ROADWORKS SUMMARY
Teal Close, ASKAM-IN-FURNESS, LA16 7JF
Introduction
View current and future planned roadworks and road closures for Teal Close, LA16 7JF and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Teal Close, ASKAM-IN-FURNESS, LA16 7JF
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Teal Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
28 Sep 2026
Westmorland And Furness Council are carrying out Highway improvement works on Abbey Road, Barrow-in-furness.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 30 June 2025 at 08:00 and could run through until 28 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Westmorland And Furness Council on 25 Aug 2026 at 11:31.
16 Oct 2026
Westmorland And Furness Council are carrying out Highway improvement works on Buckhorn Lane, Chapels, Kirkby-in-furness.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 February 2026 at 08:00 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 14 Sep 2026 at 12:14.
28 Sep 2026
Electricity North West (NorWeb) are carrying out Diversionary works on Ainslie Street, Barrow-in-furness.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 May 2026 at 16:31 and could run through until 28 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Sep 2026 at 08:56.
Monday
Cadent Gas are carrying out Utility asset works on Rating Lane, Barrow-in-furness.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 July 2026 at 17:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jul 2026 at 07:50.
28 Sep 2026
Westmorland And Furness Council are carrying out Highway improvement works on Cheltenham Street, Barrow-in-furness.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 August 2026 at 08:00 and could run through until 28 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Westmorland And Furness Council on 21 Aug 2026 at 12:40.
28 Sep 2026
Westmorland And Furness Council are carrying out Highway improvement works on Park Drive, Barrow-in-furness.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 August 2026 at 08:00 and could run through until 28 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Westmorland And Furness Council on 21 Aug 2026 at 12:35.
28 Sep 2026
Westmorland And Furness Council are carrying out Highway improvement works on Brighton Street, Barrow-in-furness.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 August 2026 at 08:00 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 26 Aug 2026 at 08:09.
Tomorrow
United Utilities Water (formerly North West Water) are carrying out New service connection on Colt House Lane, Ulverston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 14:00 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Sep 2026 at 11:57.
25 Sep 2026
Westmorland And Furness Council are carrying out Highway repair and maintenance works on Victoria Road, Ulverston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 07:00 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 7 Sep 2026 at 13:04.
7 Sep and 19 Oct 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Abbey Road, Barrow-in-furness.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Mar 2026 at 10:48.
2 Oct 2026
Cadent Gas are carrying out Utility asset works on Devonshire Road, Millom.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2026 at 12:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 11:36.
Tuesday
Westmorland And Furness Council are carrying out Highway improvement works on Hindpool Road, Barrow-in-furness.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2026 at 07:30 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 14 Sep 2026 at 11:24.
Tuesday
Westmorland And Furness Council are carrying out Highway improvement works on Walney Road, Barrow-in-furness.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2026 at 07:30 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 14 Sep 2026 at 11:23.
14 and 16 Sep 2026
Network Rail carried out Works for Rail Purposes on Access Road To Pennington From The A590t, Ulverston.
The road was closed for some or all of the period.
The works were originally planned between 14 Sep 2026 and 16 Sep 2026 and were actually completed between 14 Sep 2026 (22:00) and 16 Sep 2026 (06:00). The works impacted the carriageway only.
This roadwork event was last updated by Network Rail on 16 Sep 2026 at 09:00.
Tomorrow
Westmorland And Furness Council are carrying out Highway improvement works on Longlands Avenue, Barrow-in-furness.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 07:30 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 16 Sep 2026 at 09:03.
Tomorrow
Westmorland And Furness Council are proposing to carry out Highway improvement works on Stafford Street, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Westmorland And Furness Council on 21 Aug 2026 at 07:50.
Tomorrow
Westmorland And Furness Council are carrying out Highway improvement works on Stafford Street, Barrow-in-furness.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 18:00 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 15 Sep 2026 at 08:46.
Today
Westmorland And Furness Council are carrying out Highway repair and maintenance works on Middlefield, Barrow-in-furness.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 07:30 and could run through until 17 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 15 Sep 2026 at 11:01.
Today
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Middlefield, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2026 and could run through until 17 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 4 Sep 2026 at 09:05.
12 Oct 2026
Cadent Gas are carrying out Utility asset works on Schneider Road, Barrow-in-furness.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 13:00 and could run through until 12 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:22.
15 Sep and 12 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Schneider Road, Barrow-in-furness.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2026 and could run through until 12 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:03.
17 Sep and 19 Nov 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Pennington Lane, Ulverston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2026 and could run through until 19 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Aug 2026 at 11:03.
17 Sep and 19 Nov 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on From The U5124 To The A590t, Ulverston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2026 and could run through until 19 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Aug 2026 at 11:04.
18 Sep and 8 Oct 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Devonshire Road, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Sep 2026 at 08:37.
Wednesday
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Fife Street, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 10 Sep 2026 at 07:53.
Wednesday
Fibrus Networks are proposing to carry out Remedial works on Market Street, Ulverston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Fibrus Networks on 27 Aug 2026 at 10:04.
21 Sep and 2 Oct 2026
Westmorland And Furness Council are proposing to carry out Highway improvement works on West View Road, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 24 Aug 2026 at 08:23.
21 Sep and 2 Oct 2026
Westmorland And Furness Council are proposing to carry out Highway improvement works on Park Avenue, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 27 Aug 2026 at 11:40.
Wednesday
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Fife Street, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 16 Sep 2026 at 14:54.
22 and 24 Sep 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Bridgegate Avenue, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 8 Sep 2026 at 10:58.
23 and 25 Sep 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Emlyn Street, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 10 Sep 2026 at 07:46.
23 and 25 Sep 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Emlyn Street, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 16 Sep 2026 at 14:57.
24 and 28 Sep 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Abbots Vale, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 10 Sep 2026 at 07:43.
24 and 28 Sep 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Abbots Vale, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 16 Sep 2026 at 14:58.
25 Sep and 2 Oct 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Saves Lane, Ireleth, Askam-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 15 Sep 2026 at 07:35.
25 Sep and 2 Oct 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Saves Lane, Ireleth, Askam-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 16 Sep 2026 at 14:50.
28 Sep and 2 Oct 2026
Electricity North West (NorWeb) are proposing to carry out New service connection on Soutergate, Kirkby-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 31 Jul 2026 at 11:12.
30 Sep and 6 Oct 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Cobden Street, Dalton-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 16 Sep 2026 at 14:23.
2 and 7 Oct 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Lyndale Avenue, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 16 Sep 2026 at 14:58.
5 and 26 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Yarlside Road, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Jul 2026 at 15:24.
5 and 29 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Main Street, Haverigg.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 29 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2026 at 09:43.
5 and 9 Oct 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Rake Lane, Ulverston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 20 Jul 2026 at 07:36.
5 and 9 Oct 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Rake Lane, Ulverston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 7 Sep 2026 at 11:58.
5 and 19 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on North Lane, Haverigg.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2026 at 09:52.
7 Oct and 6 Nov 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Park Drive, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Sep 2026 at 10:20.
7 Oct and 6 Nov 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Cheltenham Street, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Sep 2026 at 10:21.
9 and 13 Oct 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Bridgegate Avenue, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2026 and could run through until 13 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 10 Sep 2026 at 07:51.
12 and 28 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Pannatt Hill, Millom.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jul 2026 at 08:13.
13 and 15 Oct 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Access Road To Pennington From The A590t, Ulverston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 31 Jul 2026 at 07:36.
13 and 15 Oct 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Access Road To Pennington From The A590t, Ulverston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 9 Sep 2026 at 21:33.
19 Oct and 11 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Lord Street, Millom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Aug 2026 at 14:19.
19 Oct and 10 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Holborn Hill, Millom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Aug 2026 at 11:39.
20 Oct and 2 Nov 2026
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Fairfield Lane, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 12 Aug 2026 at 11:40.
20 Oct and 2 Nov 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Jesmond Avenue, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 12 Aug 2026 at 11:39.
26 and 30 Oct 2026
Electricity North West (NorWeb) are proposing to carry out Utility asset works on Chapel Street, Ulverston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Jul 2026 at 08:56.
26 and 28 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Tantabank Road, Dalton-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 17 Jul 2026 at 13:15.
26 and 30 Oct 2026
Electricity North West (NorWeb) are proposing to carry out Utility asset works on Chapel Street, Ulverston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 Sep 2026 at 14:46.
29 Oct and 18 Nov 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Valley Drive, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 30 Jul 2026 at 08:49.
2 and 18 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Lowther Road, Millom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jul 2026 at 13:22.
2 and 18 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on St Georges Road, Millom.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jul 2026 at 07:58.
9 and 29 Nov 2026
Cadent Gas were proposing to carry out Utility asset works on North Lane, Haverigg.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 November 2026 and run through until 29 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 10:47.
9 and 17 Nov 2026
Electricity North West (NorWeb) are proposing to carry out Utility asset works on Bath Street, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 17 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Jun 2026 at 07:58.
9 and 23 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on North Lane, Haverigg.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Aug 2026 at 07:52.
9 and 17 Nov 2026
Electricity North West (NorWeb) are proposing to carry out Utility asset works on Bath Street, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 17 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 Sep 2026 at 11:52.
9 and 29 Nov 2026
Cadent Gas were proposing to carry out Utility asset works on Main Street, Haverigg.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 November 2026 and run through until 29 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 10:46.
16 Nov and 18 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Greengate Street, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 07:17.
16 and 30 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Main Street, Haverigg.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Aug 2026 at 07:56.
16 Nov and 11 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Market Street, Millom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 09:31.
16 Nov and 18 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Greengate Street, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 07:42.
16 and 29 Nov 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Leith Flat Brow, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Aug 2026 at 12:27.
16 Nov and 18 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Greengate Street, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 13:30.
23 and 25 Nov 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Pennington Lane, Ulverston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 25 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 3 Aug 2026 at 14:17.
23 Nov and 18 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Schneider Road, Barrow-in-furness.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 07:48.
23 Nov and 18 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Schneider Road, Barrow-in-furness.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 07:42.
23 Nov 2026 and 27 Jan 2027
Cadent Gas are proposing to carry out Utility asset works on Ainslie Street, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 11:43.
30 Nov and 13 Dec 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Abbey Approach, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 13 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Aug 2026 at 07:50.
30 Nov and 20 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Alexander Place, Askam-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Aug 2026 at 15:23.
1 and 9 Dec 2026
Electricity North West (NorWeb) are proposing to carry out Utility asset works on Meeting House Lane, Ulverston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2026 and could run through until 9 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Sep 2026 at 12:53.
1 and 9 Dec 2026
Electricity North West (NorWeb) are proposing to carry out Utility asset works on Meeting House Lane, Ulverston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2026 and could run through until 9 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 30 Jul 2026 at 08:41.
2 and 15 Dec 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Jesmond Avenue, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2026 and could run through until 15 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Sep 2026 at 10:22.
2 and 15 Dec 2026
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Fairfield Lane, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2026 and could run through until 15 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Sep 2026 at 10:22.
7 and 18 Dec 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Abbotsmead Approach, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Sep 2026 at 11:46.
7 and 18 Dec 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Abbotsmead Approach, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Sep 2026 at 11:33.
7 and 18 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Wellington Street, Millom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2026 at 09:13.
7 and 18 Dec 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Abbotsmead Approach, Barrow-in-furness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Sep 2026 at 08:02.
7 and 9 Dec 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Access Road To Pennington From The A590t, Ulverston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 9 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 10 Sep 2026 at 09:35.
7 and 9 Dec 2026
Westmorland And Furness Council are proposing to carry out Highway repair and maintenance works on Access Road To Pennington From The A590t, Ulverston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 9 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 10 Sep 2026 at 09:02.
7 and 9 Dec 2026
Westmorland And Furness Council were proposing to carry out Highway repair and maintenance works on Access Road To Pennington From The A590t, Ulverston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 December 2026 and run through until 9 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Westmorland And Furness Council on 10 Sep 2026 at 09:30.
14 Dec 2026 and 6 Jan 2027
Cadent Gas are proposing to carry out Utility asset works on Park Drive, Barrow-in-furness.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 6 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 11:09.
Roadworks Map near to Teal Close, ASKAM-IN-FURNESS, LA16 7JF
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Teal Close, ASKAM-IN-FURNESS, LA16 7JF (5 Events)
(Scheduled Dates)
(miles)
(Scheduled: 14 Sep 2026 - 18 Sep 2026)
(Scheduled: 14 Sep 2026 - 17 Sep 2026)
Contains public sector information licensed under the Open Government Licence v3.0.