ROADWORKS SUMMARY
Deacon Close, COBHAM, KT11 3NT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Deacon Close, KT11 3NT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Deacon Close, COBHAM, KT11 3NT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Deacon Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Ockham Road North

National Highways are carrying out Highway improvement works on Ockham Road North, Ockham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2023 at 19:00 and could run through until 30 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 11 Apr 2024 at 14:17.

National Highways logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Portsmouth Road

National Highways are carrying out Highway improvement works on Portsmouth Road, Ockham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2023 at 19:00 and could run through until 30 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Highways on 11 Apr 2024 at 14:18.

National Highways logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Elm Lane

National Highways are carrying out Highway improvement works on Elm Lane, Ockham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2023 at 07:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Apr 2024 at 14:52.

Surrey County Council logo
LONG TERM
Between
1 Jan and 30 Jun 2024
Details
View Map
Share
Follow
Denton Grove

Surrey County Council are proposing to carry out Highway repair and maintenance works on Denton Grove, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 17 Aug 2023 at 07:40.

Electricity Network Company logo
LONG TERM
Between
31 Jan and 13 Jun 2024
Details
View Map
Share
Follow
Newark Lane

Electricity Network Company are proposing to carry out Utility asset works on Newark Lane, Ripley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2024 and could run through until 13 June 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 22 Nov 2023 at 11:56.

UK Power Networks South Eastern logo
LONG TERM
Until
31 May 2024
Details
View Map
Share
Follow
Grange Road

UK Power Networks South Eastern are carrying out Utility asset works on Grange Road, New Haw.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2024 at 08:30 and could run through until 31 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Mar 2024 at 08:54.

Southern Gas Networks logo
LONG TERM
Between
11 Mar and 30 May 2024
Details
View Map
Share
Follow
Holme Chase

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holme Chase, Weybridge.

These works are categorised as Major.

The works will start on or after 11 March 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Jan 2024 at 16:30.

Surrey County Council logo
LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Follow
Brooklands Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Brooklands Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Nov 2023 at 13:48.

Surrey County Council logo
LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Follow
Rydens Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Rydens Road, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Sep 2023 at 09:46.

Surrey County Council logo
LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on High Street, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Oct 2023 at 12:16.

Surrey County Council logo
LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Follow
Downs Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Downs Way, Bookham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 23 Oct 2023 at 09:01.

Surrey County Council logo
LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Follow
Clandon Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clandon Road, West Clandon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Nov 2023 at 12:34.

Surrey County Council logo
LONG TERM
Between
31 Mar and 31 Jul 2024
Details
View Map
Share
Follow
Clandon Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clandon Road, Send.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 31 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Oct 2023 at 12:53.

Surrey County Council logo
LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Follow
By-pass Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on By-pass Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Sep 2023 at 10:16.

Surrey County Council logo
LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Follow
Ashley Park Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashley Park Road, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Oct 2023 at 13:01.

Surrey County Council logo
LONG TERM
Between
1 Apr and 2 Sep 2024
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 2 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Feb 2024 at 12:18.

Surrey County Council logo
LONG TERM
Between
1 Apr 2024 and 1 Apr 2026
Details
View Map
Share
Follow
Elmgrove Road

Surrey County Council are proposing to carry out Highway improvement works on Elmgrove Road, Weybridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 1 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Feb 2024 at 12:26.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 23 May 2024
Details
View Map
Share
Follow
Burstead Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burstead Close, Cobham.

These works are categorised as Major.

The works will start on or after 14 April 2024 and could run through until 23 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2024 at 15:30.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 23 May 2024
Details
View Map
Share
Follow
The Barton

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Barton, Cobham.

These works are categorised as Major.

The works will start on or after 14 April 2024 and could run through until 23 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2024 at 15:30.

UK Power Networks South Eastern logo
LONG TERM
Until
8 Jul 2024
Details
View Map
Share
Follow
Heathervale Road

UK Power Networks South Eastern are carrying out Utility asset works on Heathervale Road, Addlestone.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:00 and could run through until 8 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Apr 2024 at 08:25.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lower Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Lower Road, Bookham.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 April 2024 at 10:00 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2024 at 09:20.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Milbourne Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Milbourne Lane, Esher.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 16:00 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2024 at 09:50.

Southern Gas Networks logo
Between
21 Apr and 19 May 2024
Details
View Map
Share
Follow
Woodside Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodside Road, Cobham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2024 at 15:30.

National Highways logo
Today
Details
View Map
Share
Portsmouth Road

National Highways carried out Highway improvement works on Portsmouth Road, Cobham.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 22 Apr 2024 and 27 Apr 2024 and were actually completed between 22 Apr 2024 (20:00) and 27 Apr 2024 (06:00). The works impacted the carriageway only.

This roadwork event was last updated by National Highways on 27 Apr 2024 at 07:59.

National Highways logo
Today
Details
View Map
Share
Byfleet Road

National Highways carried out Highway improvement works on Byfleet Road, Cobham.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 22 Apr 2024 and 27 Apr 2024 and were actually completed between 22 Apr 2024 (20:00) and 27 Apr 2024 (06:00). The works impacted the carriageway only.

This roadwork event was last updated by National Highways on 27 Apr 2024 at 07:58.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Ashley Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Ashley Road, Walton-on-thames.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 10:00 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2024 at 07:22.

Surrey County Council logo
Finishing
Today
Details
View Map
Share
Follow
The Street

Surrey County Council are carrying out Highway improvement works on The Street, West Horsley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 07:00 and could run through until 27 April 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 26 Apr 2024 at 10:40.

UK Power Networks South Eastern logo
Until
14 May 2024
Details
View Map
Share
Follow
Cricket Way

UK Power Networks South Eastern are carrying out New service connection on Cricket Way, Weybridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 April 2024 at 09:00 and could run through until 14 May 2024. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Apr 2024 at 09:48.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lower Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Lower Road, Fetcham.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 April 2024 at 14:40 and could run through until 30 April 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2024 at 09:02.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Dorking Road

Ses Water (formerly Sutton & East Surrey Water Company) are carrying out Utility repair and maintenance works on Dorking Road, Bookham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2024 at 14:00 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 26 Apr 2024 at 07:23.

Surrey County Council logo
Finishing
Today
Details
View Map
Share
Follow
Bates Walk

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bates Walk, Addlestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Apr 2024 at 09:44.

Southern Gas Networks logo
Between
29 Apr and 20 May 2024
Details
View Map
Share
Follow
Green Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Byfleet, West Byfleet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Feb 2024 at 08:45.

National Highways logo
Between
29 Apr and 10 May 2024
Details
View Map
Share
Follow
Portsmouth Road

National Highways are proposing to carry out Highway improvement works on Portsmouth Road, Ockham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Apr 2024 at 13:08.

UK Power Networks South Eastern logo
LONG TERM
Between
7 May and 7 Jun 2024
Details
View Map
Share
Follow
Pinewood Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Pinewood Avenue, New Haw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 7 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Feb 2024 at 10:02.

Surrey County Council logo
Between
8 and 22 May 2024
Details
View Map
Share
Follow
Beechcroft

Surrey County Council are proposing to carry out Highway repair and maintenance works on Beechcroft, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2024 and could run through until 22 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 26 Mar 2024 at 13:08.

Southern Gas Networks logo
Between
8 and 14 May 2024
Details
View Map
Share
Follow
Bridge Street

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bridge Street, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2024 and could run through until 14 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Feb 2024 at 14:10.

UK Power Networks South Eastern logo
Between
8 and 27 May 2024
Details
View Map
Share
Follow
Oatlands Drive

UK Power Networks South Eastern are proposing to carry out New service connection on Oatlands Drive, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Apr 2024 at 08:46.

National Highways logo
Between
13 and 16 May 2024
Details
View Map
Share
Follow
Byfleet Road

National Highways are proposing to carry out Highway repair and maintenance works on Byfleet Road, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Apr 2024 at 12:16.

National Highways logo
LONG TERM
Between
13 May and 30 Nov 2024
Details
View Map
Share
Follow
Byfleet Road

National Highways are proposing to carry out Highway improvement works on Byfleet Road, Cobham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Apr 2024 at 12:17.

UK Power Networks South Eastern logo
Between
13 and 17 May 2024
Details
View Map
Share
Follow
South Road

UK Power Networks South Eastern are proposing to carry out New service connection on South Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Feb 2024 at 08:52.

Surrey County Council logo
Between
13 and 23 May 2024
Details
View Map
Share
Follow
Neville Close

Surrey County Council are proposing to carry out Highway repair and maintenance works on Neville Close, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Apr 2024 at 08:25.

Affinity Water logo
Between
14 and 17 May 2024
Details
View Map
Share
Follow
The Street

Affinity Water are proposing to carry out Utility repair and maintenance works on The Street, West Horsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 25 Mar 2024 at 13:16.

Surrey County Council logo
LONG TERM
Between
20 May 2024 and 20 May 2026
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 20 May 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:44.

Surrey County Council logo
LONG TERM
Between
20 May 2024 and 20 May 2026
Details
View Map
Share
Follow
Monument Hill

Surrey County Council are proposing to carry out Highway improvement works on Monument Hill, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 20 May 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:45.

Surrey County Council logo
LONG TERM
Between
20 May 2024 and 20 May 2026
Details
View Map
Share
Follow
Monument Green

Surrey County Council are proposing to carry out Highway improvement works on Monument Green, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 20 May 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:44.

Surrey County Council logo
Between
20 and 21 May 2024
Details
View Map
Share
Follow
Clock House Close

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clock House Close, Byfleet, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Apr 2024 at 12:25.

Affinity Water logo
Between
20 and 24 May 2024
Details
View Map
Share
Follow
Send Marsh Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Send Marsh Road, Send.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 21 Mar 2024 at 14:06.

Southern Gas Networks logo
Between
20 and 24 May 2024
Details
View Map
Share
Follow
Water Lane

Southern Gas Networks are proposing to carry out New service connection on Water Lane, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Feb 2024 at 11:01.

Surrey County Council logo
Between
20 May and 2 Jun 2024
Details
View Map
Share
Follow
Green Lane

Surrey County Council are proposing to carry out Highway improvement works on Green Lane, Ockham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 2 June 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 25 Mar 2024 at 14:37.

Surrey County Council logo
LONG TERM
Between
26 May and 12 Jul 2024
Details
View Map
Share
Follow
Copsem Lane

Surrey County Council are proposing to carry out Highway improvement works on Copsem Lane, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 23 Apr 2024 at 09:42.

Surrey County Council logo
LONG TERM
Between
3 Jun 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Old Wharf Way

Surrey County Council are proposing to carry out Highway improvement works on Old Wharf Way, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 16 Feb 2024 at 11:12.

Surrey County Council logo
LONG TERM
Between
3 Jun 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Bridge Road

Surrey County Council are proposing to carry out Highway improvement works on Bridge Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 16 Feb 2024 at 11:11.

Surrey County Council logo
Between
3 and 22 Jun 2024
Details
View Map
Share
Follow
The Copse

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Copse, Fetcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 22 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Apr 2024 at 10:51.

Surrey County Council logo
Between
3 and 22 Jun 2024
Details
View Map
Share
Follow
Meadow Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Meadow Way, Fetcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 22 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Apr 2024 at 10:52.

Surrey County Council logo
Between
3 and 22 Jun 2024
Details
View Map
Share
Follow
Meadow Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Meadow Way, Bookham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 22 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Apr 2024 at 10:54.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
10 and 28 Jun 2024
Details
View Map
Share
Follow
Anyards Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Statutory Infrastructure Works on Anyards Road, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 18 Mar 2024 at 15:36.

Surrey County Council logo
Between
10 and 14 Jun 2024
Details
View Map
Share
Follow
Horsley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Horsley Road, Effingham Junction, East Horsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 22 Mar 2024 at 12:05.

Surrey County Council logo
Between
11 and 25 Jun 2024
Details
View Map
Share
Follow
Water Lane

Surrey County Council are proposing to carry out Section 50 on Water Lane, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Apr 2024 at 13:44.

BT logo
On
11 Jun 2024
Details
View Map
Share
Follow
Oxshott Way

BT are proposing to carry out Utility repair and maintenance works on Oxshott Way, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 11 June 2024 and are due to last for only one day. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Mar 2024 at 10:31.

Surrey County Council logo
Between
11 and 15 Jun 2024
Details
View Map
Share
Follow
Beech Avenue

Surrey County Council are proposing to carry out Highway repair and maintenance works on Beech Avenue, Effingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 15 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Mar 2024 at 11:09.

Surrey County Council logo
Between
11 Jun and 7 Jul 2024
Details
View Map
Share
Follow
Tartar Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tartar Road, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 7 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 23 Apr 2024 at 08:59.

Surrey County Council logo
Between
11 and 16 Jun 2024
Details
View Map
Share
Follow
Little Bookham Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Little Bookham Street, Bookham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 16 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Feb 2024 at 15:10.

Virgin Media logo
Between
14 and 16 Jun 2024
Details
View Map
Share
Follow
Sandy Lane

Virgin Media are proposing to carry out Utility repair and maintenance works on Sandy Lane, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2024 and could run through until 16 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 25 Apr 2024 at 12:56.

UK Power Networks South Eastern logo
Between
17 and 21 Jun 2024
Details
View Map
Share
Follow
The Street

UK Power Networks South Eastern are proposing to carry out New service connection on The Street, West Horsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Apr 2024 at 13:37.

Surrey County Council logo
Until
29 Jun 2024
Details
View Map
Share
Follow
Magazine Place

Surrey County Council are carrying out Highway repair and maintenance works on Magazine Place, Leatherhead.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 June 2024 at 16:35 and could run through until 29 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 23 Feb 2024 at 09:29.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 18 Aug 2024
Details
View Map
Share
Follow
Madeira Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Madeira Road, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 18 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2024 at 09:11.

Southern Gas Networks logo
Between
23 Jun and 14 Jul 2024
Details
View Map
Share
Follow
Sheerwater Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sheerwater Road, West Byfleet.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 14 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2024 at 09:16.

Southern Gas Networks logo
Between
27 Jun and 7 Jul 2024
Details
View Map
Share
Follow
Knipp Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Knipp Hill, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2024 and could run through until 7 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Feb 2024 at 14:42.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Lammas Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lammas Lane, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Mar 2024 at 11:37.

Affinity Water logo
Between
2 and 8 Jul 2024
Details
View Map
Share
Follow
High Road

Affinity Water are proposing to carry out Utility repair and maintenance works on High Road, Byfleet, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Apr 2024 at 15:38.

Virgin Media logo
On
3 Jul 2024
Details
View Map
Share
Follow
Ship Yard

Virgin Media are proposing to carry out Utility asset works on Ship Yard, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 3 July 2024 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 2 Apr 2024 at 16:06.

Surrey County Council logo
Between
8 Jul and 6 Aug 2024
Details
View Map
Share
Follow
Canada Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Canada Road, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 6 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Apr 2024 at 10:28.

Surrey County Council logo
Between
8 and 19 Jul 2024
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Weybridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 11 Dec 2023 at 13:25.

Surrey County Council logo
Between
14 and 21 Jul 2024
Details
View Map
Share
Follow
Oatlands Drive

Surrey County Council are proposing to carry out Highway repair and maintenance works on Oatlands Drive, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 21 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Mar 2024 at 14:21.

Southern Gas Networks logo
Between
14 Jul and 1 Aug 2024
Details
View Map
Share
Follow
The Ridgeway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgeway, Fetcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 1 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Apr 2024 at 14:51.

Surrey County Council logo
Between
14 and 21 Jul 2024
Details
View Map
Share
Follow
Oatlands Drive

Surrey County Council are proposing to carry out Highway repair and maintenance works on Oatlands Drive, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 21 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Apr 2024 at 11:11.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
15 and 19 Jul 2024
Details
View Map
Share
Follow
Water Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Water Lane, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 18 Apr 2024 at 11:37.

Surrey County Council logo
Between
16 and 21 Jul 2024
Details
View Map
Share
Follow
Woodlands Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woodlands Lane, Stoke D'abernon, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2024 and could run through until 21 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 5 Mar 2024 at 11:18.

Surrey County Council logo
Between
16 and 23 Jul 2024
Details
View Map
Share
Follow
Randalls Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Randalls Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2024 and could run through until 23 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Mar 2024 at 09:09.

Surrey County Council logo
Between
16 and 23 Jul 2024
Details
View Map
Share
Follow
Randalls Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Randalls Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2024 and could run through until 23 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Mar 2024 at 09:07.

Surrey County Council logo
Between
16 and 22 Jul 2024
Details
View Map
Share
Follow
Stoke Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Stoke Road, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2024 and could run through until 22 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Apr 2024 at 10:04.

Surrey County Council logo
Between
17 and 23 Jul 2024
Details
View Map
Share
Follow
Meadow Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Meadow Way, Bookham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2024 and could run through until 23 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Apr 2024 at 12:18.

Surrey County Council logo
Between
17 and 23 Jul 2024
Details
View Map
Share
Follow
Meadow Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Meadow Way, Fetcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2024 and could run through until 23 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Apr 2024 at 12:19.

Surrey County Council logo
Between
17 and 23 Jul 2024
Details
View Map
Share
Follow
Leret Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Leret Way, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2024 and could run through until 23 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Mar 2024 at 11:33.

UK Power Networks South Eastern logo
LONG TERM
Between
17 Jul and 2 Sep 2024
Details
View Map
Share
Follow
Woodham Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Woodham Lane, Addlestone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2024 and could run through until 2 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Apr 2024 at 09:40.

Surrey County Council logo
Between
17 and 23 Jul 2024
Details
View Map
Share
Follow
The Copse

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Copse, Fetcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2024 and could run through until 23 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Apr 2024 at 12:24.

Surrey County Council logo
Between
19 and 24 Jul 2024
Details
View Map
Share
Follow
Grove Heath Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Grove Heath Lane, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 5 Apr 2024 at 12:16.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 14 Sep 2024
Details
View Map
Share
Follow
Portsmouth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Esher.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 14 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Jun 2023 at 09:03.

Southern Gas Networks logo
Between
21 Jul and 10 Aug 2024
Details
View Map
Share
Follow
West End Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West End Lane, Esher.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 10 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Jun 2023 at 06:51.

Thames Water logo
Between
22 Jul and 5 Aug 2024
Details
View Map
Share
Follow
St Marys Road

Thames Water are proposing to carry out Highway repair and maintenance works on St Marys Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 5 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 13:42.

Surrey County Council logo
LONG TERM
Between
23 Jul and 30 Aug 2024
Details
View Map
Share
Follow
Grange Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Grange Road, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 23 Oct 2023 at 09:34.

Surrey County Council logo
LONG TERM
Between
23 Jul and 30 Aug 2024
Details
View Map
Share
Follow
Ottways Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ottways Lane, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 23 Oct 2023 at 09:32.

Affinity Water logo
Between
23 and 26 Jul 2024
Details
View Map
Share
Follow
Wisley Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Wisley Lane, Wisley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 18 Apr 2024 at 07:22.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 29 Aug 2024
Details
View Map
Share
Follow
Warren Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Warren Lane, Oxshott, Leatherhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 29 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Nov 2023 at 20:47.

UK Power Networks South Eastern logo
Between
24 and 26 Jul 2024
Details
View Map
Share
Follow
Forest Road

UK Power Networks South Eastern are proposing to carry out New service connection on Forest Road, East Horsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Apr 2024 at 09:15.


Roadworks Map near to Deacon Close, COBHAM, KT11 3NT

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Apr 2024 11:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Deacon Close, COBHAM, KT11 3NT (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.