ROADWORKS SUMMARY
Mawbey Road, CHERTSEY, KT16 0HB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Mawbey Road, KT16 0HB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Mawbey Road, CHERTSEY, KT16 0HB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Mawbey Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Guildford Road

Surrey County Council are proposing to carry out Highway improvement works on Guildford Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:32.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Constitution Hill

Surrey County Council are proposing to carry out Highway improvement works on Constitution Hill, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 08:59.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Mount Hermon Road

Surrey County Council are proposing to carry out Highway improvement works on Mount Hermon Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:04.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Hill View Road

Surrey County Council are proposing to carry out Highway improvement works on Hill View Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:05.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
York Road

Surrey County Council are proposing to carry out Highway improvement works on York Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:50.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Station Approach

Surrey County Council are proposing to carry out Highway improvement works on Station Approach, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:44.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Bradfield Close

Surrey County Council are proposing to carry out Highway improvement works on Bradfield Close, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 9 Feb 2021 at 12:42.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Heathside Road

Surrey County Council are proposing to carry out Highway improvement works on Heathside Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:03.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Heathside Crescent

Surrey County Council are proposing to carry out Highway improvement works on Heathside Crescent, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 9 Apr 2021 at 09:58.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Victoria Road

Surrey County Council are proposing to carry out Highway improvement works on Victoria Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:47.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Goldsworth Road

Surrey County Council are proposing to carry out Highway improvement works on Goldsworth Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:01.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Church Street West

Surrey County Council are proposing to carry out Highway improvement works on Church Street West, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 08:57.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Forge End

Surrey County Council are proposing to carry out Highway improvement works on Forge End, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:00.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Victoria Way

Surrey County Council are proposing to carry out Highway improvement works on Victoria Way, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:49.

Network Rail logo
LONG TERM
Between
1 Nov 2022 and 31 May 2025
Details
View Map
Share
Follow
Victoria Way

Network Rail are proposing to carry out Works for Rail Purposes on Victoria Way, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2022 and could run through until 31 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 9 Jun 2021 at 06:50.

Surrey County Council logo
LONG TERM
Between
1 Mar 2023 and 30 Nov 2024
Details
View Map
Share
Follow
Oriental Road

Surrey County Council are proposing to carry out Section 50 on Oriental Road, Woking.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2023 and could run through until 30 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 27 Apr 2021 at 10:14.

National Highways logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Ockham Road North

National Highways are carrying out Highway improvement works on Ockham Road North, Ockham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2023 at 19:00 and could run through until 30 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 11 Apr 2024 at 13:17.

National Highways logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Portsmouth Road

National Highways are carrying out Highway improvement works on Portsmouth Road, Ockham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2023 at 19:00 and could run through until 30 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Highways on 11 Apr 2024 at 13:18.

National Highways logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Elm Lane

National Highways are carrying out Highway improvement works on Elm Lane, Ockham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2023 at 08:00 and could run through until 31 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 30 Sep 2024 at 11:22.

Surrey County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Elmsleigh Road

Surrey County Council are carrying out Highway improvement works on Elmsleigh Road, Staines-upon-thames.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Mar 2024 at 10:13.

Surrey County Council logo
LONG TERM
Between
1 Apr 2024 and 1 Apr 2026
Details
View Map
Share
Follow
Elmgrove Road

Surrey County Council are proposing to carry out Highway improvement works on Elmgrove Road, Weybridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 1 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 15 Feb 2024 at 12:26.

National Highways logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Byfleet Road

National Highways are carrying out Highway improvement works on Byfleet Road, Cobham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2024 at 23:01 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 May 2024 at 06:33.

Surrey County Council logo
LONG TERM
Between
20 May 2024 and 20 May 2026
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 20 May 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:44.

Surrey County Council logo
LONG TERM
Between
20 May 2024 and 20 May 2026
Details
View Map
Share
Follow
Monument Hill

Surrey County Council are proposing to carry out Highway improvement works on Monument Hill, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 20 May 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:45.

Surrey County Council logo
LONG TERM
Between
20 May 2024 and 20 May 2026
Details
View Map
Share
Follow
Monument Green

Surrey County Council are proposing to carry out Highway improvement works on Monument Green, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 20 May 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:44.

Surrey County Council logo
LONG TERM
Between
31 May and 1 Dec 2024
Details
View Map
Share
Follow
Ashford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 29 Nov 2023 at 08:51.

Surrey County Council logo
LONG TERM
Between
31 May and 1 Dec 2024
Details
View Map
Share
Follow
Ashford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 29 Nov 2023 at 08:51.

Surrey County Council logo
LONG TERM
Between
3 Jun 2024 and 1 Sep 2026
Details
View Map
Share
Old Wharf Way

Surrey County Council were proposing to carry out Highway improvement works on Old Wharf Way, Weybridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 June 2024 and run through until 1 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 16:43.

Surrey County Council logo
LONG TERM
Between
3 Jun 2024 and 1 Sep 2026
Details
View Map
Share
Bridge Road

Surrey County Council were proposing to carry out Highway improvement works on Bridge Road, Weybridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 June 2024 and run through until 1 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 16:44.

Surrey County Council logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Squires Bridge Road

Surrey County Council are carrying out Highway improvement works on Squires Bridge Road, Shepperton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 08:00 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 17 Jun 2024 at 07:34.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Laleham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Laleham Road, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 26 Feb 2024 at 09:19.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Staines Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 26 Feb 2024 at 09:17.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Ashford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 20 Mar 2024 at 13:26.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Laleham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Laleham Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 7 Feb 2024 at 13:45.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
South Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on South Street, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 5 Feb 2024 at 12:09.

Surrey County Council logo
LONG TERM
Between
22 Jul 2024 and 22 Aug 2025
Details
View Map
Share
Follow
Guildford Road

Surrey County Council are proposing to carry out Highway improvement works on Guildford Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 22 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 May 2024 at 08:24.

Surrey County Council logo
LONG TERM
Between
2 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Bridge Road

Surrey County Council are proposing to carry out Highway improvement works on Bridge Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 15 Feb 2024 at 11:49.

Surrey County Council logo
LONG TERM
Between
2 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 1 September 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 16 Feb 2024 at 09:46.

Surrey County Council logo
LONG TERM
Between
4 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Cornwall Way

Surrey County Council are proposing to carry out Highway improvement works on Cornwall Way, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:08.

Surrey County Council logo
LONG TERM
Between
4 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Wapshott Road

Surrey County Council are proposing to carry out Highway improvement works on Wapshott Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:09.

Surrey County Council logo
LONG TERM
Between
4 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Bowes Road

Surrey County Council are proposing to carry out Highway improvement works on Bowes Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:08.

Surrey County Council logo
LONG TERM
Between
4 Sep and 29 Nov 2024
Details
View Map
Share
Follow
St Pauls Road

Surrey County Council are proposing to carry out Highway improvement works on St Pauls Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:09.

Southern Gas Networks logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Westfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westfield Avenue, Westfield, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 16 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 2 Aug 2024 at 12:00.

Electricity Network Company logo
LONG TERM
Between
1 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Church Hill

Electricity Network Company are proposing to carry out Utility asset works on Church Hill, Pyrford, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 14 Aug 2024 at 15:14.

Surrey County Council logo
LONG TERM
Between
1 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
St Georges Avenue

Surrey County Council are proposing to carry out Highway improvement works on St Georges Avenue, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 08:21.

Surrey County Council logo
LONG TERM
Between
1 Oct 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Manygate Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Manygate Lane, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 1 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 9 Jul 2024 at 07:40.

Cadent Gas logo
LONG TERM
Between
3 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Stroude Road

Cadent Gas are proposing to carry out Utility asset works on Stroude Road, Virginia Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 12:45.

Cadent Gas logo
LONG TERM
Between
3 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Stroude Road

Cadent Gas are proposing to carry out Utility asset works on Stroude Road, Virginia Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 15:20.

Cadent Gas logo
LONG TERM
Until
7 Jan 2025
Details
View Map
Share
Follow
Stroude Road

Cadent Gas are carrying out Utility asset works on Stroude Road, Virginia Water.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 13:04 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:15.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 29 Nov 2024
Details
View Map
Share
Old Woking Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Woking Road, Woking.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 13:13.

Southern Gas Networks logo
LONG TERM
Between
7 Oct 2024 and 18 Apr 2025
Details
View Map
Share
Maybury Hill

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Maybury Hill, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 14:15.

Electricity Network Company logo
LONG TERM
Between
7 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Church Hill

Electricity Network Company are proposing to carry out Utility asset works on Church Hill, Pyrford, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 31 Jul 2024 at 08:41.

Cadent Gas logo
LONG TERM
Until
16 Jan 2025
Details
View Map
Share
Follow
Green Road

Cadent Gas are carrying out Utility asset works on Green Road, Thorpe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 10:40 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:47.

Cadent Gas logo
LONG TERM
Between
7 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Green Road

Cadent Gas are proposing to carry out Utility asset works on Green Road, Thorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:36.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
The Causeway

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on The Causeway, Staines-upon-thames.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 October 2024 and run through until 16 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Aug 2024 at 11:03.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
The Causeway

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on The Causeway, Staines-upon-thames.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 16 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Sep 2024 at 11:03.

Southern Gas Networks logo
LONG TERM
Between
14 Oct 2024 and 27 Jun 2025
Details
View Map
Share
Maybury Hill

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Maybury Hill, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 14:43.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Pembroke Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pembroke Road, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 08:02.

Electricity Network Company logo
LONG TERM
Between
21 Oct and 8 Dec 2024
Details
View Map
Share
Church Hill

Electricity Network Company were proposing to carry out Utility asset works on Church Hill, Pyrford, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 8 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 4 Oct 2024 at 15:04.

Electricity Network Company logo
LONG TERM
Between
21 Oct and 7 Dec 2024
Details
View Map
Share
Follow
Church Hill

Electricity Network Company are proposing to carry out Utility asset works on Church Hill, Pyrford, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 17 Oct 2024 at 09:13.

Surrey County Council logo
LONG TERM
Between
21 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Gaston Bridge Road

Surrey County Council are proposing to carry out Highway improvement works on Gaston Bridge Road, Shepperton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 14:34.

Surrey County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Gaston Bridge Road

Surrey County Council are carrying out Highway improvement works on Gaston Bridge Road, Shepperton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 10:00 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 14:55.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
St Georges Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on St Georges Avenue, Weybridge.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 21:37 and could run through until 14 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:23.

UK Power Networks South Eastern logo
LONG TERM
Between
24 Oct and 26 Nov 2024
Details
View Map
Share
Follow
Fordwater Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Fordwater Road, Chertsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Oct 2024 at 09:33.

Southern Gas Networks logo
LONG TERM
Between
26 Oct and 20 Dec 2024
Details
View Map
Share
Westfield Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Westfield Avenue, Westfield, Woking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 08:56.

Southern Gas Networks logo
Until
22 Nov 2024
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Park Road, Woking.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:10 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:42.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 18 Dec 2024
Details
View Map
Share
Follow
Shaftesbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shaftesbury Road, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Oct 2024 at 08:23.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Lockfield Drive

Surrey County Council are proposing to carry out Highway improvement works on Lockfield Drive, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 20 Sep 2024 at 15:51.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Lockfield Drive

Surrey County Council are carrying out Highway improvement works on Lockfield Drive, Woking.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 07:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 28 Oct 2024 at 08:19.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Victoria Way

Surrey County Council are proposing to carry out Highway improvement works on Victoria Way, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 20 Sep 2024 at 15:58.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Victoria Way

Surrey County Council are carrying out Highway improvement works on Victoria Way, Woking.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 07:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 28 Oct 2024 at 08:20.

Surrey County Council logo
Finishing
Today
Details
View Map
Share
Follow
Wych Hill Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wych Hill Lane, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 13 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 22 Aug 2024 at 14:18.

Electricity Network Company logo
LONG TERM
Between
30 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Newark Lane

Electricity Network Company are proposing to carry out Utility asset works on Newark Lane, Ripley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 7 Feb 2024 at 15:19.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Barrs Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Barrs Lane, Knaphill, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Aug 2024 at 10:16.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Heath Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Heath Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Jul 2024 at 13:59.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Chobham Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chobham Lane, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Aug 2024 at 12:08.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Chobham Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chobham Lane, Longcross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Aug 2024 at 13:29.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Kingston Road

Surrey County Council are proposing to carry out Highway improvement works on Kingston Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 08:07.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Kingston Road

Cadent Gas are carrying out Utility repair and maintenance works on Kingston Road, Staines-upon-thames.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 November 2024 at 21:22 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:17.

Surrey County Council logo
Between
4 and 30 Nov 2024
Details
View Map
Share
Bridge Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Bridge Road, Weybridge.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 30 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 9 Oct 2024 at 09:45.

Surrey County Council logo
LONG TERM
Between
4 Nov and 30 Dec 2024
Details
View Map
Share
Old Wharf Way

Surrey County Council were proposing to carry out Highway repair and maintenance works on Old Wharf Way, Weybridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 30 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 8 Oct 2024 at 16:01.

Surrey County Council logo
Between
4 and 30 Nov 2024
Details
View Map
Share
Old Wharf Way

Surrey County Council were proposing to carry out Highway repair and maintenance works on Old Wharf Way, Weybridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 30 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 9 Oct 2024 at 09:39.

Surrey County Council logo
Between
4 and 30 Nov 2024
Details
View Map
Share
Addlestone Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Addlestone Road, Addlestone.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 30 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 9 Oct 2024 at 09:44.

Southern Gas Networks logo
LONG TERM
Between
4 Nov 2024 and 23 Feb 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Walton-on-thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 08:48.

Southern Gas Networks logo
LONG TERM
Until
23 Feb 2025
Details
View Map
Share
Follow
Winchester Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Winchester Road, Walton-on-thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:12.

Cadent Gas logo
LONG TERM
Until
9 Dec 2024
Details
View Map
Share
Follow
Shepperton Road

Cadent Gas are carrying out Utility asset works on Shepperton Road, Shepperton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 15:24 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:00.

Cadent Gas logo
LONG TERM
Between
4 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Shepperton Road

Cadent Gas are proposing to carry out Utility asset works on Shepperton Road, Shepperton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:17.

Southern Gas Networks logo
Until
20 Nov 2024
Details
View Map
Share
Follow
Woodham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Woodham Road, Horsell, Woking.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 02:00 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 08:20.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Kingfield Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Kingfield Road, Kingfield, Woking.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 09:34 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 15:56.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Bunyard Drive

Affinity Water are carrying out Utility repair and maintenance works on Bunyard Drive, Sheerwater, Woking.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 08:33 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Nov 2024 at 08:41.

UK Power Networks South Eastern logo
LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
Woodham Lane

UK Power Networks South Eastern are carrying out New service connection on Woodham Lane, Addlestone.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 10:00 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 10:21.

Surrey County Council logo
LONG TERM
Between
6 Nov 2024 and 23 Mar 2026
Details
View Map
Share
Follow
Staines Road

Surrey County Council are proposing to carry out Highway improvement works on Staines Road, Chertsey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 23 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 26 Jun 2024 at 09:37.

Affinity Water logo
LONG TERM
Between
8 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Guildford Road

Affinity Water are proposing to carry out Utility asset works on Guildford Road, Chertsey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 4 Sep 2024 at 09:32.

Affinity Water logo
LONG TERM
Between
8 Nov and 9 Dec 2024
Details
View Map
Share
Guildford Road

Affinity Water were proposing to carry out Utility asset works on Guildford Road, Chertsey.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 November 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 11 Sep 2024 at 07:05.

Affinity Water logo
LONG TERM
Between
8 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Little Green Lane

Affinity Water are proposing to carry out Utility asset works on Little Green Lane, Chertsey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Aug 2024 at 10:21.

Affinity Water logo
LONG TERM
Between
8 Nov and 9 Dec 2024
Details
View Map
Share
Little Green Lane

Affinity Water were proposing to carry out Utility asset works on Little Green Lane, Chertsey.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Sep 2024 at 07:04.

National Highways logo
LONG TERM
Between
11 Nov 2024 and 31 Dec 2026
Details
View Map
Share
Follow
Wisley Lane

National Highways are proposing to carry out Works for road purposes on Wisley Lane, Wisley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 31 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Oct 2024 at 10:55.

National Highways logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Wisley Lane

National Highways are carrying out Works for road purposes on Wisley Lane, Wisley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 31 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Nov 2024 at 08:51.

Southern Gas Networks logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Maybury Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Maybury Hill, Woking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:55 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 08:12.

Surrey County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Chertsey Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chertsey Road, Byfleet, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 11:56.

Surrey County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Chertsey Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chertsey Road, Byfleet, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Oct 2024 at 12:17.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Chertsey Road

Surrey County Council are carrying out Highway repair and maintenance works on Chertsey Road, Byfleet, West Byfleet.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Nov 2024 at 09:04.

Surrey County Council logo
Between
11 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Sandpit Hall Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Sandpit Hall Road, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 09:02.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Braeside

BT are proposing to carry out Utility asset works on Braeside, New Haw.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Aug 2024 at 13:19.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Braeside

BT are carrying out Utility asset works on Braeside, New Haw.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Nov 2024 at 09:02.

BT logo
Finishing
Today
Details
View Map
Share
Braeside

BT were proposing to carry out Utility asset works on Braeside, New Haw.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 13 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Aug 2024 at 11:31.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Gracious Pond Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Gracious Pond Road, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 19 Aug 2024 at 11:35.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Gracious Pond Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Gracious Pond Road, Chobham, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 15 November 2024. The works were due to impact the verge only.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 14:29.

Surrey County Council logo
Between
11 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Bridge Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bridge Road, Weybridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:58.

Surrey County Council logo
Until
7 Dec 2024
Details
View Map
Share
Follow
Bridge Road

Surrey County Council are carrying out Highway repair and maintenance works on Bridge Road, Weybridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:00 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 11 Nov 2024 at 10:03.

Surrey County Council logo
Between
11 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Old Wharf Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Old Wharf Way, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:56.

Surrey County Council logo
Until
7 Dec 2024
Details
View Map
Share
Follow
Old Wharf Way

Surrey County Council are carrying out Highway repair and maintenance works on Old Wharf Way, Weybridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:00 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 11 Nov 2024 at 10:05.

Surrey County Council logo
Between
11 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Addlestone Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Addlestone Road, Addlestone.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 09:32.

Surrey County Council logo
Until
7 Dec 2024
Details
View Map
Share
Follow
Addlestone Road

Surrey County Council are carrying out Highway repair and maintenance works on Addlestone Road, Addlestone.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:00 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 11 Nov 2024 at 10:04.

Southern Gas Networks logo
Until
2 Dec 2024
Details
View Map
Share
Follow
High Street

Southern Gas Networks are carrying out Utility repair and maintenance works on High Street, Walton-on-thames.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 08:49.

Cadent Gas logo
Between
11 and 25 Nov 2024
Details
View Map
Share
Follow
Wellington Avenue

Cadent Gas are proposing to carry out Utility asset works on Wellington Avenue, Virginia Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 12:45.

Cadent Gas logo
Between
11 and 25 Nov 2024
Details
View Map
Share
Follow
Wellington Avenue

Cadent Gas are proposing to carry out Utility asset works on Wellington Avenue, Virginia Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 15:25.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Fairview Drive

UK Power Networks South Eastern are proposing to carry out New service connection on Fairview Drive, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 07:50.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Fairview Drive

UK Power Networks South Eastern are carrying out New service connection on Fairview Drive, Shepperton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:00 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Nov 2024 at 10:00.

Cornerstone Telecommunications Infrastructure logo
Finishing
Friday
Details
View Map
Share
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 15 November 2024. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 30 Aug 2024 at 16:12.

National Highways logo
Between
11 and 23 Nov 2024
Details
View Map
Share
Follow
Lyne Lane

National Highways are proposing to carry out Works for road purposes on Lyne Lane, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Aug 2024 at 11:24.

National Highways logo
Finishing
Today
Details
View Map
Share
Follow
Lyne Lane

National Highways are carrying out Works for road purposes on Lyne Lane, Chertsey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 21:00 and could run through until 13 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 12 Nov 2024 at 09:33.

Cadent Gas logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Village Road

Cadent Gas are proposing to carry out Utility asset works on Village Road, Thorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 08:53.

Cadent Gas logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Village Road

Cadent Gas are proposing to carry out Utility asset works on Village Road, Thorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:52.

Cadent Gas logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Village Road

Cadent Gas are proposing to carry out Utility asset works on Village Road, Thorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 14:25.

Surrey County Council logo
Finishing
Today
Details
View Map
Share
Follow
Vicarage Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Vicarage Road, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 14:51.

Surrey County Council logo
Finishing
Today
Details
View Map
Share
Follow
Vicarage Road

Surrey County Council are carrying out Highway repair and maintenance works on Vicarage Road, Egham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:00 and could run through until 13 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Nov 2024 at 10:05.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Byfleet Road

National Highways are proposing to carry out Works for road purposes on Byfleet Road, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 31 Oct 2024 at 12:01.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Byfleet Road

National Highways are carrying out Works for road purposes on Byfleet Road, Cobham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 20:00 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 12 Nov 2024 at 20:09.

Electricity Network Company logo
Between
14 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Church Hill

Electricity Network Company are proposing to carry out Utility asset works on Church Hill, Pyrford, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 7 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 30 Oct 2024 at 10:17.

Electricity Network Company logo
LONG TERM
Between
14 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Church Hill

Electricity Network Company are proposing to carry out Utility asset works on Church Hill, Pyrford, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 21 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 31 Oct 2024 at 09:32.

Electricity Network Company logo
LONG TERM
Between
14 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Church Hill

Electricity Network Company are proposing to carry out Utility asset works on Church Hill, Pyrford, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 21 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 1 Nov 2024 at 10:59.

Surrey County Council logo
Between
18 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Station Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Station Road, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 09:05.

Surrey County Council logo
Between
18 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Station Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Station Road, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 13:31.

Cadent Gas logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:58.

Cadent Gas logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 08:53.

Cadent Gas logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Giles Travers Close

Cadent Gas are proposing to carry out Utility asset works on Giles Travers Close, Thorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 15:37.

Scottish Hydro Electric Power Dis logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Runnemede Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Runnemede Road, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Aug 2024 at 12:33.

Scottish Hydro Electric Power Dis logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Runnemede Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Runnemede Road, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Sep 2024 at 09:01.

Surrey County Council logo
LONG TERM
Between
19 Nov 2024 and 19 May 2025
Details
View Map
Share
Follow
Maybury Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Maybury Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 23 Aug 2024 at 15:48.

Electricity Network Company logo
LONG TERM
Between
19 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Barnes Wallis Drive

Electricity Network Company are proposing to carry out Utility asset works on Barnes Wallis Drive, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 24 Sep 2024 at 16:02.

UK Power Networks South Eastern logo
Between
25 Nov and 19 Dec 2024
Details
View Map
Share
Follow
Grange Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Grange Road, New Haw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 15:38.

Cornerstone Telecommunications Infrastructure logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Sep 2024 at 11:09.

Cornerstone Telecommunications Infrastructure logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 13 Sep 2024 at 08:13.

Cornerstone Telecommunications Infrastructure logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 8 Oct 2024 at 15:46.

Cornerstone Telecommunications Infrastructure logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 16 Oct 2024 at 13:04.

Surrey County Council logo
Between
28 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Kingfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingfield Road, Kingfield, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 08:59.

Surrey County Council logo
Between
28 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Kingfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingfield Road, Kingfield, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 12:30.

Surrey County Council logo
Between
28 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Wych Hill Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wych Hill Lane, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Oct 2024 at 12:46.

Surrey County Council logo
Between
28 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Wych Hill Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wych Hill Lane, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 08:10.

Electricity Network Company logo
LONG TERM
Between
2 Dec 2024 and 1 May 2025
Details
View Map
Share
Follow
Newark Lane

Electricity Network Company are proposing to carry out Utility asset works on Newark Lane, Ripley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 1 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 8 Nov 2024 at 08:48.

BT logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Chobham Road

BT were proposing to carry out Utility asset works on Chobham Road, Knaphill, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by BT on 20 Sep 2024 at 15:08.

Cornerstone Telecommunications Infrastructure logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Camphill Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Camphill Road, West Byfleet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 Oct 2024 at 07:55.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Bedford Lane

Cadent Gas are proposing to carry out Utility asset works on Bedford Lane, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 17:01.

Cornerstone Telecommunications Infrastructure logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 30 Aug 2024 at 16:15.

Surrey County Council logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Seven Hills Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Seven Hills Road, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 8 Jul 2024 at 14:31.

Surrey County Council logo
Between
3 and 9 Dec 2024
Details
View Map
Share
Follow
Weir Road

Surrey County Council are proposing to carry out Highway improvement works on Weir Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 9 Jan 2024 at 09:23.

Surrey County Council logo
Between
3 and 9 Dec 2024
Details
View Map
Share
Follow
Bridge Road

Surrey County Council are proposing to carry out Highway improvement works on Bridge Road, Chertsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 9 Jan 2024 at 09:34.

UK Power Networks South Eastern logo
Between
6 and 20 Dec 2024
Details
View Map
Share
Follow
Almners Road

UK Power Networks South Eastern are proposing to carry out New service connection on Almners Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 30 Sep 2024 at 16:15.

UK Power Networks South Eastern logo
Between
6 and 20 Dec 2024
Details
View Map
Share
Follow
Almners Road

UK Power Networks South Eastern are proposing to carry out New service connection on Almners Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Oct 2024 at 14:02.

National Highways logo
Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Byfleet Road

National Highways are proposing to carry out Works for road purposes on Byfleet Road, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 24 Oct 2024 at 12:48.

National Highways logo
Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Byfleet Road

National Highways are proposing to carry out Works for road purposes on Byfleet Road, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 24 Oct 2024 at 14:14.

Affinity Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Holly Bank Road

Affinity Water are proposing to carry out Utility asset works on Holly Bank Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 9 Oct 2024 at 11:11.

Surrey County Council logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Park Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Nov 2024 at 09:20.

Affinity Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Ruxbury Road

Affinity Water are proposing to carry out Utility asset works on Ruxbury Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 7 Oct 2024 at 16:07.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Sep 2024 at 11:08.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 13 Sep 2024 at 08:14.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 11 Oct 2024 at 15:16.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 23 Oct 2024 at 10:40.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 29 Oct 2024 at 07:42.

Surrey County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Commercial Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Commercial Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Oct 2024 at 08:06.

Surrey County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Commercial Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Commercial Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 13:06.

Cornerstone Telecommunications Infrastructure logo
Between
20 and 22 Dec 2024
Details
View Map
Share
Follow
Camphill Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Camphill Road, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 22 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 Oct 2024 at 07:58.

Network Rail logo
Between
21 and 23 Dec 2024
Details
View Map
Share
Guildford Road

Network Rail were proposing to carry out Works for Rail Purposes on Guildford Road, Chertsey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Sep 2024 at 11:03.

Cornerstone Telecommunications Infrastructure logo
Between
2 and 5 Jan 2025
Details
View Map
Share
Follow
Camphill Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Camphill Road, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 24 Oct 2024 at 13:52.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Church Lane

Surrey County Council are proposing to carry out Highway improvement works on Church Lane, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:48.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Devonshire Road

Surrey County Council are proposing to carry out Highway improvement works on Devonshire Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:42.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Balfour Road

Surrey County Council are proposing to carry out Highway improvement works on Balfour Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:06.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Weybridge Road

Surrey County Council are proposing to carry out Highway improvement works on Weybridge Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:48.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Churchfield Road

Surrey County Council are proposing to carry out Highway improvement works on Churchfield Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:15.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Baker Street

Surrey County Council are proposing to carry out Highway improvement works on Baker Street, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:06.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Church Street

Surrey County Council are proposing to carry out Highway improvement works on Church Street, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 15 Feb 2024 at 13:25.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Minorca Road

Surrey County Council are proposing to carry out Highway improvement works on Minorca Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:43.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Portmore Park Road

Surrey County Council are proposing to carry out Highway improvement works on Portmore Park Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:46.

Cadent Gas logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Pennypot Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Pennypot Lane, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 08:11.

Network Rail logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Guildford Road

Network Rail are proposing to carry out Works for Rail Purposes on Guildford Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Oct 2024 at 17:04.

Affinity Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Ruxbury Road

Affinity Water are proposing to carry out Utility asset works on Ruxbury Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 2 Oct 2024 at 12:38.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Bedford Lane

Cadent Gas are proposing to carry out Utility asset works on Bedford Lane, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:58.

Surrey County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Lyne Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lyne Lane, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 15:22.

Surrey County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Lyne Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Lyne Lane, Egham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 14:43.

Surrey County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Lyne Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lyne Lane, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 15:23.

Affinity Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Church Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Church Road, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Oct 2024 at 10:26.

Affinity Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Church Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Church Road, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Oct 2024 at 12:06.

UK Power Networks South Eastern logo
Between
7 and 16 Jan 2025
Details
View Map
Share
Follow
Accommodation Road

UK Power Networks South Eastern are proposing to carry out New service connection on Accommodation Road, Chertsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 14:24.

UK Power Networks South Eastern logo
Between
11 and 23 Jan 2025
Details
View Map
Share
Follow
Littlewick Road

UK Power Networks South Eastern are proposing to carry out New service connection on Littlewick Road, Knaphill, Woking.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 23 January 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Sep 2024 at 15:02.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Pembroke Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pembroke Road, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 09:31.

UK Power Networks South Eastern logo
Between
13 and 29 Jan 2025
Details
View Map
Share
Littlewick Road

UK Power Networks South Eastern were proposing to carry out New service connection on Littlewick Road, Knaphill, Woking.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 29 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Oct 2024 at 09:14.

Electricity Network Company logo
LONG TERM
Between
13 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Barnes Wallis Drive

Electricity Network Company are proposing to carry out Utility asset works on Barnes Wallis Drive, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 23 Oct 2024 at 15:24.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Coworth Close

Cadent Gas are proposing to carry out Utility asset works on Coworth Close, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:58.

Affinity Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Sandy Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Sandy Lane, Maybury, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 17 Oct 2024 at 08:14.

Affinity Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Brooklands Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Brooklands Lane, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 09:38.

Surrey County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Staines By-pass

Surrey County Council are proposing to carry out Works for road purposes on Staines By-pass, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 08:42.

Surrey County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Staines By-pass

Surrey County Council are proposing to carry out Works for road purposes on Staines By-pass, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Oct 2024 at 13:26.

Energy Assets Pipelines logo
Between
17 and 23 Jan 2025
Details
View Map
Share
Follow
Rosemary Lane

Energy Assets Pipelines are proposing to carry out Utility asset works on Rosemary Lane, Thorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Energy Assets Pipelines on 15 Oct 2024 at 16:28.

Energy Assets Pipelines logo
Between
17 and 23 Jan 2025
Details
View Map
Share
Follow
Rosemary Lane

Energy Assets Pipelines are proposing to carry out Utility asset works on Rosemary Lane, Thorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Energy Assets Pipelines on 16 Oct 2024 at 13:42.

Surrey County Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hare Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hare Hill, Addlestone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Aug 2024 at 07:04.

Surrey County Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hare Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hare Hill, Addlestone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Aug 2024 at 13:54.

Southern Gas Networks logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pine Grove

Southern Gas Networks are proposing to carry out New service connection on Pine Grove, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 10:57.

Affinity Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Wisley Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Wisley Lane, Wisley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 10:09.

Surrey County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Bridge Road

Surrey County Council are proposing to carry out Highway improvement works on Bridge Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 10 Jul 2024 at 10:41.

Surrey County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Addlestone Road

Surrey County Council are proposing to carry out Highway improvement works on Addlestone Road, Addlestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 16 Jul 2024 at 13:52.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Giles Travers Close

Cadent Gas are proposing to carry out Utility asset works on Giles Travers Close, Thorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 13:20.

Surrey County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Woburn Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woburn Hill, Addlestone.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 23 Sep 2024 at 17:10.

Surrey County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Woburn Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woburn Hill, Addlestone.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Oct 2024 at 09:13.

Esso Petroleum Co logo
Between
3 and 15 Feb 2025
Details
View Map
Share
Follow
Canford Drive

Esso Petroleum Co are proposing to carry out Utility asset works on Canford Drive, Addlestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Esso Petroleum Co on 8 Nov 2024 at 17:35.

Southern Gas Networks logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Sheerwater Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sheerwater Road, West Byfleet.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Jun 2024 at 10:36.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Madeira Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Madeira Road, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Jun 2024 at 07:37.

Affinity Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Red Lion Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Red Lion Road, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 11:59.

Cadent Gas logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
The Hythe

Cadent Gas are proposing to carry out Utility asset works on The Hythe, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:00.


Roadworks Map near to Mawbey Road, CHERTSEY, KT16 0HB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 13 Nov 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Mawbey Road, CHERTSEY, KT16 0HB (11 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Affinity Water logo
PALMER CRESCENT 
(0.1 miles)
Affinity Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 12 Nov 2024 - 14 Nov 2024)
0.1
Details
Share
2
Affinity Water logo
PALMER CRESCENT 
(0.1 miles)
Affinity Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 14 Nov 2024 - 18 Nov 2024
0.1
Details
Share
Follow
3
Affinity Water logo
PALMER CRESCENT 
(0.1 miles)
Affinity Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
12 Nov 2024 09:11 - 14:29
0.1
Details
Share
4
Affinity Water logo
PALMER CRESCENT 
(0.1 miles)
Affinity Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 12 Nov 2024 - 14 Nov 2024
0.1
Details
Share
Follow
5
Affinity Water logo
PALMER CRESCENT 
(0.1 miles)
Affinity Water
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 13 Nov 2024 - 15 Nov 2024)
0.1
Details
Share
6
Affinity Water logo
VERNON CLOSE 
(0.2 miles)
Affinity Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 13 Nov 2024 - 15 Nov 2024
0.2
Details
Share
Follow
7
Affinity Water logo
SLADE ROAD 
(0.2 miles)
Affinity Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 13 Nov 2024 - 15 Nov 2024
0.2
Details
Share
Follow
8
Affinity Water logo
SPINNEY HILL 
(0.5 miles)
Affinity Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
12 Nov 2024 11:20 - 14:17
0.5
Details
Share
9
Surrey County Council logo
MAJOR
  
BITTAMS LANE 
(0.6 miles)
Surrey County Council
Highway repair and maintenance works - Footway, Verge - Give and take
Planned
Scheduled: 11 Nov 2024 - 29 Nov 2024
0.6
Details
Share
Follow
10
Affinity Water logo
STONEHILL ROAD 
(0.9 miles)
Affinity Water
Utility asset works - Carriageway, Verge - Multi-way signals
In Progress
Since: 11 Nov 2024 10:15
(Scheduled: 11 Nov 2024 - 15 Nov 2024)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.