ROADWORKS SUMMARY
L64 9RN
Introduction
View current and future planned roadworks and road closures for L64 9RN and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to L64 9RN
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
4 Oct 2024
Cheshire West And Chester Council are carrying out Highway improvement works on Heath Lane, Willaston, Neston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2023 at 12:49 and could run through until 4 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cheshire West And Chester Council on 3 Oct 2023 at 11:52.
28 Nov 2023 and 29 Nov 2024
Cheshire West And Chester Council are proposing to carry out Highway improvement works on Chester High Road, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2023 and could run through until 29 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cheshire West And Chester Council on 20 Nov 2023 at 08:12.
1 May 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Gayton Road, Gayton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 09:59.
1 May 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Church Meadow Lane, Heswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 3 Apr 2024 at 14:57.
1 May 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Oldfield Road, Heswall.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 May 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 2 Aug 2024 at 10:07.
1 May 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bellward Close, Spital.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 26 Feb 2024 at 14:22.
1 May 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Firs Avenue, Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 11 Mar 2024 at 13:58.
1 May 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Derwent Road, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 4 Mar 2024 at 15:15.
1 May 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Shallmarsh Road, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 11 Mar 2024 at 10:23.
1 May 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Orchard Way, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 11 Mar 2024 at 15:48.
24 Jun 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bowness Avenue, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 26 Jun 2024 at 10:11.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Manor Road, Brimstage.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 June 2024 at 09:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 26 Jun 2024 at 12:07.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Cedarway, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 1 Jul 2024 at 10:00.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Dee Park Road, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 4 Jul 2024 at 09:22.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Thornton Common Road, Thornton Hough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 10:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 17 Sep 2024 at 12:00.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Tudor Way, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 8 Jul 2024 at 12:47.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Cottesmore Drive, Barnston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 4 Jul 2024 at 09:22.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Redmere Drive, Barnston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 5 Jul 2024 at 14:17.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Mark Rake, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 4 Jul 2024 at 09:26.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Parkwood Close, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 5 Jul 2024 at 11:42.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Pine Avenue, Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 11 Jul 2024 at 10:14.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Firs Avenue, Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 4 Jul 2024 at 09:23.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Greendale Road, Port Sunlight.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 4 Jul 2024 at 09:24.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Overdale Avenue, Barnston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 4 Jul 2024 at 13:59.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ridgefield Road, Pensby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 5 Jul 2024 at 14:13.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Private Drive, Barnston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 5 Jul 2024 at 14:13.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Chatsworth Road, Pensby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 4 Jul 2024 at 09:14.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Pensby Road, Thingwall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2024 at 08:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 17 Sep 2024 at 12:00.
15 Jul 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Orchard Way, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 4 Jul 2024 at 13:59.
29 Jul and 30 Nov 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Nairn Close, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 25 Jul 2024 at 10:31.
29 Jul and 30 Nov 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Cullen Close, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 24 Jul 2024 at 13:17.
29 Jul and 30 Nov 2024
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Duncansby Drive, Eastham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 July 2024 and run through until 30 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 4 Sep 2024 at 09:39.
29 Jul and 30 Nov 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Kintore Close, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 25 Jul 2024 at 10:31.
29 Jul and 30 Nov 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Rydal Close, Pensby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 25 Jul 2024 at 10:31.
31 Jul 2024 and 17 Apr 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Poulton Road, Spital.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:54.
31 Jul 2024 and 17 Apr 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Spital Road, Bromborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:52.
31 Jul 2024 and 17 Apr 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Brimstage Road, Bebington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:53.
31 Jul 2024 and 17 Apr 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Church Road, Bebington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 17 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 23 Apr 2024 at 12:51.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on A41 From J A550 To M53 J5 Roundabout N, Ellesmere Port And Neston.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 11:22 and could run through until 27 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 16:30.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Hooton Road, Hooton, Ellesmere Port.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 August 2024 at 09:54 and could run through until 27 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 10:25.
4 Nov 2024
Cadent Gas are carrying out Utility asset works on Raby Park Road, Neston.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 August 2024 at 07:23 and could run through until 4 November 2024. The works will impact the verge only.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:47.
18 Oct 2024
Cadent Gas are carrying out Utility asset works on Chester High Road, Neston.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 August 2024 at 07:23 and could run through until 18 October 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:41.
18 Aug and 30 Sep 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Long Meadow, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wirral Borough Council on 10 Jul 2024 at 09:48.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Heythrop Drive, Barnston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2024 at 08:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 13 Sep 2024 at 16:13.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Paltridge Way, Pensby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2024 at 08:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 16 Sep 2024 at 08:34.
14 Oct 2024
Cadent Gas are carrying out Utility asset works on Quarry Road East, Bebington.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 August 2024 at 15:00 and could run through until 14 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 14:30.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Lyndhurst Close, Thingwall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2024 at 08:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 16 Sep 2024 at 09:02.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Redbrook Close, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 09:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 18 Sep 2024 at 08:08.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Orston Crescent, Spital.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 09:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 16 Sep 2024 at 09:16.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Granby Crescent, Spital.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 09:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 16 Sep 2024 at 09:15.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Wood Street, Port Sunlight.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 September 2024 at 08:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 20 Sep 2024 at 08:26.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Turriff Drive, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 08:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 19 Sep 2024 at 08:27.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Rhona Close, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 08:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 19 Sep 2024 at 08:28.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Sunningdale Drive, Bromborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 September 2024 at 08:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 20 Sep 2024 at 08:25.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Springhill Avenue, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 09:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 18 Sep 2024 at 08:10.
31 Oct 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Limehurst Grove, Bromborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 08:00 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 19 Sep 2024 at 08:24.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Princes Avenue, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 08:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 19 Sep 2024 at 08:22.
31 Oct 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Cottesmore Drive, Barnston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2024 at 08:30 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 13 Sep 2024 at 16:14.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Dale View Close, Barnston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2024 at 08:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 16 Sep 2024 at 08:30.
31 Oct 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Kentmere Drive, Pensby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 August 2024 at 14:00 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 17 Sep 2024 at 13:27.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Dearnford Avenue, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 09:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 18 Sep 2024 at 08:09.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Bronington Avenue, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 09:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 18 Sep 2024 at 08:08.
30 Sep 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Dearnford Close, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 09:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 18 Sep 2024 at 08:09.
30 Aug and 30 Nov 2024
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Cullen Close, Eastham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 August 2024 and run through until 30 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 4 Sep 2024 at 09:41.
31 Oct 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Bowness Avenue, Bromborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 September 2024 at 08:00 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 20 Sep 2024 at 08:25.
7 Oct 2024
Cadent Gas are carrying out Utility asset works on Ringway, Neston.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 September 2024 at 12:23 and could run through until 7 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 12:45.
31 Oct 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Mill Park Drive, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 September 2024 at 07:30 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Sep 2024 at 14:41.
1 Nov 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Sutherland Drive, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 September 2024 at 07:30 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Sep 2024 at 14:41.
31 Oct 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Heygarth Road, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 September 2024 at 07:30 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Sep 2024 at 14:42.
31 Oct 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Church Meadow Lane, Heswall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2024 at 08:00 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 13 Sep 2024 at 16:13.
31 Oct 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Rooks Way, Heswall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2024 at 08:00 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 13 Sep 2024 at 16:12.
18 Oct 2024
Cadent Gas are carrying out Utility asset works on Raby Park Road, Neston.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 September 2024 at 08:00 and could run through until 18 October 2024. The works will impact the verge only.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 08:35.
31 Oct 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Dee Park Road, Gayton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 September 2024 at 07:30 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 6 Sep 2024 at 14:40.
12 Sep and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ainsdale Close, Thingwall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 16 Aug 2024 at 08:02.
12 Sep and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Wimborne Avenue, Thingwall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 16 Aug 2024 at 08:34.
31 Oct 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Redmere Drive, Barnston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2024 at 08:30 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 13 Sep 2024 at 16:14.
14 Sep and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Woodburn Drive, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 11 Jul 2024 at 12:50.
14 Sep and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Hinderton Drive, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 11 Jul 2024 at 12:44.
14 Sep and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ronaldsway, Heswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 11 Jul 2024 at 12:46.
30 Nov 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Rydal Close, Pensby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 16 Sep 2024 at 09:01.
15 Sep and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Queensway, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 11 Jul 2024 at 12:46.
16 Sep and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Pond View Close, Barnston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 11 Jul 2024 at 12:50.
16 Sep and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Milton Crescent, Heswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 11 Jul 2024 at 12:45.
16 Sep and 4 Oct 2024
Cadent Gas were proposing to carry out Utility asset works on Church Road, Bebington.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2024 and run through until 4 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:20.
16 and 30 Sep 2024
Cadent Gas were proposing to carry out Utility asset works on Gills Lane, Barnston.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2024 and run through until 30 September 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 09:58.
30 Nov 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Parkwood Close, Bromborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 09:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 18 Sep 2024 at 08:08.
2 Oct 2024
Cadent Gas are carrying out Utility asset works on Buildwas Road, Neston.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 17:00 and could run through until 2 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 09:55.
30 Nov 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Nairn Close, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 19 Sep 2024 at 08:32.
31 Oct 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Cullen Close, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 08:00 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 19 Sep 2024 at 08:33.
18 Sep and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Duncansby Drive, Eastham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 18 Sep 2024 at 08:14.
31 Oct 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Duncansby Drive, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 08:00 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 19 Sep 2024 at 08:29.
30 Nov 2024
Wirral Borough Council are carrying out Highway repair and maintenance works on Kintore Close, Eastham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 19 Sep 2024 at 08:34.
23 Sep and 7 Oct 2024
Cadent Gas were proposing to carry out Utility asset works on Rivacre Road, Ellesmere Port.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2024 and run through until 7 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 14:41.
23 Sep and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Hawks Way, Heswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 20 Sep 2024 at 16:25.
23 Sep and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Castle Drive, Heswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 20 Sep 2024 at 16:23.
24 Sep and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Raby Park Road, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 25 Jun 2024 at 10:28.
24 Sep and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Raby Park Road, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 31 Jul 2024 at 16:03.
24 Sep and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Chester High Road, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 25 Jun 2024 at 10:27.
24 Sep and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Chester High Road, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 31 Jul 2024 at 16:10.
24 Sep and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Chester High Road, Neston.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 09:39.
25 Sep and 9 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Mayfield Gardens, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2024 and could run through until 9 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 08:43.
27 Sep and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Gratrix Road, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Jul 2024 at 13:32.
27 Sep and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Heys Avenue, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Jul 2024 at 13:32.
28 Sep and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Aldford Close, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Jul 2024 at 12:59.
30 Sep and 14 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Bromborough Road, Bebington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 14 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 15:01.
30 Sep and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Bath Street, Port Sunlight.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Jul 2024 at 13:00.
1 and 18 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Church Road, Bebington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Jul 2024 at 13:22.
1 and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Glenmarsh Close, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Jul 2024 at 13:31.
1 and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Conway Close, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Jul 2024 at 13:08.
1 and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Calder Road, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Jul 2024 at 13:02.
1 and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Mill Road, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Jul 2024 at 13:32.
3 and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Millbutt Close, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Jul 2024 at 13:32.
3 and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Millwood, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Jul 2024 at 13:41.
4 and 31 Oct 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Shallmarsh Close, Higher Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 12 Jul 2024 at 13:41.
7 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Rest Hill Road, Storeton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 23 Aug 2024 at 14:22.
7 Oct 2024 and 31 Mar 2025
Wirral Borough Council were proposing to carry out Highway repair and maintenance works on Rest Hill Road, Storeton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 23 Aug 2024 at 14:20.
14 Oct and 10 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Bull Hill, Little Neston, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 15:30.
14 Oct and 10 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Bull Hill, Little Neston, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 15:59.
14 Oct and 10 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Bull Hill, Little Neston, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 08:37.
14 Oct and 4 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Woodfall Lane, Little Neston, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 15:40.
14 Oct and 4 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Woodfall Lane, Little Neston, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 13:44.
14 Oct and 17 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Town Lane, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 17 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 12:04.
14 Oct and 17 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Town Lane, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 17 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 13:43.
14 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Trent Way, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:51.
14 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Porlock Close, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:50.
14 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Lynton Close, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:31.
14 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Parklands Drive, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:50.
14 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Beverley Drive, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 2 Sep 2024 at 12:46.
14 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Dunster Grove, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:30.
14 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Hessle Drive, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:30.
14 Oct 2024 and 31 Mar 2025
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Banks Road, Heswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 3 Sep 2024 at 15:29.
17 and 23 Oct 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Farr Hall Road, Heswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 25 Jul 2024 at 13:24.
21 Oct and 4 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Gills Lane, Barnston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Jul 2024 at 14:07.
21 Oct 2024 and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Pensby Road, Thingwall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 13:11.
21 Oct 2024 and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Pensby Road, Thingwall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 11:48.
21 Oct 2024 and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Pensby Road, Thingwall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 11:14.
22 Oct and 30 Nov 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Langdale Avenue, Pensby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 25 Jul 2024 at 15:25.
22 Oct and 30 Nov 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ridgemere Road, Pensby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 25 Jul 2024 at 15:25.
23 Oct and 30 Nov 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Ridgewood Drive, Pensby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 25 Jul 2024 at 15:26.
23 Oct and 30 Nov 2024
Wirral Borough Council are proposing to carry out Highway repair and maintenance works on Sandridge Road, Pensby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wirral Borough Council on 25 Jul 2024 at 15:26.
28 Oct and 1 Nov 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Farr Hall Road, Heswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 30 Jul 2024 at 14:03.
31 Oct and 15 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Pensby Close, Thingwall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:52.
4 Nov and 1 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Bull Hill, Little Neston, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 13:06.
4 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Town Lane, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 13:06.
4 and 22 Nov 2024
BT were proposing to carry out Utility asset works on Brimstage Road, Brimstage.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 22 Aug 2024 at 09:09.
4 and 22 Nov 2024
BT were proposing to carry out Utility asset works on Green Bank, Brimstage.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 22 November 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 22 Aug 2024 at 09:09.
4 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Cornelius Drive, Irby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 13:56.
6 and 20 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Burton Road, Little Neston, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 07:51.
6 and 27 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Woodfall Lane, Little Neston, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 14:38.
6 and 27 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Bull Hill, Little Neston, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 07:50.
6 and 27 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Town Lane, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 14:38.
11 Nov and 8 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Woodfall Lane, Little Neston, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 13:37.
11 and 15 Nov 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Birch Road, Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 24 Jul 2024 at 13:46.
11 and 15 Nov 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Birch Road, Bebington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 22 Aug 2024 at 09:33.
18 Nov and 4 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Station Road, Parkgate, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 07:49.
18 Nov and 4 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Station Road, Parkgate, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 15:38.
18 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Ringway, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 08:19.
19 Nov and 3 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Oteley Avenue, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 4 Sep 2024 at 15:07.
25 Nov and 15 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Rockfarm Drive, Little Neston, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 08:44.
25 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Mayfield Gardens, Neston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 08:20.
25 Nov and 13 Dec 2024
BT are proposing to carry out Utility asset works on Brimstage Road, Brimstage.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Sep 2024 at 13:29.
25 Nov and 13 Dec 2024
BT are proposing to carry out Utility asset works on Green Bank, Brimstage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Sep 2024 at 13:29.
28 Nov and 12 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Oteley Avenue, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 5 Sep 2024 at 15:29.
29 Nov and 13 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Acre Lane, Bromborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 12 Sep 2024 at 10:47.
29 Nov and 13 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Oteley Avenue, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 12 Sep 2024 at 10:47.
2 and 23 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Rockfarm Close, Little Neston, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 08:43.
5 Dec 2024 and 16 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Raby Park Road, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 16 January 2025. The works will impact the verge only.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:42.
9 and 23 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Buildwas Road, Neston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 08:20.
11 and 27 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Acre Lane, Bromborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 18 Sep 2024 at 15:01.
11 and 27 Dec 2024
ManWeb are proposing to carry out Utility repair and maintenance works on Oteley Avenue, Bromborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 18 Sep 2024 at 14:13.
Roadworks Map near to L64 9RN
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to L64 9RN (10 Events)
(Scheduled Dates)
(miles)
(Scheduled: 20 Sep 2024 - 24 Sep 2024)
(Scheduled: 18 Sep 2024 - 24 Sep 2024)
(Scheduled: 2 Sep 2024 - 7 Oct 2024)
(Scheduled: 17 Aug 2024 - 4 Nov 2024)
(Scheduled: 6 Sep 2024 - 18 Oct 2024)
(Scheduled: 18 Sep 2024 - 2 Oct 2024)
(Scheduled: 17 Aug 2024 - 4 Nov 2024)
(Scheduled: 17 Aug 2024 - 18 Oct 2024)