ROADWORKS SUMMARY
Rendell Crescent, BURY ST. EDMUNDS, IP32 6FP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Rendell Crescent, IP32 6FP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Rendell Crescent, BURY ST. EDMUNDS, IP32 6FP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Rendell Crescent are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Suffolk County Council logo
LONG TERM
Between
1 May 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Rougham Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Rougham Road, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 10 February 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Suffolk County Council on 27 Mar 2024 at 13:57.

Suffolk County Council logo
LONG TERM
Between
1 May 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Rougham Hill

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Rougham Hill, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 10 February 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Suffolk County Council on 27 Mar 2024 at 13:57.

UK Power Networks Eastern & London logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Lady Miriam Way

UK Power Networks Eastern & London are carrying out New service connection on Lady Miriam Way, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 08:00 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 08:02.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Bradbrook Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Bradbrook Close, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2024 at 08:14.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Bradbrook Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Bradbrook Close, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2024 at 10:04.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Bradbrook Close

UK Power Networks Eastern & London were proposing to carry out New service connection on Bradbrook Close, Bury St Edmunds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 12:08.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Bradbrook Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Bradbrook Close, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 14:20.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Bradbrook Close

UK Power Networks Eastern & London were proposing to carry out New service connection on Bradbrook Close, Bury St Edmunds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Sep 2024 at 16:06.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Bradbrook Close

UK Power Networks Eastern & London were proposing to carry out New service connection on Bradbrook Close, Bury St Edmunds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 08:30.

UK Power Networks Eastern & London logo
Between
11 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Rougham Hill

UK Power Networks Eastern & London are proposing to carry out New service connection on Rougham Hill, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2024 at 10:04.

UK Power Networks Eastern & London logo
Between
11 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Rougham Hill

UK Power Networks Eastern & London were proposing to carry out New service connection on Rougham Hill, Bury St Edmunds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 6 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 12:09.

UK Power Networks Eastern & London logo
Between
11 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Rougham Hill

UK Power Networks Eastern & London are proposing to carry out New service connection on Rougham Hill, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 14:25.

UK Power Networks Eastern & London logo
Until
6 Jan 2025
Details
View Map
Share
Follow
Rougham Hill

UK Power Networks Eastern & London are carrying out New service connection on Rougham Hill, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 08:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Dec 2024 at 08:03.

Cityfibre Metro Networks logo
Between
2 and 15 Jan 2025
Details
View Map
Share
Follow
A14 From J A1088 To J A134 W

Cityfibre Metro Networks are proposing to carry out Utility asset works on A14 From J A1088 To J A134 W, Mid Suffolk.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Aug 2024 at 15:02.

Cityfibre Metro Networks logo
Between
2 and 15 Jan 2025
Details
View Map
Share
Follow
A14 From J A1088 To J A134 W

Cityfibre Metro Networks are proposing to carry out Utility asset works on A14 From J A1088 To J A134 W, Mid Suffolk.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Aug 2024 at 11:26.

Cityfibre Metro Networks logo
Between
2 and 12 Jan 2025
Details
View Map
Share
Follow
A14 From J A1088 To J A134 W

Cityfibre Metro Networks are proposing to carry out Utility asset works on A14 From J A1088 To J A134 W, Mid Suffolk.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 12 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Sep 2024 at 08:05.

Cityfibre Metro Networks logo
Between
2 and 15 Jan 2025
Details
View Map
Share
Follow
A14 From J A134 To J A1088 E

Cityfibre Metro Networks are proposing to carry out Utility asset works on A14 From J A134 To J A1088 E, St. Edmundsbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Aug 2024 at 15:03.

Cityfibre Metro Networks logo
Between
2 and 15 Jan 2025
Details
View Map
Share
Follow
A14 From J A134 To J A1088 E

Cityfibre Metro Networks are proposing to carry out Utility asset works on A14 From J A134 To J A1088 E, St. Edmundsbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Aug 2024 at 11:26.

Cityfibre Metro Networks logo
Between
2 and 12 Jan 2025
Details
View Map
Share
Follow
A14 From J A134 To J A1088 E

Cityfibre Metro Networks are proposing to carry out Utility asset works on A14 From J A134 To J A1088 E, St. Edmundsbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 12 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Sep 2024 at 08:05.

UK Power Networks Eastern & London logo
Between
2 and 9 Jan 2025
Details
View Map
Share
Follow
Cycleway Link Between Bradbrook Close And Mount Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Cycleway Link Between Bradbrook Close And Mount Road, Bury St Edmunds.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 January 2025 and could run through until 9 January 2025. The works will impact the cycleway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2024 at 15:54.

UK Power Networks Eastern & London logo
Between
2 and 9 Jan 2025
Details
View Map
Share
Follow
Cycleway Link Between Bradbrook Close And Mount Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Cycleway Link Between Bradbrook Close And Mount Road, Bury St Edmunds.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 January 2025 and could run through until 9 January 2025. The works will impact the cycleway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 08:45.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Horsecroft Road

Cadent Gas are proposing to carry out Utility asset works on Horsecroft Road, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 11:11.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Horsecroft Road

Cadent Gas are proposing to carry out Utility asset works on Horsecroft Road, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 11:26.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Horsecroft Road

Cadent Gas are proposing to carry out Utility asset works on Horsecroft Road, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 15:16.

Suffolk County Council logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Bury Road

Suffolk County Council are proposing to carry out Highway improvement works on Bury Road, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 29 Nov 2024 at 14:11.

Suffolk County Council logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Bury Road

Suffolk County Council are proposing to carry out Highway improvement works on Bury Road, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 2 Dec 2024 at 14:46.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Parkington Walk

Cadent Gas are proposing to carry out Utility asset works on Parkington Walk, Bury St Edmunds.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 14:09.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Parkington Walk

Cadent Gas are proposing to carry out Utility asset works on Parkington Walk, Bury St Edmunds.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 16:42.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Parkington Walk

Cadent Gas are proposing to carry out Utility asset works on Parkington Walk, Bury St Edmunds.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 14:59.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Parkington Walk

Cadent Gas are proposing to carry out Utility asset works on Parkington Walk, Bury St Edmunds.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 11:31.

Suffolk County Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ixworth Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Ixworth Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 5 Sep 2024 at 14:27.

Suffolk County Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Gloucester Road

Suffolk County Council were proposing to carry out Highway improvement works on Gloucester Road, Bury St Edmunds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 4 Dec 2024 at 14:02.

Suffolk County Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Gloucester Road

Suffolk County Council are proposing to carry out Highway improvement works on Gloucester Road, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 13:48.

Anglian Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Nowton Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Nowton Road, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 2 Oct 2024 at 13:56.

Anglian Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Nowton Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Nowton Road, Bury St Edmunds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 10:08.

Suffolk County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Elderstub Lane

Suffolk County Council are proposing to carry out Highway improvement works on Elderstub Lane, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Nov 2024 at 11:34.

Suffolk County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Elderstub Lane

Suffolk County Council are proposing to carry out Highway improvement works on Elderstub Lane, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 13 Nov 2024 at 11:11.

Suffolk County Council logo
LONG TERM
Between
13 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Sicklesmere Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Sicklesmere Road, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 21 Oct 2024 at 12:11.

UK Power Networks Eastern & London logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Rougham Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Rougham Road, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Dec 2024 at 16:03.

Cadent Gas logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Anderson Walk

Cadent Gas are proposing to carry out Utility asset works on Anderson Walk, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 14:08.

Cadent Gas logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Anderson Walk

Cadent Gas are proposing to carry out Utility asset works on Anderson Walk, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 16:42.

Cadent Gas logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Anderson Walk

Cadent Gas are proposing to carry out Utility asset works on Anderson Walk, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 14:58.

Cadent Gas logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Anderson Walk

Cadent Gas were proposing to carry out Utility asset works on Anderson Walk, Bury St Edmunds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 28 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 13:52.

Suffolk County Council logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Gloucester Road

Suffolk County Council were proposing to carry out Highway improvement works on Gloucester Road, Bury St Edmunds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 1 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 4 Dec 2024 at 14:36.

Suffolk County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
East Barton Road

Suffolk County Council are proposing to carry out Highway improvement works on East Barton Road, Great Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Nov 2024 at 16:24.

Suffolk County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
East Barton Road

Suffolk County Council are proposing to carry out Highway improvement works on East Barton Road, Great Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 15 Nov 2024 at 08:36.

Anglian Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Ampton Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Ampton Road, Ingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Oct 2024 at 10:49.

Cityfibre Metro Networks logo
Between
15 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Hengrave.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 4 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 11 Nov 2024 at 13:24.

Cityfibre Metro Networks logo
Between
15 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Hengrave.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 4 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 11:42.

Cityfibre Metro Networks logo
Between
15 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Hengrave.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 4 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Nov 2024 at 11:18.

Suffolk County Council logo
LONG TERM
Between
17 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Sicklesmere Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Sicklesmere Road, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 22 Oct 2024 at 13:14.

Suffolk County Council logo
Between
19 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Out Westgate

Suffolk County Council are proposing to carry out Highway improvement works on Out Westgate, Bury St Edmunds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 13 Nov 2024 at 11:49.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Bury Road

Suffolk County Council are proposing to carry out Highway improvement works on Bury Road, Little Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 27 Nov 2024 at 16:07.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Bury Road

Suffolk County Council are proposing to carry out Highway improvement works on Bury Road, Little Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 2 Dec 2024 at 14:47.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Barrow Road

Suffolk County Council are proposing to carry out Highway improvement works on Barrow Road, Great Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 27 Nov 2024 at 16:07.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Barrow Road

Suffolk County Council are proposing to carry out Highway improvement works on Barrow Road, Great Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 2 Dec 2024 at 14:47.

UK Power Networks Eastern & London logo
Between
20 and 27 Jan 2025
Details
View Map
Share
Follow
The Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on The Street, Great Livermere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Oct 2024 at 08:26.

UK Power Networks Eastern & London logo
Between
20 and 27 Jan 2025
Details
View Map
Share
The Street

UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on The Street, Great Livermere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Oct 2024 at 10:26.

UK Power Networks Eastern & London logo
Between
23 and 29 Jan 2025
Details
View Map
Share
Follow
Pump Lane

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Pump Lane, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Nov 2024 at 13:21.

Cityfibre Metro Networks logo
Between
23 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Tut Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Tut Hill, Fornham All Saints.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 13:11.

Cityfibre Metro Networks logo
Between
23 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Tut Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Tut Hill, Fornham All Saints.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 16:09.

Cityfibre Metro Networks logo
Between
23 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Tut Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Tut Hill, Fornham All Saints.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Dec 2024 at 08:32.

Cityfibre Metro Networks logo
Between
23 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Fornham All Saints.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 13:11.

Cityfibre Metro Networks logo
Between
23 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Fornham All Saints.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 16:10.

Cityfibre Metro Networks logo
Between
23 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Fornham All Saints.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Dec 2024 at 08:32.

Suffolk County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Ixworth Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Ixworth Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 23 Sep 2024 at 13:58.

Suffolk County Council logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Gloucester Road

Suffolk County Council are proposing to carry out Highway improvement works on Gloucester Road, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 5 Dec 2024 at 12:46.

Suffolk County Council logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Gloucester Road

Suffolk County Council are proposing to carry out Highway improvement works on Gloucester Road, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 6 Dec 2024 at 10:27.

Suffolk County Council logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Lake Avenue

Suffolk County Council were proposing to carry out Highway improvement works on Lake Avenue, Bury St Edmunds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 5 Dec 2024 at 11:35.

Anglian Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
East Barton Road

Anglian Water were proposing to carry out Utility repair and maintenance works on East Barton Road, Great Barton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 25 Nov 2024 at 09:41.

Suffolk County Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Lake Avenue

Suffolk County Council were proposing to carry out Highway improvement works on Lake Avenue, Bury St Edmunds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 4 Dec 2024 at 14:24.

Anglian Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
St Botolphs Lane

Anglian Water are proposing to carry out Remedial works on St Botolphs Lane, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 3 Sep 2024 at 09:51.

Anglian Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
St Botolphs Lane

Anglian Water are proposing to carry out Remedial works on St Botolphs Lane, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 19 Nov 2024 at 13:23.

Cityfibre Metro Networks logo
Between
14 Feb and 6 Mar 2025
Details
View Map
Share
Follow
The Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Green, Fornham All Saints.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 13:12.

Cityfibre Metro Networks logo
Between
14 Feb and 6 Mar 2025
Details
View Map
Share
Follow
The Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Green, Fornham All Saints.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 16:12.

Cityfibre Metro Networks logo
Between
14 Feb and 6 Mar 2025
Details
View Map
Share
Follow
The Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Green, Fornham All Saints.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Dec 2024 at 08:31.

Cityfibre Metro Networks logo
Between
14 Feb and 6 Mar 2025
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Street, Fornham All Saints.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 13:12.

Cityfibre Metro Networks logo
Between
14 Feb and 6 Mar 2025
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Street, Fornham All Saints.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 16:11.

Cityfibre Metro Networks logo
Between
14 Feb and 6 Mar 2025
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Street, Fornham All Saints.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Dec 2024 at 08:32.

Suffolk County Council logo
LONG TERM
Between
17 Feb and 4 May 2025
Details
View Map
Share
Follow
Sicklesmere Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Sicklesmere Road, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 13 Nov 2024 at 15:40.

Suffolk County Council logo
LONG TERM
Between
17 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Thurston Road

Suffolk County Council are proposing to carry out Works for road purposes on Thurston Road, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 22 Nov 2024 at 16:43.

Suffolk County Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
The Avenue

Suffolk County Council are proposing to carry out Highway improvement works on The Avenue, Great Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 14:11.

Suffolk County Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
The Avenue

Suffolk County Council are proposing to carry out Highway improvement works on The Avenue, Great Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 13 Dec 2024 at 12:10.

Suffolk County Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Fornham Road

Suffolk County Council are proposing to carry out Highway improvement works on Fornham Road, Great Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 14:10.

Suffolk County Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Fornham Road

Suffolk County Council are proposing to carry out Highway improvement works on Fornham Road, Great Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 13 Dec 2024 at 12:10.

Suffolk County Council logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Ampton Road

Suffolk County Council are proposing to carry out Works for road purposes on Ampton Road, Ingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 12:54.

UK Power Networks Eastern & London logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on The Street, Great Livermere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 10:19.

Suffolk County Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Bunbury Road

Suffolk County Council were proposing to carry out Highway improvement works on Bunbury Road, Bury St Edmunds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 4 Dec 2024 at 14:28.

Suffolk County Council logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Ampton Road

Suffolk County Council are proposing to carry out Works for road purposes on Ampton Road, Ingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 19 Dec 2024 at 12:46.

Suffolk County Council logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Ampton Road

Suffolk County Council are proposing to carry out Works for road purposes on Ampton Road, Ingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 19 Dec 2024 at 12:35.

Anglian Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
The Street

Anglian Water were proposing to carry out Remedial works on The Street, Troston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 12 Dec 2024 at 11:50.

Cadent Gas logo
LONG TERM
Between
3 Mar and 16 May 2025
Details
View Map
Share
Follow
Hospital Road

Cadent Gas are proposing to carry out Utility asset works on Hospital Road, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 13:55.

Cadent Gas logo
LONG TERM
Between
3 Mar and 16 May 2025
Details
View Map
Share
Follow
Hospital Road

Cadent Gas are proposing to carry out Utility asset works on Hospital Road, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 12:56.

Cadent Gas logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Hollow Road

Cadent Gas are proposing to carry out Diversionary works on Hollow Road, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 14:51.

Anglian Water logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Twites Corner

Anglian Water are proposing to carry out Utility repair and maintenance works on Twites Corner, Great Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 5 Dec 2024 at 13:06.

Cityfibre Metro Networks logo
Between
6 and 16 Mar 2025
Details
View Map
Share
Follow
Poplar Meadow

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Poplar Meadow, Rushbrooke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 16 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 13:45.

Cityfibre Metro Networks logo
Between
6 and 16 Mar 2025
Details
View Map
Share
Follow
Poplar Meadow

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Poplar Meadow, Rushbrooke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 16 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Dec 2024 at 06:59.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Skyliner Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Skyliner Way, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2024 at 08:15.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Skyliner Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Skyliner Way, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2024 at 10:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Skyliner Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Skyliner Way, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 12:10.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Skyliner Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Skyliner Way, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 14:13.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Skyliner Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Skyliner Way, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 11:05.

Cityfibre Metro Networks logo
Between
7 and 21 Mar 2025
Details
View Map
Share
Bury Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Bury Road, Flempton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 March 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Dec 2024 at 21:02.

Cityfibre Metro Networks logo
Between
7 and 23 Mar 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Flempton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 12:00.

Cityfibre Metro Networks logo
Between
7 and 23 Mar 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Flempton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 09:01.

Cityfibre Metro Networks logo
Between
7 and 23 Mar 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Flempton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 10:48.

Suffolk County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Gloucester Road

Suffolk County Council were proposing to carry out Highway improvement works on Gloucester Road, Bury St Edmunds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 5 Dec 2024 at 11:28.

Suffolk County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Lake Avenue

Suffolk County Council are proposing to carry out Highway improvement works on Lake Avenue, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 5 Dec 2024 at 12:38.

Suffolk County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Lake Avenue

Suffolk County Council are proposing to carry out Highway improvement works on Lake Avenue, Bury St Edmunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 6 Dec 2024 at 10:27.

Anglian Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
The Street

Anglian Water are proposing to carry out Remedial works on The Street, Troston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 19 Dec 2024 at 10:27.

Anglian Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
The Street

Anglian Water are proposing to carry out Remedial works on The Street, Troston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 19 Dec 2024 at 13:58.

Cityfibre Metro Networks logo
Between
12 and 30 Mar 2025
Details
View Map
Share
Bury Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Bury Road, Flempton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 March 2025 and run through until 30 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Dec 2024 at 21:04.

Suffolk County Council logo
LONG TERM
Between
17 Mar and 2 May 2025
Details
View Map
Share
Follow
Thurston Road

Suffolk County Council are proposing to carry out Works for road purposes on Thurston Road, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 5 Dec 2024 at 08:35.

Cityfibre Metro Networks logo
Between
22 and 28 Mar 2025
Details
View Map
Share
Risby Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Risby Road, Flempton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Dec 2024 at 21:01.

Cityfibre Metro Networks logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Linkwood Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Linkwood Road, Little Whelnetham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 13:45.

Cityfibre Metro Networks logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Linkwood Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Linkwood Road, Little Whelnetham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Dec 2024 at 07:02.

Cityfibre Metro Networks logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Eastlowe Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Eastlowe Hill, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 13:44.

Cityfibre Metro Networks logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Eastlowe Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Eastlowe Hill, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Dec 2024 at 07:03.

Cityfibre Metro Networks logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Elderstub Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Elderstub Lane, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 13:44.

Cityfibre Metro Networks logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Elderstub Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Elderstub Lane, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Dec 2024 at 07:02.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 6 May 2025
Details
View Map
Share
Follow
Compiegne Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Compiegne Way, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2024 at 08:15.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 6 May 2025
Details
View Map
Share
Follow
Compiegne Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Compiegne Way, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2024 at 10:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 6 May 2025
Details
View Map
Share
Compiegne Way

UK Power Networks Eastern & London were proposing to carry out New service connection on Compiegne Way, Bury St Edmunds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 6 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 12:11.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 6 May 2025
Details
View Map
Share
Follow
Compiegne Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Compiegne Way, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 08:34.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 6 May 2025
Details
View Map
Share
Follow
Compiegne Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Compiegne Way, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 11:56.

Cityfibre Metro Networks logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Risby Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Risby Road, Flempton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 12:24.

Cityfibre Metro Networks logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Risby Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Risby Road, Flempton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 07:54.


Roadworks Map near to Rendell Crescent, BURY ST. EDMUNDS, IP32 6FP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Dec 2024 02:54
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Rendell Crescent, BURY ST. EDMUNDS, IP32 6FP (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Anglian Water logo
URGENT
  
FRIARY MEADOW 
(0.7 miles)
Anglian Water
Utility repair and maintenance works - Carriageway - Two-way signals
Complete
20 Dec 2024 08:00 - 24 Dec 2024 10:48
0.7
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.