ROADWORKS SUMMARY
Coventry Road, HINCKLEY, LE10 0NB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Coventry Road, LE10 0NB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Coventry Road, HINCKLEY, LE10 0NB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Coventry Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leicestershire County Council logo
LONG TERM
Until
19 Mar 2028
Details
View Map
Share
Follow
Footpath T53

Leicestershire County Council are carrying out Highway improvement works on Footpath T53, Hinckley And Bosworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 10:09 and could run through until 19 March 2028. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Jun 2026 at 12:14.

Leicestershire County Council logo
LONG TERM
Until
26 Oct 2026
Details
View Map
Share
Follow
Footpath U6

Leicestershire County Council are carrying out Highway improvement works on Footpath U6, Hinckley And Bosworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 April 2026 at 00:00 and could run through until 26 October 2026. The works will impact the footpath only.

This roadwork event was last updated by Leicestershire County Council on 15 May 2026 at 15:58.

Warwickshire County Council logo
LONG TERM
Until
8 Jan 2027
Details
View Map
Share
Follow
Vicarage Street

Warwickshire County Council are carrying out Highway improvement works on Vicarage Street, Nuneaton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 11:00 and could run through until 8 January 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Warwickshire County Council on 24 Jul 2026 at 15:07.

Warwickshire County Council logo
LONG TERM
Until
8 Jan 2027
Details
View Map
Share
Follow
Bond Street

Warwickshire County Council are carrying out Highway improvement works on Bond Street, Nuneaton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 13:00 and could run through until 8 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 5 May 2026 at 15:36.

Warwickshire County Council logo
LONG TERM
Until
8 Jan 2027
Details
View Map
Share
Follow
Leicester Road

Warwickshire County Council are carrying out Highway improvement works on Leicester Road, Nuneaton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 13:00 and could run through until 8 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 5 May 2026 at 15:37.

Warwickshire County Council logo
LONG TERM
Until
8 Jan 2027
Details
View Map
Share
Follow
Wheat Street

Warwickshire County Council are carrying out Highway improvement works on Wheat Street, Nuneaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 11:00 and could run through until 8 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 5 May 2026 at 15:25.

Warwickshire County Council logo
LONG TERM
Until
8 Jan 2027
Details
View Map
Share
Follow
Wheat Street

Warwickshire County Council are carrying out Highway improvement works on Wheat Street, Nuneaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 11:00 and could run through until 8 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 5 May 2026 at 15:38.

Warwickshire County Council logo
LONG TERM
Until
8 Jan 2027
Details
View Map
Share
Follow
Bond Gate

Warwickshire County Council are carrying out Highway improvement works on Bond Gate, Nuneaton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 13:00 and could run through until 8 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 5 May 2026 at 15:35.

Warwickshire County Council logo
LONG TERM
Until
8 Jan 2027
Details
View Map
Share
Follow
Justice Walk

Warwickshire County Council are carrying out Highway improvement works on Justice Walk, Nuneaton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 13:00 and could run through until 8 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 5 May 2026 at 15:28.

Network Rail logo
LONG TERM
Until
30 Nov 2026
Details
View Map
Share
Follow
Marston Lane

Network Rail are carrying out Works for Rail Purposes on Marston Lane, Bedworth.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 June 2026 at 20:00 and could run through until 30 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Jul 2026 at 10:07.

Warwickshire County Council logo
LONG TERM
Until
28 Sep 2026
Details
View Map
Share
Follow
Leicester Road

Warwickshire County Council are carrying out roadworks on Leicester Road, Wolvey Heath.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2026 at 08:00 and could run through until 28 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 21 Aug 2026 at 12:33.

Leicestershire County Council logo
LONG TERM
Until
19 Mar 2027
Details
View Map
Share
Follow
Mill Lane

Leicestershire County Council are carrying out Highway improvement works on Mill Lane, Sutton Cheney.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2026 at 10:14 and could run through until 19 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 19 Aug 2026 at 12:40.

Leicestershire County Council logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Gwendoline Avenue

Leicestershire County Council are carrying out Highway improvement works on Gwendoline Avenue, Hinckley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 August 2026 at 13:12 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Sep 2026 at 17:00.

Warwickshire County Council logo
LONG TERM
Between
1 Sep and 9 Oct 2026
Details
View Map
Share
Church Street

Warwickshire County Council were proposing to carry out Highway improvement works on Church Street, Nuneaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2026 and run through until 9 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 15 Sep 2026 at 15:26.

Warwickshire County Council logo
LONG TERM
Between
1 Sep and 9 Oct 2026
Details
View Map
Share
Bridge Street

Warwickshire County Council were proposing to carry out Highway improvement works on Bridge Street, Nuneaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2026 and run through until 9 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 15 Sep 2026 at 15:26.

Warwickshire County Council logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Nuneaton Road

Warwickshire County Council are carrying out roadworks on Nuneaton Road, Bulkington, Bedworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 07:30 and could run through until 16 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 14 Sep 2026 at 15:23.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Wykin Lane

Cadent Gas are carrying out New service connection on Wykin Lane, Stoke Golding.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 10:50 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 10:50.

Warwickshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Justice Walk

Warwickshire County Council are proposing to carry out Highway improvement works on Justice Walk, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Warwickshire County Council on 24 Jun 2026 at 10:12.

Warwickshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Wheat Street

Warwickshire County Council are proposing to carry out Highway improvement works on Wheat Street, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Warwickshire County Council on 24 Jun 2026 at 10:18.

Leicestershire County Council logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Market Bosworth Road

Leicestershire County Council are proposing to carry out Highway improvement works on Market Bosworth Road, Sutton Cheney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 19 Jun 2026 at 14:58.

Severn Trent Water logo
Between
29 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Kirkby Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Kirkby Road, Barwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Aug 2026 at 17:35.

Indigo Power logo
Between
1 and 16 Oct 2026
Details
View Map
Share
Follow
Rugby Road

Indigo Power are proposing to carry out New service connection on Rugby Road, Burbage.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Indigo Power on 16 Sep 2026 at 14:37.

Leicestershire County Council logo
Between
2 and 6 Oct 2026
Details
View Map
Share
Follow
Rugby Road

Leicestershire County Council are proposing to carry out Highway improvement works on Rugby Road, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 Sep 2026 at 14:29.

Leicestershire County Council logo
Between
2 and 6 Oct 2026
Details
View Map
Share
Follow
Trinity Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Trinity Lane, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 Sep 2026 at 14:28.

Leicestershire County Council logo
Between
4 and 7 Oct 2026
Details
View Map
Share
Follow
Dodwells Road

Leicestershire County Council are proposing to carry out Highway improvement works on Dodwells Road, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 8 Sep 2026 at 14:20.

Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Nutts Lane

Optimal Power Networks are proposing to carry out Utility asset works on Nutts Lane, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Optimal Power Networks on 12 Aug 2026 at 16:46.

National Highways logo
LONG TERM
Between
5 Oct and 19 Dec 2026
Details
View Map
Share
Follow
Hinckley Road

National Highways are proposing to carry out roadworks on Hinckley Road, Watling Street, Wolvey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 1 Sep 2026 at 16:13.

Leicestershire County Council logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Market Bosworth Road

Leicestershire County Council are proposing to carry out Highway improvement works on Market Bosworth Road, Sutton Cheney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 19 Jun 2026 at 14:58.

Indigo Power logo
Between
17 and 23 Oct 2026
Details
View Map
Share
Follow
Herald Way

Indigo Power are proposing to carry out New service connection on Herald Way, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Indigo Power on 16 Sep 2026 at 15:36.

Western Power Distribution (East Midlands) logo
Between
19 and 25 Oct 2026
Details
View Map
Share
Follow
Main Street

Western Power Distribution (East Midlands) are proposing to carry out Disconnection or alteration of supply on Main Street, Higham On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 21 Jul 2026 at 12:14.

Western Power Distribution (East Midlands) logo
Between
19 and 24 Oct 2026
Details
View Map
Share
Follow
Normandy Way Cycleway

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Normandy Way Cycleway, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 24 October 2026. The works will impact the cycleway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 24 Jul 2026 at 14:58.

Western Power Distribution (East Midlands) logo
Between
19 and 24 Oct 2026
Details
View Map
Share
Follow
Normandy Way Cycleway

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Normandy Way Cycleway, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 24 October 2026. The works will impact the cycleway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Sep 2026 at 16:22.

BT logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
Wykin Lane

BT are proposing to carry out Remedial works on Wykin Lane, Stoke Golding.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the verge only.

This roadwork event was last updated by BT on 10 Sep 2026 at 11:48.

Severn Trent Water logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
New Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on New Street, Earl Shilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Jul 2026 at 12:51.

Severn Trent Water logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
Hinckley Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hinckley Road, Earl Shilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 6 Jul 2026 at 11:00.

Severn Trent Water logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
Hinckley Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hinckley Road, Earl Shilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 14 Aug 2026 at 10:53.

Western Power Distribution (East Midlands) logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Fenn Lanes

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Fenn Lanes, Fenny Drayton, Witherley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 1 Sep 2026 at 08:29.

Western Power Distribution (East Midlands) logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Fenn Lanes

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Fenn Lanes, Fenny Drayton, Witherley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 7 Sep 2026 at 16:37.

Warwickshire County Council logo
Between
19 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Chapel Street

Warwickshire County Council are proposing to carry out Section 50 on Chapel Street, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 8 Sep 2026 at 10:53.

Cadent Gas logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Ashford Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Ashford Road, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 18:43.

Leicestershire County Council logo
LONG TERM
Between
19 Oct 2026 and 13 Nov 2027
Details
View Map
Share
Follow
Footpath U26

Leicestershire County Council are proposing to carry out Highway improvement works on Footpath U26, Earl Shilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 13 November 2027. The works will impact the footpath only.

This roadwork event was last updated by Leicestershire County Council on 21 Aug 2026 at 16:28.

Leicestershire County Council logo
Between
19 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Footpath U26

Leicestershire County Council are proposing to carry out Highway improvement works on Footpath U26, Earl Shilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the footpath only.

This roadwork event was last updated by Leicestershire County Council on 21 Aug 2026 at 16:28.

Severn Trent Water logo
Between
20 and 23 Oct 2026
Details
View Map
Share
St Marys Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on St Marys Road, Nuneaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2026 and run through until 23 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2026 at 09:42.

Indigo Power logo
Between
26 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Rugby Road

Indigo Power are proposing to carry out New service connection on Rugby Road, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Indigo Power on 16 Sep 2026 at 15:00.

Indigo Power logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Wolvey Road

Indigo Power are proposing to carry out New service connection on Wolvey Road, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Indigo Power on 16 Sep 2026 at 16:46.

Cadent Gas logo
Between
26 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Sunnyside

Cadent Gas are proposing to carry out Utility asset works on Sunnyside, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 16:49.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
26 Oct and 4 Dec 2026
Details
View Map
Share
Follow
Cherry Orchard Estate

Western Power Distribution (East Midlands) are proposing to carry out Disconnection or alteration of supply on Cherry Orchard Estate, Higham On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 23 Jul 2026 at 08:50.

Severn Trent Water logo
LONG TERM
Between
27 Oct 2026 and 8 Jun 2027
Details
View Map
Share
Follow
Church Lane

Severn Trent Water are proposing to carry out Utility asset works on Church Lane, Weddington, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 8 June 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Aug 2026 at 15:43.

BT logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Coniston Close

BT are proposing to carry out Utility repair and maintenance works on Coniston Close, Earl Shilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Aug 2026 at 12:28.

Severn Trent Water logo
LONG TERM
Between
2 Nov and 21 Dec 2026
Details
View Map
Share
Follow
Sibson Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sibson Lane, Sutton Cheney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 21 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 22 Aug 2026 at 09:40.

Severn Trent Water logo
LONG TERM
Between
2 Nov and 21 Dec 2026
Details
View Map
Share
Follow
Upton Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Upton Lane, Sutton Cheney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 21 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 22 Aug 2026 at 09:40.

Indigo Power logo
Between
2 and 17 Nov 2026
Details
View Map
Share
Follow
Herald Way

Indigo Power are proposing to carry out New service connection on Herald Way, Burbage.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 17 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Indigo Power on 16 Sep 2026 at 16:12.

Cadent Gas logo
LONG TERM
Between
3 Nov 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Barwell Lane

Cadent Gas are proposing to carry out Utility asset works on Barwell Lane, Hinckley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 25 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 17:10.

Cadent Gas logo
Between
3 and 17 Nov 2026
Details
View Map
Share
Follow
Ashby Road

Cadent Gas are proposing to carry out Utility asset works on Ashby Road, Hinckley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 17 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 16:57.

Severn Trent Water logo
Between
9 and 22 Nov 2026
Details
View Map
Share
Mere Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Mere Lane, Copston Magna.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 22 November 2026. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 25 Aug 2026 at 14:16.

Warwickshire County Council logo
Between
9 and 12 Nov 2026
Details
View Map
Share
St Nicolas Park Drive

Warwickshire County Council were proposing to carry out Highway improvement works on St Nicolas Park Drive, St Nicolas Park, Nuneaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 12 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 16 Sep 2026 at 15:13.

Warwickshire County Council logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Follow
Gipsy Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Gipsy Lane, Whitestone, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 18 Aug 2026 at 14:08.

Severn Trent Water logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Follow
Druid Street

Severn Trent Water are proposing to carry out New service connection on Druid Street, Hinckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2026 at 12:59.

Severn Trent Water logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Druid Street

Severn Trent Water were proposing to carry out New service connection on Druid Street, Hinckley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 11 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 1 Sep 2026 at 12:36.

Warwickshire County Council logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Follow
Weddington Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Weddington Lane, Caldecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 11 Aug 2026 at 16:14.

Warwickshire County Council logo
Between
9 and 12 Nov 2026
Details
View Map
Share
Pallett Drive

Warwickshire County Council were proposing to carry out Highway improvement works on Pallett Drive, St Nicolas Park, Nuneaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 12 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 16 Sep 2026 at 14:59.

Severn Trent Water logo
Between
11 and 13 Nov 2026
Details
View Map
Share
Follow
Elmesthorpe Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Elmesthorpe Lane, Earl Shilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Sep 2026 at 08:55.

Severn Trent Water logo
Between
11 and 13 Nov 2026
Details
View Map
Share
Follow
Elmesthorpe Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Elmesthorpe Lane, Earl Shilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Sep 2026 at 09:00.

Cadent Gas logo
Between
16 and 18 Nov 2026
Details
View Map
Share
Follow
Heath Lane

Cadent Gas are proposing to carry out Remedial works on Heath Lane, Earl Shilton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 14:06.

Severn Trent Water logo
Between
17 and 25 Nov 2026
Details
View Map
Share
Follow
Mere Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mere Lane, Copston Magna.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2026 and could run through until 25 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 11 Sep 2026 at 11:16.

Severn Trent Water logo
Between
17 and 30 Nov 2026
Details
View Map
Share
Follow
Mere Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mere Lane, Copston Magna.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2026 and could run through until 30 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2026 at 12:21.

Indigo Power logo
Between
23 Nov and 17 Dec 2026
Details
View Map
Share
Follow
Rugby Road Service Road To Houses 140 To 208

Indigo Power are proposing to carry out New service connection on Rugby Road Service Road To Houses 140 To 208, Burbage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 17 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Indigo Power on 16 Sep 2026 at 15:19.

Warwickshire County Council logo
Between
23 Nov and 5 Dec 2026
Details
View Map
Share
Follow
Lutterworth Road

Warwickshire County Council are proposing to carry out Highway improvement works on Lutterworth Road, Five Lane Ends, Wolvey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 11 Sep 2026 at 14:05.

Severn Trent Water logo
Between
23 and 26 Nov 2026
Details
View Map
Share
Furnace Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Furnace Road, Bedworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 November 2026 and run through until 26 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2026 at 14:11.

Warwickshire County Council logo
Between
23 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Lutterworth Road

Warwickshire County Council are proposing to carry out Highway improvement works on Lutterworth Road, Five Lane Ends, Wolvey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 31 Jul 2026 at 12:49.

Warwickshire County Council logo
Between
23 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Vicarage Street

Warwickshire County Council are proposing to carry out Highway improvement works on Vicarage Street, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 7 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 3 Sep 2026 at 14:31.

Warwickshire County Council logo
Between
23 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Vicarage Street

Warwickshire County Council are proposing to carry out Highway improvement works on Vicarage Street, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 7 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 2 Sep 2026 at 12:25.


Roadworks Map near to Coventry Road, HINCKLEY, LE10 0NB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 22:06
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Coventry Road, HINCKLEY, LE10 0NB (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Western Power Distribution (East Midlands) logo
BRINDLEY ROAD 
(0.3 miles)
Western Power Distribution (East Midlands)
New service connection - Footway, Verge - No carriageway incursion
Complete
11 Sep 2026 13:54 - 16 Sep 2026 14:10
0.3
Details
Share
2
Western Power Distribution (East Midlands) logo
NEWTON ROAD 
(0.3 miles)
Western Power Distribution (East Midlands)
New service connection - Footway - Give and take
Planned
Scheduled: 15 Sep 2026 - 17 Sep 2026
0.3
Details
Share
Follow
3
Western Power Distribution (East Midlands) logo
NEWTON ROAD 
(0.3 miles)
Western Power Distribution (East Midlands)
New service connection - Footway - Some carriageway incursion
In Progress
Since: 15 Sep 2026 14:30
(Scheduled: 15 Sep 2026 - 17 Sep 2026)
0.3
Details
Share
Follow
4
BT logo
A5 FROM J A47/B4666 ROUNDABOUT TO START OF DUALLING SOUTH OF HINCKLEY INCLUDING ROUNDABOUT 
(0.5 miles)
BT
Utility repair and maintenance works - Verge - Two-way signals
In Progress
Since: 14 Sep 2026 08:00
(Scheduled: 14 Sep 2026 - 25 Sep 2026)
0.5
Details
Share
Follow
5
Leicestershire County Council logo
EMERGENCY
  
ROSEMARY WAY 
(0.6 miles)
Leicestershire County Council
Highway improvement works - Carriageway - Give and take
Complete
25 Aug 2026 13:17 - 1 Sep 2026 11:05
0.6
Details
Share
6
Leicestershire County Council logo
MAJOR
  
FOOTPATH U6 
(0.9 miles)
Leicestershire County Council
Highway improvement works - Footpath - Road closure
In Progress
Since: 27 Apr 2026 00:00
(Scheduled: 27 Apr 2026 - 26 Oct 2026)
0.9
Details
Share
Follow
7
Leicestershire County Council logo
MAJOR
  
FOOTPATH T53 
(0.9 miles)
Leicestershire County Council
Highway improvement works - Carriageway - Road closure
In Progress
Since: 24 Oct 2024 10:09
(Scheduled: 24 Oct 2024 - 19 Mar 2028)
0.9
Details
Share
Follow
8
Western Power Distribution (East Midlands) logo
URGENT
  
THE LONG SHOOT 
(0.9 miles)
Western Power Distribution (East Midlands)
Utility repair and maintenance works - Footway, Verge - No carriageway incursion
In Progress
Since: 11 Sep 2026 09:00
(Scheduled: 11 Sep 2026 - 24 Sep 2026)
0.9
Details
Share
Follow
9
Virgin Media logo
BUTE CLOSE 
(1.0 miles)
Virgin Media
New service connection - Footway - No carriageway incursion
Complete
14 Sep 2026 08:21 - 09:16
1.0
Details
Share