ROADWORKS SUMMARY
Brittons Crescent, BURY ST. EDMUNDS, IP29 5AG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Brittons Crescent, IP29 5AG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Brittons Crescent, BURY ST. EDMUNDS, IP29 5AG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Brittons Crescent are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Anglian Water logo
LONG TERM
Until
22 Mar 2025
Details
View Map
Share
Follow
Dane Hill Road

Anglian Water are carrying out Utility asset works on Dane Hill Road, Kennett.

These works are categorised as Major.

The works started on 23 October 2023 at 07:00 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 23 Oct 2023 at 06:20.

Anglian Water logo
LONG TERM
Until
19 May 2025
Details
View Map
Share
Follow
Gazeley Road

Anglian Water are carrying out Utility asset works on Gazeley Road, Kentford.

These works are categorised as Major.

The works started on 21 November 2023 at 11:00 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Nov 2023 at 11:12.

Anglian Water logo
LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Herringswell Road

Anglian Water are carrying out Utility asset works on Herringswell Road, Kentford.

These works are categorised as Major.

The works started on 2 January 2024 at 09:30 and could run through until 1 July 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 30 Jan 2024 at 13:21.

Suffolk County Council logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Bury Road

Suffolk County Council are proposing to carry out Highway improvement works on Bury Road, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 2 Dec 2024 at 14:46.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Parkington Walk

Cadent Gas are proposing to carry out Utility asset works on Parkington Walk, Bury St Edmunds.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 14:59.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Parkington Walk

Cadent Gas are proposing to carry out Utility asset works on Parkington Walk, Bury St Edmunds.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 16:42.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Parkington Walk

Cadent Gas are proposing to carry out Utility asset works on Parkington Walk, Bury St Edmunds.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 14:09.

Suffolk County Council logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Bury Road

Suffolk County Council are proposing to carry out Highway improvement works on Bury Road, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 29 Nov 2024 at 14:11.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Parkington Walk

Cadent Gas are proposing to carry out Utility asset works on Parkington Walk, Bury St Edmunds.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 11:31.

Cityfibre Metro Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Old School Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Old School Road, Whepstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 13:31.

Cadent Gas logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Anderson Walk

Cadent Gas are proposing to carry out Utility asset works on Anderson Walk, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 16:42.

Cadent Gas logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Anderson Walk

Cadent Gas are proposing to carry out Utility asset works on Anderson Walk, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 14:08.

Cityfibre Metro Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Old School Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Old School Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 12:54.

Cadent Gas logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Anderson Walk

Cadent Gas are proposing to carry out Utility asset works on Anderson Walk, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 14:58.

Cadent Gas logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Anderson Walk

Cadent Gas were proposing to carry out Utility asset works on Anderson Walk, Bury St Edmunds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 28 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 13:52.

Cityfibre Metro Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Chedburgh Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Chedburgh Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 12:54.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Bury Road

Suffolk County Council are proposing to carry out Highway improvement works on Bury Road, Little Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 27 Nov 2024 at 16:07.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Bury Road

Suffolk County Council are proposing to carry out Highway improvement works on Bury Road, Little Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 2 Dec 2024 at 14:47.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Barrow Road

Suffolk County Council are proposing to carry out Highway improvement works on Barrow Road, Great Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 27 Nov 2024 at 16:07.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Barrow Road

Suffolk County Council are proposing to carry out Highway improvement works on Barrow Road, Great Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 2 Dec 2024 at 14:47.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
The Green

Suffolk County Council are proposing to carry out Highway improvement works on The Green, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 28 Nov 2024 at 16:25.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
The Green

Suffolk County Council are proposing to carry out Highway improvement works on The Green, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 27 Nov 2024 at 16:06.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
The Green

Suffolk County Council were proposing to carry out Highway improvement works on The Green, Barrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 10:00.

Cityfibre Metro Networks logo
Between
23 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Tut Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Tut Hill, Fornham All Saints.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Dec 2024 at 08:32.

Cityfibre Metro Networks logo
Between
23 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Tut Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Tut Hill, Fornham All Saints.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 16:09.

Cityfibre Metro Networks logo
Between
23 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Tut Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Tut Hill, Fornham All Saints.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 13:11.

Anglian Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Gazeley Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Gazeley Road, Moulton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 6 Nov 2024 at 08:48.

Suffolk County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Colethorpe Lane

Suffolk County Council are proposing to carry out Highway improvement works on Colethorpe Lane, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 3 Dec 2024 at 12:19.

Anglian Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Gazeley Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Gazeley Road, Moulton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 13 Nov 2024 at 10:03.

Suffolk County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Colethorpe Lane

Suffolk County Council are proposing to carry out Highway improvement works on Colethorpe Lane, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 3 Dec 2024 at 13:22.

Suffolk County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Coalpit Lane

Suffolk County Council are proposing to carry out Highway improvement works on Coalpit Lane, Forest Heath, Higham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 3 Dec 2024 at 13:21.

Suffolk County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Coalpit Lane

Suffolk County Council are proposing to carry out Highway improvement works on Coalpit Lane, Forest Heath, Higham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 3 Dec 2024 at 12:20.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Gazeley Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Gazeley Road, Moulton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 14:41.

Cadent Gas logo
LONG TERM
Between
3 Mar and 16 May 2025
Details
View Map
Share
Follow
Hospital Road

Cadent Gas are proposing to carry out Utility asset works on Hospital Road, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 12:56.

Cityfibre Metro Networks logo
Between
3 and 30 Mar 2025
Details
View Map
Share
Follow
Old School Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Old School Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 13:59.

Cityfibre Metro Networks logo
Between
3 and 30 Mar 2025
Details
View Map
Share
Follow
Chedburgh Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Chedburgh Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 13:59.

Cadent Gas logo
LONG TERM
Between
3 Mar and 16 May 2025
Details
View Map
Share
Follow
Hospital Road

Cadent Gas are proposing to carry out Utility asset works on Hospital Road, Bury St Edmunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 13:55.

Anglian Water logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Twites Corner

Anglian Water are proposing to carry out Utility repair and maintenance works on Twites Corner, Great Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 5 Dec 2024 at 13:06.

Cityfibre Metro Networks logo
Between
7 and 21 Mar 2025
Details
View Map
Share
Bury Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Bury Road, Flempton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 March 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Dec 2024 at 21:02.

Cityfibre Metro Networks logo
Between
7 and 23 Mar 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Flempton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 12:00.

Cityfibre Metro Networks logo
Between
7 and 23 Mar 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Flempton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 09:01.

Cityfibre Metro Networks logo
Between
7 and 23 Mar 2025
Details
View Map
Share
Follow
Bury Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Flempton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 10:48.

Cityfibre Metro Networks logo
Between
10 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Chedburgh Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Chedburgh Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 12:49.

Cityfibre Metro Networks logo
Between
10 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Chedburgh Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Chedburgh Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Nov 2024 at 12:47.

Cityfibre Metro Networks logo
Between
10 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Old School Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Old School Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 12:49.

Cityfibre Metro Networks logo
Between
10 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Old School Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Old School Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Nov 2024 at 12:48.

Cityfibre Metro Networks logo
Between
12 and 30 Mar 2025
Details
View Map
Share
Bury Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Bury Road, Flempton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 March 2025 and run through until 30 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Dec 2024 at 21:04.

Cityfibre Metro Networks logo
Between
22 and 28 Mar 2025
Details
View Map
Share
Risby Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Risby Road, Flempton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Dec 2024 at 21:01.

Cityfibre Metro Networks logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Risby Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Risby Road, Flempton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 12:24.

Cityfibre Metro Networks logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Risby Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Risby Road, Flempton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 07:54.


Roadworks Map near to Brittons Crescent, BURY ST. EDMUNDS, IP29 5AG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Dec 2024 00:35
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Brittons Crescent, BURY ST. EDMUNDS, IP29 5AG (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)