ROADWORKS SUMMARY
Crockatt Road, IPSWICH, IP7 6RL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Crockatt Road, IP7 6RL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Crockatt Road, IPSWICH, IP7 6RL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Crockatt Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Anglian Water logo
LONG TERM
Until
20 Jul 2025
Details
View Map
Share
Follow
Hadleigh Road

Anglian Water are carrying out Utility asset works on Hadleigh Road, Raydon.

These works are categorised as Major.

The works started on 20 January 2024 at 11:00 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 20 Jan 2024 at 11:12.

Anglian Water logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Higham Road

Anglian Water are carrying out Utility asset works on Higham Road, Raydon.

These works are categorised as Major.

The works started on 2 February 2024 at 17:00 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 2 Feb 2024 at 17:25.

Anglian Water logo
LONG TERM
Until
11 Aug 2025
Details
View Map
Share
Follow
Folly Road

Anglian Water are carrying out Utility asset works on Folly Road, Chattisham.

These works are categorised as Major.

The works started on 12 February 2024 at 08:00 and could run through until 11 August 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 12 Feb 2024 at 08:29.

Anglian Water logo
LONG TERM
Until
11 Aug 2025
Details
View Map
Share
Follow
Wolves Farm Lane

Anglian Water are carrying out Utility asset works on Wolves Farm Lane, Aldham.

These works are categorised as Major.

The works started on 12 February 2024 at 08:00 and could run through until 11 August 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 12 Feb 2024 at 08:30.

Anglian Water logo
LONG TERM
Until
14 Aug 2025
Details
View Map
Share
Follow
Woodlands Road

Anglian Water are carrying out Utility asset works on Woodlands Road, Raydon.

These works are categorised as Major.

The works started on 15 February 2024 at 14:45 and could run through until 14 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 15 Feb 2024 at 14:58.

Anglian Water logo
LONG TERM
Until
14 Aug 2025
Details
View Map
Share
Follow
Woodlands Road

Anglian Water are carrying out Utility asset works on Woodlands Road, Raydon.

These works are categorised as Major.

The works started on 8 March 2024 at 07:00 and could run through until 14 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 8 Mar 2024 at 07:44.

Anglian Water logo
LONG TERM
Until
8 Sep 2025
Details
View Map
Share
Follow
Wenham Road

Anglian Water are carrying out Utility asset works on Wenham Road, Copdock And Washbrook.

These works are categorised as Major.

The works started on 11 March 2024 at 05:55 and could run through until 8 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 11 Mar 2024 at 05:57.

Anglian Water logo
LONG TERM
Until
8 Sep 2025
Details
View Map
Share
Follow
The Street

Anglian Water are carrying out Utility asset works on The Street, Aldham.

These works are categorised as Major.

The works started on 11 March 2024 at 05:55 and could run through until 8 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 11 Mar 2024 at 05:56.

Anglian Water logo
LONG TERM
Between
22 Mar 2024 and 18 Sep 2025
Details
View Map
Share
Follow
The Street

Anglian Water are proposing to carry out Utility asset works on The Street, Chattisham.

These works are categorised as Major.

The works will start on or after 22 March 2024 and could run through until 18 September 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 17 Jan 2024 at 11:32.

Anglian Water logo
LONG TERM
Until
22 Sep 2025
Details
View Map
Share
Follow
Semer Road

Anglian Water are carrying out Utility asset works on Semer Road, Nedging With Naughton.

These works are categorised as Major.

The works started on 24 March 2024 at 06:00 and could run through until 22 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 24 Mar 2024 at 06:28.

Anglian Water logo
LONG TERM
Until
4 Oct 2025
Details
View Map
Share
Follow
Pond Hall Road

Anglian Water are carrying out Utility asset works on Pond Hall Road, Hadleigh.

These works are categorised as Major.

The works started on 5 April 2024 at 08:52 and could run through until 4 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 5 Apr 2024 at 07:52.

Anglian Water logo
LONG TERM
Between
22 Apr 2024 and 21 Oct 2025
Details
View Map
Share
Follow
Nedging Road

Anglian Water are proposing to carry out Utility asset works on Nedging Road, Nedging With Naughton.

These works are categorised as Major.

The works will start on or after 22 April 2024 and could run through until 21 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 27 Mar 2024 at 13:53.

Anglian Water logo
LONG TERM
Until
25 Oct 2025
Details
View Map
Share
Follow
Elmsett Road

Anglian Water are carrying out Utility asset works on Elmsett Road, Whatfield.

These works are categorised as Major.

The works started on 26 April 2024 at 09:42 and could run through until 25 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 23 Feb 2025 at 10:58.

Anglian Water logo
LONG TERM
Between
6 May 2024 and 6 Nov 2025
Details
View Map
Share
Follow
Ipswich Road

Anglian Water are proposing to carry out Utility asset works on Ipswich Road, Hadleigh.

These works are categorised as Major.

The works will start on or after 6 May 2024 and could run through until 6 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 8 May 2024 at 08:07.

Anglian Water logo
LONG TERM
Until
12 Nov 2025
Details
View Map
Share
Follow
Ipswich Road

Anglian Water are carrying out Utility asset works on Ipswich Road, Nedging With Naughton.

These works are categorised as Major.

The works started on 13 May 2024 at 07:00 and could run through until 12 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 13 May 2024 at 06:21.

Anglian Water logo
LONG TERM
Until
13 Nov 2025
Details
View Map
Share
Follow
Naughton Road

Anglian Water are carrying out Utility asset works on Naughton Road, Whatfield.

These works are categorised as Major.

The works started on 14 May 2024 at 10:30 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 14 May 2024 at 09:33.

Anglian Water logo
LONG TERM
Until
16 Nov 2025
Details
View Map
Share
Follow
Marsh Road

Anglian Water are carrying out Utility asset works on Marsh Road, Stoke By Nayland.

These works are categorised as Major.

The works started on 17 May 2024 at 13:50 and could run through until 16 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 17 May 2024 at 13:50.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lady Lane

Cadent Gas are carrying out Utility repair and maintenance works on Lady Lane, Hadleigh.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 14:00 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 10:34.

Anglian Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Layham Road

Anglian Water are carrying out Utility repair and maintenance works on Layham Road, Layham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 March 2025 at 11:50 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 19 Mar 2025 at 14:48.

Anglian Water logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Wenham Road

Anglian Water are proposing to carry out Utility asset works on Wenham Road, Copdock And Washbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 15:36.

Suffolk County Council logo
LONG TERM
Between
17 Mar and 9 May 2025
Details
View Map
Share
Follow
Hadleigh Road

Suffolk County Council are proposing to carry out Works for road purposes on Hadleigh Road, Elmsett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 26 Feb 2025 at 12:30.

Suffolk County Council logo
LONG TERM
Between
17 Mar and 9 May 2025
Details
View Map
Share
Follow
Hadleigh Road

Suffolk County Council are proposing to carry out Works for road purposes on Hadleigh Road, Elmsett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Suffolk County Council on 24 Jan 2025 at 12:28.

Anglian Water logo
Finishing
Monday
Details
View Map
Share
Follow
Boswell Lane

Anglian Water are carrying out Utility repair and maintenance works on Boswell Lane, Hadleigh.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2025 at 12:11 and could run through until 24 March 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 18 Mar 2025 at 16:11.

Anglian Water logo
Finishing
Tomorrow
Details
View Map
Share
Hadleigh Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Hadleigh Road, Babergh, Higham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 March 2025 and run through until 21 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 26 Feb 2025 at 14:23.

Anglian Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Sulleys Hill

Anglian Water are carrying out Utility repair and maintenance works on Sulleys Hill, Raydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 March 2025 at 08:49 and could run through until 25 March 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 20 Mar 2025 at 09:36.

Anglian Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Tye Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Tye Lane, Bramford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 23 Dec 2024 at 08:14.

Anglian Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lower Raydon

Anglian Water are carrying out Utility repair and maintenance works on Lower Raydon, Raydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 March 2025 at 08:00 and could run through until 25 March 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 20 Mar 2025 at 16:37.

Suffolk County Council logo
Finishing
Today
Details
View Map
Share
Upper Street

Suffolk County Council were proposing to carry out Highway repair and maintenance works on Upper Street, Layham.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 20 March 2025 The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 20 Mar 2025 at 10:36.

Anglian Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Sulleys Hill

Anglian Water were proposing to carry out Utility repair and maintenance works on Sulleys Hill, Raydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 28 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 3 Jan 2025 at 09:19.

Suffolk County Council logo
Finishing
Wednesday
Details
View Map
Share
Road From A1071 To 8417

Suffolk County Council were proposing to carry out Highway improvement works on Road From A1071 To 8417, Hadleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 21 Feb 2025 at 15:47.

Suffolk County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Road From A1071 To 8417

Suffolk County Council are proposing to carry out Highway improvement works on Road From A1071 To 8417, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 24 Feb 2025 at 14:40.

Suffolk County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Road From A1071 To 8417

Suffolk County Council are proposing to carry out Highway improvement works on Road From A1071 To 8417, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 3 Mar 2025 at 13:48.

Suffolk County Council logo
Finishing
Wednesday
Details
View Map
Share
Cosford Road

Suffolk County Council were proposing to carry out Highway improvement works on Cosford Road, Aldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 21 Feb 2025 at 15:43.

Suffolk County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cosford Road

Suffolk County Council are proposing to carry out Highway improvement works on Cosford Road, Aldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 24 Feb 2025 at 14:40.

Suffolk County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cosford Road

Suffolk County Council are proposing to carry out Highway improvement works on Cosford Road, Aldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 3 Mar 2025 at 13:49.

Suffolk County Council logo
Finishing
Wednesday
Details
View Map
Share
Whatfield Road

Suffolk County Council were proposing to carry out Highway improvement works on Whatfield Road, Aldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 21 Feb 2025 at 15:40.

Suffolk County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Whatfield Road

Suffolk County Council are proposing to carry out Highway improvement works on Whatfield Road, Aldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 24 Feb 2025 at 13:35.

Suffolk County Council logo
Finishing
Wednesday
Details
View Map
Share
Whatfield Road

Suffolk County Council were proposing to carry out Highway improvement works on Whatfield Road, Aldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 20 Jan 2025 at 13:20.

Suffolk County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Whatfield Road

Suffolk County Council are proposing to carry out Highway improvement works on Whatfield Road, Aldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 28 Jan 2025 at 12:43.

Suffolk County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Whatfield Road

Suffolk County Council are proposing to carry out Highway improvement works on Whatfield Road, Aldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 26 Feb 2025 at 12:31.

Suffolk County Council logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Road From A1071 To 8417

Suffolk County Council were proposing to carry out Highway improvement works on Road From A1071 To 8417, Hadleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 March 2025 and run through until 27 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 20 Jan 2025 at 13:21.

Suffolk County Council logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Road From A1071 To 8417

Suffolk County Council were proposing to carry out Highway improvement works on Road From A1071 To 8417, Hadleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 March 2025 and run through until 27 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 20 Jan 2025 at 13:14.

Suffolk County Council logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Cosford Road

Suffolk County Council were proposing to carry out Highway improvement works on Cosford Road, Aldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 March 2025 and run through until 27 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 20 Jan 2025 at 13:15.

Suffolk County Council logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Cosford Road

Suffolk County Council were proposing to carry out Highway improvement works on Cosford Road, Aldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 March 2025 and run through until 27 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 20 Jan 2025 at 13:21.

Suffolk County Council logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Whatfield Road

Suffolk County Council were proposing to carry out Highway improvement works on Whatfield Road, Aldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 March 2025 and run through until 27 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 20 Jan 2025 at 13:17.

Suffolk County Council logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Whatfield Road

Suffolk County Council were proposing to carry out Highway improvement works on Whatfield Road, Aldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 March 2025 and run through until 27 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 20 Jan 2025 at 13:19.

Anglian Water logo
Between
28 and 31 Mar 2025
Details
View Map
Share
Follow
Ipswich Road

Anglian Water are proposing to carry out Utility asset works on Ipswich Road, Nedging With Naughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 22 Jan 2025 at 15:19.

UK Power Networks Eastern & London logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Raydon Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Raydon Road, Wenham Magna.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jan 2025 at 13:40.

UK Power Networks Eastern & London logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Raydon Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Raydon Road, Wenham Magna.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2025 at 08:46.

Suffolk County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Flowton Road

Suffolk County Council are proposing to carry out Highway improvement works on Flowton Road, Elmsett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 19 Feb 2025 at 10:39.

Suffolk County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Flowton Road

Suffolk County Council are proposing to carry out Highway improvement works on Flowton Road, Elmsett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 24 Feb 2025 at 15:48.

Suffolk County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Flowton Road

Suffolk County Council are proposing to carry out Highway improvement works on Flowton Road, Elmsett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 28 Feb 2025 at 15:34.

Suffolk County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Flowton Road

Suffolk County Council were proposing to carry out Highway improvement works on Flowton Road, Elmsett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 4 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 3 Mar 2025 at 13:38.

Suffolk County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Flowton Road

Suffolk County Council are proposing to carry out Highway improvement works on Flowton Road, Elmsett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 3 Mar 2025 at 15:46.

Suffolk County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Flowton Road

Suffolk County Council are proposing to carry out Highway improvement works on Flowton Road, Elmsett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the verge only.

This roadwork event was last updated by Suffolk County Council on 6 Mar 2025 at 10:34.

Suffolk County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Bildeston Road

Suffolk County Council are proposing to carry out Highway improvement works on Bildeston Road, Offton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Feb 2025 at 11:40.

Suffolk County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Bildeston Road

Suffolk County Council are proposing to carry out Highway improvement works on Bildeston Road, Offton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 20 Feb 2025 at 09:42.

UK Power Networks Eastern & London logo
Between
4 and 18 Apr 2025
Details
View Map
Share
Follow
Benton Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 11:10.

UK Power Networks Eastern & London logo
Between
4 and 18 Apr 2025
Details
View Map
Share
Benton Street

UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 April 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Dec 2024 at 09:59.

Anglian Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Sulleys Hill

Anglian Water are proposing to carry out Utility repair and maintenance works on Sulleys Hill, Raydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 9 Jan 2025 at 14:10.

Anglian Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Sulleys Hill

Anglian Water were proposing to carry out Utility repair and maintenance works on Sulleys Hill, Raydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 11 April 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 6 Mar 2025 at 15:04.

UK Power Networks Eastern & London logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Benton Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Dec 2024 at 10:20.

UK Power Networks Eastern & London logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
Benton Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jan 2025 at 08:39.

UK Power Networks Eastern & London logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
Benton Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Feb 2025 at 11:51.

UK Power Networks Eastern & London logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
Benton Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 08:28.

Gigaclear logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
George Street

Gigaclear are proposing to carry out Utility asset works on George Street, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 5 Mar 2025 at 13:27.

Gigaclear logo
Between
7 and 11 Apr 2025
Details
View Map
Share
George Street

Gigaclear were proposing to carry out Utility asset works on George Street, Hadleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 5 Mar 2025 at 07:12.

Gigaclear logo
Between
7 and 11 Apr 2025
Details
View Map
Share
George Street

Gigaclear were proposing to carry out Utility asset works on George Street, Hadleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 5 Mar 2025 at 08:59.

Gigaclear logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
George Street

Gigaclear are proposing to carry out Utility asset works on George Street, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 3 Mar 2025 at 10:08.

Anglian Water logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Hadleigh Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Hadleigh Road, Whatfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 5 Feb 2025 at 16:09.

Anglian Water logo
Between
7 and 17 Apr 2025
Details
View Map
Share
The Green

Anglian Water were proposing to carry out Utility repair and maintenance works on The Green, Whatfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 5 Feb 2025 at 16:10.

Anglian Water logo
Between
7 and 17 Apr 2025
Details
View Map
Share
The Street

Anglian Water were proposing to carry out Utility repair and maintenance works on The Street, Whatfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 5 Feb 2025 at 16:11.

Anglian Water logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
Naughton Road

Anglian Water are proposing to carry out Utility asset works on Naughton Road, Whatfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 20 Dec 2024 at 09:46.

UK Power Networks Eastern & London logo
Between
14 and 22 Apr 2025
Details
View Map
Share
Hadleigh Road

UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Hadleigh Road, Babergh, Higham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 22 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 11:21.

Anglian Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Castle Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Castle Road, Hadleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 16 April 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 21 Jan 2025 at 13:44.

Suffolk County Council logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Stone Street

Suffolk County Council are proposing to carry out Highway improvement works on Stone Street, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 26 Feb 2025 at 12:22.

Suffolk County Council logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Union Hill

Suffolk County Council are proposing to carry out Highway improvement works on Union Hill, Semer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 26 Feb 2025 at 12:22.

Anglian Water logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Sherbourne Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Sherbourne Street, Boxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 April 2025 and run through until 25 April 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 7 Feb 2025 at 10:06.

Suffolk County Council logo
Between
5 and 11 May 2025
Details
View Map
Share
Follow
Stone Street

Suffolk County Council are proposing to carry out Works for road purposes on Stone Street, Boxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 11 May 2025. The works will impact the verge only.

This roadwork event was last updated by Suffolk County Council on 18 Feb 2025 at 15:53.

Suffolk County Council logo
Between
5 and 11 May 2025
Details
View Map
Share
Follow
Stone Street

Suffolk County Council are proposing to carry out Works for road purposes on Stone Street, Boxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 11 May 2025. The works will impact the verge only.

This roadwork event was last updated by Suffolk County Council on 18 Feb 2025 at 16:49.

Anglian Water logo
Between
6 and 16 May 2025
Details
View Map
Share
Higham Road

Anglian Water were proposing to carry out Utility asset works on Higham Road, Raydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 16 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 25 Feb 2025 at 09:22.

Anglian Water logo
Between
6 and 8 May 2025
Details
View Map
Share
Layham Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Layham Road, Layham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 8 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 25 Feb 2025 at 10:47.

Suffolk County Council logo
Between
6 and 14 May 2025
Details
View Map
Share
Ipswich Road

Suffolk County Council were proposing to carry out Highway improvement works on Ipswich Road, Hadleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 14 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 27 Feb 2025 at 13:36.

Suffolk County Council logo
Between
6 and 14 May 2025
Details
View Map
Share
Follow
Ipswich Road

Suffolk County Council are proposing to carry out Highway improvement works on Ipswich Road, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 13:15.

Suffolk County Council logo
Between
6 and 14 May 2025
Details
View Map
Share
Follow
Ipswich Road

Suffolk County Council are proposing to carry out Highway improvement works on Ipswich Road, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 20 Mar 2025 at 09:23.

Suffolk County Council logo
Between
6 and 14 May 2025
Details
View Map
Share
Follow
A1071 Hadleigh Bypass

Suffolk County Council are proposing to carry out Highway repair and maintenance works on A1071 Hadleigh Bypass, Hadleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 13:14.

Suffolk County Council logo
Between
6 and 14 May 2025
Details
View Map
Share
Follow
Back Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Back Road, Hintlesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 13:12.

Suffolk County Council logo
Between
6 and 14 May 2025
Details
View Map
Share
Follow
Back Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Back Road, Hintlesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 14:50.

Suffolk County Council logo
LONG TERM
Between
6 May and 17 Jun 2025
Details
View Map
Share
Follow
Flowton Road

Suffolk County Council are proposing to carry out Works for road purposes on Flowton Road, Flowton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 19 Feb 2025 at 12:34.

Suffolk County Council logo
LONG TERM
Between
6 May and 17 Jun 2025
Details
View Map
Share
Follow
Flowton Road

Suffolk County Council are proposing to carry out Works for road purposes on Flowton Road, Elmsett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 19 Feb 2025 at 12:34.

Anglian Water logo
Between
6 and 16 May 2025
Details
View Map
Share
Follow
Semer Road

Anglian Water are proposing to carry out Utility asset works on Semer Road, Nedging With Naughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 4 Feb 2025 at 10:56.

Anglian Water logo
Between
12 and 14 May 2025
Details
View Map
Share
Main Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Main Road, Somersham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 14 May 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 7 Feb 2025 at 08:29.

Anglian Water logo
Between
19 and 21 May 2025
Details
View Map
Share
Butchers Lane

Anglian Water were proposing to carry out Remedial works on Butchers Lane, Boxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 21 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 27 Feb 2025 at 10:57.

Suffolk County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Flowton Road

Suffolk County Council are proposing to carry out Works for Rail Purposes on Flowton Road, Flowton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 5 Mar 2025 at 13:26.

Suffolk County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Flowton Road

Suffolk County Council are proposing to carry out Works for Rail Purposes on Flowton Road, Flowton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 6 Mar 2025 at 09:05.

Suffolk County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Flowton Road

Suffolk County Council are proposing to carry out Works for Rail Purposes on Flowton Road, Elmsett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 25 Feb 2025 at 16:14.

Suffolk County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Flowton Road

Suffolk County Council are proposing to carry out Works for Rail Purposes on Flowton Road, Elmsett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 6 Mar 2025 at 09:06.

Anglian Water logo
Between
24 May and 1 Jun 2025
Details
View Map
Share
Follow
Hadleigh Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Hadleigh Road, Whatfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 7 Feb 2025 at 15:55.

Anglian Water logo
Between
24 May and 1 Jun 2025
Details
View Map
Share
Follow
The Green

Anglian Water are proposing to carry out Utility repair and maintenance works on The Green, Whatfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 7 Feb 2025 at 15:55.

Anglian Water logo
Between
24 May and 1 Jun 2025
Details
View Map
Share
Follow
The Street

Anglian Water are proposing to carry out Utility repair and maintenance works on The Street, Whatfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 7 Feb 2025 at 15:56.

Cadent Gas logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Follow
Ipswich Road

Cadent Gas are proposing to carry out Utility asset works on Ipswich Road, Elmsett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jun 2024 at 12:23.

Cadent Gas logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Ipswich Road

Cadent Gas were proposing to carry out Utility asset works on Ipswich Road, Elmsett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 20 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Feb 2025 at 09:38.

Anglian Water logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Main Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Road, Somersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 11 Feb 2025 at 11:02.

Anglian Water logo
Between
4 and 6 Jun 2025
Details
View Map
Share
The Street

Anglian Water were proposing to carry out Remedial works on The Street, Aldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 19 Mar 2025 at 15:04.

Anglian Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Pigeons Lane

Anglian Water were proposing to carry out Utility repair and maintenance works on Pigeons Lane, Copdock And Washbrook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 17 Mar 2025 at 14:50.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Cox Hill

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Cox Hill, Boxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2025 at 16:14.


Roadworks Map near to Crockatt Road, IPSWICH, IP7 6RL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 20 Mar 2025 20:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Crockatt Road, IPSWICH, IP7 6RL (19 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Suffolk County Council logo
MAJOR
  
ELLEN ALDOUS AVENUE 
(0.3 miles)
Suffolk County Council
Works for road purposes - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 17 Mar 2025 - 11 Apr 2025
0.3
Details
Share
Follow
2
Suffolk County Council logo
MAJOR
  
ELLEN ALDOUS AVENUE 
(0.3 miles)
Suffolk County Council
Works for road purposes - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 17 Mar 2025 - 11 Apr 2025
0.3
Details
Share
Follow
3
Cadent Gas logo
MAJOR
  
FOOTWAY BESIDE NO 77 ALDHAM ROAD TO BEHIND NO 29 CHURCHILL AVENUE 
(0.3 miles)
Cadent Gas
Utility asset works - Footway - No carriageway incursion
Complete
14 Feb 2025 10:00 - 17 Mar 2025 09:19
0.3
Details
Share
4
UK Power Networks Eastern & London logo
LADY LANE 
(0.3 miles)
UK Power Networks Eastern & London
New service connection - Footway - Two-way signals
Cancelled
(Scheduled: 20 Mar 2025 - 24 Mar 2025)
0.3
Details
Share
5
Cadent Gas logo
EMERGENCY
  
LADY LANE 
(0.3 miles)
Cadent Gas
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
In Progress
Since: 24 Feb 2025 14:00
(Scheduled: 24 Feb 2025 - 25 Mar 2025)
0.3
Details
Share
Follow
6
Anglian Water logo
URGENT
  
BOSWELL LANE 
(0.4 miles)
Anglian Water
Utility repair and maintenance works - Verge - Road closure
In Progress
Since: 18 Mar 2025 12:11
(Scheduled: 18 Mar 2025 - 24 Mar 2025)
0.4
Details
Share
Follow
7
UK Power Networks Eastern & London logo
MAJOR
  
FOOTWAY OUTSIDE NO 14 TIMPERLEY CLOSE TO OUTSIDE NO 19 
(0.4 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footpath - No carriageway incursion
Planned
Scheduled: 20 Mar 2025 - 26 Mar 2025
0.4
Details
Share
Follow
8
UK Power Networks Eastern & London logo
FOOTWAY OUTSIDE NO 14 TIMPERLEY CLOSE TO OUTSIDE NO 19 
(0.4 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footpath - No carriageway incursion
In Progress
Since: 20 Mar 2025 08:14
(Scheduled: 20 Mar 2025 - 26 Mar 2025)
0.4
Details
Share
Follow
9
Cadent Gas logo
MAJOR
  
FOOTWAY BESIDE NO 31 CHURCHILL AVENUE TO BEHIND NO 45 
(0.4 miles)
Cadent Gas
Utility asset works - Footway - No carriageway incursion
Complete
14 Feb 2025 09:59 - 17 Mar 2025 09:18
0.4
Details
Share
10
Cadent Gas logo
MAJOR
  
FOOTWAY FROM TIMPERLEY CLOSE TO BRADFIELD AVENUE 
(0.4 miles)
Cadent Gas
Utility asset works - Footway - No carriageway incursion
Complete
14 Feb 2025 10:01 - 17 Mar 2025 09:20
0.4
Details
Share