ROADWORKS SUMMARY
Shopping Precinct, The Street, IPSWICH, IP9 2EP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Shopping Precinct, The Street, IP9 2EP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Shopping Precinct, The Street, IPSWICH, IP9 2EP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Shopping Precinct, The Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Anglian Water logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Higham Road

Anglian Water are carrying out Utility asset works on Higham Road, Raydon.

These works are categorised as Major.

The works started on 2 February 2024 at 17:00 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 2 Feb 2024 at 17:25.

Anglian Water logo
LONG TERM
Until
20 Jul 2025
Details
View Map
Share
Follow
Hadleigh Road

Anglian Water are carrying out Utility asset works on Hadleigh Road, Raydon.

These works are categorised as Major.

The works started on 20 January 2024 at 11:00 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 20 Jan 2024 at 11:12.

Anglian Water logo
LONG TERM
Until
11 Aug 2025
Details
View Map
Share
Follow
Wolves Farm Lane

Anglian Water are carrying out Utility asset works on Wolves Farm Lane, Aldham.

These works are categorised as Major.

The works started on 12 February 2024 at 08:00 and could run through until 11 August 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 12 Feb 2024 at 08:30.

Anglian Water logo
LONG TERM
Until
11 Aug 2025
Details
View Map
Share
Follow
Folly Road

Anglian Water are carrying out Utility asset works on Folly Road, Chattisham.

These works are categorised as Major.

The works started on 12 February 2024 at 08:00 and could run through until 11 August 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 12 Feb 2024 at 08:29.

Anglian Water logo
LONG TERM
Until
14 Aug 2025
Details
View Map
Share
Follow
Woodlands Road

Anglian Water are carrying out Utility asset works on Woodlands Road, Raydon.

These works are categorised as Major.

The works started on 15 February 2024 at 14:45 and could run through until 14 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 15 Feb 2024 at 14:58.

Anglian Water logo
LONG TERM
Until
14 Aug 2025
Details
View Map
Share
Follow
Woodlands Road

Anglian Water are carrying out Utility asset works on Woodlands Road, Raydon.

These works are categorised as Major.

The works started on 8 March 2024 at 07:00 and could run through until 14 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 8 Mar 2024 at 07:44.

Anglian Water logo
LONG TERM
Until
8 Sep 2025
Details
View Map
Share
Follow
Wenham Road

Anglian Water are carrying out Utility asset works on Wenham Road, Copdock And Washbrook.

These works are categorised as Major.

The works started on 11 March 2024 at 05:55 and could run through until 8 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 11 Mar 2024 at 05:57.

Anglian Water logo
LONG TERM
Until
14 Sep 2025
Details
View Map
Share
Follow
Thorington Street

Anglian Water are carrying out Utility asset works on Thorington Street, Stoke By Nayland.

These works are categorised as Major.

The works started on 2 April 2024 at 16:00 and could run through until 14 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 2 Apr 2024 at 15:20.

Anglian Water logo
LONG TERM
Between
22 Mar 2024 and 18 Sep 2025
Details
View Map
Share
Follow
The Street

Anglian Water are proposing to carry out Utility asset works on The Street, Chattisham.

These works are categorised as Major.

The works will start on or after 22 March 2024 and could run through until 18 September 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 17 Jan 2024 at 11:32.

Anglian Water logo
LONG TERM
Until
4 Oct 2025
Details
View Map
Share
Follow
Pond Hall Road

Anglian Water are carrying out Utility asset works on Pond Hall Road, Hadleigh.

These works are categorised as Major.

The works started on 5 April 2024 at 08:52 and could run through until 4 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 5 Apr 2024 at 07:52.

Anglian Water logo
LONG TERM
Between
22 Apr 2024 and 10 Oct 2025
Details
View Map
Share
Follow
Ipswich Road

Anglian Water are proposing to carry out Utility asset works on Ipswich Road, Wherstead.

These works are categorised as Major.

The works will start on or after 22 April 2024 and could run through until 10 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 22 Mar 2024 at 15:38.

Anglian Water logo
LONG TERM
Between
6 May 2024 and 6 Nov 2025
Details
View Map
Share
Follow
Ipswich Road

Anglian Water are proposing to carry out Utility asset works on Ipswich Road, Hadleigh.

These works are categorised as Major.

The works will start on or after 6 May 2024 and could run through until 6 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 8 May 2024 at 08:07.

Anglian Water logo
LONG TERM
Until
16 Nov 2025
Details
View Map
Share
Follow
Marsh Road

Anglian Water are carrying out Utility asset works on Marsh Road, Stoke By Nayland.

These works are categorised as Major.

The works started on 17 May 2024 at 13:50 and could run through until 16 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 17 May 2024 at 13:50.

Anglian Water logo
LONG TERM
Until
2 Dec 2025
Details
View Map
Share
Follow
Grove Hill

Anglian Water are carrying out Utility asset works on Grove Hill, Belstead.

These works are categorised as Major.

The works started on 3 June 2024 at 12:40 and could run through until 2 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 3 Jun 2024 at 11:42.

Anglian Water logo
LONG TERM
Until
11 Feb 2025
Details
View Map
Share
Follow
London Road Former A12

Anglian Water are carrying out Utility asset works on London Road Former A12, Copdock.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:30 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 12 Aug 2024 at 09:34.

Suffolk County Council logo
LONG TERM
Between
21 Oct 2024 and 24 Jan 2025
Details
View Map
Share
Church Road

Suffolk County Council were proposing to carry out Highway repair and maintenance works on Church Road, Bentley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 29 Aug 2024 at 09:49.

Suffolk County Council logo
LONG TERM
Between
21 Oct 2024 and 24 Jan 2025
Details
View Map
Share
Church Road

Suffolk County Council were proposing to carry out Highway repair and maintenance works on Church Road, Bentley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 17 Sep 2024 at 13:21.

Suffolk County Council logo
LONG TERM
Between
11 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Church Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Church Road, Bentley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 21 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Suffolk County Council on 3 Oct 2024 at 12:27.

Suffolk County Council logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Ipswich Road

Suffolk County Council are carrying out Highway repair and maintenance works on Ipswich Road, Wherstead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:00 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 5 Dec 2024 at 11:36.

Suffolk County Council logo
LONG TERM
Between
11 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Ipswich Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Ipswich Road, Wherstead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 17 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Suffolk County Council on 6 Nov 2024 at 13:53.

Suffolk County Council logo
LONG TERM
Between
2 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Heath Road

Suffolk County Council were proposing to carry out Highway repair and maintenance works on Heath Road, East Bergholt.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 21 Nov 2024 at 09:26.

Suffolk County Council logo
LONG TERM
Between
2 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Heath Road

Suffolk County Council were proposing to carry out Highway repair and maintenance works on Heath Road, East Bergholt.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 14:38.

Suffolk County Council logo
LONG TERM
Between
2 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Heath Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Heath Road, East Bergholt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 27 Nov 2024 at 09:28.

Suffolk County Council logo
LONG TERM
Between
2 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Heath Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Heath Road, East Bergholt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 28 Nov 2024 at 09:34.

Suffolk County Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Heath Road

Suffolk County Council are carrying out Highway repair and maintenance works on Heath Road, East Bergholt.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:00 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 2 Dec 2024 at 08:56.

Anglian Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Higham Road

Anglian Water are carrying out Utility repair and maintenance works on Higham Road, Babergh, Higham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 December 2024 at 22:20 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 27 Dec 2024 at 22:31.

Suffolk County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Road From C727 To C473

Suffolk County Council are proposing to carry out Highway improvement works on Road From C727 To C473, Shelley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Nov 2024 at 12:27.

Suffolk County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Lower Raydon

Suffolk County Council are proposing to carry out Highway improvement works on Lower Raydon, Raydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 19 Nov 2024 at 12:11.

Suffolk County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Lower Raydon

Suffolk County Council are proposing to carry out Highway improvement works on Lower Raydon, Raydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Nov 2024 at 12:26.

Suffolk County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Shelley Road

Suffolk County Council are proposing to carry out Highway improvement works on Shelley Road, Layham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 19 Nov 2024 at 12:11.

Suffolk County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Road From C727 To C473

Suffolk County Council are proposing to carry out Highway improvement works on Road From C727 To C473, Shelley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 19 Nov 2024 at 12:11.

Suffolk County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Layham Road

Suffolk County Council are proposing to carry out Highway improvement works on Layham Road, Shelley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Nov 2024 at 12:27.

Anglian Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Grove Hill

Anglian Water are proposing to carry out Utility asset works on Grove Hill, Belstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 28 Oct 2024 at 08:10.

Anglian Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Grove Hill

Anglian Water were proposing to carry out Section 58 on Grove Hill, Belstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 18 Oct 2024 at 08:45.

Suffolk County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Layham Road

Suffolk County Council are proposing to carry out Highway improvement works on Layham Road, Shelley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 19 Nov 2024 at 12:12.

Suffolk County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Shelley Road

Suffolk County Council are proposing to carry out Highway improvement works on Shelley Road, Layham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Nov 2024 at 12:27.

Essex County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Long Road

Essex County Council are proposing to carry out Highway improvement works on Long Road, Mistley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 16 Dec 2024 at 15:03.

Cadent Gas logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Sproughton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:35.

Anglian Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Ipswich Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Ipswich Road, Wherstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 9 Dec 2024 at 07:30.

UK Power Networks Eastern & London logo
Between
17 and 24 Jan 2025
Details
View Map
Share
Follow
Benton Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Oct 2024 at 15:09.

UK Power Networks Eastern & London logo
Between
17 and 24 Jan 2025
Details
View Map
Share
Follow
Benton Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Oct 2024 at 13:13.

UK Power Networks Eastern & London logo
Between
17 and 24 Jan 2025
Details
View Map
Share
Follow
Benton Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2024 at 12:50.

UK Power Networks Eastern & London logo
Between
17 and 24 Jan 2025
Details
View Map
Share
Follow
Benton Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 12:07.

UK Power Networks Eastern & London logo
Between
17 and 24 Jan 2025
Details
View Map
Share
Benton Street

UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Sep 2024 at 11:32.

Anglian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Woodlands Road

Anglian Water were proposing to carry out Utility asset works on Woodlands Road, Raydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 11:19.

Anglian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Woodlands Road

Anglian Water were proposing to carry out Utility asset works on Woodlands Road, Raydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 9 Oct 2024 at 12:51.

Anglian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Woodlands Road

Anglian Water were proposing to carry out Utility asset works on Woodlands Road, Raydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 12:51.

Anglian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Woodlands Road

Anglian Water were proposing to carry out Utility asset works on Woodlands Road, Raydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 12:49.

Anglian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Woodlands Road

Anglian Water are proposing to carry out Utility asset works on Woodlands Road, Raydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 08:16.

Anglian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Woodlands Road

Anglian Water were proposing to carry out Utility asset works on Woodlands Road, Raydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 11:19.

Suffolk County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Ipswich Road

Suffolk County Council are proposing to carry out Highway improvement works on Ipswich Road, Tattingstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 14:48.

Suffolk County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Ipswich Road

Suffolk County Council are proposing to carry out Highway improvement works on Ipswich Road, Tattingstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 13:24.

Suffolk County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Ipswich Road

Suffolk County Council are proposing to carry out Highway improvement works on Ipswich Road, Tattingstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 10 Dec 2024 at 10:00.

Suffolk County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Lemons Hill

Suffolk County Council are proposing to carry out Highway improvement works on Lemons Hill, Tattingstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 13 Dec 2024 at 08:59.

Suffolk County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Lemons Hill

Suffolk County Council are proposing to carry out Highway improvement works on Lemons Hill, Tattingstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 13:24.

Suffolk County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Lemons Hill

Suffolk County Council were proposing to carry out Highway improvement works on Lemons Hill, Tattingstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 10 Dec 2024 at 14:50.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Ramsey Close

Cadent Gas are proposing to carry out Utility asset works on Ramsey Close, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:03.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Fountains Road

Cadent Gas are proposing to carry out Utility asset works on Fountains Road, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:02.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Stoke Park Drive

Cadent Gas are proposing to carry out Utility asset works on Stoke Park Drive, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:03.

Essex County Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Brook Street

Essex County Council are proposing to carry out Highway improvement works on Brook Street, Dedham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 09:33.

Anglian Water logo
Between
7 and 10 Feb 2025
Details
View Map
Share
Hadleigh Road

Anglian Water were proposing to carry out Section 58 on Hadleigh Road, Raydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 February 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 8 Nov 2024 at 09:09.

Anglian Water logo
Between
7 and 10 Feb 2025
Details
View Map
Share
Hadleigh Road

Anglian Water were proposing to carry out Section 58 on Hadleigh Road, Raydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 February 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 12:54.

Gigaclear logo
Between
8 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Rigby Avenue

Gigaclear are proposing to carry out Remedial works on Rigby Avenue, Mistley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 19 Dec 2024 at 13:42.

Anglian Water logo
Between
8 and 10 Feb 2025
Details
View Map
Share
The Heath

Anglian Water were proposing to carry out Utility repair and maintenance works on The Heath, Tattingstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 February 2025 and run through until 10 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 5 Nov 2024 at 14:57.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Waldegrave Way

Cadent Gas were proposing to carry out Utility asset works on Waldegrave Way, Lawford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 16:59.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Waldegrave Way

Cadent Gas are proposing to carry out Utility asset works on Waldegrave Way, Lawford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:17.

Anglian Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Hadleigh Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Hadleigh Road, Burstall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 15:10.

Anglian Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Burstall Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Burstall Road, Sproughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 15:38.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Fountains Road

Cadent Gas are proposing to carry out Utility asset works on Fountains Road, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:01.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Belstead Road

Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:01.

Cadent Gas logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Colchester Road

Cadent Gas are proposing to carry out Utility asset works on Colchester Road, Lawford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 14:04.

Cadent Gas logo
Between
12 and 26 Feb 2025
Details
View Map
Share
Follow
Belstead Road

Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 14:18.

Cadent Gas logo
Between
12 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Belstead Road

Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 15:39.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Long Road

Cadent Gas were proposing to carry out Utility asset works on Long Road, Lawford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 17:09.

Suffolk County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Pattern Bush Close

Suffolk County Council are proposing to carry out Highway improvement works on Pattern Bush Close, Brantham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 20 Dec 2024 at 12:16.

Anglian Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Pond Hall Road

Anglian Water are proposing to carry out Utility asset works on Pond Hall Road, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 15:26.

Suffolk County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Wallers Grove

Suffolk County Council are proposing to carry out Highway improvement works on Wallers Grove, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 11:17.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Edgefield Avenue

Cadent Gas are proposing to carry out Utility asset works on Edgefield Avenue, Lawford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:21.

Suffolk County Council logo
LONG TERM
Between
17 Feb and 6 Jun 2025
Details
View Map
Share
Follow
Church Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Church Road, Bentley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 23 Dec 2024 at 09:44.

Suffolk County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Palfrey Heights

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Palfrey Heights, Brantham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 9 Dec 2024 at 09:51.

Suffolk County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Brooklands Rise

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Brooklands Rise, Brantham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 9 Dec 2024 at 09:51.

Suffolk County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Brooklands Road

Suffolk County Council are proposing to carry out Highway improvement works on Brooklands Road, Brantham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 20 Dec 2024 at 12:16.

Cadent Gas logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Belstead Road

Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:18.

Affinity Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Dead Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Dead Lane, Mistley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 15 Nov 2024 at 14:46.

Cadent Gas logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Belstead Road

Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:09.

Cadent Gas logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Belstead Road

Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:48.

Anglian Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Woodlands Road

Anglian Water are proposing to carry out Utility asset works on Woodlands Road, Raydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 20 Dec 2024 at 13:47.

UK Power Networks Eastern & London logo
Between
10 and 18 Mar 2025
Details
View Map
Share
Follow
Hadleigh Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Hadleigh Road, Babergh, Higham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Dec 2024 at 14:36.

UK Power Networks Eastern & London logo
Between
10 and 18 Mar 2025
Details
View Map
Share
Follow
Hadleigh Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Hadleigh Road, Babergh, Higham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Dec 2024 at 15:46.

Anglian Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Hadleigh Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Hadleigh Road, Babergh, Higham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 24 Dec 2024 at 09:39.

Cadent Gas logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Stoke Park Drive

Cadent Gas are proposing to carry out Utility asset works on Stoke Park Drive, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:12.

Cadent Gas logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Stoke Park Drive

Cadent Gas are proposing to carry out Utility asset works on Stoke Park Drive, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 14:32.

Cadent Gas logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Belstead Road

Cadent Gas were proposing to carry out Utility asset works on Belstead Road, Ipswich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 15:27.

Anglian Water logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Wenham Road

Anglian Water are proposing to carry out Utility asset works on Wenham Road, Copdock And Washbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 4 Dec 2024 at 11:54.

Anglian Water logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Wenham Road

Anglian Water are proposing to carry out Utility asset works on Wenham Road, Copdock And Washbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 15:36.

Anglian Water logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Hadleigh Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Hadleigh Road, Babergh, Higham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 24 Dec 2024 at 10:07.

Affinity Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Mistley Quay

Affinity Water are proposing to carry out Utility repair and maintenance works on Mistley Quay, Mistley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Dec 2024 at 15:25.

Anglian Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Sulleys Hill

Anglian Water are proposing to carry out Utility repair and maintenance works on Sulleys Hill, Raydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 23 Dec 2024 at 13:00.


Roadworks Map near to Shopping Precinct, The Street, IPSWICH, IP9 2EP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Dec 2024 02:54
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Shopping Precinct, The Street, IPSWICH, IP9 2EP (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
EMERGENCY
  
FARTHINGS WENT 
(0.1 miles)
Cadent Gas
Utility repair and maintenance works - Footpath - Some carriageway incursion
Complete
18 Dec 2024 10:46 - 22 Dec 2024 07:17
0.1
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.