ROADWORKS SUMMARY
Seven Hills, Felixstowe Road, IPSWICH, IP10 0DQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Seven Hills, Felixstowe Road, IP10 0DQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Seven Hills, Felixstowe Road, IPSWICH, IP10 0DQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Seven Hills, Felixstowe Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Anglian Water logo
LONG TERM
Between
22 Apr 2024 and 10 Oct 2025
Details
View Map
Share
Follow
Ipswich Road

Anglian Water are proposing to carry out Utility asset works on Ipswich Road, Wherstead.

These works are categorised as Major.

The works will start on or after 22 April 2024 and could run through until 10 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 22 Mar 2024 at 15:38.

Cadent Gas logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Woodbridge Road

Cadent Gas were proposing to carry out Utility asset works on Woodbridge Road, Ipswich.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:32.

Suffolk County Council logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Ipswich Road

Suffolk County Council are carrying out Highway repair and maintenance works on Ipswich Road, Wherstead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:00 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 5 Dec 2024 at 11:36.

Suffolk County Council logo
LONG TERM
Between
11 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Ipswich Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Ipswich Road, Wherstead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 17 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Suffolk County Council on 6 Nov 2024 at 13:53.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
North Hill Road

Cadent Gas were proposing to carry out Utility asset works on North Hill Road, Ipswich.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:40.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
St Johns Road

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on St Johns Road, Ipswich.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 December 2024 at 21:33 and could run through until 3 January 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Dec 2024 at 21:35.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Post Mill Close

Cadent Gas were proposing to carry out Utility asset works on Post Mill Close, Ipswich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:43.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Belle Vue Road

Cadent Gas were proposing to carry out Utility asset works on Belle Vue Road, Ipswich.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:42.

Cadent Gas logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Norman Crescent

Cadent Gas were proposing to carry out Utility asset works on Norman Crescent, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:05.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Benacre Road

Cadent Gas were proposing to carry out Utility asset works on Benacre Road, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:05.

Energy Assets Pipelines logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Westerfield Road

Energy Assets Pipelines were proposing to carry out Utility asset works on Westerfield Road, Ipswich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Pipelines on 19 Nov 2024 at 15:57.

Cadent Gas logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Avondale Road

Cadent Gas were proposing to carry out Utility asset works on Avondale Road, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:06.

Anglian Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Hall Farm Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Hall Farm Road, Great Bealings.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 15:36.

Suffolk County Council logo
Between
8 and 15 Jan 2025
Details
View Map
Share
Follow
Lodge Road

Suffolk County Council are proposing to carry out Works for road purposes on Lodge Road, Great Bealings.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 15 January 2025. The works will impact the verge only.

This roadwork event was last updated by Suffolk County Council on 17 Dec 2024 at 10:31.

Cityfibre Metro Networks logo
Between
8 and 14 Jan 2025
Details
View Map
Share
Follow
School Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on School Lane, Martlesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 14 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 12 Dec 2024 at 09:36.

LONG TERM
Between
14 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Sandyhill Lane

GTC Pipelines are proposing to carry out Utility asset works on Sandyhill Lane, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 24 Oct 2024 at 11:12.

LONG TERM
Between
14 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Sandyhill Lane

GTC Pipelines are proposing to carry out Utility asset works on Sandyhill Lane, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 25 Oct 2024 at 13:14.

Cityfibre Metro Networks logo
Between
16 Jan and 5 Feb 2025
Details
View Map
Share
Follow
St Martins Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Martins Green, Trimley St Martin.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Nov 2024 at 10:13.

Cityfibre Metro Networks logo
Between
16 Jan and 5 Feb 2025
Details
View Map
Share
Follow
St Martins Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Martins Green, Trimley St Martin.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 12:54.

Cadent Gas logo
Between
18 and 31 Jan 2025
Details
View Map
Share
Gloucester Road

Cadent Gas were proposing to carry out Utility asset works on Gloucester Road, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:07.

Cadent Gas logo
Between
18 and 31 Jan 2025
Details
View Map
Share
Fairfield Road

Cadent Gas were proposing to carry out Utility asset works on Fairfield Road, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:07.

Cadent Gas logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Northgate Street

Cadent Gas are proposing to carry out Utility asset works on Northgate Street, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 12:48.

National Highways logo
Between
20 Jan and 1 Feb 2025
Details
View Map
Share
Follow
C355 From A14 To C370

National Highways are proposing to carry out Works for road purposes on C355 From A14 To C370, Trimley St Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Oct 2024 at 10:57.

Suffolk County Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
High Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on High Road, Trimley St Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 4 Nov 2024 at 08:59.

Suffolk County Council logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
High Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on High Road, Trimley St Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 28 Oct 2024 at 10:54.

Suffolk County Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
High Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on High Road, Trimley St Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 21 Oct 2024 at 10:56.

Suffolk County Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
High Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on High Road, Trimley St Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 28 Oct 2024 at 11:59.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Stoke Park Drive

Cadent Gas are proposing to carry out Utility asset works on Stoke Park Drive, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:03.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Ramsey Close

Cadent Gas are proposing to carry out Utility asset works on Ramsey Close, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:03.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Fountains Road

Cadent Gas are proposing to carry out Utility asset works on Fountains Road, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:02.

Anglian Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Westerfield Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 13 Nov 2024 at 12:33.

Cityfibre Metro Networks logo
Between
6 and 19 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Mill Lane, Trimley St Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 12 Dec 2024 at 11:04.

Cityfibre Metro Networks logo
Between
6 and 19 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Mill Lane, Trimley St Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 29 Nov 2024 at 10:46.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
St Nicholas Street

BT are proposing to carry out Utility asset works on St Nicholas Street, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 31 Oct 2024 at 15:06.

Anglian Water logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Falcon Street

Anglian Water are proposing to carry out Remedial works on Falcon Street, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 12:35.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Rivers Street

Cadent Gas were proposing to carry out Utility asset works on Rivers Street, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:50.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Belstead Road

Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:01.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Woodbridge Road

Cadent Gas were proposing to carry out Utility asset works on Woodbridge Road, Ipswich.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:46.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Belvedere Road

Cadent Gas were proposing to carry out Utility asset works on Belvedere Road, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:49.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Fountains Road

Cadent Gas are proposing to carry out Utility asset works on Fountains Road, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:01.

National Highways logo
Between
10 and 22 Feb 2025
Details
View Map
Share
Follow
C355 From A14 To C370

National Highways are proposing to carry out Works for road purposes on C355 From A14 To C370, Trimley St Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 Nov 2024 at 10:59.

National Highways logo
Between
10 and 22 Feb 2025
Details
View Map
Share
Follow
C355 From A14 To C370

National Highways are proposing to carry out Works for road purposes on C355 From A14 To C370, Trimley St Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Nov 2024 at 10:35.

Cadent Gas logo
Between
12 and 26 Feb 2025
Details
View Map
Share
Follow
Belstead Road

Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 14:18.

Cadent Gas logo
Between
12 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Belstead Road

Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 15:39.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Westerfield Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 14:28.

Anglian Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Westerfield Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 22 Nov 2024 at 08:33.

Anglian Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Westerfield Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 22 Nov 2024 at 11:42.

Anglian Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Westerfield Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Westerfield Road, Ipswich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 14:04.

Anglian Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Hall Farm Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Hall Farm Road, Great Bealings.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 13:26.

Anglian Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Hall Farm Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Hall Farm Road, Great Bealings.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 10:38.

Cityfibre Metro Networks logo
Between
20 Feb and 12 Mar 2025
Details
View Map
Share
Follow
St Martins Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Martins Green, Trimley St Martin.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Dec 2024 at 14:14.

Cityfibre Metro Networks logo
Between
20 Feb and 12 Mar 2025
Details
View Map
Share
Follow
St Martins Green

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Martins Green, Trimley St Martin.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 11 Dec 2024 at 08:22.

Cityfibre Metro Networks logo
Between
20 Feb and 7 Mar 2025
Details
View Map
Share
Follow
High Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on High Road, Trimley St Martin.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 16 Dec 2024 at 08:23.

Cityfibre Metro Networks logo
Between
20 Feb and 7 Mar 2025
Details
View Map
Share
Follow
High Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on High Road, Trimley St Martin.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Dec 2024 at 14:15.

UK Power Networks Eastern & London logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
High Road

UK Power Networks Eastern & London are proposing to carry out New service connection on High Road, Trimley St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 10:29.

UK Power Networks Eastern & London logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
High Road

UK Power Networks Eastern & London are proposing to carry out New service connection on High Road, Trimley St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 10:42.

Anglian Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
The Street

Anglian Water were proposing to carry out Utility repair and maintenance works on The Street, Little Bealings.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 10 Dec 2024 at 14:16.

Cadent Gas logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Belstead Road

Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:48.

Cadent Gas logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Belstead Road

Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:18.

Cadent Gas logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Belstead Road

Cadent Gas are proposing to carry out Utility asset works on Belstead Road, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:09.

Suffolk County Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
High Road

Suffolk County Council are proposing to carry out Section 50 on High Road, Trimley St Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 17 Dec 2024 at 08:39.

LONG TERM
Between
26 Feb and 8 Apr 2025
Details
View Map
Share
Sandyhill Lane

GTC Pipelines were proposing to carry out Utility asset works on Sandyhill Lane, Ipswich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 8 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 10 Dec 2024 at 11:59.

Suffolk County Council logo
Between
10 and 28 Mar 2025
Details
View Map
Share
High Road

Suffolk County Council were proposing to carry out Section 50 on High Road, Trimley St Martin.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 23 Dec 2024 at 11:55.

UK Power Networks Eastern & London logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Holbrook Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Holbrook Road, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Dec 2024 at 10:24.

UK Power Networks Eastern & London logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Holbrook Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Holbrook Road, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Dec 2024 at 16:09.

Suffolk County Council logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Tower Ramparts

Suffolk County Council are proposing to carry out Highway improvement works on Tower Ramparts, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 24 Dec 2024 at 13:37.

Suffolk County Council logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
High Street

Suffolk County Council are proposing to carry out Highway improvement works on High Street, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 24 Dec 2024 at 13:35.

Suffolk County Council logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Museum Street

Suffolk County Council are proposing to carry out Highway improvement works on Museum Street, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 24 Dec 2024 at 13:36.

Suffolk County Council logo
LONG TERM
Between
24 Mar and 2 May 2025
Details
View Map
Share
Follow
Fen Bight Circle

Suffolk County Council are proposing to carry out Works for road purposes on Fen Bight Circle, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 16 Dec 2024 at 09:22.

Suffolk County Council logo
LONG TERM
Between
24 Mar and 2 May 2025
Details
View Map
Share
Follow
Fen Bight Circle

Suffolk County Council are proposing to carry out Works for road purposes on Fen Bight Circle, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 17 Dec 2024 at 09:34.

Suffolk County Council logo
LONG TERM
Between
24 Mar and 2 May 2025
Details
View Map
Share
Follow
Downham Boulevard

Suffolk County Council are proposing to carry out Works for road purposes on Downham Boulevard, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 16 Dec 2024 at 09:22.

Suffolk County Council logo
LONG TERM
Between
24 Mar and 2 May 2025
Details
View Map
Share
Follow
Downham Boulevard

Suffolk County Council are proposing to carry out Works for road purposes on Downham Boulevard, Ipswich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 17 Dec 2024 at 09:33.


Roadworks Map near to Seven Hills, Felixstowe Road, IPSWICH, IP10 0DQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Dec 2024 00:35
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Seven Hills, Felixstowe Road, IPSWICH, IP10 0DQ (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.