ROADWORKS SUMMARY
Bawdsey, WOODBRIDGE, IP12 3AT
Introduction

View current and future planned roadworks and road closures for IP12 3AT and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Bawdsey, WOODBRIDGE, IP12 3AT
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
8 Jul 2024 and 6 Nov 2025
Suffolk County Council are proposing to carry out Highway repair and maintenance works on Ford Hill, Shottisham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 6 November 2025. The works will impact the verge only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Suffolk County Council on 4 Jul 2024 at 07:57.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on High Road, Trimley St Mary.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 March 2025 at 11:45 and could run through until 21 March 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 08:28.
10 and 28 Mar 2025
Suffolk County Council were proposing to carry out Section 50 on High Road, Trimley St Martin.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 23 Dec 2024 at 11:55.
Tuesday
Cityfibre Metro Networks are carrying out Statutory Infrastructure Works on Falcon Street, Felixstowe.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 March 2025 at 08:45 and could run through until 25 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 12 Mar 2025 at 08:50.
Tuesday
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Falcon Street, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 25 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 13:27.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on New Road, Trimley St Mary.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 March 2025 at 11:06 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:05.
Tuesday
Suffolk County Council are carrying out Highway repair and maintenance works on Trinity Avenue, Felixstowe.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 March 2025 at 23:15 and could run through until 25 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 19 Mar 2025 at 08:49.
Today
UK Power Networks Eastern & London are proposing to carry out New service connection on Berners Road, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jan 2025 at 11:32.
Today
UK Power Networks Eastern & London are proposing to carry out New service connection on Berners Road, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jan 2025 at 09:22.
26 Mar and 8 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Gulpher Road, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 8 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Jan 2025 at 09:48.
31 Mar and 13 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Back Road, Falkenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 13 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 7 Feb 2025 at 10:53.
31 Mar and 13 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Back Road, Falkenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 13 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 13 Feb 2025 at 15:51.
31 Mar and 11 Apr 2025
Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Back Road, Kirton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 11 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 6 Feb 2025 at 12:08.
31 Mar and 13 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Back Road, Kirton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 13 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 7 Feb 2025 at 10:51.
31 Mar and 15 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Maidstone Road, Felixstowe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 15 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 09:03.
31 Mar and 13 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Back Road, Kirton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 13 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 13 Feb 2025 at 15:50.
1 and 10 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Links Avenue, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 10 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 12:31.
1 and 15 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Beatrice Avenue, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 12:32.
5 and 24 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Maidstone Road, Felixstowe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 24 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 13:53.
5 and 17 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Maidstone Road, Felixstowe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 5 Feb 2025 at 09:15.
7 and 11 Apr 2025
Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Alley Road, Kirton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 11 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 24 Feb 2025 at 09:31.
7 and 11 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Alley Road, Kirton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 28 Feb 2025 at 10:15.
7 and 11 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Alley Road, Kirton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Mar 2025 at 08:48.
7 and 21 Apr 2025
Suffolk County Council are proposing to carry out Section 50 on High Road, Trimley St Martin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 21 Jan 2025 at 14:39.
7 and 21 Apr 2025
Suffolk County Council are proposing to carry out Section 50 on High Road, Trimley St Martin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 7 Jan 2025 at 15:27.
14 and 22 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Church Lane, Kirton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 7 Feb 2025 at 10:57.
14 and 22 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Church Lane, Kirton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 13 Feb 2025 at 15:53.
15 and 30 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Gulpher Road, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 22 Jan 2025 at 11:13.
15 and 30 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Victoria Road, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 7 Mar 2025 at 10:19.
15 and 30 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Victoria Road, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 3 Mar 2025 at 12:00.
16 Apr and 1 May 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Gulpher Road, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 1 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 29 Jan 2025 at 19:59.
16 and 18 Apr 2025
Suffolk County Council are proposing to carry out Works for road purposes on Ferry Lane, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the verge only.
This roadwork event was last updated by Suffolk County Council on 21 Jan 2025 at 16:17.
16 and 18 Apr 2025
Suffolk County Council are proposing to carry out Works for road purposes on Ferry Lane, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the verge only.
This roadwork event was last updated by Suffolk County Council on 21 Jan 2025 at 20:09.
16 Apr and 1 May 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Gulpher Road, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 1 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 5 Feb 2025 at 13:04.
16 Apr and 1 May 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Gulpher Road, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 1 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 30 Jan 2025 at 20:36.
17 and 25 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Church Lane, Trimley St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 10 Mar 2025 at 11:00.
17 and 25 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Church Lane, Trimley St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Mar 2025 at 15:53.
17 and 25 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Church Lane, Trimley St Martin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 10 Mar 2025 at 10:59.
17 and 25 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Church Lane, Trimley St Martin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Mar 2025 at 15:53.
17 and 23 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Ferry Lane, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 23 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 10 Mar 2025 at 11:28.
17 and 23 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Ferry Lane, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 23 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 14 Mar 2025 at 15:53.
17 and 25 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Grimston Lane, Trimley St Martin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 10 Mar 2025 at 10:33.
17 and 25 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Grimston Lane, Trimley St Martin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Mar 2025 at 10:33.
22 Apr and 4 May 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Thurmans Lane, Trimley St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 4 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 10 Mar 2025 at 11:42.
22 Apr and 4 May 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Thurmans Lane, Trimley St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 4 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 3 Mar 2025 at 10:58.
23 Apr and 18 May 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Falkenham Road, Kirton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 18 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 13 Feb 2025 at 15:54.
23 Apr and 18 May 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Falkenham Road, Kirton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 18 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 7 Feb 2025 at 10:34.
23 Apr and 18 May 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Falkenham Road, Falkenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 18 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 7 Feb 2025 at 10:33.
23 Apr and 18 May 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Falkenham Road, Falkenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 18 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 13 Feb 2025 at 15:54.
25 Apr and 4 May 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Grange Road, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 4 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Mar 2025 at 09:11.
25 Apr and 3 May 2025
Suffolk County Council are proposing to carry out Highway improvement works on King Street, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 3 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 17 Mar 2025 at 12:02.
25 Apr and 4 May 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Grange Road, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 4 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 11 Mar 2025 at 10:32.
28 Apr and 19 May 2025
Cadent Gas are proposing to carry out Utility asset works on High Road, Trimley St Martin.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 08:51.
30 Apr and 2 May 2025
Suffolk County Council are proposing to carry out Highway improvement works on Victoria Street, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 17 Mar 2025 at 12:14.
6 May and 20 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Trimley St Martin.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 08:52.
12 May and 2 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on High Road, Trimley St Martin.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 15:00.
12 and 23 May 2025
Suffolk County Council are proposing to carry out Works for road purposes on Gulpher Road, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Suffolk County Council on 11 Feb 2025 at 12:30.
19 May and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Trimley St Martin.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 09:19.
19 May and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Cavendish Road, Trimley St Martin.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 09:17.
2 and 4 Jun 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on The Street, Shottisham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 14 Mar 2025 at 12:01.
9 and 13 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Ranelagh Road, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Mar 2025 at 09:18.
9 and 13 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Ranelagh Road, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 10:27.
16 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Old Kirton Road, Trimley St Martin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 10:58.
16 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Looe Road, Felixstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jan 2025 at 21:25.
Roadworks Map near to Bawdsey, WOODBRIDGE, IP12 3AT
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Bawdsey, WOODBRIDGE, IP12 3AT (3 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.