ROADWORKS SUMMARY
The Meadows, BURY ST. EDMUNDS, IP30 9TS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Meadows, IP30 9TS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Meadows, BURY ST. EDMUNDS, IP30 9TS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Meadows are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Anglian Water logo
LONG TERM
Until
11 Aug 2025
Details
View Map
Share
Follow
Bury Road

Anglian Water are carrying out Utility asset works on Bury Road, Bradfield St George.

These works are categorised as Major.

The works started on 12 February 2024 at 08:00 and could run through until 11 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 12 Feb 2024 at 08:31.

Anglian Water logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Buxhall Road

Anglian Water are carrying out Utility asset works on Buxhall Road, Brettenham.

These works are categorised as Major.

The works started on 16 February 2024 at 16:30 and could run through until 15 August 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 16 Feb 2024 at 17:34.

Anglian Water logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Dakings Lane

Anglian Water are carrying out Utility asset works on Dakings Lane, Felsham.

These works are categorised as Major.

The works started on 16 February 2024 at 16:30 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Feb 2024 at 17:33.

Anglian Water logo
LONG TERM
Until
8 Sep 2025
Details
View Map
Share
Follow
Cooks Green

Anglian Water are carrying out Utility asset works on Cooks Green, Hitcham.

These works are categorised as Major.

The works started on 11 March 2024 at 05:50 and could run through until 8 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 11 Mar 2024 at 05:56.

Anglian Water logo
LONG TERM
Until
8 Sep 2025
Details
View Map
Share
Follow
Cockfield Road

Anglian Water are carrying out Utility asset works on Cockfield Road, Felsham.

These works are categorised as Major.

The works started on 11 March 2024 at 05:50 and could run through until 8 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 11 Mar 2024 at 05:55.

Anglian Water logo
LONG TERM
Until
22 Sep 2025
Details
View Map
Share
Follow
Bradfield St George Road

Anglian Water are carrying out Utility asset works on Bradfield St George Road, Bradfield St Clare.

These works are categorised as Major.

The works started on 24 March 2024 at 06:00 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 24 Mar 2024 at 06:27.

Anglian Water logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Bury Road

Anglian Water are carrying out Utility asset works on Bury Road, Bradfield St Clare.

These works are categorised as Major.

The works started on 2 April 2024 at 12:50 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 2 Apr 2024 at 11:58.

Anglian Water logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Church Road

Anglian Water are carrying out Utility asset works on Church Road, Brettenham.

These works are categorised as Major.

The works started on 12 April 2024 at 07:21 and could run through until 10 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 12 Apr 2024 at 06:21.

Anglian Water logo
LONG TERM
Until
22 Oct 2025
Details
View Map
Share
Follow
Ixer Lane

Anglian Water are carrying out Utility asset works on Ixer Lane, Great Whelnetham.

These works are categorised as Major.

The works started on 24 April 2024 at 07:03 and could run through until 22 October 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 24 Apr 2024 at 06:03.

Anglian Water logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Dux Street

Anglian Water are carrying out Utility asset works on Dux Street, Brettenham.

These works are categorised as Major.

The works started on 8 May 2024 at 08:30 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 8 May 2024 at 07:58.

Suffolk County Council logo
LONG TERM
Between
17 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Thurston Road

Suffolk County Council are proposing to carry out Works for road purposes on Thurston Road, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 22 Nov 2024 at 16:43.

Suffolk County Council logo
LONG TERM
Between
17 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Beyton Road

Suffolk County Council are proposing to carry out Works for road purposes on Beyton Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 22 Nov 2024 at 16:43.

Suffolk County Council logo
LONG TERM
Between
17 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Thedwastre Road

Suffolk County Council are proposing to carry out Works for road purposes on Thedwastre Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 22 Nov 2024 at 16:43.

Cityfibre Metro Networks logo
LONG TERM
Between
26 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Cocks Green Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Cocks Green Lane, Great Whelnetham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 1 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Jan 2025 at 10:39.

Cityfibre Metro Networks logo
LONG TERM
Between
26 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Cocks Green Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Cocks Green Lane, Great Whelnetham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 1 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Jan 2025 at 11:44.

Cityfibre Metro Networks logo
LONG TERM
Between
26 Feb and 1 Apr 2025
Details
View Map
Share
Cocks Green Lane

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Cocks Green Lane, Great Whelnetham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 1 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Jan 2025 at 14:19.

Cityfibre Metro Networks logo
LONG TERM
Between
4 Mar and 14 Apr 2025
Details
View Map
Share
Freewood Street

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Freewood Street, Bradfield St George.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 14 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 07:47.

Cityfibre Metro Networks logo
LONG TERM
Between
4 Mar and 14 Apr 2025
Details
View Map
Share
Church Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Church Road, Bradfield St George.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 14 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 07:47.

Anglian Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Buxhall Road

Anglian Water are carrying out Utility asset works on Buxhall Road, Brettenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 08:00 and could run through until 23 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 19 Mar 2025 at 08:49.

Suffolk County Council logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Follow
Finborough Road

Suffolk County Council are proposing to carry out Works for road purposes on Finborough Road, Onehouse.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the verge only.

This roadwork event was last updated by Suffolk County Council on 3 Mar 2025 at 13:28.

Anglian Water logo
Finishing
Tomorrow
Details
View Map
Share
Bury Road

Anglian Water were proposing to carry out Utility asset works on Bury Road, Bradfield St George.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 26 Feb 2025 at 08:12.

Suffolk County Council logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Thurston Road

Suffolk County Council are carrying out Works for road purposes on Thurston Road, Rougham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 07:30 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 17 Mar 2025 at 09:42.

Suffolk County Council logo
LONG TERM
Between
17 Mar and 2 May 2025
Details
View Map
Share
Follow
Beyton Road

Suffolk County Council are proposing to carry out Works for road purposes on Beyton Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 3 Dec 2024 at 15:37.

Suffolk County Council logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Beyton Road

Suffolk County Council are carrying out Works for road purposes on Beyton Road, Thurston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 07:30 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 17 Mar 2025 at 09:43.

Suffolk County Council logo
LONG TERM
Between
17 Mar and 2 May 2025
Details
View Map
Share
Follow
Thedwastre Road

Suffolk County Council are proposing to carry out Works for road purposes on Thedwastre Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 3 Dec 2024 at 15:36.

Suffolk County Council logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Thedwastre Road

Suffolk County Council are carrying out Works for road purposes on Thedwastre Road, Thurston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 07:30 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 17 Mar 2025 at 09:44.

Anglian Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Forest Road

Anglian Water are carrying out Utility repair and maintenance works on Forest Road, Onehouse.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 March 2025 at 13:00 and could run through until 26 March 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 20 Mar 2025 at 16:45.

Cityfibre Metro Networks logo
Between
21 Mar and 17 Apr 2025
Details
View Map
Share
The Street

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on The Street, Bradfield Combust.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 March 2025 and run through until 17 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Dec 2024 at 08:02.

Cityfibre Metro Networks logo
Between
21 Mar and 17 Apr 2025
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Street, Bradfield Combust.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 16:36.

Cityfibre Metro Networks logo
Between
21 Mar and 17 Apr 2025
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Street, Bradfield Combust.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 12:03.

Cityfibre Metro Networks logo
Between
21 Mar and 17 Apr 2025
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Street, Bradfield Combust.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 13:46.

Cityfibre Metro Networks logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Bradfield St George Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bradfield St George Road, Bradfield St Clare.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 12:49.

Cityfibre Metro Networks logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Bradfield St George Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bradfield St George Road, Bradfield St Clare.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Dec 2024 at 09:15.

Cityfibre Metro Networks logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Linkwood Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Linkwood Road, Little Whelnetham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 13:45.

Cityfibre Metro Networks logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Linkwood Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Linkwood Road, Little Whelnetham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Feb 2025 at 16:36.

Cityfibre Metro Networks logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Eastlowe Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Eastlowe Hill, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 13:44.

Cityfibre Metro Networks logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Eastlowe Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Eastlowe Hill, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Feb 2025 at 16:37.

Cityfibre Metro Networks logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Elderstub Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Elderstub Lane, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 13:44.

Cityfibre Metro Networks logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Elderstub Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Elderstub Lane, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Feb 2025 at 16:36.

UK Power Networks Eastern & London logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Great Green

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Great Green, Cockfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 15:42.

UK Power Networks Eastern & London logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Great Green

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Great Green, Cockfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 11:43.

UK Power Networks Eastern & London logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Great Green

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Great Green, Cockfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2025 at 12:23.

Cityfibre Metro Networks logo
Between
31 Mar and 13 Apr 2025
Details
View Map
Share
Follow
Rougham Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Rougham Road, Bradfield St George.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 13 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 12:51.

Cityfibre Metro Networks logo
Between
31 Mar and 13 Apr 2025
Details
View Map
Share
Follow
Rougham Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Rougham Road, Bradfield St George.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 13 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Dec 2024 at 09:17.

Anglian Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Church Road

Anglian Water are proposing to carry out Utility asset works on Church Road, Brettenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 3 Dec 2024 at 10:14.

Suffolk County Council logo
Between
7 and 12 Apr 2025
Details
View Map
Share
Tot Hill

Suffolk County Council were proposing to carry out Highway improvement works on Tot Hill, Haughley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 12 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 18 Feb 2025 at 10:18.

Suffolk County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
The Folly

Suffolk County Council are proposing to carry out Highway improvement works on The Folly, Haughley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 4 Mar 2025 at 15:42.

Suffolk County Council logo
Between
7 and 12 Apr 2025
Details
View Map
Share
Haughley New Street

Suffolk County Council were proposing to carry out Highway improvement works on Haughley New Street, Haughley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 12 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 18 Feb 2025 at 10:27.

Suffolk County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
The Folly

Suffolk County Council were proposing to carry out Highway improvement works on The Folly, Haughley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 4 Mar 2025 at 08:47.

Suffolk County Council logo
Between
7 and 12 Apr 2025
Details
View Map
Share
Haughley New Street

Suffolk County Council were proposing to carry out Highway improvement works on Haughley New Street, Wetherden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 12 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 18 Feb 2025 at 10:29.

Suffolk County Council logo
Between
7 and 12 Apr 2025
Details
View Map
Share
Old Bury Road

Suffolk County Council were proposing to carry out Highway improvement works on Old Bury Road, Wetherden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 12 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 18 Feb 2025 at 10:31.

Suffolk County Council logo
Between
7 and 12 Apr 2025
Details
View Map
Share
Old A45

Suffolk County Council were proposing to carry out Highway improvement works on Old A45, Woolpit.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 12 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Feb 2025 at 14:25.

Suffolk County Council logo
Between
7 and 12 Apr 2025
Details
View Map
Share
Old A45

Suffolk County Council were proposing to carry out Highway improvement works on Old A45, Woolpit.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 12 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 12 Feb 2025 at 14:35.

Suffolk County Council logo
Between
7 and 12 Apr 2025
Details
View Map
Share
Old A45

Suffolk County Council were proposing to carry out Highway improvement works on Old A45, Woolpit.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 12 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 18 Feb 2025 at 10:32.

Suffolk County Council logo
Between
7 and 12 Apr 2025
Details
View Map
Share
A14 From J A1088 To J A1308 E

Suffolk County Council were proposing to carry out Highway improvement works on A14 From J A1088 To J A1308 E, Mid Suffolk.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 12 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 18 Feb 2025 at 10:33.

Suffolk County Council logo
Between
7 and 12 Apr 2025
Details
View Map
Share
Warren Lane

Suffolk County Council were proposing to carry out Highway improvement works on Warren Lane, Elmswell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 12 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 18 Feb 2025 at 10:17.

Anglian Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Ixworth Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Ixworth Road, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 4 Feb 2025 at 11:29.

UK Power Networks Eastern & London logo
Between
8 and 15 Apr 2025
Details
View Map
Share
Howe Lane

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Howe Lane, Cockfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 April 2025 and run through until 15 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 15:15.

Cityfibre Metro Networks logo
Between
11 Apr and 4 May 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Cockfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 4 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Mar 2025 at 10:16.

Cityfibre Metro Networks logo
Between
11 Apr and 4 May 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Cockfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 4 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Mar 2025 at 08:21.

Cityfibre Metro Networks logo
Between
11 Apr and 4 May 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Cockfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 4 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Mar 2025 at 10:30.

Cityfibre Metro Networks logo
Between
11 Apr and 4 May 2025
Details
View Map
Share
Follow
Cross Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Cross Green, Cockfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 4 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Mar 2025 at 10:15.

Cityfibre Metro Networks logo
Between
11 Apr and 4 May 2025
Details
View Map
Share
Follow
Cross Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Cross Green, Cockfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 4 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Mar 2025 at 08:20.

Cityfibre Metro Networks logo
Between
11 Apr and 4 May 2025
Details
View Map
Share
Follow
Cross Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Cross Green, Cockfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 4 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Mar 2025 at 12:01.

Cityfibre Metro Networks logo
Between
11 Apr and 4 May 2025
Details
View Map
Share
Follow
Cross Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Cross Green, Cockfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 4 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Mar 2025 at 09:39.

Anglian Water logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Dakings Lane

Anglian Water are proposing to carry out Utility asset works on Dakings Lane, Felsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 19 Nov 2024 at 11:09.

Cityfibre Metro Networks logo
Between
14 and 22 Apr 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Bradfield St George.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 12:50.

Cityfibre Metro Networks logo
Between
14 and 22 Apr 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Bradfield St George.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Dec 2024 at 09:16.

Cityfibre Metro Networks logo
Between
15 and 23 Apr 2025
Details
View Map
Share
Bradfield St George Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Bradfield St George Road, Bradfield St Clare.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 23 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 07:32.

Suffolk County Council logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Follow
Thurston Road

Suffolk County Council are proposing to carry out Works for road purposes on Thurston Road, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 3 Dec 2024 at 15:37.

Suffolk County Council logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Thurston Road

Suffolk County Council were proposing to carry out Works for road purposes on Thurston Road, Rougham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 2 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 4 Dec 2024 at 16:50.

Anglian Water logo
Between
21 and 25 Apr 2025
Details
View Map
Share
Follow
Dux Street

Anglian Water are proposing to carry out Utility asset works on Dux Street, Brettenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 11:28.

Cityfibre Metro Networks logo
Between
22 and 30 Apr 2025
Details
View Map
Share
Follow
The Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Green, Thorpe Morieux.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 30 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 5 Mar 2025 at 11:37.

Cityfibre Metro Networks logo
Between
22 Apr and 6 May 2025
Details
View Map
Share
Follow
Ixer Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Ixer Lane, Bradfield Combust.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 16:33.

UK Power Networks Eastern & London logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Grove Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Grove Lane, Wetherden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Feb 2025 at 15:31.

Cityfibre Metro Networks logo
Between
23 and 27 Apr 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Thorpe Morieux.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 27 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Mar 2025 at 10:39.

Cityfibre Metro Networks logo
Between
23 and 27 Apr 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Thorpe Morieux.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 27 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 11 Mar 2025 at 09:45.

Cityfibre Metro Networks logo
Between
23 and 27 Apr 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Thorpe Morieux.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 27 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Mar 2025 at 14:00.

Cityfibre Metro Networks logo
Between
23 and 27 Apr 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Thorpe Morieux.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 27 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Mar 2025 at 09:38.

Cityfibre Metro Networks logo
Between
23 and 27 Apr 2025
Details
View Map
Share
Follow
Lower Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Lower Green, Little Whelnetham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 27 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Feb 2025 at 15:20.

Cityfibre Metro Networks logo
Between
23 Apr and 13 May 2025
Details
View Map
Share
Follow
Moat Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Moat Lane, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 13 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 13:44.

Cityfibre Metro Networks logo
Between
23 Apr and 13 May 2025
Details
View Map
Share
Follow
Moat Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Moat Lane, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 13 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Dec 2024 at 09:15.

Cityfibre Metro Networks logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Norton Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Norton Road, Tostock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 7 Mar 2025 at 12:04.

Cityfibre Metro Networks logo
Between
24 Apr and 8 May 2025
Details
View Map
Share
Rougham Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Rougham Road, Bradfield St George.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 April 2025 and run through until 8 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 07:34.

Anglian Water logo
Between
25 and 28 Apr 2025
Details
View Map
Share
Follow
Water Run

Anglian Water are proposing to carry out Utility asset works on Water Run, Hitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 24 Jan 2025 at 09:15.

Cityfibre Metro Networks logo
Between
28 Apr and 7 May 2025
Details
View Map
Share
Follow
The Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Green, Thorpe Morieux.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 7 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 5 Mar 2025 at 12:01.

Cityfibre Metro Networks logo
Between
28 Apr and 7 May 2025
Details
View Map
Share
Follow
The Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Green, Thorpe Morieux.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 7 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Mar 2025 at 09:39.

Cityfibre Metro Networks logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Old Hall Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Old Hall Lane, Cockfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Mar 2025 at 09:44.

Cityfibre Metro Networks logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Old Hall Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Old Hall Lane, Cockfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Mar 2025 at 13:54.

UK Power Networks Eastern & London logo
Between
28 Apr and 1 May 2025
Details
View Map
Share
Follow
Wash Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Wash Lane, Onehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2025 at 15:19.

Cityfibre Metro Networks logo
Between
30 Apr and 7 May 2025
Details
View Map
Share
Follow
Old Norton Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Old Norton Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 7 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Mar 2025 at 08:06.

Cityfibre Metro Networks logo
Between
6 and 12 May 2025
Details
View Map
Share
Follow
Poplar Meadow

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Poplar Meadow, Rushbrooke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 12 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Feb 2025 at 09:51.

Cityfibre Metro Networks logo
Between
6 and 9 May 2025
Details
View Map
Share
Follow
New Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on New Road, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 16 Mar 2025 at 17:22.

Suffolk County Council logo
Between
6 and 31 May 2025
Details
View Map
Share
Follow
Ixworth Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Ixworth Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 11 Feb 2025 at 14:02.

Cityfibre Metro Networks logo
Between
7 and 13 May 2025
Details
View Map
Share
Follow
Water Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Water Lane, Little Whelnetham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 13 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 16:34.

Cityfibre Metro Networks logo
Between
7 and 13 May 2025
Details
View Map
Share
Follow
Water Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Water Lane, Little Whelnetham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 13 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Dec 2024 at 09:17.

Cityfibre Metro Networks logo
Between
9 May and 6 Jun 2025
Details
View Map
Share
Follow
Cocks Green Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Cocks Green Lane, Great Whelnetham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 6 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Mar 2025 at 10:20.

Cityfibre Metro Networks logo
Between
9 May and 6 Jun 2025
Details
View Map
Share
Felsham Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Felsham Road, Bradfield St George.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 May 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 07:50.

Cityfibre Metro Networks logo
Between
9 May and 6 Jun 2025
Details
View Map
Share
Hollybush Corner

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Hollybush Corner, Bradfield St George.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 May 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 07:50.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Thurston Road

Suffolk County Council are proposing to carry out Works for road purposes on Thurston Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 29 Jan 2025 at 16:35.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Thurston Road

Suffolk County Council are proposing to carry out Works for road purposes on Thurston Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 11 Feb 2025 at 10:21.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Thurston Road

Suffolk County Council are proposing to carry out Works for road purposes on Thurston Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 12 Feb 2025 at 09:59.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Beyton Road

Suffolk County Council are proposing to carry out Works for road purposes on Beyton Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 29 Jan 2025 at 16:35.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Beyton Road

Suffolk County Council are proposing to carry out Works for road purposes on Beyton Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 11 Feb 2025 at 10:22.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Beyton Road

Suffolk County Council are proposing to carry out Works for road purposes on Beyton Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 11 Feb 2025 at 16:05.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Thedwastre Road

Suffolk County Council are proposing to carry out Works for road purposes on Thedwastre Road, Thurston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 13 Feb 2025 at 12:15.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Thedwastre Road

Suffolk County Council are proposing to carry out Works for road purposes on Thedwastre Road, Thurston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 13 Feb 2025 at 15:05.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Barton Road

Suffolk County Council are proposing to carry out Works for road purposes on Barton Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 29 Jan 2025 at 16:35.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Barton Road

Suffolk County Council are proposing to carry out Works for road purposes on Barton Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 11 Feb 2025 at 10:21.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Barton Road

Suffolk County Council are proposing to carry out Works for road purposes on Barton Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 11 Feb 2025 at 16:05.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Station Hill

Suffolk County Council are proposing to carry out Works for road purposes on Station Hill, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 24 Jan 2025 at 10:58.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Station Hill

Suffolk County Council are proposing to carry out Works for road purposes on Station Hill, Thurston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 29 Jan 2025 at 16:35.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Station Hill

Suffolk County Council are proposing to carry out Works for road purposes on Station Hill, Thurston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 10 Feb 2025 at 13:02.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Station Hill

Suffolk County Council are proposing to carry out Works for road purposes on Station Hill, Thurston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 11 Feb 2025 at 10:24.

Suffolk County Council logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Station Hill

Suffolk County Council are proposing to carry out Works for road purposes on Station Hill, Thurston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 11 Feb 2025 at 14:00.

UK Power Networks Eastern & London logo
Between
13 and 16 May 2025
Details
View Map
Share
Follow
Wash Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Wash Lane, Onehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Mar 2025 at 10:48.

Cityfibre Metro Networks logo
Between
14 and 28 May 2025
Details
View Map
Share
Follow
Howe Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Howe Lane, Cockfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 28 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Mar 2025 at 10:24.

Cityfibre Metro Networks logo
Between
14 and 22 May 2025
Details
View Map
Share
Follow
Ixer Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Ixer Lane, Bradfield Combust.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 22 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Mar 2025 at 09:41.

Cityfibre Metro Networks logo
LONG TERM
Between
14 May and 25 Jun 2025
Details
View Map
Share
Follow
Freewood Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Freewood Street, Bradfield St George.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 25 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 12:50.

Cityfibre Metro Networks logo
LONG TERM
Between
14 May and 25 Jun 2025
Details
View Map
Share
Follow
Freewood Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Freewood Street, Bradfield St George.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 25 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Dec 2024 at 09:15.

Cityfibre Metro Networks logo
LONG TERM
Between
14 May and 25 Jun 2025
Details
View Map
Share
Follow
Church Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Church Road, Bradfield St George.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 25 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 13:47.

Cityfibre Metro Networks logo
LONG TERM
Between
14 May and 25 Jun 2025
Details
View Map
Share
Follow
Church Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Church Road, Bradfield St George.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 25 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Dec 2024 at 09:16.

Cityfibre Metro Networks logo
Between
14 and 27 May 2025
Details
View Map
Share
Follow
Elderstub Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Elderstub Lane, Rougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 27 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Mar 2025 at 10:33.

Cityfibre Metro Networks logo
Between
15 and 21 May 2025
Details
View Map
Share
Follow
Thurston Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Thurston Road, Beyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 21 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Mar 2025 at 10:18.

Cityfibre Metro Networks logo
Between
15 and 21 May 2025
Details
View Map
Share
Follow
Thurston Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Thurston Road, Beyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 21 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Mar 2025 at 15:13.

Suffolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Tot Hill

Suffolk County Council were proposing to carry out Highway improvement works on Tot Hill, Haughley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 24 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 11:54.

Suffolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Haughley New Street

Suffolk County Council were proposing to carry out Highway improvement works on Haughley New Street, Haughley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 24 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 11:52.

Suffolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Haughley New Street

Suffolk County Council were proposing to carry out Highway improvement works on Haughley New Street, Wetherden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 24 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 11:46.

Suffolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Old Bury Road

Suffolk County Council are proposing to carry out Highway improvement works on Old Bury Road, Wetherden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 19 Feb 2025 at 10:01.

Suffolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Old Bury Road

Suffolk County Council are proposing to carry out Highway improvement works on Old Bury Road, Wetherden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 3 Mar 2025 at 11:33.

Suffolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Old Bury Road

Suffolk County Council were proposing to carry out Highway improvement works on Old Bury Road, Wetherden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 24 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 11:45.

Suffolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Old A45

Suffolk County Council are proposing to carry out Highway improvement works on Old A45, Woolpit.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 19 Feb 2025 at 10:01.

Suffolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Old A45

Suffolk County Council are proposing to carry out Highway improvement works on Old A45, Woolpit.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 3 Mar 2025 at 11:33.

Suffolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Old A45

Suffolk County Council were proposing to carry out Highway improvement works on Old A45, Woolpit.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 24 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 11:38.

Suffolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
A14 From J A1088 To J A1308 E

Suffolk County Council were proposing to carry out Highway improvement works on A14 From J A1088 To J A1308 E, Mid Suffolk.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 24 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 18 Feb 2025 at 10:50.

Suffolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
A14 From J A1088 To J A1308 E

Suffolk County Council are proposing to carry out Highway improvement works on A14 From J A1088 To J A1308 E, Mid Suffolk.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 10:48.

Suffolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Warren Lane

Suffolk County Council are proposing to carry out Highway improvement works on Warren Lane, Elmswell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 19 Feb 2025 at 10:01.

Suffolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Warren Lane

Suffolk County Council are proposing to carry out Highway improvement works on Warren Lane, Elmswell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 3 Mar 2025 at 11:32.

Suffolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Warren Lane

Suffolk County Council were proposing to carry out Highway improvement works on Warren Lane, Elmswell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 24 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 11:41.

Cityfibre Metro Networks logo
Between
19 May and 10 Jun 2025
Details
View Map
Share
Pakenham Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Pakenham Road, Thurston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 10 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 16 Mar 2025 at 10:38.

Cityfibre Metro Networks logo
Between
19 May and 16 Jun 2025
Details
View Map
Share
Follow
Pakenham Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Pakenham Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Mar 2025 at 09:40.

Cityfibre Metro Networks logo
Between
19 May and 16 Jun 2025
Details
View Map
Share
Follow
Pakenham Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Pakenham Road, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Mar 2025 at 16:31.

Cityfibre Metro Networks logo
Between
19 May and 16 Jun 2025
Details
View Map
Share
Follow
Church Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Church Hill, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Mar 2025 at 09:41.

Cityfibre Metro Networks logo
Between
19 May and 16 Jun 2025
Details
View Map
Share
Follow
Church Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Church Hill, Thurston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Mar 2025 at 16:29.

Cityfibre Metro Networks logo
Between
20 May and 3 Jun 2025
Details
View Map
Share
Follow
Chapel Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Chapel Road, Bradfield Combust.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 3 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Mar 2025 at 13:40.

Cityfibre Metro Networks logo
Between
22 May and 9 Jun 2025
Details
View Map
Share
Follow
Church Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Church Road, Beyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Mar 2025 at 15:12.

Suffolk County Council logo
Between
2 and 7 Jun 2025
Details
View Map
Share
Follow
Tot Hill

Suffolk County Council are proposing to carry out Highway improvement works on Tot Hill, Haughley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 11:55.

Suffolk County Council logo
Between
2 and 7 Jun 2025
Details
View Map
Share
Follow
Haughley New Street

Suffolk County Council are proposing to carry out Highway improvement works on Haughley New Street, Haughley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 11:53.

Suffolk County Council logo
Between
2 and 7 Jun 2025
Details
View Map
Share
Follow
Haughley New Street

Suffolk County Council are proposing to carry out Highway improvement works on Haughley New Street, Wetherden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 11:49.

Suffolk County Council logo
Between
2 and 7 Jun 2025
Details
View Map
Share
Follow
Old Bury Road

Suffolk County Council are proposing to carry out Highway improvement works on Old Bury Road, Wetherden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 11:46.

Suffolk County Council logo
Between
2 and 7 Jun 2025
Details
View Map
Share
Follow
Old A45

Suffolk County Council are proposing to carry out Highway improvement works on Old A45, Woolpit.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 11:41.

Suffolk County Council logo
Between
2 and 7 Jun 2025
Details
View Map
Share
Follow
A14 From J A1088 To J A1308 E

Suffolk County Council are proposing to carry out Highway improvement works on A14 From J A1088 To J A1308 E, Mid Suffolk.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 17 Mar 2025 at 15:59.

Suffolk County Council logo
Between
2 and 7 Jun 2025
Details
View Map
Share
A14 From J A1088 To J A1308 E

Suffolk County Council were proposing to carry out Highway improvement works on A14 From J A1088 To J A1308 E, Mid Suffolk.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 7 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 20 Mar 2025 at 08:24.

Suffolk County Council logo
Between
2 and 7 Jun 2025
Details
View Map
Share
Follow
A14 From J A1088 To J A1308 E

Suffolk County Council are proposing to carry out Highway improvement works on A14 From J A1088 To J A1308 E, Mid Suffolk.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 20 Mar 2025 at 08:34.

Suffolk County Council logo
Between
2 and 7 Jun 2025
Details
View Map
Share
Follow
Warren Lane

Suffolk County Council are proposing to carry out Highway improvement works on Warren Lane, Elmswell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 11:42.

Cityfibre Metro Networks logo
Between
9 and 15 Jun 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Bradfield St George.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 07:44.

UK Power Networks Eastern & London logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Ashfield Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Ashfield Road, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2025 at 11:38.

Anglian Water logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
East Barton Road

Anglian Water are proposing to carry out Utility repair and maintenance works on East Barton Road, Great Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 17 Mar 2025 at 14:57.


Roadworks Map near to The Meadows, BURY ST. EDMUNDS, IP30 9TS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 20 Mar 2025 23:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Meadows, BURY ST. EDMUNDS, IP30 9TS (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.