ROADWORKS SUMMARY
Boxted, BURY ST. EDMUNDS, IP29 4LL
Introduction
View current and future planned roadworks and road closures for IP29 4LL and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Boxted, BURY ST. EDMUNDS, IP29 4LL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
5 Aug 2025
Anglian Water are carrying out Utility asset works on Kiln Lane, Rede.
These works are categorised as Major.
The works started on 6 February 2024 at 10:00 and could run through until 5 August 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 6 Feb 2024 at 11:32.
8 Aug 2025
Anglian Water are carrying out Utility asset works on Tuffields Road, Whepstead.
These works are categorised as Major.
The works started on 9 February 2024 at 14:55 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 9 Feb 2024 at 16:53.
15 Aug 2025
Anglian Water are carrying out Utility asset works on Bury Road, Brockley.
These works are categorised as Major.
The works started on 16 February 2024 at 16:00 and could run through until 15 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 16 Feb 2024 at 17:06.
15 Aug 2025
Anglian Water are carrying out Utility asset works on Brands Lane, Hawstead.
These works are categorised as Major.
The works started on 16 February 2024 at 16:00 and could run through until 15 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 16 Feb 2024 at 17:04.
15 Aug 2025
Anglian Water are carrying out Utility asset works on Rede Road, Whepstead.
These works are categorised as Major.
The works started on 16 February 2024 at 16:00 and could run through until 15 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 16 Feb 2024 at 17:04.
5 Sep 2025
Anglian Water are carrying out Utility asset works on Folly Lane, Lawshall.
These works are categorised as Major.
The works started on 6 March 2024 at 09:33 and could run through until 5 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 6 Mar 2024 at 09:33.
Tuesday
Anglian Water are carrying out Utility repair and maintenance works on Brook Street, Glemsford.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 December 2024 at 10:00 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 23 Dec 2024 at 10:21.
6 and 8 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Bull Lane, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 13:40.
6 and 10 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Bull Lane, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 08:57.
6 and 10 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Bull Lane, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 14:06.
6 and 10 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Melford Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 08:48.
6 and 10 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Melford Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 14:04.
6 and 10 Jan 2025
Suffolk County Council were proposing to carry out Highway improvement works on Borley Road, Long Melford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 6 Dec 2024 at 09:51.
6 and 10 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Borley Road, Long Melford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 10:25.
6 and 10 Jan 2025
Suffolk County Council were proposing to carry out Highway improvement works on Borley Road, Long Melford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 8 Nov 2024 at 08:59.
6 and 8 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Melford Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 13:39.
8 and 10 Jan 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on The Street, Lawshall.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 7 Oct 2024 at 11:42.
13 and 19 Jan 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Folly Lane, Lawshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 13:08.
13 and 15 Jan 2025
Anglian Water were proposing to carry out Remedial works on Straight Road, Whepstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 19 Dec 2024 at 12:10.
13 and 15 Jan 2025
Anglian Water were proposing to carry out Remedial works on Brands Lane, Hawstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 6 Dec 2024 at 11:41.
13 and 19 Jan 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Folly Lane, Lawshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 15 Nov 2024 at 08:16.
13 and 19 Jan 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Folly Lane, Lawshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Nov 2024 at 10:58.
20 Jan and 2 Feb 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Whepstead Road, Hawstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 12:55.
20 and 24 Jan 2025
Anglian Water were proposing to carry out Utility asset works on Rede Road, Whepstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 12:56.
20 Jan and 2 Feb 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Brands Lane, Hawstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 12:55.
24 and 27 Jan 2025
Anglian Water were proposing to carry out Utility asset works on Bury Road, Brockley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 17 Oct 2024 at 10:07.
24 and 27 Jan 2025
Anglian Water were proposing to carry out Utility asset works on Bury Road, Brockley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 12:04.
24 and 27 Jan 2025
Anglian Water were proposing to carry out Utility asset works on Bury Road, Brockley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 12:57.
27 and 31 Jan 2025
Anglian Water were proposing to carry out Utility asset works on Tuffields Road, Whepstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 12:58.
30 Jan and 1 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Church Street, Belchamp St Paul.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 13:24.
31 Jan and 3 Feb 2025
Anglian Water are proposing to carry out Utility asset works on Bury Road, Brockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 12:35.
31 Jan and 3 Feb 2025
Anglian Water were proposing to carry out Utility asset works on Bury Road, Brockley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 09:43.
31 Jan and 3 Feb 2025
Anglian Water were proposing to carry out Utility asset works on Bury Road, Brockley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 09:12.
3 Feb and 2 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Straight Road, Whepstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 13:02.
4 and 6 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on St Catherines Road, Long Melford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 14:40.
4 and 10 Feb 2025
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on St Catherines Road, Long Melford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 February 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 09:49.
7 and 10 Feb 2025
BT are proposing to carry out Utility asset works on Belchamp Road, Essex, Pentlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 20 Nov 2024 at 09:26.
7 and 10 Feb 2025
BT are proposing to carry out Utility asset works on Belchamp Road, Essex, Pentlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 11 Nov 2024 at 13:15.
11 and 13 Feb 2025
Suffolk County Council are proposing to carry out Highway improvement works on Halstead Road, Foxearth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 15:45.
11 and 13 Feb 2025
Suffolk County Council are proposing to carry out Highway repair and maintenance works on Borley Road, Long Melford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 16 Dec 2024 at 11:34.
11 and 13 Feb 2025
Suffolk County Council are proposing to carry out Highway improvement works on Borley Road, Long Melford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 16:31.
12 and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on The Street, Shimpling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Dec 2024 at 16:37.
17 and 23 Feb 2025
Anglian Water were proposing to carry out Utility asset works on Kiln Lane, Rede.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 08:00.
17 and 19 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on The Street, Lawshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 08:33.
19 and 23 Feb 2025
Anglian Water were proposing to carry out Utility asset works on Kiln Lane, Rede.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 12:59.
19 and 23 Feb 2025
Anglian Water were proposing to carry out Utility asset works on Kiln Lane, Rede.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 08:41.
24 and 28 Feb 2025
Anglian Water were proposing to carry out Utility asset works on Brands Lane, Hawstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 13:00.
10 and 23 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Brands Lane, Hawstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 23 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 14:00.
10 and 12 Mar 2025
Anglian Water were proposing to carry out Remedial works on Brands Lane, Hawstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 12 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 11:52.
10 and 23 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Whepstead Road, Hawstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 23 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 14:00.
17 and 20 Mar 2025
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on The Green, Cavendish.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 20 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Dec 2024 at 11:55.
17 and 21 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on The Green, Cavendish.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 08:31.
24 Mar and 22 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Straight Road, Whepstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 22 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 14:00.
25 and 31 Mar 2025
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on The Green, Cavendish.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 March 2025 and run through until 31 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Dec 2024 at 11:29.
Roadworks Map near to Boxted, BURY ST. EDMUNDS, IP29 4LL
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Boxted, BURY ST. EDMUNDS, IP29 4LL (1 Events)
(Scheduled Dates)
(miles)
(Scheduled: 23 Dec 2024 - 31 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.