ROADWORKS SUMMARY
Epsom Lane North, TADWORTH, KT20 5EH
Introduction
View current and future planned roadworks and road closures for Epsom Lane North, KT20 5EH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Epsom Lane North, TADWORTH, KT20 5EH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Epsom Lane North are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
18 Jan 2025
Network Rail are carrying out Works for Rail Purposes on Epsom & Ewell Footpath 67/30, Epsom & Ewell.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 September 2023 at 08:30 and could run through until 18 January 2025. The works will impact the footpath only.
This roadwork event was last updated by Network Rail on 24 Oct 2024 at 06:33.
Tomorrow
Surrey County Council are proposing to carry out Highway repair and maintenance works on Shelvers Spur, Tadworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Feb 2024 at 08:46.
1 Jul 2024 and 1 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Rosedale Road, Stoneleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 21 Mar 2024 at 14:06.
12 Aug 2024 and 23 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollymead Road, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 23 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 24 Jul 2024 at 13:44.
23 May 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Hollymead Road, Chipstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:00.
1 Sep 2024 and 1 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Gatton Park Road, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 12 Jun 2024 at 12:07.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Wilmot Way, Banstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2024 at 12:00 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 14:39.
20 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Egmont Road, Sutton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2024 at 14:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 10:31.
15 Sep 2024 and 12 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2024 and could run through until 12 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 4 Jul 2024 at 11:06.
12 Dec 2024
UK Power Networks South Eastern are carrying out New service connection on Cedar Road, Sutton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 October 2024 at 08:00 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Oct 2024 at 08:33.
7 Oct 2024 and 7 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on By-pass Road, Leatherhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 7 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 1 Jul 2024 at 13:40.
7 Oct 2024 and 7 Apr 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Kingston Road, Leatherhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 7 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 11:15.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holly Lane West, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 09:03.
7 Oct and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monks Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:08.
7 Oct and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garrard Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:56.
14 Oct and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Colcokes Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:06.
Thursday
Southern Gas Networks are carrying out Utility repair and maintenance works on Holly Lane East, Banstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 October 2024 at 15:00 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 08:33.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2024 at 13:25.
10 Dec 2024
UK Power Networks South Eastern are carrying out New service connection on Hill Road, Carshalton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 October 2024 at 12:29 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 17 Oct 2024 at 12:53.
21 Oct and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monks Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 14:30.
21 Oct and 8 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Gardens, Ewell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 8 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 08:07.
21 Oct and 24 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:19.
21 Oct and 24 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 13:59.
Monday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chipstead Way, Woodmansterne.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 15 Aug 2024 at 09:39.
Monday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bridle Road, Epsom.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:16.
28 Oct and 24 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramley Road, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 13:58.
28 Oct 2024 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Highway, Sutton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 12:03.
28 Oct 2024 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Highway, Sutton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 17:15.
28 Oct 2024 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Highway, Sutton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:16.
28 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on The Highway, Sutton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 08:47.
21 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Stoneleigh Crescent, Stoneleigh.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 28 Oct 2024 at 09:17.
1 Nov 2024 and 15 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Gatton Park Road, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 3 Oct 2024 at 14:06.
1 Nov 2024 and 30 Apr 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Gatton Park Road, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 31 Oct 2024 at 09:40.
1 Nov 2024 and 31 Mar 2025
Surrey County Council are proposing to carry out Highway improvement works on Frenches Road, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Aug 2024 at 15:16.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Albury Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:24.
1 Nov 2024 and 1 May 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Gatton Bottom, Merstham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 13:20.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Christ Church Road, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 May 2024 at 13:16.
4 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on North Acre, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:49.
4 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garratts Lane, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:04.
4 Nov and 23 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Albert Road, Epsom.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:17.
4 Nov and 24 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:02.
11 Nov and 24 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:15.
11 Nov and 24 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Aug 2024 at 15:17.
11 Nov and 24 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 24 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Sep 2024 at 15:35.
10 Dec 2024
Thames Water are carrying out Utility asset works on Woodlands Road, Epsom.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 09:30 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 13:54.
10 Dec 2024
Thames Water are carrying out Utility asset works on Wells Road, Epsom.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 08:30 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 13:00.
13 Dec 2024
UK Power Networks South Eastern are carrying out New service connection on Wellesley Road, Sutton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 08:00 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 08:05.
12 Dec 2024
UK Power Networks South Eastern are carrying out New service connection on Eaton Road, Sutton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 10:00 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Nov 2024 at 14:11.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Hook Road, Epsom.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 November 2024 at 18:00 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 06:51.
17 Nov 2024 and 17 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Gadesden Road, West Ewell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2024 and could run through until 17 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 28 Aug 2024 at 08:30.
18 Nov and 15 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Tadworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 15:13.
30 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Holly Lane West, Banstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 09:30 and could run through until 30 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 09:36.
18 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lyme Regis Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:46.
18 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Horsecroft, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:52.
Thursday
London Borough Of Sutton are proposing to carry out Highway repair and maintenance works on Church Road, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Sutton on 11 Nov 2024 at 17:01.
18 Nov and 20 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Carshalton Road, Sutton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 14:01.
19 Nov 2024 and 19 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Kingswood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 19 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 08:38.
Thursday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Kingswood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 30 Aug 2024 at 15:01.
21 Nov and 9 Dec 2024
London Borough Of Sutton are proposing to carry out Highway repair and maintenance works on Mulgrave Road, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Sutton on 13 Nov 2024 at 14:13.
Tuesday
Surrey County Council are carrying out Highway repair and maintenance works on Headley Road, Leatherhead.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 November 2024 at 20:00 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 09:25.
Friday
Surrey County Council are carrying out Highway repair and maintenance works on Townpath - Links Road, Ashtead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 09:00 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 09:27.
25 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:01.
25 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Lane, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:54.
25 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cranfield Road East, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 16:34.
25 Nov 2024 and 23 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 11:41.
25 Nov 2024 and 23 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 11:13.
25 Nov 2024 and 23 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 28 Oct 2024 at 11:49.
9 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Nutley Lane, Reigate.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 10:45 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 15:51.
27 Nov and 13 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garton Bank, Banstead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 15:10.
Wednesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Brighton Road, Coulsdon, Croydon.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 15:30 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 11:39.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Ottways Lane, Ashtead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Aug 2024 at 10:37.
Wednesday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Walton Road, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 09:36.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holly Lane, Banstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 13:30.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pound Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:55.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stirling Close, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:51.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monks Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:51.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Colcokes Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:49.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garrard Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:54.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Banks, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:07.
2 and 22 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Alberta Avenue, Cheam.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 15:27.
Friday
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Disconnection or alteration of supply on Kingston Road (Service Road 395-427), Ewell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 13 Nov 2024 at 14:58.
9 and 13 Dec 2024
Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out New service connection on Horsecroft, Banstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 18 Nov 2024 at 14:27.
9 and 13 Dec 2024
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Horsecroft, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 18 Nov 2024 at 14:29.
9 and 13 Dec 2024
Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out New service connection on Horsecroft, Banstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 20 Nov 2024 at 11:53.
9 and 13 Dec 2024
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Horsecroft, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Nov 2024 at 12:35.
9 and 13 Dec 2024
Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out New service connection on Fir Tree Road, Banstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 9 Oct 2024 at 10:59.
9 and 23 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lynwood Road, Epsom.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:18.
9 Dec 2024 and 10 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on College Road, Epsom.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 10 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:18.
10 and 14 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on West Street, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 27 Sep 2024 at 14:10.
16 and 20 Dec 2024
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Brockham Lane, Brockham, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 24 Sep 2024 at 13:51.
16 Dec 2024 and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Crescent, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:57.
16 Dec 2024 and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornfield Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:07.
16 Dec 2024 and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalk Pit Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:09.
2 Jan and 2 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Tadworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:19.
2 Jan and 16 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Street, Leatherhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 10:55.
2 Jan and 16 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Street, Leatherhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 11:47.
2 Jan and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chipstead Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 11:48.
2 Jan and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chipstead Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 12:44.
2 Jan and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chipstead Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 15:57.
2 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashdown Road, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:56.
2 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashdown Road, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:07.
2 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:56.
2 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:32.
2 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:57.
2 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:33.
2 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cranfield Road East, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 16:14.
2 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Way, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:26.
2 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Way, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:33.
2 Jan and 27 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:41.
2 Jan and 27 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 12:27.
6 and 10 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Brightlands Road, Reigate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 10 Oct 2024 at 09:06.
6 and 10 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Brightlands Road, Reigate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 24 Oct 2024 at 12:25.
6 Jan and 15 Jun 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Gatton Park Road, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 10:48.
6 Jan and 3 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Brook Road, Merstham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 12:54.
6 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Apr 2024 at 12:01.
6 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:23.
6 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 13:19.
6 and 25 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Kingswood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 14:28.
6 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Kingswood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 14:40.
6 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Kingswood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 27 Nov 2024 at 08:45.
6 and 10 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Elmore Road, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:28.
6 and 10 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Elmore Road, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 11:50.
6 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on How Lane, Chipstead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 13 Jul 2024 at 19:08.
6 and 10 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Rectory Lane, Woodmansterne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 1 Nov 2024 at 15:01.
6 and 10 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Rectory Lane, Woodmansterne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 21 Nov 2024 at 15:43.
6 Jan and 11 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Downside Road, Sutton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 07:38.
6 Jan and 11 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Downside Road, Sutton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Nov 2024 at 13:36.
6 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Lane, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 09:48.
6 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Lane, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 07:04.
11 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Betchworth, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 23 Aug 2024 at 10:50.
13 Jan and 22 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Buckland Road, Reigate.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 10:22.
13 Jan and 22 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Buckland.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 10:27.
13 and 28 Jan 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Station Road, Betchworth, Dorking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 28 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 21 Oct 2024 at 14:36.
13 and 18 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ormside Way, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:08.
13 and 18 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Frenches Road, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:08.
13 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellesford Close, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 11:52.
13 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellesford Close, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 12:56.
13 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellesford Close, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 16:00.
13 Jan and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pound Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:24.
13 and 15 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility repair and maintenance works on Park Road, Banstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Oct 2024 at 11:31.
13 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stirling Close, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:28.
13 Jan and 1 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lambert Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 08:34.
13 Jan and 1 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lambert Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 13:00.
13 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salisbury Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 08:35.
13 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salisbury Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 13:00.
13 Jan and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Road, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:46.
13 Jan and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Road, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:18.
13 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramley Road, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:52.
13 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Way, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:15.
13 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Way, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:29.
13 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Close, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:08.
13 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Close, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:28.
13 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Way, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:10.
13 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Way, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:23.
13 and 17 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility repair and maintenance works on Plough Road, West Ewell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 1 Nov 2024 at 14:26.
13 Jan and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:48.
13 Jan and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 12:37.
16 Jan and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Hillcroome Road, Sutton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 07:43.
16 Jan and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Hillcroome Road, Sutton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 13:43.
16 Jan and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Hillcroome Road, Sutton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Nov 2024 at 12:03.
20 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Crescent, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:18.
20 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornfield Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:15.
20 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornfield Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 14:34.
20 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalk Pit Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:06.
20 Jan and 11 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsdown Road, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:58.
20 Jan and 11 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsdown Road, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:09.
20 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashdown Road, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 15:44.
20 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 13:48.
20 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 13:11.
20 Jan and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Lane, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 16:13.
20 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 08:55.
21 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on How Lane, Chipstead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 13:03.
21 and 23 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Holly Lane, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 26 Nov 2024 at 14:04.
21 and 23 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Holly Lane, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 27 Nov 2024 at 08:06.
21 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 13:51.
21 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 13:20.
22 Jan and 1 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:38.
27 and 30 Jan 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Old London Road, Mickleham, Dorking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 10:24.
27 and 30 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Old London Road, Mickleham, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 10:52.
27 and 30 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Old London Road, Mickleham, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 07:30.
27 Jan and 15 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Church Street, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 13:54.
27 Jan and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Road, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 15:42.
27 Jan and 15 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Church Street, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 13:52.
27 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:54.
27 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:34.
27 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Banks, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 16:12.
27 Jan and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 12:36.
27 Jan and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:01.
27 Jan and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 13:32.
27 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalgrove Road, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:45.
27 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalgrove Road, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 16:35.
27 and 31 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Plough Road, West Ewell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 13 Nov 2024 at 16:55.
27 and 31 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Plough Road, West Ewell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 14:25.
27 Jan and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Way, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:59.
27 Jan and 4 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Cedar Road, Sutton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 11:02.
31 Jan and 3 Feb 2025
BT are proposing to carry out Utility asset works on Park Lane, Surrey, Ashtead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 3 Nov 2024 at 10:36.
31 Jan and 3 Feb 2025
BT are proposing to carry out Utility asset works on Park Lane, Surrey, Ashtead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 5 Nov 2024 at 15:33.
31 Jan and 28 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Fairview Road, Sutton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:56.
3 Feb and 31 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Road, Merstham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 12:16.
3 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lyme Regis Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:01.
3 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:23.
3 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 15:35.
3 and 25 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longdown Road, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:52.
3 and 25 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longdown Road, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:11.
3 and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsdown Road, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 15:36.
3 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 11:17.
3 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farmdale Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:18.
3 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farmdale Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:30.
3 and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farmdale Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:06.
3 Feb and 31 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Road, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 18:11.
3 Feb and 31 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farm Road, Sutton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 31 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 09:43.
3 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Way, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:57.
3 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 08:48.
4 and 6 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Nork Way, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 09:36.
4 and 6 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Nork Way, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 10:41.
6 and 18 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Christ Church Road, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 16:03.
7 and 14 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Downland Way, Epsom Downs.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 15 Nov 2024 at 10:19.
7 and 14 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Downland Way, Epsom Downs.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 25 Nov 2024 at 13:35.
10 Feb and 31 Mar 2025
Surrey County Council are proposing to carry out Highway improvement works on Outwood Lane, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 14:18.
10 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Horsecroft, Banstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:32.
10 Feb and 9 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Lane, Carshalton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 14:03.
10 Feb and 9 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Lane, Carshalton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 15:09.
10 Feb and 2 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Lane, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 11:40.
10 Feb and 2 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Lane, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 13:57.
10 Feb and 2 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Little Woodcote Lane, Carshalton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 17:32.
10 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 13:47.
10 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 13:35.
10 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Radcliffe Gardens, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:28.
10 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Radcliffe Gardens, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:34.
10 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Staplehurst Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:17.
10 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Staplehurst Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:30.
10 Feb and 14 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upland Road, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:50.
10 Feb and 14 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upland Road, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 07:40.
11 and 13 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Reigate Road, Leatherhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 13:40.
11 and 13 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Reigate Road, Leatherhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 22 Nov 2024 at 10:21.
17 and 22 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ormside Way, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 12:51.
17 and 22 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Frenches Road, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 12:46.
17 and 21 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Monkswell Lane, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 12:08.
17 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Ottways Lane, Ashtead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Sep 2024 at 10:34.
17 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Ottways Lane, Ashtead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 10 Sep 2024 at 09:02.
17 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Ottways Lane, Ashtead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Nov 2024 at 11:56.
17 and 28 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Merrymeet, Woodmansterne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 11:02.
17 and 28 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Tonbridge Close, Woodmansterne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 11:10.
17 Feb and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longdown Road, Epsom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 15:39.
17 Feb and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harbury Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:25.
17 Feb and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harbury Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:32.
17 Feb and 21 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Way, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 15:28.
17 Feb and 24 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hilbert Road, North Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 12:26.
17 Feb and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wrayfield Road, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 13:36.
18 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Street, Ewell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:49.
24 Feb and 11 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 15:15.
24 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ingleton Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:23.
24 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ingleton Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:31.
24 Feb and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fullerton Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:11.
24 Feb and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fullerton Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:23.
Roadworks Map near to Epsom Lane North, TADWORTH, KT20 5EH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Epsom Lane North, TADWORTH, KT20 5EH (9 Events)
(Scheduled Dates)
(miles)
(Scheduled: 27 Nov 2024 - 4 Dec 2024)
(Scheduled: 26 Nov 2024 - 3 Dec 2024)
(Scheduled: 25 Nov 2024 - 1 Dec 2024)
(Scheduled: 18 Nov 2024 - 17 Jan 2025)