ROADWORKS SUMMARY
Walton Street, TADWORTH, KT20 7RZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Walton Street, KT20 7RZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Walton Street, TADWORTH, KT20 7RZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Walton Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Network Rail logo
LONG TERM
Until
18 Jan 2025
Details
View Map
Share
Follow
Epsom & Ewell Footpath 67/30

Network Rail are carrying out Works for Rail Purposes on Epsom & Ewell Footpath 67/30, Epsom & Ewell.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2023 at 08:30 and could run through until 18 January 2025. The works will impact the footpath only.

This roadwork event was last updated by Network Rail on 24 Oct 2024 at 06:33.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2024
Details
View Map
Share
Follow
Shelvers Spur

Surrey County Council are proposing to carry out Highway repair and maintenance works on Shelvers Spur, Tadworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2024 at 08:46.

Southern Gas Networks logo
LONG TERM
Between
12 Aug 2024 and 23 May 2025
Details
View Map
Share
Follow
Hollymead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollymead Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 23 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Jul 2024 at 13:44.

Southern Gas Networks logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
Hollymead Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Hollymead Road, Chipstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:00.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Mar 2025
Details
View Map
Share
Follow
Gatton Park Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 12 Jun 2024 at 12:07.

Southern Gas Networks logo
LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Wilmot Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Wilmot Way, Banstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 12:00 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 14:39.

Surrey County Council logo
LONG TERM
Between
15 Sep 2024 and 12 Mar 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2024 and could run through until 12 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 4 Jul 2024 at 11:06.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Holly Lane East

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holly Lane East, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 09:02.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Holly Lane East

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holly Lane East, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2024 at 14:06.

Surrey County Council logo
LONG TERM
Between
7 Oct 2024 and 7 Apr 2025
Details
View Map
Share
Follow
Dovers Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dovers Green Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 29 Jul 2024 at 15:41.

Surrey County Council logo
LONG TERM
Between
7 Oct 2024 and 7 Apr 2025
Details
View Map
Share
Follow
By-pass Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on By-pass Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 1 Jul 2024 at 13:40.

Surrey County Council logo
LONG TERM
Between
7 Oct 2024 and 7 Apr 2025
Details
View Map
Share
Follow
Kingston Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingston Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 1 Jul 2024 at 13:29.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Holly Lane West

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holly Lane West, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 09:03.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 23 Dec 2024
Details
View Map
Share
Follow
Monks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monks Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:08.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 23 Dec 2024
Details
View Map
Share
Follow
Garrard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garrard Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:56.

Southern Gas Networks logo
LONG TERM
Between
14 Oct and 23 Dec 2024
Details
View Map
Share
Follow
Colcokes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Colcokes Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:06.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Holly Lane East

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holly Lane East, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 08:29.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Holly Lane East

Southern Gas Networks are carrying out Utility repair and maintenance works on Holly Lane East, Banstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 October 2024 at 15:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 15:13.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 2 Dec 2024
Details
View Map
Share
Follow
Sandcross Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandcross Lane, Reigate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 12:16.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 23 Dec 2024
Details
View Map
Share
Follow
Monks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monks Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 14:30.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 8 Dec 2024
Details
View Map
Share
Follow
West Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Gardens, Ewell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 08:07.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 24 Dec 2024
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:19.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 24 Dec 2024
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 13:59.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 2 Dec 2024
Details
View Map
Share
Chipstead Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chipstead Way, Woodmansterne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Aug 2024 at 09:39.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 2 Dec 2024
Details
View Map
Share
Bridle Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bridle Road, Epsom.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:16.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 24 Dec 2024
Details
View Map
Share
Follow
Bramley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramley Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 13:58.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Nutfield Marsh Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Nutfield Marsh Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:27.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
1 Nov 2024 and 15 Mar 2025
Details
View Map
Share
Follow
Gatton Park Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 3 Oct 2024 at 14:06.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Gatton Park Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 31 Oct 2024 at 09:40.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Frenches Road

Surrey County Council are proposing to carry out Highway improvement works on Frenches Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2024 at 15:16.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Albury Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Albury Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:24.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Gatton Bottom

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gatton Bottom, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:22.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Christ Church Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Christ Church Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 May 2024 at 13:16.

Southern Gas Networks logo
Between
4 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Slipshatch Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Slipshatch Road, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 12:31.

Southern Gas Networks logo
Between
4 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Slipshatch Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Slipshatch Road, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2024 at 14:13.

Southern Gas Networks logo
Between
4 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Slipshatch Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Slipshatch Road, Reigate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 08:17.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Holly Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holly Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 09:56.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 23 Dec 2024
Details
View Map
Share
Follow
North Acre

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on North Acre, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:49.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Garratts Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garratts Lane, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:04.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 23 Dec 2024
Details
View Map
Share
Albert Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Albert Road, Epsom.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:17.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Higher Green

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Higher Green, Ewell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 11:07.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:02.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Cheam Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:15.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Cheam Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Aug 2024 at 15:17.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 24 Dec 2024
Details
View Map
Share
Cheam Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 24 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2024 at 15:35.

Thames Water logo
Until
3 Dec 2024
Details
View Map
Share
Follow
Woodlands Road

Thames Water are carrying out Utility asset works on Woodlands Road, Epsom.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 09:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 13:45.

Thames Water logo
Until
3 Dec 2024
Details
View Map
Share
Follow
Wells Road

Thames Water are carrying out Utility asset works on Wells Road, Epsom.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 08:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 14:11.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hook Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Hook Road, Epsom.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 November 2024 at 18:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 06:37.

Southern Gas Networks logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Brandsland

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brandsland, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 13:18.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bell Street

Surrey County Council are proposing to carry out Highway improvement works on Bell Street, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 9 Jan 2024 at 15:09.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 9 Jan 2024 at 15:23.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Church Street

Surrey County Council are proposing to carry out Highway improvement works on Church Street, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 9 Jan 2024 at 15:10.

Southern Gas Networks logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Nutfield Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Nutfield Road, Merstham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:47.

Southern Gas Networks logo
Between
18 Nov and 15 Dec 2024
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Tadworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 15:13.

Southern Gas Networks logo
LONG TERM
Until
30 Dec 2024
Details
View Map
Share
Follow
Holly Lane West

Southern Gas Networks are carrying out Utility repair and maintenance works on Holly Lane West, Banstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 09:30 and could run through until 30 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 09:36.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Lyme Regis Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lyme Regis Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:46.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Horsecroft

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Horsecroft, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:52.

Surrey County Council logo
LONG TERM
Between
19 Nov 2024 and 19 May 2025
Details
View Map
Share
Follow
Brighton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 08:38.

Surrey County Council logo
Between
19 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Brighton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Aug 2024 at 15:01.

Surrey County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Bonsor Drive

Surrey County Council are carrying out Highway repair and maintenance works on Bonsor Drive, Tadworth.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 14:46 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 15:45.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Priory Road

Ses Water (formerly Sutton & East Surrey Water Company) are carrying out Utility repair and maintenance works on Priory Road, Reigate.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 09:40 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 21 Nov 2024 at 15:46.

Southern Gas Networks logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Sandcross Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandcross Lane, Reigate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 12:15.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Brockham Lane

Southern Gas Networks are proposing to carry out New service connection on Brockham Lane, Brockham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 13:49.

Surrey County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Wiggie Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wiggie Lane, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 13:17.

Surrey County Council logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Townpath - Links Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Townpath - Links Road, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 09:35.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Shrubland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:01.

Southern Gas Networks logo
Between
27 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Garton Bank

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garton Bank, Banstead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 13:39.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Townpath - Pixham Mill

Network Rail are proposing to carry out Works for Rail Purposes on Townpath - Pixham Mill, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jan 2024 at 10:14.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Townpath - Pixham Mill

Network Rail are proposing to carry out Works for Rail Purposes on Townpath - Pixham Mill, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Oct 2024 at 13:34.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Bradley Lane

Network Rail were proposing to carry out roadworks on Bradley Lane, Pixham, Dorking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Nov 2024 at 09:35.

Southern Gas Networks logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Hitchings Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hitchings Way, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 11:05.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Sandcross Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandcross Lane, Reigate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 07:55.

UK Power Networks South Eastern logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Ottways Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Ottways Lane, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Aug 2024 at 10:37.

Surrey County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Walton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Walton Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 09:36.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Holly Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holly Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 13:30.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Pound Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pound Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:55.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Stirling Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stirling Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:51.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Monks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monks Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:51.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Colcokes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Colcokes Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:49.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Garrard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garrard Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:54.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Horsecroft

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out New service connection on Horsecroft, Banstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 18 Nov 2024 at 14:27.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Horsecroft

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Horsecroft, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 18 Nov 2024 at 14:29.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Horsecroft

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out New service connection on Horsecroft, Banstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 20 Nov 2024 at 11:53.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Horsecroft

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Horsecroft, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 20 Nov 2024 at 11:57.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Fir Tree Road

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out New service connection on Fir Tree Road, Banstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 9 Oct 2024 at 10:59.

Southern Gas Networks logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Lynwood Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lynwood Road, Epsom.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:18.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 10 Feb 2025
Details
View Map
Share
College Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on College Road, Epsom.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 10 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:18.

Network Rail logo
Between
10 and 14 Dec 2024
Details
View Map
Share
Follow
West Street

Network Rail are proposing to carry out Works for Rail Purposes on West Street, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Sep 2024 at 14:10.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Brockham Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Brockham Lane, Brockham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 24 Sep 2024 at 13:51.

Southern Gas Networks logo
LONG TERM
Between
16 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Gale Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Crescent, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:57.

Southern Gas Networks logo
LONG TERM
Between
16 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Thornfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornfield Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:07.

Southern Gas Networks logo
LONG TERM
Between
16 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Chalk Pit Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalk Pit Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:09.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 2 Feb 2025
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Tadworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:19.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 2 Feb 2025
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Tadworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 14:30.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Church Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Street, Leatherhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 10:55.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Chipstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chipstead Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 11:48.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Chipstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chipstead Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:39.

Southern Gas Networks logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Ashdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:56.

Southern Gas Networks logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Ashdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:07.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:56.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:32.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:57.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:33.

Southern Gas Networks logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Hitchings Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hitchings Way, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 11:23.

Southern Gas Networks logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Sandcross Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandcross Lane, Reigate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 11:21.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Brightlands Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Brightlands Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 10 Oct 2024 at 09:06.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Brightlands Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Brightlands Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 24 Oct 2024 at 12:25.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
6 Jan and 15 Jun 2025
Details
View Map
Share
Follow
Gatton Park Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 10:48.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Brook Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Brook Road, Merstham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 12:54.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ashcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Apr 2024 at 12:01.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ashcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:23.

Southern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Ashcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 13:19.

Surrey County Council logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
Brighton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 14:28.

Surrey County Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Brighton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 14:40.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Elmore Road

Southern Gas Networks are proposing to carry out New service connection on Elmore Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:28.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Elmore Road

Southern Gas Networks are proposing to carry out New service connection on Elmore Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 11:50.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
How Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on How Lane, Chipstead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Jul 2024 at 19:08.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Rectory Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Rectory Lane, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 1 Nov 2024 at 15:01.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Rectory Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Rectory Lane, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 21 Nov 2024 at 15:43.

Network Rail logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Betchworth, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Aug 2024 at 10:50.

Surrey County Council logo
LONG TERM
Between
13 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Buckland Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Buckland Road, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 10:22.

Surrey County Council logo
LONG TERM
Between
13 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Buckland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 10:27.

Surrey County Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Station Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Station Road, Betchworth, Dorking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 28 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Oct 2024 at 14:36.

Surrey County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Ormside Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ormside Way, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:08.

Surrey County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Frenches Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Frenches Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:08.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wellesford Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellesford Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 11:52.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wellesford Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellesford Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:41.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Pound Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pound Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:24.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Park Road

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility repair and maintenance works on Park Road, Banstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Oct 2024 at 11:31.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Stirling Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stirling Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:28.

Southern Gas Networks logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Lambert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lambert Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 08:34.

Southern Gas Networks logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Lambert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lambert Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 11:56.

Southern Gas Networks logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Salisbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salisbury Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 08:35.

Southern Gas Networks logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Salisbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salisbury Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 11:55.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Links Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:46.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Links Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:18.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Bramley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramley Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:52.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Snowerhill Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Snowerhill Road, Betchworth, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 25 Oct 2024 at 15:43.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Snowerhill Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Snowerhill Road, Betchworth, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 2 Nov 2024 at 09:30.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Gale Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Crescent, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:18.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Thornfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornfield Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:15.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Chalk Pit Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalk Pit Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:06.

Southern Gas Networks logo
Between
20 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Kingsdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:58.

Southern Gas Networks logo
Between
20 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Kingsdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:09.

Southern Gas Networks logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Ashdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 15:44.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:09.

Southern Gas Networks logo
Between
21 Jan and 3 Feb 2025
Details
View Map
Share
Follow
How Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on How Lane, Chipstead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 11:55.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Holly Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Holly Lane, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Oct 2024 at 13:28.

Southern Gas Networks logo
Between
21 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:15.

Thames Water logo
Between
22 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Baxter Avenue

Thames Water are proposing to carry out Utility asset works on Baxter Avenue, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 17:14.

Surrey County Council logo
Between
22 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:38.

Surrey County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Somerset Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Somerset Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Oct 2024 at 11:22.

Surrey County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Cronks Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cronks Hill, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Oct 2024 at 11:21.

Surrey County Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Old London Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Old London Road, Mickleham, Dorking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 10:24.

Surrey County Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Old London Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Old London Road, Mickleham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 10:52.

Surrey County Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Old London Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Old London Road, Mickleham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 07:30.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Links Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 15:42.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:54.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:34.

BT logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Park Lane

BT are proposing to carry out Utility asset works on Park Lane, Surrey, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 3 Nov 2024 at 10:36.

BT logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Park Lane

BT are proposing to carry out Utility asset works on Park Lane, Surrey, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 5 Nov 2024 at 15:33.

UK Power Networks South Eastern logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Ranelagh Road

UK Power Networks South Eastern are proposing to carry out New service connection on Ranelagh Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 20:56.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Brook Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Road, Merstham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 12:16.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Lyme Regis Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lyme Regis Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:01.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Shrubland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:23.

Southern Gas Networks logo
Between
3 and 25 Feb 2025
Details
View Map
Share
Follow
Longdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:52.

Southern Gas Networks logo
Between
3 and 25 Feb 2025
Details
View Map
Share
Follow
Longdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:11.

Southern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Kingsdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 15:36.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Cheam Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 11:17.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Nork Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Nork Way, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 09:36.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Nork Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Nork Way, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 10:41.

Surrey County Council logo
Between
6 and 18 Feb 2025
Details
View Map
Share
Follow
Christ Church Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Christ Church Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 16:03.

UK Power Networks South Eastern logo
Between
7 and 14 Feb 2025
Details
View Map
Share
Follow
Downland Way

UK Power Networks South Eastern are proposing to carry out New service connection on Downland Way, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Nov 2024 at 10:19.

UK Power Networks South Eastern logo
Between
7 and 14 Feb 2025
Details
View Map
Share
Follow
Downland Way

UK Power Networks South Eastern are proposing to carry out New service connection on Downland Way, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 10:42.

Surrey County Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Outwood Lane

Surrey County Council are proposing to carry out Highway improvement works on Outwood Lane, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 13:08.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Horsecroft

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Horsecroft, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:32.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:03.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Reigate Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Reigate Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 13:40.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Reigate Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Reigate Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 22 Nov 2024 at 10:21.

BT logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Dene Street

BT are proposing to carry out Utility asset works on Dene Street, Surrey, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Nov 2024 at 11:15.

Surrey County Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Ormside Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ormside Way, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 12:51.

Surrey County Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Frenches Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Frenches Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 12:46.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Monkswell Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Monkswell Lane, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 12:08.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Ottways Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Ottways Lane, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Sep 2024 at 10:34.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Ottways Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Ottways Lane, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Sep 2024 at 09:02.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Ottways Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Ottways Lane, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Nov 2024 at 11:56.

Surrey County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Merrymeet

Surrey County Council are proposing to carry out Highway repair and maintenance works on Merrymeet, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 11:02.

Surrey County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Tonbridge Close

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tonbridge Close, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 11:10.

Southern Gas Networks logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Longdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 15:39.

Southern Gas Networks logo
Between
18 Feb and 7 Mar 2025
Details
View Map
Share
Follow
West Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Street, Ewell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:49.


Roadworks Map near to Walton Street, TADWORTH, KT20 7RZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Nov 2024 15:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Walton Street, TADWORTH, KT20 7RZ (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Gas Networks logo
MAJOR
  
THE AVENUE 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 18 Nov 2024 - 15 Dec 2024
0.5
Details
Share
Follow
2
Surrey County Council logo
MAJOR
  
THE AVENUE 
(0.8 miles)
Surrey County Council
Highway repair and maintenance works - Footway - Priority working
Planned
Scheduled: 3 Oct 2024 - 3 Mar 2025
0.8
Details
Share
Follow
3
Surrey County Council logo
MAJOR
  
CROSS ROAD 
(0.8 miles)
Surrey County Council
Highway repair and maintenance works - Footway - Road closure
In Progress
Since: 18 Nov 2024 09:10
(Scheduled: 18 Nov 2024 - 17 Jan 2025)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.