ROADWORKS SUMMARY
Northumberland Street, MORECAMBE, LA4 4AY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Northumberland Street, LA4 4AY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Northumberland Street, MORECAMBE, LA4 4AY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Northumberland Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Until
25 Jun 2025
Details
View Map
Share
Follow
Ryelands Road

Cadent Gas are carrying out Utility asset works on Ryelands Road, Lancaster.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 May 2025 at 08:45 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jun 2025 at 07:52.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Caton Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out New service connection on Caton Road, Lancaster.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:20 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 14 Jun 2025 at 09:44.

Lancashire County Council logo
LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Westminster Avenue

Lancashire County Council are carrying out Highway repair and maintenance works on Westminster Avenue, Morecambe.

These works are categorised as Major.

The works started on 12 May 2025 at 06:00 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 3 Jun 2025 at 14:17.

Lancashire County Council logo
LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Westcliffe Drive

Lancashire County Council are carrying out Highway repair and maintenance works on Westcliffe Drive, Morecambe.

These works are categorised as Major.

The works started on 9 May 2025 at 06:00 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 3 Jun 2025 at 14:19.

Lancashire County Council logo
LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Westminster Road

Lancashire County Council are carrying out Highway repair and maintenance works on Westminster Road, Morecambe.

These works are categorised as Major.

The works started on 12 May 2025 at 06:00 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 3 Jun 2025 at 14:17.

Cadent Gas logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Morecambe Road

Cadent Gas are carrying out Utility asset works on Morecambe Road, Morecambe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 09:03.

Lancashire County Council logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Scotforth Road

Lancashire County Council are carrying out Highway repair and maintenance works on Scotforth Road, South Of River, Lancaster.

These works are categorised as Major.

The works started on 23 May 2025 at 06:00 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 13 Jun 2025 at 14:46.

Lancashire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Scotforth Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Scotforth Road, South Of River, Lancaster.

These works are categorised as Major.

The works will start on or after 23 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 3 Mar 2025 at 09:34.

Lancashire County Council logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Greaves Road

Lancashire County Council are carrying out Highway repair and maintenance works on Greaves Road, South Of River, Lancaster.

These works are categorised as Major.

The works started on 23 May 2025 at 06:00 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 13 Jun 2025 at 14:44.

Lancashire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Greaves Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Greaves Road, South Of River, Lancaster.

These works are categorised as Major.

The works will start on or after 23 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 3 Mar 2025 at 09:25.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Torrisholme Road

Cadent Gas are proposing to carry out Utility asset works on Torrisholme Road, Lancaster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 14:09.

Cadent Gas logo
Between
2 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Ryelands Road

Cadent Gas are proposing to carry out Utility asset works on Ryelands Road, Lancaster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 13:34.

Electricity North West (NorWeb) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Nelson Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Nelson Street, Morecambe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Mar 2025 at 13:09.

Electricity North West (NorWeb) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Nelson Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Nelson Street, Morecambe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Apr 2025 at 10:43.

Electricity North West (NorWeb) logo
Until
25 Jun 2025
Details
View Map
Share
Follow
Nelson Street

Electricity North West (NorWeb) are carrying out New service connection on Nelson Street, Morecambe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 June 2025 at 09:34 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Jun 2025 at 11:33.

Cadent Gas logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Crewgarth Road

Cadent Gas are proposing to carry out Utility asset works on Crewgarth Road, Morecambe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 14:14.

Cadent Gas logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Burlington Grove

Cadent Gas are proposing to carry out Utility asset works on Burlington Grove, Morecambe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 14:15.

Cadent Gas logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Broadway

Cadent Gas are proposing to carry out Utility asset works on Broadway, Morecambe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 14:14.

Cadent Gas logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Lancaster Road

Cadent Gas are proposing to carry out Utility asset works on Lancaster Road, Morecambe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 13:33.

Cadent Gas logo
LONG TERM
Between
16 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Morecambe Road

Cadent Gas are proposing to carry out Utility asset works on Morecambe Road, Morecambe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 13:32.

Lancashire County Council logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Bulk Road

Lancashire County Council are proposing to carry out Section 50 on Bulk Road, Lancaster.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 29 May 2025 at 15:33.

Lancashire County Council logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Bulk Road

Lancashire County Council are proposing to carry out Section 50 on Bulk Road, Lancaster.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 29 May 2025 at 16:02.

Cadent Gas logo
Between
23 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Crewgarth Road

Cadent Gas are proposing to carry out Utility asset works on Crewgarth Road, Morecambe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 09:03.

Lancashire County Council logo
LONG TERM
Between
23 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Coulston Road

Lancashire County Council are proposing to carry out Section 50 on Coulston Road, Lancaster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 20 May 2025 at 12:58.

Lancashire County Council logo
LONG TERM
Between
23 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Golgotha Road

Lancashire County Council are proposing to carry out Section 50 on Golgotha Road, Lancaster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 20 May 2025 at 12:29.

Cadent Gas logo
LONG TERM
Between
30 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Slyne Road

Cadent Gas are proposing to carry out Utility asset works on Slyne Road, Bolton Le Sands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2025 at 14:18.

Cadent Gas logo
LONG TERM
Between
30 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Slyne Road

Cadent Gas are proposing to carry out Utility asset works on Slyne Road, Bolton Le Sands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jun 2025 at 14:58.

Cadent Gas logo
Between
30 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Westgate

Cadent Gas are proposing to carry out Utility asset works on Westgate, Morecambe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Mar 2025 at 10:13.

Cadent Gas logo
Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
Townley Street

Cadent Gas are proposing to carry out New service connection on Townley Street, Morecambe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 May 2025 at 14:05.

Cadent Gas logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Bolton Le Sands.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 09:52.

Cadent Gas logo
LONG TERM
Between
7 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Slyne Road

Cadent Gas are proposing to carry out Utility asset works on Slyne Road, Bolton Le Sands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 09:36.

Lancashire County Council logo
Between
14 and 29 Jul 2025
Details
View Map
Share
Follow
Lentworth Drive

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Lentworth Drive, Lancaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 15 Apr 2025 at 10:21.

Lancashire County Council logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Endcliffe Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Endcliffe Road, Morecambe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 15 Apr 2025 at 11:15.

Lancashire County Council logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Hawarden Avenue

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Hawarden Avenue, Morecambe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 15 Apr 2025 at 10:50.

Virgin Media logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Northgate

Virgin Media are proposing to carry out Utility repair and maintenance works on Northgate, White Lund Industrial Estate, Heaton With Oxcliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 1 Apr 2025 at 11:20.

Lancashire County Council logo
Between
14 and 29 Jul 2025
Details
View Map
Share
Follow
Cedar Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Cedar Road, Lancaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 14 Apr 2025 at 12:28.

Lancashire County Council logo
Between
4 and 20 Aug 2025
Details
View Map
Share
Follow
Kingsway

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Kingsway, Heysham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 24 Apr 2025 at 09:14.

Cadent Gas logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Townley Street

Cadent Gas are proposing to carry out New service connection on Townley Street, Morecambe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 10:03.

Cadent Gas logo
Between
6 and 27 Aug 2025
Details
View Map
Share
Follow
Lonsdale Road

Cadent Gas are proposing to carry out Utility asset works on Lonsdale Road, Morecambe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 14:11.

Lancashire County Council logo
LONG TERM
Between
12 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Coulston Road

Lancashire County Council are proposing to carry out Section 50 on Coulston Road, Lancaster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 20 May 2025 at 12:35.

Lancashire County Council logo
Between
12 and 29 Aug 2025
Details
View Map
Share
Follow
Torrisholme Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Torrisholme Road, Lancaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 28 Apr 2025 at 12:12.

Lancashire County Council logo
LONG TERM
Between
12 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Golgotha Road

Lancashire County Council are proposing to carry out Section 50 on Golgotha Road, Lancaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 20 May 2025 at 12:22.

Lancashire County Council logo
Between
21 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Bulk Road

Lancashire County Council are proposing to carry out Section 50 on Bulk Road, Lancaster.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 29 May 2025 at 15:31.

Lancashire County Council logo
Between
21 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Bulk Road

Lancashire County Council are proposing to carry out Section 50 on Bulk Road, Lancaster.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 29 May 2025 at 16:00.

United Utilities Water (formerly North West Water) logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Main Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Main Road, Bolton Le Sands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Jun 2025 at 14:37.

Cadent Gas logo
Between
1 and 15 Sep 2025
Details
View Map
Share
Follow
Westgate

Cadent Gas are proposing to carry out Utility asset works on Westgate, Morecambe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 May 2025 at 08:54.

United Utilities Water (formerly North West Water) logo
Between
2 and 4 Sep 2025
Details
View Map
Share
Follow
Skipton Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Skipton Street, Morecambe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 May 2025 at 16:06.

Electricity North West (NorWeb) logo
Between
10 and 17 Sep 2025
Details
View Map
Share
Follow
Dorchester Gardens

Electricity North West (NorWeb) are proposing to carry out New service connection on Dorchester Gardens, Morecambe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 11 Jun 2025 at 09:19.


Roadworks Map near to Northumberland Street, MORECAMBE, LA4 4AY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Jun 2025 08:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Northumberland Street, MORECAMBE, LA4 4AY (20 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Electricity North West (NorWeb) logo
MAJOR
  
NELSON STREET 
(0.2 miles)
Electricity North West (NorWeb)
New service connection - Footway, Carriageway - Road closure
In Progress
Since: 17 Jun 2025 09:34
(Scheduled: 16 Jun 2025 - 25 Jun 2025)
0.2
Details
Share
Follow
2
Electricity North West (NorWeb) logo
MAJOR
  
NELSON STREET 
(0.2 miles)
Electricity North West (NorWeb)
New service connection - Footway, Carriageway - Road closure
Planned
Scheduled: 16 Jun 2025 - 24 Jun 2025
0.2
Details
Share
Follow
3
Electricity North West (NorWeb) logo
MAJOR
  
NELSON STREET 
(0.2 miles)
Electricity North West (NorWeb)
New service connection - Footway, Carriageway - Road closure
Planned
Scheduled: 16 Jun 2025 - 24 Jun 2025
0.2
Details
Share
Follow
4
United Utilities Water (formerly North West Water) logo
SANDRINGHAM COURT 
(0.3 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 17 Jun 2025 08:21
(Scheduled: 17 Jun 2025 - 19 Jun 2025)
0.3
Details
Share
Follow
5
Lancashire County Council logo
MAJOR
  
WESTMINSTER AVENUE 
(0.3 miles)
Lancashire County Council
Highway repair and maintenance works - Carriageway - Stop/go boards
In Progress
Since: 12 May 2025 06:00
(Scheduled: 9 May 2025 - 1 Jul 2025)
0.3
Details
Share
Follow
6
Cadent Gas logo
WOODHILL LANE 
(0.4 miles)
Cadent Gas
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 16 Jun 2025 12:06
(Scheduled: 16 Jun 2025 - 18 Jun 2025)
0.4
Details
Share
Follow
7
United Utilities Water (formerly North West Water) logo
SANDRINGHAM ROAD 
(0.4 miles)
United Utilities Water (formerly North West Water)
Disconnection or alteration of supply - Footway, Carriageway - Give and take
In Progress
Since: 16 Jun 2025 10:28
(Scheduled: 16 Jun 2025 - 20 Jun 2025)
0.4
Details
Share
Follow
8
United Utilities Water (formerly North West Water) logo
SANDRINGHAM ROAD 
(0.4 miles)
United Utilities Water (formerly North West Water)
Disconnection or alteration of supply - Footway, Carriageway - Give and take
Planned
Scheduled: 17 Jun 2025 - 20 Jun 2025
0.4
Details
Share
Follow
9
United Utilities Water (formerly North West Water) logo
JAMES STREET 
(0.6 miles)
United Utilities Water (formerly North West Water)
Remedial works - Footway - Some carriageway incursion
In Progress
Since: 16 Jun 2025 17:05
(Scheduled: 13 Jun 2025 - 18 Jun 2025)
0.6
Details
Share
Follow
10
BT logo
BARTHOLOMEW ROAD 
(0.8 miles)
BT
Utility asset works - Footway, Verge - Give and take
Planned
Scheduled: 17 Jun 2025 - 19 Jun 2025
0.8
Details
Share
Follow