11:36.

Leicestershire County Council logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
The Hollow

Leicestershire County Council are proposing to carry out Highway improvement works on The Hollow, Earl Shilton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Apr 2025 at 16:26.

Leicestershire County Council logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
The Hollow

Leicestershire County Council are proposing to carry out Highway improvement works on The Hollow, Earl Shilton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 2 May 2025 at 09:26.

Leicestershire County Council logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
High Street

Leicestershire County Council are proposing to carry out Highway improvement works on High Street, Earl Shilton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Apr 2025 at 16:26.

Leicestershire County Council logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
High Street

Leicestershire County Council are proposing to carry out Highway improvement works on High Street, Earl Shilton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 2 May 2025 at 10:26.

Cityfibre Metro Networks logo
Between
2 and 15 Aug 2025
Details
View Map
Share
Follow
Mansion Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Mansion Street, Hinckley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 08:46.

Cityfibre Metro Networks logo
Between
2 and 15 Aug 2025
Details
View Map
Share
Follow
Trinity Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Trinity Lane, Hinckley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 08:46.

Cadent Gas logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Greenway

Cadent Gas are proposing to carry out Utility asset works on Greenway, Whitestone, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 13:22.

Cadent Gas logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Greenway

Cadent Gas are proposing to carry out Utility asset works on Greenway, Whitestone, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 09:57.

Severn Trent Water logo
LONG TERM
Between
4 Aug and 10 Oct 2025
Details
View Map
Share
Follow
St Marys Road

Severn Trent Water are proposing to carry out Utility asset works on St Marys Road, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 May 2025 at 14:04.

Cityfibre Metro Networks logo
Between
4 and 9 Aug 2025
Details
View Map
Share
Follow
Mansion Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Mansion Street, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 9 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 23 May 2025 at 09:16.

Leicestershire County Council logo
Between
4 and 10 Aug 2025
Details
View Map
Share
Follow
Ashby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Ashby Road, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Apr 2025 at 14:16.

Leicestershire County Council logo
Between
4 and 10 Aug 2025
Details
View Map
Share
Follow
Ashby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Ashby Road, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 May 2025 at 13:46.

Leicestershire County Council logo
Between
4 and 10 Aug 2025
Details
View Map
Share
Follow
Normandy Way

Leicestershire County Council are proposing to carry out Highway improvement works on Normandy Way, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Apr 2025 at 14:16.

Leicestershire County Council logo
Between
4 and 10 Aug 2025
Details
View Map
Share
Follow
Normandy Way

Leicestershire County Council are proposing to carry out Highway improvement works on Normandy Way, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 May 2025 at 13:46.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Stapleton Lane

Cadent Gas are proposing to carry out Utility asset works on Stapleton Lane, Barwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 12:36.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Stapleton Lane

Cadent Gas are proposing to carry out Utility asset works on Stapleton Lane, Barwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 13:16.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Stapleton Lane

Cadent Gas were proposing to carry out Utility asset works on Stapleton Lane, Barwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 18 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 13:25.

Severn Trent Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Earl Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Earl Street, Earl Shilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 May 2025 at 11:56.

Severn Trent Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Earl Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Earl Street, Earl Shilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 20 May 2025 at 09:06.

Severn Trent Water logo
Between
7 and 9 Aug 2025
Details
View Map
Share
Lower Bond Street

Severn Trent Water were proposing to carry out New service connection on Lower Bond Street, Hinckley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 August 2025 and run through until 9 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 20 May 2025 at 10:39.

Severn Trent Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Duke Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Duke Street, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 May 2025 at 14:10.

Severn Trent Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Duke Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Duke Street, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 27 May 2025 at 09:07.

Severn Trent Water logo
LONG TERM
Between
11 Aug and 17 Oct 2025
Details
View Map
Share
Follow
Willington Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Willington Street, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 30 May 2025 at 09:15.

Murphy Power Distribution logo
LONG TERM
Between
11 Aug and 10 Oct 2025
Details
View Map
Share
Follow
Higham Lane

Murphy Power Distribution are proposing to carry out Utility asset works on Higham Lane, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 2 Apr 2025 at 15:21.

Cadent Gas logo
LONG TERM
Between
18 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Meadowside

Cadent Gas are proposing to carry out Utility asset works on Meadowside, Whitestone, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 16:00.

Cadent Gas logo
LONG TERM
Between
18 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Meadowside

Cadent Gas are proposing to carry out Utility asset works on Meadowside, Whitestone, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 09:59.

Cadent Gas logo
LONG TERM
Between
18 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Hill Farm Avenue

Cadent Gas are proposing to carry out Utility asset works on Hill Farm Avenue, Whitestone, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 16:04.

Western Power Distribution (East Midlands) logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
Equity Road East

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Equity Road East, Earl Shilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 23 May 2025 at 15:06.

Leicestershire County Council logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Stanley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Stanley Road, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 18 Feb 2025 at 12:36.

Leicestershire County Council logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Stanley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Stanley Road, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 24 Feb 2025 at 09:16.

Leicestershire County Council logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Hollycroft

Leicestershire County Council are proposing to carry out Highway improvement works on Hollycroft, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 19 Feb 2025 at 11:56.

Leicestershire County Council logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Hollycroft

Leicestershire County Council are proposing to carry out Highway improvement works on Hollycroft, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 24 Feb 2025 at 09:16.

Leicestershire County Council logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Tudor Road

Leicestershire County Council are proposing to carry out Highway improvement works on Tudor Road, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 18 Feb 2025 at 12:36.

Leicestershire County Council logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Tudor Road

Leicestershire County Council are proposing to carry out Highway improvement works on Tudor Road, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 24 Feb 2025 at 09:16.

Leicestershire County Council logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Stoke Road

Leicestershire County Council are proposing to carry out Highway improvement works on Stoke Road, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 18 Feb 2025 at 12:36.

Leicestershire County Council logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Stoke Road

Leicestershire County Council are proposing to carry out Highway improvement works on Stoke Road, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 24 Feb 2025 at 09:16.

Leicestershire County Council logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Towers Drive

Leicestershire County Council are proposing to carry out Highway improvement works on Towers Drive, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 4 Mar 2025 at 16:30.

Leicestershire County Council logo
Between
26 and 31 Aug 2025
Details
View Map
Share
Follow
Church Street

Leicestershire County Council are proposing to carry out Highway improvement works on Church Street, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Apr 2025 at 15:46.

Leicestershire County Council logo
Between
26 and 31 Aug 2025
Details
View Map
Share
Follow
Church Street

Leicestershire County Council are proposing to carry out Highway improvement works on Church Street, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 6 May 2025 at 12:36.

Leicestershire County Council logo
Between
26 and 31 Aug 2025
Details
View Map
Share
Follow
Woodland Avenue

Leicestershire County Council are proposing to carry out Highway improvement works on Woodland Avenue, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Apr 2025 at 15:46.

Leicestershire County Council logo
Between
26 and 31 Aug 2025
Details
View Map
Share
Follow
Woodland Avenue

Leicestershire County Council are proposing to carry out Highway improvement works on Woodland Avenue, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 6 May 2025 at 12:36.

Leicestershire County Council logo
Between
26 and 31 Aug 2025
Details
View Map
Share
Follow
Hinckley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Hinckley Road, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Apr 2025 at 15:46.

Leicestershire County Council logo
Between
26 and 31 Aug 2025
Details
View Map
Share
Follow
Hinckley Road

Leicestershire County Council are proposing to carry out Highway improvement works on Hinckley Road, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 6 May 2025 at 12:36.


Roadworks Map near to Wolvey Road, HINCKLEY, LE10 3FS (2 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 09:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wolvey Road, HINCKLEY, LE10 3FS (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cityfibre Metro Networks logo
COVENTRY ROAD 
(0.7 miles)
Cityfibre Metro Networks
Remedial works - Footway - No carriageway incursion
In Progress
Since: 3 Jun 2025 08:00
(Scheduled: 3 Jun 2025)
0.7
Details
Share
Follow
2
Western Power Distribution (East Midlands) logo
RUGBY ROAD 
(0.9 miles)
Western Power Distribution (East Midlands)
New service connection - Footway - Some carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.