ROADWORKS SUMMARY
Carr Street, IPSWICH, IP4 1HA
Introduction
View current and future planned roadworks and road closures for Carr Street, IP4 1HA and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Carr Street, IPSWICH, IP4 1HA
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Carr Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
8 Sep 2025
Anglian Water are carrying out Utility asset works on Wenham Road, Copdock And Washbrook.
These works are categorised as Major.
The works started on 11 March 2024 at 05:55 and could run through until 8 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 11 Mar 2024 at 05:57.
22 Apr 2024 and 10 Oct 2025
Anglian Water are proposing to carry out Utility asset works on Ipswich Road, Wherstead.
These works are categorised as Major.
The works will start on or after 22 April 2024 and could run through until 10 October 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Anglian Water on 22 Mar 2024 at 15:38.
20 May 2024 and 31 Dec 2025
Suffolk County Council are proposing to carry out Highway repair and maintenance works on Somersham Road, Bramford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 31 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Suffolk County Council on 28 Mar 2024 at 17:19.
2 Dec 2025
Anglian Water are carrying out Utility asset works on Grove Hill, Belstead.
These works are categorised as Major.
The works started on 3 June 2024 at 12:40 and could run through until 2 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 3 Jun 2024 at 11:42.
11 Feb 2025
Anglian Water are carrying out Utility asset works on London Road Former A12, Copdock.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:30 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 12 Aug 2024 at 09:34.
12 Aug 2024 and 7 Mar 2025
Suffolk County Council were proposing to carry out Highway improvement works on Bramford Road, Ipswich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 August 2024 and run through until 7 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 5 Aug 2024 at 11:08.
9 Sep 2024 and 4 Apr 2025
Suffolk County Council are proposing to carry out Highway improvement works on Bramford Road, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Suffolk County Council on 8 Aug 2024 at 14:21.
4 Apr 2025
Suffolk County Council are carrying out Highway improvement works on Bramford Road, Ipswich.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 08:00 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 10:47.
21 Oct 2024 and 24 Jan 2025
Suffolk County Council were proposing to carry out Highway repair and maintenance works on Church Road, Bentley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 17 Sep 2024 at 13:21.
21 Oct 2024 and 28 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Woodbridge Road, Ipswich.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:32.
11 Nov 2024 and 21 Feb 2025
Suffolk County Council are proposing to carry out Highway repair and maintenance works on Church Road, Bentley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Suffolk County Council on 3 Oct 2024 at 12:27.
11 Nov 2024 and 17 Jan 2025
Suffolk County Council are proposing to carry out Highway repair and maintenance works on Ipswich Road, Wherstead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 17 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Suffolk County Council on 6 Nov 2024 at 13:53.
17 Jan 2025
Suffolk County Council are carrying out Highway repair and maintenance works on Ipswich Road, Wherstead.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:00 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 5 Dec 2024 at 11:36.
9 Dec 2024 and 10 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on North Hill Road, Ipswich.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:40.
Friday
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on St Johns Road, Ipswich.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 December 2024 at 21:33 and could run through until 3 January 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Dec 2024 at 21:35.
6 and 17 Jan 2025
Anglian Water are proposing to carry out Utility asset works on Grove Hill, Belstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 28 Oct 2024 at 08:10.
6 and 17 Jan 2025
Anglian Water were proposing to carry out Section 58 on Grove Hill, Belstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 18 Oct 2024 at 08:45.
6 and 17 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Norman Crescent, Ipswich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:05.
6 and 17 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Avondale Road, Ipswich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:06.
6 and 31 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Benacre Road, Ipswich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:05.
6 Jan and 27 Feb 2025
Suffolk County Council are proposing to carry out Section 50 on London Road, Ipswich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 12:38.
6 Jan and 27 Feb 2025
Suffolk County Council are proposing to carry out Section 50 on London Road, Ipswich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 13:45.
6 Jan and 27 Feb 2025
Suffolk County Council are proposing to carry out Section 50 on London Road, Ipswich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 10:37.
6 Jan and 27 Feb 2025
Suffolk County Council were proposing to carry out Section 50 on Suffolk Retail Park Road, Ipswich.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 27 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 12:30.
6 and 24 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Post Mill Close, Ipswich.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:43.
6 Jan and 21 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Belle Vue Road, Ipswich.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:42.
6 and 17 Jan 2025
Energy Assets Pipelines were proposing to carry out Utility asset works on Westerfield Road, Ipswich.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Energy Assets Pipelines on 19 Nov 2024 at 15:57.
6 Jan and 14 Feb 2025
Suffolk County Council were proposing to carry out Highway improvement works on Footpath Between Henley Avenue And Fircroft Road, Ipswich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footpath only.
This roadwork event was last updated by Suffolk County Council on 21 Nov 2024 at 10:05.
6 Jan and 14 Feb 2025
Suffolk County Council were proposing to carry out Highway improvement works on Footpath Between Henley Avenue And Fircroft Road, Ipswich.
These works were categorised as Major.
The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway and footpath.
This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 11:49.
6 and 31 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Footpath Between Henley Avenue And Fircroft Road, Ipswich.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 12:53.
6 and 31 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Footpath Between Henley Avenue And Fircroft Road, Ipswich.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Suffolk County Council on 29 Nov 2024 at 10:14.
6 and 31 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Henley Avenue, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 12:53.
6 and 31 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Henley Avenue, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Suffolk County Council on 29 Nov 2024 at 10:05.
7 and 9 Jan 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Hall Farm Road, Great Bealings.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 15:36.
8 and 22 Jan 2025
Suffolk County Council are proposing to carry out Highway repair and maintenance works on Henley Road, Akenham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 22 January 2025. The works will impact the verge only.
This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 15:01.
8 and 22 Jan 2025
Suffolk County Council are proposing to carry out Highway repair and maintenance works on Henley Road, Akenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 22 January 2025. The works will impact the verge only.
This roadwork event was last updated by Suffolk County Council on 19 Nov 2024 at 10:31.
13 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Church Lane, Sproughton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the verge only.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:35.
14 Jan and 24 Feb 2025
GTC Pipelines are proposing to carry out Utility asset works on Sandyhill Lane, Ipswich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by GTC Pipelines on 24 Oct 2024 at 11:12.
14 Jan and 24 Feb 2025
GTC Pipelines are proposing to carry out Utility asset works on Sandyhill Lane, Ipswich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by GTC Pipelines on 25 Oct 2024 at 13:14.
14 and 16 Jan 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Sandy Lane, Barham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 16 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Anglian Water on 5 Dec 2024 at 10:14.
15 and 17 Jan 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Ipswich Road, Wherstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Anglian Water on 9 Dec 2024 at 07:30.
16 Jan and 14 Mar 2025
Suffolk County Council are proposing to carry out Section 50 on London Road, Ipswich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Suffolk County Council on 22 Nov 2024 at 09:25.
18 and 31 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Fairfield Road, Ipswich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:07.
18 and 31 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Gloucester Road, Ipswich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:07.
20 and 22 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Northgate Street, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 12:48.
21 and 23 Jan 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Westerfield Road, Westerfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 23 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Anglian Water on 18 Dec 2024 at 11:58.
29 and 31 Jan 2025
Suffolk County Council were proposing to carry out Highway improvement works on Lemons Hill, Tattingstone.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 10 Dec 2024 at 14:50.
29 and 31 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Lemons Hill, Tattingstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 13:24.
29 and 31 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Lemons Hill, Tattingstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 13 Dec 2024 at 08:59.
29 and 31 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Ipswich Road, Tattingstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 10 Dec 2024 at 10:00.
29 and 31 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Ipswich Road, Tattingstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 13:24.
29 and 31 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Ipswich Road, Tattingstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 14:48.
3 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Ramsey Close, Ipswich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:03.
3 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fountains Road, Ipswich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:02.
3 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Stoke Park Drive, Ipswich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:03.
3 and 15 Feb 2025
National Highways are proposing to carry out Works for road purposes on Ipswich Road, Claydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Dec 2024 at 14:11.
3 and 15 Feb 2025
National Highways were proposing to carry out Highway repair and maintenance works on Ipswich Road, Claydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 15 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 16 Dec 2024 at 16:57.
3 and 15 Feb 2025
National Highways are proposing to carry out Works for road purposes on Norwich Road, Claydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Dec 2024 at 14:12.
3 and 15 Feb 2025
National Highways are proposing to carry out Works for road purposes on Norwich Road, Barham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Dec 2024 at 14:13.
4 and 6 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 13 Nov 2024 at 12:33.
6 and 15 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Bury Road, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 15 February 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 9 Oct 2024 at 09:21.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Fountains Road, Ipswich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:01.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:01.
10 and 12 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Hadleigh Road, Burstall.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 15:10.
10 and 12 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Burstall Road, Sproughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 15:38.
10 and 12 Feb 2025
BT are proposing to carry out Utility asset works on St Nicholas Street, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 31 Oct 2024 at 15:06.
10 and 13 Feb 2025
Anglian Water are proposing to carry out Remedial works on Falcon Street, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 12:35.
10 and 28 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Woodbridge Road, Ipswich.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:46.
10 and 28 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Belvedere Road, Ipswich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:49.
10 and 28 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Rivers Street, Ipswich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:50.
12 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 15:39.
12 and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 14:18.
17 Feb and 6 Jun 2025
Suffolk County Council are proposing to carry out Highway repair and maintenance works on Church Road, Bentley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 23 Dec 2024 at 09:44.
17 and 21 Feb 2025
Suffolk County Council are proposing to carry out Highway improvement works on Wallers Grove, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 11:17.
17 and 19 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 14:28.
17 and 21 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 22 Nov 2024 at 08:33.
17 and 19 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 13:27.
18 and 20 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 22 Nov 2024 at 11:42.
18 and 20 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 14:04.
18 and 20 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Hall Farm Road, Great Bealings.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 13:26.
19 and 21 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Hall Farm Road, Great Bealings.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 10:38.
24 Feb and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:09.
24 Feb and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:18.
24 Feb and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:48.
24 and 26 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on The Street, Little Bealings.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 10 Dec 2024 at 14:16.
26 Feb and 8 Apr 2025
GTC Pipelines were proposing to carry out Utility asset works on Sandyhill Lane, Ipswich.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 February 2025 and run through until 8 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by GTC Pipelines on 10 Dec 2024 at 11:59.
27 Feb and 4 Apr 2025
Suffolk County Council are proposing to carry out Highway repair and maintenance works on Bramford Road, Ipswich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Suffolk County Council on 4 Oct 2024 at 15:39.
3 Mar and 6 Jun 2025
Suffolk County Council are proposing to carry out Section 50 on Bramford Road, Ipswich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Suffolk County Council on 18 Dec 2024 at 10:27.
10 and 14 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Bramford Road, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 14:50.
10 and 15 Mar 2025
BT are proposing to carry out Utility asset works on A14 J A1156 Leave E, Mid Suffolk.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 11 Nov 2024 at 10:15.
10 and 15 Mar 2025
BT are proposing to carry out Utility asset works on A14 J A1156 Leave E, Mid Suffolk.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 4 Nov 2024 at 08:55.
17 and 28 Mar 2025
Anglian Water are proposing to carry out Utility asset works on Wenham Road, Copdock And Washbrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 15:36.
17 and 28 Mar 2025
Anglian Water are proposing to carry out Utility asset works on Wenham Road, Copdock And Washbrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 4 Dec 2024 at 11:54.
17 Mar and 11 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Stoke Park Drive, Ipswich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:12.
17 Mar and 11 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Stoke Park Drive, Ipswich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 14:32.
17 Mar and 11 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Belstead Road, Ipswich.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 15:27.
17 and 21 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Holbrook Road, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Dec 2024 at 10:24.
17 and 21 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Holbrook Road, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Dec 2024 at 16:09.
17 Mar and 11 Apr 2025
Suffolk County Council are proposing to carry out Highway improvement works on Museum Street, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 24 Dec 2024 at 13:36.
17 Mar and 11 Apr 2025
Suffolk County Council are proposing to carry out Highway improvement works on High Street, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 24 Dec 2024 at 13:35.
17 Mar and 11 Apr 2025
Suffolk County Council are proposing to carry out Highway improvement works on Tower Ramparts, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 24 Dec 2024 at 13:37.
19 and 21 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Tye Lane, Bramford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 23 Dec 2024 at 08:14.
24 Mar and 2 May 2025
Suffolk County Council are proposing to carry out Works for road purposes on Fen Bight Circle, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 16 Dec 2024 at 09:22.
24 Mar and 2 May 2025
Suffolk County Council are proposing to carry out Works for road purposes on Fen Bight Circle, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 17 Dec 2024 at 09:34.
24 Mar and 2 May 2025
Suffolk County Council are proposing to carry out Works for road purposes on Downham Boulevard, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 16 Dec 2024 at 09:22.
24 Mar and 2 May 2025
Suffolk County Council are proposing to carry out Works for road purposes on Downham Boulevard, Ipswich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 17 Dec 2024 at 09:33.
24 and 27 Mar 2025
BT are proposing to carry out Utility asset works on A14 J A1156 Leave E, Mid Suffolk.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 4 Oct 2024 at 12:12.
24 and 28 Mar 2025
BT are proposing to carry out Utility asset works on A14 J A1156 Leave E, Mid Suffolk.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 15 Nov 2024 at 10:21.
24 and 27 Mar 2025
BT are proposing to carry out Utility asset works on A14 J A1156 Leave E, Mid Suffolk.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 1 Oct 2024 at 14:05.
24 and 28 Mar 2025
BT are proposing to carry out Utility asset works on A14 J A1156 Leave E, Mid Suffolk.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 19 Nov 2024 at 12:42.
Roadworks Map near to Carr Street, IPSWICH, IP4 1HA
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Carr Street, IPSWICH, IP4 1HA (3 Events)
(Scheduled Dates)
(miles)
(Scheduled: 30 Nov 2024 - 3 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.