ROADWORKS SUMMARY
Orchard End, WOODBRIDGE, IP13 6UA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Orchard End, IP13 6UA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Orchard End, WOODBRIDGE, IP13 6UA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Orchard End are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
North Hill Road

Cadent Gas were proposing to carry out Utility asset works on North Hill Road, Ipswich.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:40.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
St Johns Road

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on St Johns Road, Ipswich.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 December 2024 at 21:33 and could run through until 3 January 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Dec 2024 at 21:35.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Belle Vue Road

Cadent Gas were proposing to carry out Utility asset works on Belle Vue Road, Ipswich.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:42.

Suffolk County Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Henley Avenue

Suffolk County Council are proposing to carry out Highway improvement works on Henley Avenue, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 29 Nov 2024 at 10:05.

Suffolk County Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Henley Avenue

Suffolk County Council are proposing to carry out Highway improvement works on Henley Avenue, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 12:53.

Suffolk County Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Footpath Between Henley Avenue And Fircroft Road

Suffolk County Council are proposing to carry out Highway improvement works on Footpath Between Henley Avenue And Fircroft Road, Ipswich.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Suffolk County Council on 29 Nov 2024 at 10:14.

Suffolk County Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Footpath Between Henley Avenue And Fircroft Road

Suffolk County Council are proposing to carry out Highway improvement works on Footpath Between Henley Avenue And Fircroft Road, Ipswich.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 12:53.

Suffolk County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Footpath Between Henley Avenue And Fircroft Road

Suffolk County Council were proposing to carry out Highway improvement works on Footpath Between Henley Avenue And Fircroft Road, Ipswich.

These works were categorised as Major.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 11:49.

Suffolk County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Footpath Between Henley Avenue And Fircroft Road

Suffolk County Council were proposing to carry out Highway improvement works on Footpath Between Henley Avenue And Fircroft Road, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Suffolk County Council on 21 Nov 2024 at 10:05.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Ufford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 10:48.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Ufford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 09:13.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Byng Hall Road

Cadent Gas are proposing to carry out Utility asset works on Byng Hall Road, Ufford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 09:23.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Post Mill Close

Cadent Gas were proposing to carry out Utility asset works on Post Mill Close, Ipswich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:43.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Pettistree.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 12:49.

Cadent Gas logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Ufford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 13:03.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Ufford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 08:28.

Energy Assets Pipelines logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Westerfield Road

Energy Assets Pipelines were proposing to carry out Utility asset works on Westerfield Road, Ipswich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Pipelines on 19 Nov 2024 at 15:57.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Byng Hall Road

Cadent Gas are proposing to carry out Utility asset works on Byng Hall Road, Ufford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 15:07.

Anglian Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Hall Farm Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Hall Farm Road, Great Bealings.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 15:36.

Cityfibre Metro Networks logo
Between
8 and 14 Jan 2025
Details
View Map
Share
Follow
School Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on School Lane, Martlesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 14 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 12 Dec 2024 at 09:36.

Suffolk County Council logo
Between
8 and 15 Jan 2025
Details
View Map
Share
Follow
Lodge Road

Suffolk County Council are proposing to carry out Works for road purposes on Lodge Road, Great Bealings.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 15 January 2025. The works will impact the verge only.

This roadwork event was last updated by Suffolk County Council on 17 Dec 2024 at 10:31.

Suffolk County Council logo
Between
8 and 22 Jan 2025
Details
View Map
Share
Follow
Henley Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Henley Road, Akenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 22 January 2025. The works will impact the verge only.

This roadwork event was last updated by Suffolk County Council on 19 Nov 2024 at 10:31.

Suffolk County Council logo
Between
8 and 22 Jan 2025
Details
View Map
Share
Follow
Henley Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Henley Road, Akenham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 22 January 2025. The works will impact the verge only.

This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 15:01.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Boulge Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Boulge Road, Hasketon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 18 Dec 2024 at 11:02.

UK Power Networks Eastern & London logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Grundisburgh Road

UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Grundisburgh Road, Hasketon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 11:52.

Cadent Gas logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
A12 Bredfield

Cadent Gas are proposing to carry out Utility asset works on A12 Bredfield, Bredfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 10:57.

UK Power Networks Eastern & London logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Grundisburgh Road

UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Grundisburgh Road, Hasketon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Oct 2024 at 14:37.

UK Power Networks Eastern & London logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Grundisburgh Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Grundisburgh Road, Hasketon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Sep 2024 at 13:29.

UK Power Networks Eastern & London logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Grundisburgh Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Grundisburgh Road, Hasketon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2024 at 11:53.

UK Power Networks Eastern & London logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Grundisburgh Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Grundisburgh Road, Hasketon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Sep 2024 at 10:24.

Anglian Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Bredfield Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Bredfield Street, Woodbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 09:42.

Cityfibre Metro Networks logo
Between
15 and 21 Jan 2025
Details
View Map
Share
Follow
Theatre Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Theatre Street, Woodbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 14:47.

Cityfibre Metro Networks logo
Between
15 and 21 Jan 2025
Details
View Map
Share
Follow
Theatre Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Theatre Street, Woodbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Nov 2024 at 11:35.

Anglian Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Westerfield Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Westerfield Road, Westerfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 23 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 18 Dec 2024 at 11:58.

Cityfibre Metro Networks logo
Between
22 Jan and 11 Feb 2025
Details
View Map
Share
Follow
New Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on New Street, Woodbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 16 Dec 2024 at 08:21.

Cityfibre Metro Networks logo
Between
22 Jan and 11 Feb 2025
Details
View Map
Share
Follow
New Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on New Street, Woodbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Dec 2024 at 11:57.

Cadent Gas logo
LONG TERM
Between
27 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Byng Hall Road

Cadent Gas are proposing to carry out Utility asset works on Byng Hall Road, Ufford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 14:06.

Suffolk County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Lower Street

Suffolk County Council are proposing to carry out Highway improvement works on Lower Street, Ufford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 29 Nov 2024 at 08:54.

Suffolk County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Lower Street

Suffolk County Council are proposing to carry out Highway improvement works on Lower Street, Ufford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 28 Nov 2024 at 09:30.

Suffolk County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Bridge Road

Suffolk County Council are proposing to carry out Highway improvement works on Bridge Road, Bromeswell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 29 Nov 2024 at 08:53.

Suffolk County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Bridge Road

Suffolk County Council are proposing to carry out Highway improvement works on Bridge Road, Bromeswell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 28 Nov 2024 at 09:29.

Anglian Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Westerfield Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 13 Nov 2024 at 12:33.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Rivers Street

Cadent Gas were proposing to carry out Utility asset works on Rivers Street, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:50.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Belvedere Road

Cadent Gas were proposing to carry out Utility asset works on Belvedere Road, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:49.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Woodbridge Road

Cadent Gas were proposing to carry out Utility asset works on Woodbridge Road, Ipswich.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:46.

Anglian Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Westerfield Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 22 Nov 2024 at 08:33.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Westerfield Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 14:28.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Westerfield Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 13:27.

Anglian Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Westerfield Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 22 Nov 2024 at 11:42.

Anglian Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Bredfield Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Bredfield Street, Woodbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 25 Nov 2024 at 09:31.

Anglian Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Westerfield Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 14:04.

Anglian Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Hall Farm Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Hall Farm Road, Great Bealings.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 13:26.

Anglian Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Hall Farm Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Hall Farm Road, Great Bealings.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 10:38.

Cityfibre Metro Networks logo
Between
21 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Bredfield Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bredfield Road, Melton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 9 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Dec 2024 at 07:04.

Cityfibre Metro Networks logo
Between
21 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Bredfield Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bredfield Road, Melton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 9 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 09:20.

Anglian Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
The Street

Anglian Water were proposing to carry out Utility repair and maintenance works on The Street, Little Bealings.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 10 Dec 2024 at 14:16.

Network Rail logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Wilford Bridge Road

Network Rail are proposing to carry out Works for Rail Purposes on Wilford Bridge Road, Melton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Nov 2024 at 11:47.

Anglian Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Otley Road

Anglian Water are proposing to carry out Remedial works on Otley Road, Cretingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 26 Nov 2024 at 11:43.

Cadent Gas logo
LONG TERM
Between
3 Mar and 25 Apr 2025
Details
View Map
Share
Follow
A12 Bredfield

Cadent Gas are proposing to carry out Utility asset works on A12 Bredfield, Bredfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:03.

Cadent Gas logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
Byng Hall Road

Cadent Gas are proposing to carry out Utility asset works on Byng Hall Road, Ufford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 13:24.

Cadent Gas logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Ufford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 13:24.

Network Rail logo
Between
11 and 14 Mar 2025
Details
View Map
Share
Follow
Wilford Bridge Road

Network Rail are proposing to carry out Works for Rail Purposes on Wilford Bridge Road, Melton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Nov 2024 at 13:09.


Roadworks Map near to Orchard End, WOODBRIDGE, IP13 6UA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Dec 2024 01:23
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Orchard End, WOODBRIDGE, IP13 6UA (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.