ROADWORKS SUMMARY
Main Road, WOODBRIDGE, IP13 0HL
Introduction

View current and future planned roadworks and road closures for Main Road, IP13 0HL and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Main Road, WOODBRIDGE, IP13 0HL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Main Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Mar 2025
Cadent Gas are carrying out Utility asset works on Main Road, Pettistree.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 January 2025 at 11:42 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 13:08.
31 Mar 2025
Cadent Gas are carrying out Utility asset works on High Street, Ufford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:45 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 13:33.
Tomorrow
Suffolk County Council are proposing to carry out Highway improvement works on A12 Melton, Melton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Suffolk County Council on 22 Jan 2025 at 11:52.
Tomorrow
Suffolk County Council were proposing to carry out Highway improvement works on Woods Lane, Melton.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 27 Jan 2025 at 12:12.
Tomorrow
Suffolk County Council were proposing to carry out Highway improvement works on A12 Melton, Melton.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 27 Jan 2025 at 12:09.
Tomorrow
Suffolk County Council were proposing to carry out Highway improvement works on A12 Hasketon, Hasketon.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 27 Jan 2025 at 12:05.
Tomorrow
Suffolk County Council were proposing to carry out Highway improvement works on Grove Road, Woodbridge.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 27 Jan 2025 at 12:00.
24 Feb and 26 May 2025
BT are proposing to carry out Utility repair and maintenance works on A12 Hacheston Northbound Slip On, Hacheston.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 16 Jan 2025 at 11:33.
3 and 31 Mar 2025
Suffolk County Council are proposing to carry out Highway improvement works on A12 Hasketon, Hasketon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 30 Jan 2025 at 13:28.
31 Mar 2025
Suffolk County Council are carrying out Highway improvement works on A12 Melton, Melton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 20:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 4 Mar 2025 at 07:56.
3 and 31 Mar 2025
Suffolk County Council are proposing to carry out Highway improvement works on A12 Melton, Melton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 30 Jan 2025 at 13:29.
3 and 31 Mar 2025
Suffolk County Council are proposing to carry out Highway improvement works on A12 Woodbridge, Woodbridge.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 30 Jan 2025 at 13:28.
31 Mar 2025
Suffolk County Council are carrying out Highway improvement works on A12 Woodbridge, Woodbridge.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 20:00 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 4 Mar 2025 at 07:57.
31 Mar 2025
Suffolk County Council are carrying out Highway improvement works on A12 Melton, Melton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 20:00 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 4 Mar 2025 at 07:56.
3 and 31 Mar 2025
Suffolk County Council are proposing to carry out Highway improvement works on Grove Road, Woodbridge.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 30 Jan 2025 at 13:28.
31 Mar 2025
Suffolk County Council are carrying out Highway improvement works on Grove Road, Woodbridge.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 20:00 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 4 Mar 2025 at 07:57.
2 Jun 2025
BT are carrying out Utility repair and maintenance works on A12 Hacheston Northbound Slip On, Hacheston.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 08:15 and could run through until 2 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 3 Mar 2025 at 08:31.
31 Mar 2025
Suffolk County Council are carrying out Highway improvement works on A12 Hasketon, Hasketon.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 20:00 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 4 Mar 2025 at 07:57.
3 and 31 Mar 2025
Suffolk County Council are proposing to carry out Highway improvement works on A12 Melton, Melton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 30 Jan 2025 at 13:29.
31 Mar 2025
Cadent Gas are carrying out Utility asset works on A12 Ufford, Ufford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 09:46 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 09:51.
3 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on A12 Ufford, Ufford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Feb 2025 at 11:58.
3 and 31 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on High Street, Ufford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Feb 2025 at 12:04.
3 and 31 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Byng Hall Road, Ufford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 10:08.
3 Mar and 25 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on A12 Bredfield, Bredfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:03.
10 Mar and 6 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Johns Hill, Woodbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 22 Jan 2025 at 10:19.
6 Apr 2025
Cityfibre Metro Networks are carrying out Statutory Infrastructure Works on New Street, Woodbridge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 March 2025 at 09:05 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 12 Mar 2025 at 09:10.
10 Mar and 11 Apr 2025
Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Chapel Street, Woodbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Jan 2025 at 15:40.
10 Mar and 6 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Chapel Street, Woodbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 22 Jan 2025 at 10:20.
6 Apr 2025
Cityfibre Metro Networks are carrying out Statutory Infrastructure Works on Chapel Street, Woodbridge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 March 2025 at 10:00 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 12 Mar 2025 at 13:57.
10 Mar and 11 Apr 2025
Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on St Johns Street, Woodbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Jan 2025 at 15:38.
10 Mar and 6 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Johns Street, Woodbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 22 Jan 2025 at 10:20.
6 Apr 2025
Cityfibre Metro Networks are carrying out Statutory Infrastructure Works on St Johns Street, Woodbridge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 March 2025 at 10:00 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 12 Mar 2025 at 11:00.
10 Mar and 11 Apr 2025
Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Castle Street, Woodbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Jan 2025 at 15:40.
10 Mar and 11 Apr 2025
Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on St Johns Hill, Woodbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Jan 2025 at 15:42.
6 Apr 2025
Cityfibre Metro Networks are carrying out Statutory Infrastructure Works on St Johns Hill, Woodbridge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 March 2025 at 10:00 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 12 Mar 2025 at 13:57.
Today
UK Power Networks Eastern & London are proposing to carry out New service connection on Kingston Road, Woodbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jan 2025 at 09:49.
UK Power Networks Eastern & London carried out New service connection on Kingston Road, Woodbridge.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 17 Mar 2025 and 20 Mar 2025 and were actually completed between 17 Mar 2025 (08:30) and 20 Mar 2025 (16:31). The works impacted the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2025 at 16:38.
Today
UK Power Networks Eastern & London are proposing to carry out New service connection on Kingston Road, Woodbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jan 2025 at 11:32.
Wednesday
Anglian Water are carrying out Utility repair and maintenance works on California, Wickham Market.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 March 2025 at 07:40 and could run through until 26 March 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 20 Mar 2025 at 13:44.
Suffolk County Council carried out Highway repair and maintenance works on Silverlace Green, Parham.
The road was closed for some or all of the period.
The works were completed on 20 March 2025 The works impacted the carriageway only.
This roadwork event was last updated by Suffolk County Council on 20 Mar 2025 at 13:44.
Suffolk County Council carried out Highway repair and maintenance works on Silverlace Green, Marlesford.
The road was closed for some or all of the period.
The works were completed on 20 March 2025 The works impacted the carriageway only.
This roadwork event was last updated by Suffolk County Council on 20 Mar 2025 at 13:41.
Suffolk County Council carried out Highway repair and maintenance works on Church Road, Little Glemham.
The road was closed for some or all of the period.
The works were completed on 20 March 2025 The works impacted the carriageway only.
This roadwork event was last updated by Suffolk County Council on 20 Mar 2025 at 13:46.
7 and 14 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Theatre Street, Woodbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 17 Feb 2025 at 11:50.
7 Apr and 23 May 2025
Cadent Gas were proposing to carry out Utility asset works on A12 Bredfield, Bredfield.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 12:07.
7 and 14 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Theatre Street, Woodbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 7 Feb 2025 at 12:10.
7 and 14 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Theatre Street, Woodbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 29 Jan 2025 at 19:27.
14 Apr and 4 May 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Grundisburgh Road, Hasketon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 4 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Mar 2025 at 12:05.
14 and 22 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Theatre Street, Woodbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Jan 2025 at 12:05.
14 and 22 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Theatre Street, Woodbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Jan 2025 at 13:39.
15 and 17 Apr 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Church Street, Woodbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 13 Jan 2025 at 08:48.
22 and 24 Apr 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Campsea Ashe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 22 Jan 2025 at 10:11.
22 and 24 Apr 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Ashe Row, Campsea Ashe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 24 April 2025. The works were due to impact the verge only.
This roadwork event was last updated by Anglian Water on 22 Jan 2025 at 11:28.
23 and 25 Apr 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Theatre Street, Woodbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 April 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 23 Jan 2025 at 11:26.
28 and 30 Apr 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Ashe Row, Campsea Ashe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 23 Jan 2025 at 14:36.
28 and 30 Apr 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Theatre Street, Woodbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 30 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 24 Feb 2025 at 13:01.
6 and 8 May 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Monewden Road, Charsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 6 Feb 2025 at 11:12.
20 and 23 May 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Snape Road, Tunstall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Feb 2025 at 11:23.
20 and 22 May 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Chapel Lane, Charsfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 May 2025 and run through until 22 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 6 Mar 2025 at 12:45.
20 and 26 May 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Snape Road, Tunstall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Feb 2025 at 14:35.
26 May and 18 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on A12 Bredfield, Bredfield.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 12:08.
28 and 30 May 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Spring Lane, Wickham Market.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 4 Mar 2025 at 10:26.
28 and 31 May 2025
Suffolk County Council are proposing to carry out Highway improvement works on A12 Melton, Melton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 12:22.
28 and 31 May 2025
Suffolk County Council are proposing to carry out Highway improvement works on A12 Bredfield, Bredfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 14 Mar 2025 at 12:22.
2 and 4 Jun 2025
Suffolk County Council are proposing to carry out Section 50 on Ship Corner, Blaxhall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 7 Mar 2025 at 10:47.
16 and 18 Jun 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Bullards Lane, Woodbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 19 Mar 2025 at 11:05.
Roadworks Map near to Main Road, WOODBRIDGE, IP13 0HL
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Main Road, WOODBRIDGE, IP13 0HL (8 Events)
(Scheduled Dates)
(miles)
(Scheduled: 6 Jan 2025 - 31 Mar 2025)
(Scheduled: 3 Mar 2025 - 31 Mar 2025)
(Scheduled: 20 Mar 2025)
(Scheduled: 6 Jan 2025 - 31 Mar 2025)
Contains public sector information licensed under the Open Government Licence v3.0.