ROADWORKS SUMMARY
Bury Road, THETFORD, IP24 2GE
Introduction
View current and future planned roadworks and road closures for Bury Road, IP24 2GE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Bury Road, THETFORD, IP24 2GE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bury Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Thursday
Anglian Water are proposing to carry out Utility repair and maintenance works on Ampton Road, Ingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 21 Oct 2024 at 10:49.
Thursday
Anglian Water were proposing to carry out Utility repair and maintenance works on Ampton Road, Ingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 16 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 9 Jan 2025 at 13:45.
20 and 27 Jan 2025
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on The Street, Great Livermere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 31 Oct 2024 at 10:26.
20 and 27 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on The Street, Great Livermere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Oct 2024 at 08:26.
17 Feb and 23 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Street, Culford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 10 Jan 2025 at 15:05.
17 and 21 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on The Street, Great Livermere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 10:19.
17 Feb and 14 Mar 2025
Suffolk County Council are proposing to carry out Works for road purposes on Ampton Road, Ingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 12 Dec 2024 at 12:54.
24 Feb and 21 Mar 2025
Suffolk County Council are proposing to carry out Works for road purposes on Ampton Road, Ingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 7 Jan 2025 at 08:05.
24 Feb and 21 Mar 2025
Suffolk County Council are proposing to carry out Works for road purposes on Ampton Road, Ingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 6 Jan 2025 at 08:15.
24 Feb and 21 Mar 2025
Suffolk County Council are proposing to carry out Works for road purposes on Ampton Road, Ingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 19 Dec 2024 at 12:35.
26 and 28 Feb 2025
Anglian Water were proposing to carry out Remedial works on The Street, Troston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 12 Dec 2024 at 11:50.
3 and 21 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Icklingham Road, West Stow.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Jan 2025 at 14:56.
3 and 21 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Icklingham Road, West Stow.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Jan 2025 at 12:36.
3 and 21 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Road From A1101 To B1106, Icklingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Jan 2025 at 14:54.
3 and 21 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Road From A1101 To B1106, Icklingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Jan 2025 at 12:38.
7 and 23 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Flempton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 10:48.
7 and 23 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Flempton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 09:01.
7 and 23 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bury Road, Flempton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 12:00.
7 and 21 Mar 2025
Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Bury Road, Flempton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 March 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Dec 2024 at 21:02.
10 and 12 Mar 2025
Anglian Water were proposing to carry out Remedial works on The Street, Troston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 12 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 6 Jan 2025 at 09:14.
10 and 12 Mar 2025
Anglian Water are proposing to carry out Remedial works on The Street, Troston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 19 Dec 2024 at 10:27.
11 and 17 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on West Stow Road, Culford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 17 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Jan 2025 at 14:39.
11 and 17 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on West Stow Road, Culford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 17 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Jan 2025 at 12:38.
12 and 30 Mar 2025
Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Bury Road, Flempton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 March 2025 and run through until 30 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Dec 2024 at 21:04.
18 and 24 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Road From Culford Road To Bury Road, Fornham St Genevieve.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 24 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Jan 2025 at 14:38.
18 and 24 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Road From Culford Road To Bury Road, Fornham St Genevieve.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 24 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Jan 2025 at 12:38.
22 and 28 Mar 2025
Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Risby Road, Flempton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Dec 2024 at 21:01.
24 and 30 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Risby Road, Flempton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 07:54.
24 and 30 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Risby Road, Flempton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 12:24.
25 and 31 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Green, Timworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Jan 2025 at 14:38.
25 and 31 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Green, Timworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Jan 2025 at 12:37.
31 Mar and 4 Apr 2025
Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on West Stow Road, Flempton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 4 April 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Dec 2024 at 21:02.
31 Mar and 6 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on West Stow Road, Flempton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 6 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 07:55.
31 Mar and 6 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on West Stow Road, Flempton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 6 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 12:24.
Roadworks Map near to Bury Road, THETFORD, IP24 2GE
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Bury Road, THETFORD, IP24 2GE (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.