ROADWORKS SUMMARY
The Green, BURY ST. EDMUNDS, IP29 4BY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Green, IP29 4BY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Green, BURY ST. EDMUNDS, IP29 4BY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Green are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Anglian Water logo
LONG TERM
Until
5 Aug 2025
Details
View Map
Share
Follow
Kiln Lane

Anglian Water are carrying out Utility asset works on Kiln Lane, Rede.

These works are categorised as Major.

The works started on 6 February 2024 at 10:00 and could run through until 5 August 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 6 Feb 2024 at 11:32.

Anglian Water logo
LONG TERM
Until
8 Aug 2025
Details
View Map
Share
Follow
Tuffields Road

Anglian Water are carrying out Utility asset works on Tuffields Road, Whepstead.

These works are categorised as Major.

The works started on 9 February 2024 at 14:55 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 9 Feb 2024 at 16:53.

Anglian Water logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Brands Lane

Anglian Water are carrying out Utility asset works on Brands Lane, Hawstead.

These works are categorised as Major.

The works started on 16 February 2024 at 16:00 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Feb 2024 at 17:04.

Anglian Water logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Bury Road

Anglian Water are carrying out Utility asset works on Bury Road, Brockley.

These works are categorised as Major.

The works started on 16 February 2024 at 16:00 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Feb 2024 at 17:06.

Anglian Water logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Rede Road

Anglian Water are carrying out Utility asset works on Rede Road, Whepstead.

These works are categorised as Major.

The works started on 16 February 2024 at 16:00 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Feb 2024 at 17:04.

Anglian Water logo
LONG TERM
Until
5 Sep 2025
Details
View Map
Share
Follow
Folly Lane

Anglian Water are carrying out Utility asset works on Folly Lane, Lawshall.

These works are categorised as Major.

The works started on 6 March 2024 at 09:33 and could run through until 5 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 6 Mar 2024 at 09:33.

Suffolk County Council logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Bury Road

Suffolk County Council are proposing to carry out Highway improvement works on Bury Road, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 29 Nov 2024 at 14:11.

Suffolk County Council logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Bury Road

Suffolk County Council are proposing to carry out Highway improvement works on Bury Road, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 2 Dec 2024 at 14:46.

Cityfibre Metro Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Old School Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Old School Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 12:54.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Brands Lane

Anglian Water were proposing to carry out Remedial works on Brands Lane, Hawstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 6 Dec 2024 at 11:41.

Cityfibre Metro Networks logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
Folly Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Folly Lane, Lawshall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Nov 2024 at 08:16.

Cityfibre Metro Networks logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
Folly Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Folly Lane, Lawshall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Nov 2024 at 10:58.

Cityfibre Metro Networks logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
Folly Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Folly Lane, Lawshall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 13:08.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Straight Road

Anglian Water were proposing to carry out Remedial works on Straight Road, Whepstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 19 Dec 2024 at 12:10.

Cityfibre Metro Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Chedburgh Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Chedburgh Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 12:54.

Cityfibre Metro Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Old School Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Old School Road, Whepstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 13:31.

Cityfibre Metro Networks logo
Between
14 and 19 Jan 2025
Details
View Map
Share
Follow
Church Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Church Hill, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 19 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 12:57.

Cityfibre Metro Networks logo
Between
20 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Whepstead Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Whepstead Road, Hawstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 12:55.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
The Green

Suffolk County Council are proposing to carry out Highway improvement works on The Green, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 28 Nov 2024 at 16:25.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
The Green

Suffolk County Council are proposing to carry out Highway improvement works on The Green, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 27 Nov 2024 at 16:06.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
The Green

Suffolk County Council were proposing to carry out Highway improvement works on The Green, Barrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 10:00.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Bury Road

Suffolk County Council are proposing to carry out Highway improvement works on Bury Road, Little Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 27 Nov 2024 at 16:07.

Cityfibre Metro Networks logo
Between
20 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Brands Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Brands Lane, Hawstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 12:55.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Barrow Road

Suffolk County Council are proposing to carry out Highway improvement works on Barrow Road, Great Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 27 Nov 2024 at 16:07.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Bury Road

Suffolk County Council are proposing to carry out Highway improvement works on Bury Road, Little Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 2 Dec 2024 at 14:47.

Suffolk County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Barrow Road

Suffolk County Council are proposing to carry out Highway improvement works on Barrow Road, Great Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 2 Dec 2024 at 14:47.

Anglian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Rede Road

Anglian Water were proposing to carry out Utility asset works on Rede Road, Whepstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 12:56.

Anglian Water logo
Between
24 and 27 Jan 2025
Details
View Map
Share
Bury Road

Anglian Water were proposing to carry out Utility asset works on Bury Road, Brockley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 17 Oct 2024 at 10:07.

Anglian Water logo
Between
24 and 27 Jan 2025
Details
View Map
Share
Bury Road

Anglian Water were proposing to carry out Utility asset works on Bury Road, Brockley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 12:57.

Anglian Water logo
Between
24 and 27 Jan 2025
Details
View Map
Share
Bury Road

Anglian Water were proposing to carry out Utility asset works on Bury Road, Brockley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 12:04.

Cityfibre Metro Networks logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Brockley Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Brockley Road, Whepstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Nov 2024 at 13:25.

Anglian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Tuffields Road

Anglian Water were proposing to carry out Utility asset works on Tuffields Road, Whepstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 12:58.

Anglian Water logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Bury Road

Anglian Water are proposing to carry out Utility asset works on Bury Road, Brockley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 12:35.

Anglian Water logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Bury Road

Anglian Water were proposing to carry out Utility asset works on Bury Road, Brockley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 09:43.

Anglian Water logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Bury Road

Anglian Water were proposing to carry out Utility asset works on Bury Road, Brockley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 09:12.

Cityfibre Metro Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Rectory Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Rectory Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 12:56.

Cityfibre Metro Networks logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Straight Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Straight Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 13:02.

Cityfibre Metro Networks logo
Between
4 and 24 Feb 2025
Details
View Map
Share
Follow
Brockley Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Brockley Road, Whepstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 11:25.

Cityfibre Metro Networks logo
Between
4 and 24 Feb 2025
Details
View Map
Share
Follow
Brockley Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Brockley Road, Whepstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 14:01.

Cityfibre Metro Networks logo
Between
4 and 24 Feb 2025
Details
View Map
Share
Follow
Brockley Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Brockley Road, Whepstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 10:02.

Cityfibre Metro Networks logo
Between
4 and 24 Feb 2025
Details
View Map
Share
Follow
Brockley Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Brockley Road, Whepstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:20.

Suffolk County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Colethorpe Lane

Suffolk County Council are proposing to carry out Highway improvement works on Colethorpe Lane, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 3 Dec 2024 at 12:19.

Suffolk County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Colethorpe Lane

Suffolk County Council are proposing to carry out Highway improvement works on Colethorpe Lane, Barrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 3 Dec 2024 at 13:22.

Cityfibre Metro Networks logo
LONG TERM
Between
10 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Rede Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Rede Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 16 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 13:03.

Anglian Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Kiln Lane

Anglian Water were proposing to carry out Utility asset works on Kiln Lane, Rede.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 08:00.

Cityfibre Metro Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Brockley Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Brockley Road, Whepstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Nov 2024 at 12:58.

Anglian Water logo
Between
19 and 23 Feb 2025
Details
View Map
Share
Kiln Lane

Anglian Water were proposing to carry out Utility asset works on Kiln Lane, Rede.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 08:41.

Anglian Water logo
Between
19 and 23 Feb 2025
Details
View Map
Share
Kiln Lane

Anglian Water were proposing to carry out Utility asset works on Kiln Lane, Rede.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 12:59.

Anglian Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Brands Lane

Anglian Water were proposing to carry out Utility asset works on Brands Lane, Hawstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 13:00.

Cityfibre Metro Networks logo
Between
3 and 9 Mar 2025
Details
View Map
Share
Follow
Church Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Church Hill, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 9 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 14:00.

Cityfibre Metro Networks logo
Between
3 and 30 Mar 2025
Details
View Map
Share
Follow
Chedburgh Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Chedburgh Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 13:59.

Cityfibre Metro Networks logo
Between
3 and 30 Mar 2025
Details
View Map
Share
Follow
Old School Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Old School Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 13:59.

Cityfibre Metro Networks logo
Between
3 and 9 Mar 2025
Details
View Map
Share
Follow
Church Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Church Hill, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 9 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Nov 2024 at 12:31.

Cityfibre Metro Networks logo
Between
3 and 9 Mar 2025
Details
View Map
Share
Follow
Church Hill

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Church Hill, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 9 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 12:49.

Anglian Water logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Twites Corner

Anglian Water are proposing to carry out Utility repair and maintenance works on Twites Corner, Great Saxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 5 Dec 2024 at 13:06.

Cityfibre Metro Networks logo
Between
10 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Chedburgh Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Chedburgh Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Nov 2024 at 12:47.

Cityfibre Metro Networks logo
Between
10 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Chedburgh Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Chedburgh Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 12:49.

Cityfibre Metro Networks logo
Between
10 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Old School Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Old School Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 12:49.

Cityfibre Metro Networks logo
Between
10 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Old School Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Old School Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Nov 2024 at 12:48.

Cityfibre Metro Networks logo
Between
10 and 23 Mar 2025
Details
View Map
Share
Follow
Whepstead Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Whepstead Road, Hawstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 23 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 14:00.

Anglian Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Brands Lane

Anglian Water were proposing to carry out Remedial works on Brands Lane, Hawstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 12 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 11:52.

Cityfibre Metro Networks logo
Between
10 and 23 Mar 2025
Details
View Map
Share
Follow
Brands Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Brands Lane, Hawstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 23 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 14:00.

Cityfibre Metro Networks logo
Between
24 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Rectory Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Rectory Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 22 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 14:00.

Cityfibre Metro Networks logo
Between
24 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Straight Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Straight Road, Whepstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 22 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 14:00.


Roadworks Map near to The Green, BURY ST. EDMUNDS, IP29 4BY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Dec 2024 01:23
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Green, BURY ST. EDMUNDS, IP29 4BY (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Anglian Water logo
MAJOR
  
CHURCH END 
(0.4 miles)
Anglian Water
Utility asset works - Verge - No carriageway incursion
Planned
Scheduled: 18 Nov 2024 - 18 Nov 2025
0.4
Details
Share
Follow
2
Anglian Water logo
MAJOR
  
CHURCH END 
(0.4 miles)
Anglian Water
Utility asset works - Verge - No carriageway incursion
In Progress
Since: 19 Nov 2024 12:30
(Scheduled: 19 Nov 2024 - 18 Nov 2025)
0.4
Details
Share
Follow
3
Anglian Water logo
MAJOR
  
BURY ROAD 
(0.4 miles)
Anglian Water
Utility asset works - Carriageway - Some carriageway incursion
In Progress
Since: 16 Jan 2023 10:19
(Scheduled: 16 Jan 2023 - 31 Mar 2025)
0.4
Details
Share
Follow
4
Anglian Water logo
MAJOR
  
ROAD FROM A143 TO GATESBURYS LANE 
(0.6 miles)
Anglian Water
Utility asset works - Verge - No carriageway incursion
In Progress
Since: 3 Apr 2024 09:24
(Scheduled: 2 Apr 2024 - 28 Nov 2025)
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.