ROADWORKS SUMMARY
Wood View, STOWMARKET, IP14 3SD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wood View, IP14 3SD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wood View, STOWMARKET, IP14 3SD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wood View are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Suffolk County Council logo
LONG TERM
Between
2 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Stowupland Road

Suffolk County Council were proposing to carry out Section 50 on Stowupland Road, Stowmarket.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 28 Aug 2024 at 12:46.

Cadent Gas logo
LONG TERM
Between
4 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Recreation Road

Cadent Gas are proposing to carry out Utility asset works on Recreation Road, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 13:23.

Cadent Gas logo
LONG TERM
Between
4 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Recreation Road

Cadent Gas are proposing to carry out Utility asset works on Recreation Road, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 29 Jul 2024 at 14:41.

Cadent Gas logo
LONG TERM
Until
3 Feb 2025
Details
View Map
Share
Follow
Finborough Road

Cadent Gas are carrying out Utility asset works on Finborough Road, Stowmarket.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:09 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:11.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Finborough Road

Cadent Gas are proposing to carry out Utility asset works on Finborough Road, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 3 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 11:28.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Recreation Road

Cadent Gas are proposing to carry out Utility asset works on Recreation Road, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 11:03.

Suffolk County Council logo
LONG TERM
Between
6 Jan and 30 May 2025
Details
View Map
Share
Follow
Stowupland Road

Suffolk County Council are proposing to carry out Section 50 on Stowupland Road, Stowmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Suffolk County Council on 29 Aug 2024 at 14:31.

Suffolk County Council logo
LONG TERM
Between
6 Jan and 30 May 2025
Details
View Map
Share
Follow
Stowupland Road

Suffolk County Council are proposing to carry out Section 50 on Stowupland Road, Stowmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Suffolk County Council on 20 Sep 2024 at 14:35.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Recreation Road

Cadent Gas are proposing to carry out Utility asset works on Recreation Road, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 16:37.

Anglian Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Church Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Church Road, Old Newton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 14:32.

Anglian Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Creeting St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 14 Oct 2024 at 16:13.

Network Rail logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Crown Street

Network Rail are proposing to carry out Works for Rail Purposes on Crown Street, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Nov 2024 at 16:01.

Network Rail logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Crown Street

Network Rail are proposing to carry out Works for Rail Purposes on Crown Street, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Sep 2024 at 11:11.

Network Rail logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Cardinalls Road

Network Rail are proposing to carry out Works for Rail Purposes on Cardinalls Road, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Nov 2024 at 11:05.

Network Rail logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Cardinalls Road

Network Rail are proposing to carry out Works for Rail Purposes on Cardinalls Road, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Sep 2024 at 10:24.

Cadent Gas logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Chilton Avenue

Cadent Gas are proposing to carry out Utility asset works on Chilton Avenue, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 14:16.

Cadent Gas logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Chilton Avenue

Cadent Gas are proposing to carry out Utility asset works on Chilton Avenue, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 08:28.

Cadent Gas logo
LONG TERM
Between
20 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Danescourt Avenue

Cadent Gas are proposing to carry out Utility asset works on Danescourt Avenue, Stowmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 15:34.

Cadent Gas logo
LONG TERM
Between
20 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Danescourt Avenue

Cadent Gas are proposing to carry out Utility asset works on Danescourt Avenue, Stowmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 14:56.

Anglian Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Church Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Church Road, Stowupland.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Oct 2024 at 12:02.

Anglian Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Webb Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Webb Road, Stowmarket.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 11 Nov 2024 at 13:55.

Anglian Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Hillside

Anglian Water are proposing to carry out Utility repair and maintenance works on Hillside, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 13 Nov 2024 at 11:44.

Anglian Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Brown Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Brown Street, Old Newton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 15:38.

Cadent Gas logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Kent Road

Cadent Gas are proposing to carry out Utility asset works on Kent Road, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 12:55.

Cadent Gas logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Kent Road

Cadent Gas are proposing to carry out Utility asset works on Kent Road, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 14:22.

Cadent Gas logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Curwen Road

Cadent Gas are proposing to carry out Utility asset works on Curwen Road, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 12:55.

Cadent Gas logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Curwen Road

Cadent Gas are proposing to carry out Utility asset works on Curwen Road, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 14:21.

Anglian Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Creeting Road West

Anglian Water are proposing to carry out Utility repair and maintenance works on Creeting Road West, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 22 Nov 2024 at 14:10.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Church Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Road, Old Newton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 11 Dec 2024 at 15:31.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Church Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Road, Old Newton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 15 Nov 2024 at 15:42.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Mill Lane

BT were proposing to carry out Utility asset works on Mill Lane, Suffolk, Creeting St Peter.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 29 Nov 2024 at 14:23.

Anglian Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Bildeston Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Bildeston Road, Combs.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 5 Dec 2024 at 09:13.

Suffolk County Council logo
LONG TERM
Between
24 Feb and 25 Apr 2025
Details
View Map
Share
Follow
Clay Lane

Suffolk County Council are proposing to carry out Highway improvement works on Clay Lane, Bacton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 10 Dec 2024 at 15:06.

Network Rail logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Wassicks Lane

Network Rail are proposing to carry out Works for Rail Purposes on Wassicks Lane, Old Newton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Dec 2024 at 15:16.

Network Rail logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Wassicks Lane

Network Rail are proposing to carry out Works for Rail Purposes on Wassicks Lane, Old Newton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Dec 2024 at 11:58.

Network Rail logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Wassicks Lane

Network Rail are proposing to carry out Works for Rail Purposes on Wassicks Lane, Old Newton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Nov 2024 at 10:17.

Anglian Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Grove Lane

Anglian Water were proposing to carry out Remedial works on Grove Lane, Elmswell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 6 Dec 2024 at 12:18.

Anglian Water logo
Between
1 and 3 Mar 2025
Details
View Map
Share
Follow
Kiln Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Kiln Lane, Elmswell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 6 Dec 2024 at 14:10.

Anglian Water logo
Between
1 and 3 Mar 2025
Details
View Map
Share
Follow
A1088 From District Boundary To A14

Anglian Water are proposing to carry out Utility repair and maintenance works on A1088 From District Boundary To A14, Elmswell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 6 Dec 2024 at 14:09.

Anglian Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Bildeston Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Bildeston Road, Combs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 24 Dec 2024 at 11:09.

Suffolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
From Cedars Roundabout To Church Road

Suffolk County Council are proposing to carry out Highway improvement works on From Cedars Roundabout To Church Road, Stowupland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 20 Dec 2024 at 14:32.

Anglian Water logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Grove Lane

Anglian Water are proposing to carry out Remedial works on Grove Lane, Elmswell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 9 Dec 2024 at 12:23.

Anglian Water logo
Between
17 and 25 Mar 2025
Details
View Map
Share
Saxham Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Saxham Street, Stowupland.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 25 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 12:26.

Suffolk County Council logo
LONG TERM
Between
17 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Station Road

Suffolk County Council are proposing to carry out Highway improvement works on Station Road, Bacton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 10 Dec 2024 at 15:25.

Electricity Network Company logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
St Edmunds Road

Electricity Network Company are proposing to carry out Utility asset works on St Edmunds Road, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 18 Dec 2024 at 09:47.

Electricity Network Company logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
St Edmunds Road

Electricity Network Company are proposing to carry out Utility asset works on St Edmunds Road, Stowmarket.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 17 Dec 2024 at 16:08.


Roadworks Map near to Wood View, STOWMARKET, IP14 3SD

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Dec 2024 01:41
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wood View, STOWMARKET, IP14 3SD (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.