ROADWORKS SUMMARY
Hilltop View, WOODFORD GREEN, IG8 8BQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hilltop View, IG8 8BQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hilltop View, WOODFORD GREEN, IG8 8BQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hilltop View are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Essex County Council logo
LONG TERM
Until
4 May 2026
Details
View Map
Share
Follow
Station Way

Essex County Council are carrying out Highway improvement works on Station Way, Buckhurst Hill.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 April 2023 at 08:33 and could run through until 4 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Jul 2024 at 07:13.

LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 3 Sep 2025 at 08:45.

LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 30 November 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 26 Sep 2025 at 12:20.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 12:09.

LONG TERM
Between
28 Nov 2024 and 6 Mar 2026
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 12:16.

LONG TERM
Until
11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 January 2025 at 08:00 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 16 Jan 2025 at 08:13.

London Borough Of Barking And Dagenham logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Longbridge Road

London Borough Of Barking And Dagenham are carrying out Highway improvement works on Longbridge Road, Barking.

These works are categorised as Major.

The works started on 3 March 2025 at 09:30 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 1 Oct 2025 at 14:52.

London Borough Of Enfield logo
LONG TERM
Until
18 Feb 2026
Details
View Map
Share
Follow
Harbet Road

London Borough Of Enfield are carrying out Highway improvement works on Harbet Road, Edmonton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 08:00 and could run through until 18 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 17 Mar 2025 at 08:04.

Thames Water logo
LONG TERM
Between
28 Apr and 20 Oct 2025
Details
View Map
Share
Jeffreys Road

Thames Water were proposing to carry out Utility asset works on Jeffreys Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 10:43.

Thames Water logo
LONG TERM
Between
28 Apr and 20 Oct 2025
Details
View Map
Share
Follow
Jeffreys Road

Thames Water are proposing to carry out Utility asset works on Jeffreys Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 10:50.

London Borough Of Waltham Forest logo
LONG TERM
Between
6 May 2025 and 31 Jan 2026
Details
View Map
Share
Follow
High Street

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on High Street, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 31 January 2026. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 Apr 2025 at 15:15.

London Borough Of Waltham Forest logo
LONG TERM
Between
6 May 2025 and 31 Jan 2026
Details
View Map
Share
Follow
High Street

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on High Street, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 31 January 2026. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Waltham Forest on 16 Jun 2025 at 15:59.

London Borough Of Waltham Forest logo
LONG TERM
Between
6 May 2025 and 31 Jan 2026
Details
View Map
Share
High Street

London Borough Of Waltham Forest were proposing to carry out Highway improvement works on High Street, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 31 January 2026. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Waltham Forest on 9 Apr 2025 at 11:14.

Thames Water logo
LONG TERM
Until
27 Feb 2026
Details
View Map
Share
Follow
Forest Road

Thames Water are carrying out Utility asset works on Forest Road, Walthamstow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:30 and could run through until 27 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 12:59.

Cadent Gas logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 12:10.

Cadent Gas logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Forest Road

Cadent Gas were proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 11 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 14:13.

London Borough Of Waltham Forest logo
LONG TERM
Until
4 Dec 2025
Details
View Map
Share
Follow
Forest Road

London Borough Of Waltham Forest are carrying out Highway improvement works on Forest Road, Walthamstow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2025 at 08:00 and could run through until 4 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 Sep 2025 at 09:33.

Thames Water logo
LONG TERM
Between
8 Jul and 21 Oct 2025
Details
View Map
Share
Follow
Riverwalk Road

Thames Water are proposing to carry out Utility asset works on Riverwalk Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 8 May 2025 at 11:41.

London Borough Of Waltham Forest logo
LONG TERM
Until
1 Dec 2026
Details
View Map
Share
Follow
Oliver Road

London Borough Of Waltham Forest are carrying out roadworks on Oliver Road, Leyton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 July 2025 at 08:00 and could run through until 1 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 Jul 2025 at 09:54.

London Borough Of Waltham Forest logo
LONG TERM
Until
1 Dec 2026
Details
View Map
Share
Follow
Oliver Road

London Borough Of Waltham Forest are carrying out roadworks on Oliver Road, Leyton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 July 2025 at 08:00 and could run through until 1 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 Jul 2025 at 09:53.

Thames Water logo
LONG TERM
Until
26 Nov 2025
Details
View Map
Share
Follow
Winsbeach

Thames Water are carrying out Utility asset works on Winsbeach, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 13:27 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 16:03.

Thames Water logo
LONG TERM
Until
26 Nov 2025
Details
View Map
Share
Follow
Woodstock Road

Thames Water are carrying out Utility asset works on Woodstock Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 13:27 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 16:02.

Cornerstone Telecommunications Infrastructure logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Markhouse Road

Cornerstone Telecommunications Infrastructure are carrying out Utility repair and maintenance works on Markhouse Road, Walthamstow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 July 2025 at 12:00 and could run through until 31 October 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 22 Sep 2025 at 13:13.

Thames Water logo
LONG TERM
Between
28 Jul and 29 Oct 2025
Details
View Map
Share
Follow
Whipps Cross Road

Thames Water are proposing to carry out Utility repair and maintenance works on Whipps Cross Road, Leytonstone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Mar 2025 at 16:05.

Thames Water logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Park Grove Road

Thames Water are proposing to carry out Utility asset works on Park Grove Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 14:59.

Thames Water logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Park Grove Road

Thames Water are carrying out Utility asset works on Park Grove Road, Leytonstone.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 14:12 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 08:58.

Thames Water logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Mayville Road

Thames Water are proposing to carry out Utility asset works on Mayville Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 15:12.

Thames Water logo
LONG TERM
Between
4 Aug and 25 Oct 2025
Details
View Map
Share
Follow
Norman Road

Thames Water are proposing to carry out Utility asset works on Norman Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 14:58.

Thames Water logo
LONG TERM
Between
4 Aug 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Selborne Road

Thames Water are proposing to carry out Utility asset works on Selborne Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 15 Jul 2025 at 15:05.

Thames Water logo
LONG TERM
Until
6 Feb 2026
Details
View Map
Share
Follow
Selborne Road

Thames Water are carrying out Utility asset works on Selborne Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 11:02 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 15:40.

LONG TERM
Between
11 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Osborne Road

London Borough Of Newham are proposing to carry out Highway improvement works on Osborne Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 17 Jun 2025 at 09:07.

Thames Water logo
LONG TERM
Between
25 Aug and 10 Nov 2025
Details
View Map
Share
Follow
Aden Road

Thames Water are proposing to carry out Utility asset works on Aden Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 22 Jul 2025 at 15:50.

Thames Water logo
LONG TERM
Between
25 Aug and 8 Dec 2025
Details
View Map
Share
Follow
Riverwalk Road

Thames Water are proposing to carry out Utility asset works on Riverwalk Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 12:05.

Thames Water logo
LONG TERM
Until
10 Nov 2025
Details
View Map
Share
Follow
Riverwalk Road

Thames Water are carrying out Utility asset works on Riverwalk Road, Enfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:47 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 15:14.

Thames Water logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Belton Road

Thames Water are proposing to carry out Utility asset works on Belton Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 08:26.

Thames Water logo
LONG TERM
Today
Details
View Map
Share
Belton Road

Thames Water carried out Utility asset works on Belton Road, Forest Gate, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 1 Sep 2025 and 8 Oct 2025 and were actually completed between 3 Sep 2025 (08:13) and 8 Oct 2025 (13:38). The works impacted the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 13:38.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Sylvan Road

Thames Water are carrying out Utility asset works on Sylvan Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 13:37 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 09:27.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
The Broadway

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on The Broadway, Dagenham.

These works are categorised as Major.

The works will start on or after 4 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 23 Sep 2025 at 13:23.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Priory Avenue

Thames Water are carrying out Utility asset works on Priory Avenue, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 September 2025 at 15:38 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2025 at 15:38.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Shrubland Road

Thames Water are proposing to carry out Utility asset works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 11:24.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Cedars Avenue

Thames Water are proposing to carry out Utility asset works on Cedars Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 15:17.

LONG TERM
Between
8 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Ilford Lane

London Borough Of Redbridge are proposing to carry out Highway improvement works on Ilford Lane, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 28 May 2025 at 08:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Sep and 16 Nov 2025
Details
View Map
Share
Follow
Beehive Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Beehive Lane, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2025 at 11:16.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Sep and 16 Nov 2025
Details
View Map
Share
Follow
Beehive Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Beehive Lane, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jul 2025 at 13:30.

Thames Water logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Hale End Road

Thames Water are proposing to carry out Utility asset works on Hale End Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 11:46.

London Borough Of Waltham Forest logo
LONG TERM
Until
8 Sep 2026
Details
View Map
Share
Follow
Beech Hall Road

London Borough Of Waltham Forest are carrying out roadworks on Beech Hall Road, Chingford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2025 at 09:00 and could run through until 8 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 4 Sep 2025 at 09:18.

LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Cherry Tree Rise

London Borough Of Redbridge are carrying out Highway repair and maintenance works on Cherry Tree Rise, Buckhurst Hill.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 06:18 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 8 Sep 2025 at 06:18.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
11 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Haydon Road

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Haydon Road, Dagenham.

These works are categorised as Major.

The works will start on or after 11 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 23 Sep 2025 at 11:55.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
11 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Grantham Gardens

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Grantham Gardens, Chadwell Heath.

These works are categorised as Major.

The works will start on or after 11 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 23 Sep 2025 at 13:23.

UK Power Networks Eastern & London logo
LONG TERM
Until
9 Nov 2025
Details
View Map
Share
Follow
Beehive Lane

UK Power Networks Eastern & London are carrying out New service connection on Beehive Lane, Ilford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:00 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2025 at 10:51.

Thames Water logo
LONG TERM
Between
15 Sep and 31 Oct 2025
Details
View Map
Share
Hale End Road

Thames Water were proposing to carry out Utility asset works on Hale End Road, Walthamstow.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 08:25.

Cadent Gas logo
LONG TERM
Between
15 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Hatch Lane

Cadent Gas are proposing to carry out Utility asset works on Hatch Lane, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jun 2024 at 15:16.

Cadent Gas logo
LONG TERM
Between
15 Sep and 8 Dec 2025
Details
View Map
Share
Hatch Lane

Cadent Gas were proposing to carry out Utility asset works on Hatch Lane, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 17:49.

Cadent Gas logo
LONG TERM
Between
15 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Blackthorne Drive

Cadent Gas are proposing to carry out Utility asset works on Blackthorne Drive, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jun 2024 at 15:15.

Cadent Gas logo
LONG TERM
Between
15 Sep and 8 Dec 2025
Details
View Map
Share
Blackthorne Drive

Cadent Gas were proposing to carry out Utility asset works on Blackthorne Drive, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 07:36.

Essex County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Roding Road

Essex County Council are proposing to carry out Highway improvement works on Roding Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Jul 2025 at 16:09.

Essex County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Valley Hill

Essex County Council are proposing to carry out Highway improvement works on Valley Hill, Loughton Town, Loughton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 15 Jul 2025 at 11:32.

Cadent Gas logo
Finishing
Saturday
Details
View Map
Share
Follow
Morson Road

Cadent Gas are proposing to carry out Utility asset works on Morson Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 11 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2025 at 14:33.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Highbridge Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Highbridge Road, Barking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 14:51.

Finishing
Friday
Details
View Map
Share
Follow
Keogh Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Keogh Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 19 Jun 2025 at 12:26.

LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Ilford Lane

London Borough Of Redbridge are carrying out Highway improvement works on Ilford Lane, Ilford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 07:57 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 22 Sep 2025 at 07:59.

Thames Water logo
Until
20 Oct 2025
Details
View Map
Share
Follow
Short Road

Thames Water are carrying out Utility asset works on Short Road, Leytonstone.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 12:31 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Sep 2025 at 12:34.

Cadent Gas logo
Between
22 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Hove Avenue

Cadent Gas are proposing to carry out Utility asset works on Hove Avenue, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jun 2024 at 14:41.

Cadent Gas logo
Between
22 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Hove Avenue

Cadent Gas are proposing to carry out Utility asset works on Hove Avenue, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 09:45.

Cadent Gas logo
Between
22 Sep and 16 Oct 2025
Details
View Map
Share
Hove Avenue

Cadent Gas were proposing to carry out Utility asset works on Hove Avenue, Walthamstow.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 16 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 16:21.

London Borough Of Enfield logo
LONG TERM
Between
22 Sep and 1 Dec 2025
Details
View Map
Share
Follow
Harbet Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Harbet Road, Edmonton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 3 Sep 2025 at 11:42.

London Borough Of Enfield logo
LONG TERM
Between
22 Sep and 1 Dec 2025
Details
View Map
Share
Follow
Harbet Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Harbet Road, Edmonton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 16 Sep 2025 at 14:17.

London Borough Of Enfield logo
LONG TERM
Between
22 Sep and 1 Dec 2025
Details
View Map
Share
Follow
Angel Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Angel Road, Edmonton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 8 Sep 2025 at 11:54.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Forest Drive

Essex County Council are carrying out Section 50 on Forest Drive, Theydon Bois, Epping.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2025 at 10:00 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Oct 2025 at 10:33.

London Borough Of Waltham Forest logo
LONG TERM
Between
24 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Ellingham Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Ellingham Road, Stratford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 2 Oct 2025 at 08:30.

Thames Water logo
Between
26 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Hatherley Mews

Thames Water are proposing to carry out New service connection on Hatherley Mews, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jul 2025 at 11:52.

London Borough Of Waltham Forest logo
LONG TERM
Between
29 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Hatherley Mews

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Hatherley Mews, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 18 Sep 2025 at 14:39.

Thames Water logo
LONG TERM
Between
29 Sep and 24 Nov 2025
Details
View Map
Share
Follow
Ulverston Road

Thames Water are proposing to carry out Utility asset works on Ulverston Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 14:16.

London Borough Of Waltham Forest logo
LONG TERM
Between
1 Oct 2025 and 15 Jan 2026
Details
View Map
Share
Follow
York Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on York Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 27 Jun 2025 at 16:10.

London Borough Of Waltham Forest logo
LONG TERM
Between
1 Oct 2025 and 15 Jan 2026
Details
View Map
Share
Follow
Dunedin Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Dunedin Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 27 Jun 2025 at 15:56.

London Borough Of Waltham Forest logo
LONG TERM
Between
1 Oct 2025 and 15 Jan 2026
Details
View Map
Share
Follow
Lyttelton Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Lyttelton Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 27 Jun 2025 at 16:11.

London Borough Of Waltham Forest logo
LONG TERM
Between
1 Oct 2025 and 15 Jan 2026
Details
View Map
Share
Follow
Cathall Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Cathall Road, Leytonstone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 24 Jun 2025 at 15:57.

London Borough Of Waltham Forest logo
LONG TERM
Between
1 Oct 2025 and 15 Jan 2026
Details
View Map
Share
Follow
Snaresbrook Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Snaresbrook Road, Leytonstone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 24 Jun 2025 at 16:00.

Thames Water logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Ulverston Road

Thames Water are carrying out Utility asset works on Ulverston Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2025 at 09:49 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 09:49.

Thames Water logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Hale End Road

Thames Water are carrying out Utility asset works on Hale End Road, Walthamstow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 October 2025 at 16:19 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 16:19.

London Borough Of Waltham Forest logo
Finishing
Today
Details
View Map
Share
Follow
Marmion Approach

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Marmion Approach, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 24 Jul 2025 at 12:15.

London Borough Of Waltham Forest logo
Finishing
Today
Details
View Map
Share
Follow
St Johns Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on St Johns Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 24 Jul 2025 at 12:10.

Thames Water logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Ismailia Road

Thames Water are carrying out Utility asset works on Ismailia Road, Forest Gate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2025 at 11:44 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 11:44.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Longbridge Road

Cadent Gas are carrying out Utility repair and maintenance works on Longbridge Road, Dagenham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2025 at 10:00 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 08:23.

UK Power Networks Eastern & London logo
Between
4 and 26 Oct 2025
Details
View Map
Share
Follow
Bramley Crescent

UK Power Networks Eastern & London are proposing to carry out New service connection on Bramley Crescent, Gants Hill, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Sep 2025 at 10:31.

UK Power Networks Eastern & London logo
Between
4 and 26 Oct 2025
Details
View Map
Share
Follow
Bramley Crescent

UK Power Networks Eastern & London are proposing to carry out New service connection on Bramley Crescent, Gants Hill, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Oct 2025 at 08:30.

UK Power Networks Eastern & London logo
Until
26 Oct 2025
Details
View Map
Share
Follow
Bramley Crescent

UK Power Networks Eastern & London are carrying out New service connection on Bramley Crescent, Gants Hill, Ilford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 12:45 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 12:55.

Finishing
Friday
Details
View Map
Share
Follow
Dorset Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Dorset Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 11 Sep 2025 at 16:36.

Finishing
Friday
Details
View Map
Share
Follow
Dorset Road

London Borough Of Newham are carrying out Highway repair and maintenance works on Dorset Road, Forest Gate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 6 Oct 2025 at 08:27.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Katherine Road

Thames Water are proposing to carry out Utility repair and maintenance works on Katherine Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jul 2025 at 10:40.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Forest View Road

Thames Water are proposing to carry out Utility repair and maintenance works on Forest View Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Jul 2025 at 14:33.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Forest View Road

Thames Water are carrying out Utility repair and maintenance works on Forest View Road, Manor Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 09:08.

London Borough Of Waltham Forest logo
LONG TERM
Between
6 Oct 2025 and 20 Jan 2026
Details
View Map
Share
Follow
Dunedin Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Dunedin Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 3 Oct 2025 at 17:53.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Windsor Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Windsor Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jul 2025 at 16:13.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Windsor Road

Thames Water are carrying out Disconnection or alteration of supply on Windsor Road, Leyton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:37 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 11:14.

Network Rail logo
Finishing
Today
Details
View Map
Share
Lancaster Road

Network Rail were proposing to carry out Works for Rail Purposes on Lancaster Road, Leytonstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jun 2025 at 11:13.

Network Rail logo
Finishing
Today
Details
View Map
Share
Follow
Lancaster Road

Network Rail are proposing to carry out Works for Rail Purposes on Lancaster Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Jul 2025 at 15:35.

Network Rail logo
Finishing
Today
Details
View Map
Share
Follow
Lancaster Road

Network Rail are carrying out Works for Rail Purposes on Lancaster Road, Leytonstone.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:00 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Oct 2025 at 09:07.

Thames Water logo
Until
19 Oct 2025
Details
View Map
Share
Follow
Brisbane Road

Thames Water are carrying out Utility repair and maintenance works on Brisbane Road, Ilford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 10:20 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 10:45.

Cadent Gas logo
LONG TERM
Between
6 Oct and 17 Dec 2025
Details
View Map
Share
Follow
Cranley Drive

Cadent Gas are proposing to carry out Utility asset works on Cranley Drive, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jul 2025 at 14:00.

Cadent Gas logo
LONG TERM
Between
6 Oct and 17 Dec 2025
Details
View Map
Share
Cranley Drive

Cadent Gas were proposing to carry out Utility asset works on Cranley Drive, Newbury Park, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 11:07.

Cadent Gas logo
LONG TERM
Between
6 Oct and 17 Dec 2025
Details
View Map
Share
Cranley Drive

Cadent Gas were proposing to carry out Utility asset works on Cranley Drive, Newbury Park, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2025 at 14:59.

Cadent Gas logo
LONG TERM
Between
6 Oct and 17 Dec 2025
Details
View Map
Share
Cranley Drive

Cadent Gas were proposing to carry out Utility asset works on Cranley Drive, Newbury Park, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 10:58.

Cadent Gas logo
LONG TERM
Between
6 Oct and 17 Dec 2025
Details
View Map
Share
Cranley Drive

Cadent Gas were proposing to carry out Utility asset works on Cranley Drive, Newbury Park, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2025 at 14:57.

Thames Water logo
LONG TERM
Between
6 Oct and 17 Nov 2025
Details
View Map
Share
Shrubland Road

Thames Water were proposing to carry out Utility asset works on Shrubland Road, Walthamstow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 11:14.

Cadent Gas logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Prospect Hill

Cadent Gas were proposing to carry out Utility asset works on Prospect Hill, Walthamstow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 09:06.

Cadent Gas logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Follow
Prospect Hill

Cadent Gas are proposing to carry out Utility asset works on Prospect Hill, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 08:16.

Cadent Gas logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Follow
Church Hill

Cadent Gas are proposing to carry out Utility asset works on Church Hill, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 15:30.

Cadent Gas logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Follow
Church Hill

Cadent Gas are proposing to carry out Utility asset works on Church Hill, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 08:19.

Thames Water logo
LONG TERM
Between
6 Oct and 8 Dec 2025
Details
View Map
Share
Follow
Woodstock Road

Thames Water are proposing to carry out Utility asset works on Woodstock Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 12:58.

Thames Water logo
LONG TERM
Until
8 Dec 2025
Details
View Map
Share
Follow
Woodstock Road

Thames Water are carrying out Utility asset works on Woodstock Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 11:55 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 11:55.

Finishing
Friday
Details
View Map
Share
Follow
Burland Road

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Burland Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 29 Sep 2025 at 13:00.

Finishing
Friday
Details
View Map
Share
Follow
Burland Road

London Borough Of Havering are carrying out Highway repair and maintenance works on Burland Road, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 6 Oct 2025 at 08:17.

London Borough Of Enfield logo
LONG TERM
Until
30 Dec 2025
Details
View Map
Share
Follow
Harbet Road

London Borough Of Enfield are carrying out Highway improvement works on Harbet Road, Edmonton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 30 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 6 Oct 2025 at 09:25.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Pudding Lane

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Pudding Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Aug 2025 at 16:54.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Pudding Lane

UK Power Networks Eastern & London are carrying out Disconnection or alteration of supply on Pudding Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:38 and could run through until 10 October 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 08:38.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Hepworth Gardens

Cadent Gas were proposing to carry out Utility repair and maintenance works on Hepworth Gardens, Barking.

The works were originally planned to start 7 October 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 14:18.

Cadent Gas logo
Between
7 and 15 Oct 2025
Details
View Map
Share
Valence Wood Road

Cadent Gas carried out Utility repair and maintenance works on Valence Wood Road, Dagenham.

The works were originally planned between 7 Oct 2025 and 15 Oct 2025 and were actually completed between 7 Oct 2025 (12:27) and 8 Oct 2025 (16:16). The works impacted the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 16:27.

Thames Water logo
Until
20 Oct 2025
Details
View Map
Share
Follow
Horn Lane

Thames Water are carrying out Utility repair and maintenance works on Horn Lane, Woodford Green.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 10:00 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 11:00.

Cadent Gas logo
Until
16 Oct 2025
Details
View Map
Share
Follow
Valence Avenue

Cadent Gas are carrying out Utility repair and maintenance works on Valence Avenue, Dagenham.

The works started on 8 October 2025 at 08:46 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 10:04.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Valence Avenue

Cadent Gas were proposing to carry out Utility repair and maintenance works on Valence Avenue, Dagenham.

The works were originally planned to start 8 October 2025 and run through until 14 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 14:15.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Forest Lane

Thames Water are carrying out Utility repair and maintenance works on Forest Lane, Chigwell Town, Chigwell.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 01:22 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 20:28.

Between
9 and 24 Oct 2025
Details
View Map
Share
Follow
Halley Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Halley Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 31 Jul 2025 at 10:06.

Between
9 and 24 Oct 2025
Details
View Map
Share
Follow
Gainsborough Avenue

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Gainsborough Avenue, Manor Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 29 Jul 2025 at 09:46.

Thames Water logo
LONG TERM
Between
11 Oct and 22 Nov 2025
Details
View Map
Share
Follow
Ismailia Road

Thames Water are proposing to carry out Utility asset works on Ismailia Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 22 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 08:27.

Thames Water logo
Between
12 and 16 Oct 2025
Details
View Map
Share
Follow
Cleveland Park Crescent

Thames Water are proposing to carry out Utility asset works on Cleveland Park Crescent, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2023 at 16:30.

Between
13 and 16 Oct 2025
Details
View Map
Share
Lens Road

London Borough Of Newham were proposing to carry out Highway repair and maintenance works on Lens Road, Forest Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 16 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 15 Sep 2025 at 09:47.

Between
13 and 16 Oct 2025
Details
View Map
Share
Follow
Lens Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Lens Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 1 Oct 2025 at 09:03.

Thames Water logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Tavistock Road

Thames Water were proposing to carry out roadworks on Tavistock Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 15 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jul 2025 at 11:16.

UK Power Networks Eastern & London logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Green Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Green Street, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Jul 2025 at 09:13.

Cadent Gas logo
Between
13 Oct and 2 Nov 2025
Details
View Map
Share
Quebec Road

Cadent Gas were proposing to carry out Utility asset works on Quebec Road, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 11:00.

Cadent Gas logo
Between
13 Oct and 2 Nov 2025
Details
View Map
Share
Quebec Road

Cadent Gas were proposing to carry out Utility asset works on Quebec Road, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2025 at 10:55.

Cadent Gas logo
Between
13 Oct and 2 Nov 2025
Details
View Map
Share
Milton Crescent

Cadent Gas were proposing to carry out Utility asset works on Milton Crescent, Gants Hill, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 11:00.

Cadent Gas logo
Between
13 Oct and 2 Nov 2025
Details
View Map
Share
Milton Crescent

Cadent Gas were proposing to carry out Utility asset works on Milton Crescent, Gants Hill, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2025 at 10:56.

Thames Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Sylvan Road

Thames Water are proposing to carry out New service connection on Sylvan Road, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 10:31.

Thames Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Sylvan Road

Thames Water are proposing to carry out New service connection on Sylvan Road, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 15:00.

Thames Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Clarendon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clarendon Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jul 2025 at 11:01.

Thames Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Clarendon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clarendon Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 15:00.

Thames Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Clarendon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clarendon Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 15:07.

Thames Water logo
LONG TERM
Between
13 Oct and 25 Nov 2025
Details
View Map
Share
Follow
Leeside Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Leeside Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jul 2025 at 16:53.

Thames Water logo
LONG TERM
Between
13 Oct and 25 Nov 2025
Details
View Map
Share
Follow
Watermead Way

Thames Water are proposing to carry out Statutory Infrastructure Works on Watermead Way, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jul 2025 at 16:53.

Cadent Gas logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Beechwood Drive

Cadent Gas are proposing to carry out Utility asset works on Beechwood Drive, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 16:24.

Cadent Gas logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Henrys Avenue

Cadent Gas are proposing to carry out Utility asset works on Henrys Avenue, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 16:18.

Cadent Gas logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 16:17.

Cadent Gas logo
Between
13 Oct and 11 Nov 2025
Details
View Map
Share
Follow
Montalt Road

Cadent Gas are proposing to carry out Utility asset works on Montalt Road, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 15:58.

Between
14 and 16 Oct 2025
Details
View Map
Share
Charles Road

London Borough Of Newham were proposing to carry out Highway repair and maintenance works on Charles Road, Forest Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2025 and run through until 16 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 15 Sep 2025 at 09:46.

Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Charles Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Charles Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 1 Oct 2025 at 09:04.

Thames Water logo
LONG TERM
Between
15 Oct and 26 Nov 2025
Details
View Map
Share
Follow
Norman Road

Thames Water are proposing to carry out Utility asset works on Norman Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 09:04.

Essex County Council logo
Between
15 and 16 Oct 2025
Details
View Map
Share
Follow
High Road

Essex County Council are proposing to carry out Highway improvement works on High Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Aug 2025 at 15:45.

Cadent Gas logo
LONG TERM
Between
16 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Arkley Crescent

Cadent Gas are proposing to carry out Utility asset works on Arkley Crescent, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jun 2024 at 14:52.

Cadent Gas logo
LONG TERM
Between
16 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Arkley Crescent

Cadent Gas are proposing to carry out Utility asset works on Arkley Crescent, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 09:19.

National Grid Electricity Transmission logo
Between
16 and 18 Oct 2025
Details
View Map
Share
Watermead Way

National Grid Electricity Transmission were proposing to carry out Utility repair and maintenance works on Watermead Way, Tottenham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 October 2025 and run through until 18 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 28 Apr 2025 at 09:10.

Essex County Council logo
Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
Old Station Road

Essex County Council are proposing to carry out Highway improvement works on Old Station Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Aug 2025 at 15:40.

Thames Water logo
LONG TERM
Between
17 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 09:50.

Between
17 Oct and 14 Nov 2025
Details
View Map
Share
Fourth Avenue

London Borough Of Newham were proposing to carry out Highway repair and maintenance works on Fourth Avenue, Manor Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 October 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 1 Sep 2025 at 10:29.

National Grid Electricity Transmission logo
Between
17 and 19 Oct 2025
Details
View Map
Share
Follow
Watermead Way

National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Watermead Way, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 19 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 19 Jul 2024 at 13:38.

Between
20 and 24 Oct 2025
Details
View Map
Share
Whyteville Road

London Borough Of Newham were proposing to carry out Highway repair and maintenance works on Whyteville Road, Forest Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 15 Sep 2025 at 09:46.

Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Whyteville Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Whyteville Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 8 Oct 2025 at 08:15.

Between
20 and 28 Oct 2025
Details
View Map
Share
Follow
Osborne Road

London Borough Of Newham are proposing to carry out Highway improvement works on Osborne Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 11 Sep 2025 at 10:05.

Cadent Gas logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Prospect Hill

Cadent Gas are proposing to carry out Utility asset works on Prospect Hill, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 15:00.

Telefonica UK logo
Between
20 and 26 Oct 2025
Details
View Map
Share
Follow
Forest Road

Telefonica UK are proposing to carry out Utility asset works on Forest Road, Walthamstow.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 28 Aug 2025 at 15:51.

Virgin Media logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Garman Road

Virgin Media are proposing to carry out Utility asset works on Garman Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 11 Jul 2025 at 15:01.

Virgin Media logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Garman Road

Virgin Media are proposing to carry out Utility asset works on Garman Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 8 Oct 2025 at 16:35.

Essex County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
High Road

Essex County Council are proposing to carry out Highway improvement works on High Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Sep 2025 at 14:38.

Essex County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
High Road

Essex County Council are proposing to carry out Highway improvement works on High Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Oct 2025 at 15:58.

Essex County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Manor Road

Essex County Council are proposing to carry out Highway improvement works on Manor Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Sep 2025 at 13:55.

Essex County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Manor Road

Essex County Council are proposing to carry out Highway improvement works on Manor Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Oct 2025 at 15:58.

Essex County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
High Road

Essex County Council are proposing to carry out Highway improvement works on High Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Sep 2025 at 14:44.

Essex County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
High Road

Essex County Council are proposing to carry out Highway improvement works on High Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Oct 2025 at 15:58.

Essex County Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Pyrles Lane

Essex County Council are proposing to carry out Remedial works on Pyrles Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Sep 2025 at 16:14.

Essex County Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Remedial works on Epping Lane, Theydon Bois, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Sep 2025 at 12:40.

Essex County Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Remedial works on Epping Lane, Theydon Garnon, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Sep 2025 at 12:35.

BT logo
On
23 Oct 2025
Details
View Map
Share
Follow
Burrow Road

BT are proposing to carry out Utility asset works on Burrow Road, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 23 October 2025 and are due to last for only one day. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Jul 2025 at 12:32.

BT logo
On
23 Oct 2025
Details
View Map
Share
Follow
Burrow Road

BT are proposing to carry out Utility asset works on Burrow Road, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 23 October 2025 and are due to last for only one day. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Oct 2025 at 12:00.

Thames Water logo
LONG TERM
Between
24 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Exeter Road

Thames Water are proposing to carry out Utility asset works on Exeter Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 11:00.

Cadent Gas logo
Between
24 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Footpath From Saville Row To Chingford Lane

Cadent Gas are proposing to carry out Utility asset works on Footpath From Saville Row To Chingford Lane, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jun 2025 at 12:45.

UK Power Networks Eastern & London logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Follow
Beehive Lane

UK Power Networks Eastern & London are proposing to carry out roadworks on Beehive Lane, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 10:30.

UK Power Networks Eastern & London logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Follow
Beehive Lane

UK Power Networks Eastern & London are proposing to carry out roadworks on Beehive Lane, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2025 at 10:46.

LONG TERM
Between
27 Oct 2025 and 28 Feb 2026
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Romford Road, Forest Gate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 11 Aug 2025 at 10:18.

Cadent Gas logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Grove Green Road

Cadent Gas are proposing to carry out Utility asset works on Grove Green Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 12:30.

Cadent Gas logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Lynton Crescent

Cadent Gas were proposing to carry out Utility asset works on Lynton Crescent, Gants Hill, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 11:01.

Thames Water logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Suffolk Park Road

Thames Water are proposing to carry out Utility asset works on Suffolk Park Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:18.

Thames Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Pretoria Avenue

Thames Water were proposing to carry out Utility asset works on Pretoria Avenue, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 11:33.

Thames Water logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Pretoria Avenue

Thames Water are proposing to carry out Utility asset works on Pretoria Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 15:54.

Telefonica UK logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Forest Road

Telefonica UK were proposing to carry out Utility asset works on Forest Road, Walthamstow.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 5 Sep 2025 at 16:53.

Telefonica UK logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Forest Road

Telefonica UK are proposing to carry out Utility asset works on Forest Road, Walthamstow.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 15 Sep 2025 at 16:12.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Melville Road

Thames Water are proposing to carry out Utility asset works on Melville Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2023 at 16:30.

Thames Water logo
LONG TERM
Between
27 Oct 2025 and 2 Feb 2026
Details
View Map
Share
Follow
Marlborough Road

Thames Water are proposing to carry out Utility asset works on Marlborough Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 10:31.

Thames Water logo
LONG TERM
Between
27 Oct 2025 and 2 Feb 2026
Details
View Map
Share
Follow
Marlborough Road

Thames Water are proposing to carry out Utility asset works on Marlborough Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 15:00.

Cadent Gas logo
LONG TERM
Between
27 Oct and 17 Dec 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jul 2025 at 14:00.

Cadent Gas logo
Between
27 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Marion Grove

Cadent Gas are proposing to carry out Utility asset works on Marion Grove, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 16:17.

Cadent Gas logo
Between
27 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Lichfield Road

Cadent Gas are proposing to carry out Utility asset works on Lichfield Road, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 16:20.

Essex County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Debden Lane

Essex County Council are proposing to carry out Highway improvement works on Debden Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jul 2025 at 14:16.

Essex County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Debden Lane

Essex County Council are proposing to carry out Highway improvement works on Debden Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Sep 2025 at 13:39.

Essex County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Debden Lane

Essex County Council are proposing to carry out Highway improvement works on Debden Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Sep 2025 at 14:27.

Essex County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Debden Lane

Essex County Council are proposing to carry out Highway improvement works on Debden Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Sep 2025 at 12:18.

UK Power Networks Eastern & London logo
Between
30 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Beehive Lane

UK Power Networks Eastern & London are proposing to carry out roadworks on Beehive Lane, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2025 at 15:45.

UK Power Networks Eastern & London logo
Between
31 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Beehive Lane

UK Power Networks Eastern & London are proposing to carry out roadworks on Beehive Lane, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 10:30.

Thames Water logo
LONG TERM
Between
3 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Beauchamp Road

Thames Water are proposing to carry out Utility asset works on Beauchamp Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2025 at 12:10.

LONG TERM
Between
3 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Dersingham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Dersingham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 26 Sep 2025 at 10:41.

London Borough Of Waltham Forest logo
Between
3 and 6 Nov 2025
Details
View Map
Share
Follow
Grove Green Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Grove Green Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 14 Aug 2025 at 11:34.

Cadent Gas logo
Between
3 and 23 Nov 2025
Details
View Map
Share
Southview Crescent

Cadent Gas were proposing to carry out Utility asset works on Southview Crescent, Gants Hill, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 23 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 11:01.

Cadent Gas logo
Between
3 and 23 Nov 2025
Details
View Map
Share
Lonsdale Crescent

Cadent Gas were proposing to carry out Utility asset works on Lonsdale Crescent, Gants Hill, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 23 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 11:01.

London Borough Of Waltham Forest logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Hall Lane

London Borough Of Waltham Forest were proposing to carry out Highway repair and maintenance works on Hall Lane, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 5 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 1 Aug 2025 at 10:27.

Essex County Council logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Borders Lane

Essex County Council are proposing to carry out Highway improvement works on Borders Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 16 Jul 2025 at 15:06.

Thames Water logo
Between
4 and 6 Nov 2025
Details
View Map
Share
Tavistock Road

Thames Water were proposing to carry out roadworks on Tavistock Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 6 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 07:47.

Between
5 and 28 Nov 2025
Details
View Map
Share
Follow
Tylney Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Tylney Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 7 Aug 2025 at 12:14.

Thames Water logo
LONG TERM
Between
5 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Fernhill Court

Thames Water are proposing to carry out Utility asset works on Fernhill Court, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Oct 2025 at 14:35.

Thames Water logo
LONG TERM
Between
5 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Castleton Road

Thames Water are proposing to carry out Utility asset works on Castleton Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 16:04.

Essex County Council logo
Between
5 and 6 Nov 2025
Details
View Map
Share
Follow
High Road

Essex County Council are proposing to carry out Highway improvement works on High Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Aug 2025 at 10:18.

Between
6 and 28 Nov 2025
Details
View Map
Share
Morris Avenue

London Borough Of Newham were proposing to carry out Highway repair and maintenance works on Morris Avenue, Manor Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 1 Sep 2025 at 08:37.

Thames Water logo
Between
6 and 11 Nov 2025
Details
View Map
Share
Follow
George Lane

Thames Water are proposing to carry out Utility asset works on George Lane, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2025 at 17:32.

Thames Water logo
Between
6 and 11 Nov 2025
Details
View Map
Share
Follow
George Lane

Thames Water are proposing to carry out Utility asset works on George Lane, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 12:02.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
The Green

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on The Green, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 4 Aug 2025 at 15:19.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Wingfield Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Wingfield Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 4 Aug 2025 at 15:38.

Thames Water logo
LONG TERM
Between
7 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Exeter Road

Thames Water are proposing to carry out Utility asset works on Exeter Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 15:48.

Thames Water logo
LONG TERM
Between
7 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Edison Close

Thames Water are proposing to carry out Utility asset works on Edison Close, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 09:37.

Telefonica UK logo
Between
7 and 28 Nov 2025
Details
View Map
Share
Borders Lane

Telefonica UK were proposing to carry out Utility asset works on Borders Lane, Loughton Town, Loughton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 November 2025 and run through until 28 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 16 Sep 2025 at 09:31.

Telefonica UK logo
Between
8 and 23 Nov 2025
Details
View Map
Share
Follow
Borders Lane

Telefonica UK are proposing to carry out Utility asset works on Borders Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 10 Sep 2025 at 19:23.

Telefonica UK logo
Between
8 and 24 Nov 2025
Details
View Map
Share
Follow
Borders Lane

Telefonica UK are proposing to carry out Utility asset works on Borders Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 1 Oct 2025 at 16:38.

Telefonica UK logo
Between
8 and 29 Nov 2025
Details
View Map
Share
Borders Lane

Telefonica UK were proposing to carry out Utility asset works on Borders Lane, Loughton Town, Loughton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 November 2025 and run through until 29 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 17 Sep 2025 at 15:19.

Transport for London (TfL) logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 11:55.

Transport for London (TfL) logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 12:00.

Transport for London (TfL) logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 11:39.

Transport for London (TfL) logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 14:18.

London Borough Of Waltham Forest logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Leopold Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Leopold Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 14 Aug 2025 at 11:48.

London Borough Of Waltham Forest logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Sylvan Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Sylvan Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 15 Aug 2025 at 09:17.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Warner Road

Thames Water are proposing to carry out Utility asset works on Warner Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:15.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Stoneydown Avenue

Thames Water are proposing to carry out Utility asset works on Stoneydown Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:18.

Thames Water logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Ritchings Avenue

Thames Water are proposing to carry out Utility asset works on Ritchings Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:18.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Malford Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Malford Grove, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2025 at 11:16.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Malford Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Malford Grove, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 15:00.

London Borough Of Waltham Forest logo
LONG TERM
Between
10 Nov 2025 and 31 Aug 2026
Details
View Map
Share
Follow
Forest Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Forest Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 31 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 25 Aug 2025 at 16:30.

Cadent Gas logo
LONG TERM
Between
10 Nov and 31 Dec 2025
Details
View Map
Share
Follow
Chingford Lane

Cadent Gas are proposing to carry out Utility asset works on Chingford Lane, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Jun 2025 at 12:45.

Cadent Gas logo
Between
10 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Elm Grove

Cadent Gas are proposing to carry out Utility asset works on Elm Grove, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 15:39.

Cadent Gas logo
Between
10 Nov and 1 Dec 2025
Details
View Map
Share
Follow
High Elms

Cadent Gas are proposing to carry out Utility asset works on High Elms, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jun 2025 at 12:45.

Cadent Gas logo
LONG TERM
Between
10 Nov and 31 Dec 2025
Details
View Map
Share
Follow
Chingford Lane

Cadent Gas are proposing to carry out Utility asset works on Chingford Lane, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 16:25.

Virgin Media logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Manor Road

Virgin Media are proposing to carry out Utility asset works on Manor Road, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 2 Sep 2025 at 09:31.

Virgin Media logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Manor Road

Virgin Media are proposing to carry out Utility asset works on Manor Road, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 8 Sep 2025 at 14:20.

Thames Water logo
Between
10 and 26 Nov 2025
Details
View Map
Share
Follow
Forest Avenue

Thames Water are proposing to carry out Utility asset works on Forest Avenue, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 5 Aug 2025 at 15:55.

Thames Water logo
Between
10 and 26 Nov 2025
Details
View Map
Share
Follow
Forest Avenue

Thames Water are proposing to carry out Utility asset works on Forest Avenue, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 16:18.

Thames Water logo
LONG TERM
Between
10 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Jeffreys Road

Thames Water were proposing to carry out Utility asset works on Jeffreys Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 19 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2025 at 15:01.

Thames Water logo
LONG TERM
Between
10 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Jeffreys Road

Thames Water are proposing to carry out Utility asset works on Jeffreys Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 14:57.

Thames Water logo
LONG TERM
Between
10 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Jeffreys Road

Thames Water are proposing to carry out Utility asset works on Jeffreys Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 11:49.

Thames Water logo
LONG TERM
Between
10 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Jeffreys Road

Thames Water are proposing to carry out Utility asset works on Jeffreys Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 08:14.

Thames Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Mott Street

Thames Water are proposing to carry out Remedial works on Mott Street, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Aug 2025 at 15:54.

London Borough Of Waltham Forest logo
Between
12 and 15 Nov 2025
Details
View Map
Share
Follow
Onra Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Onra Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 14 Aug 2025 at 11:32.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Northcote Road

Thames Water are proposing to carry out Utility asset works on Northcote Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:15.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Warner Road

Thames Water are proposing to carry out Utility asset works on Warner Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:15.

Thames Water logo
LONG TERM
Between
17 Nov 2025 and 2 Feb 2026
Details
View Map
Share
Follow
Clarendon Road

Thames Water are proposing to carry out Utility asset works on Clarendon Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 2 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 10:31.

Thames Water logo
LONG TERM
Between
17 Nov 2025 and 2 Feb 2026
Details
View Map
Share
Follow
Clarendon Road

Thames Water are proposing to carry out Utility asset works on Clarendon Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 2 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 15:00.

Thames Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Rosebank Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Rosebank Grove, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Aug 2025 at 15:27.

Thames Water logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Bedford Road

Thames Water are proposing to carry out Utility asset works on Bedford Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 10:30.

Thames Water logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Bedford Road

Thames Water are proposing to carry out Utility asset works on Bedford Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 08:30.

Thames Water logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Bedford Road

Thames Water are proposing to carry out Utility asset works on Bedford Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 12:17.

Cadent Gas logo
LONG TERM
Between
17 Nov 2025 and 11 Jan 2026
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 11 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 10:45.

Cadent Gas logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Beechwood Drive

Cadent Gas are proposing to carry out Utility asset works on Beechwood Drive, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 15:50.

Cadent Gas logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Henrys Avenue

Cadent Gas are proposing to carry out Utility asset works on Henrys Avenue, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 16:23.

Cadent Gas logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 16:25.

Cadent Gas logo
Between
17 Nov and 16 Dec 2025
Details
View Map
Share
Follow
Montalt Road

Cadent Gas are proposing to carry out Utility asset works on Montalt Road, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 16 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 15:54.

London Borough Of Waltham Forest logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Marmion Approach

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Marmion Approach, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 14 Aug 2025 at 11:34.

London Borough Of Waltham Forest logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
St Johns Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on St Johns Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 14 Aug 2025 at 11:51.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Brook Parade

Thames Water are proposing to carry out roadworks on Brook Parade, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 16:19.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Brook Parade

Thames Water were proposing to carry out New service connection on Brook Parade, Chigwell Town, Chigwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 21 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 08:44.

Essex County Council logo
Between
18 and 20 Nov 2025
Details
View Map
Share
Follow
Old Station Road

Essex County Council are proposing to carry out Highway improvement works on Old Station Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Aug 2025 at 10:47.

Transport for London (TfL) logo
Between
19 and 21 Nov 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 15:37.

Thames Water logo
LONG TERM
Between
22 Nov 2025 and 17 Jan 2026
Details
View Map
Share
Follow
Beauchamp Road

Thames Water are proposing to carry out Utility asset works on Beauchamp Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2025 and could run through until 17 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 08:27.

Between
24 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Abbey Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 16 Sep 2025 at 10:12.

Between
24 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Abbey Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 16 Sep 2025 at 10:34.

Between
24 and 29 Nov 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 3 Oct 2025 at 14:40.

Between
24 and 29 Nov 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 3 Oct 2025 at 13:57.

BT logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Lindley Road

BT are proposing to carry out Utility repair and maintenance works on Lindley Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Sep 2025 at 15:35.

Thames Water logo
Between
24 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Royston Parade

Thames Water are proposing to carry out Utility repair and maintenance works on Royston Parade, Ilford.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 24 November 2025 and could run through until 10 December 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 15:54.

Thames Water logo
Between
24 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Royston Parade

Thames Water are proposing to carry out Utility repair and maintenance works on Royston Parade, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 10 December 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 11:56.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:15.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Palmerston Road

Thames Water were proposing to carry out Utility asset works on Palmerston Road, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 22:40.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Palmerston Road

Thames Water are proposing to carry out Utility asset works on Palmerston Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 22:43.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Somers Road

Thames Water are proposing to carry out Utility asset works on Somers Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:15.

Thames Water logo
Between
25 Nov and 9 Dec 2025
Details
View Map
Share
Follow
East Duck Lees Lane

Thames Water are proposing to carry out Utility asset works on East Duck Lees Lane, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 08:31.

LONG TERM
Between
1 Dec 2025 and 12 Jan 2026
Details
View Map
Share
Follow
Sheringham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Sheringham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 26 Sep 2025 at 10:43.

Network Rail logo
Between
1 and 4 Dec 2025
Details
View Map
Share
Follow
Cann Hall Road

Network Rail are proposing to carry out Works for Rail Purposes on Cann Hall Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Sep 2025 at 16:10.

Thames Water logo
Between
1 and 15 Dec 2025
Details
View Map
Share
Woodford Road

Thames Water were proposing to carry out Utility asset works on Woodford Road, South Woodford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 15 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 13:02.

Thames Water logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Woodford Road

Thames Water are proposing to carry out Utility asset works on Woodford Road, South Woodford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 10:30.

Thames Water logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Woodford Road

Thames Water are proposing to carry out Utility asset works on Woodford Road, South Woodford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Oct 2025 at 10:31.

Cadent Gas logo
Between
1 and 22 Dec 2025
Details
View Map
Share
Follow
High Road

Cadent Gas are proposing to carry out Utility asset works on High Road, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jun 2025 at 12:45.

Cadent Gas logo
Between
1 and 22 Dec 2025
Details
View Map
Share
Follow
The Charter Road

Cadent Gas are proposing to carry out Utility asset works on The Charter Road, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 13:29.

Cadent Gas logo
Between
1 and 22 Dec 2025
Details
View Map
Share
Follow
The Charter Road

Cadent Gas are proposing to carry out Utility asset works on The Charter Road, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 16:16.

Cadent Gas logo
Between
1 and 22 Dec 2025
Details
View Map
Share
Follow
Footpath From Saville Row To Chingford Lane

Cadent Gas are proposing to carry out Utility asset works on Footpath From Saville Row To Chingford Lane, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 15:56.

Cadent Gas logo
Between
1 and 22 Dec 2025
Details
View Map
Share
Follow
Marion Grove

Cadent Gas are proposing to carry out Utility asset works on Marion Grove, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 16:00.

Cadent Gas logo
Between
1 and 22 Dec 2025
Details
View Map
Share
Follow
Lichfield Road

Cadent Gas are proposing to carry out Utility asset works on Lichfield Road, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 15:58.

Cadent Gas logo
Between
1 and 30 Dec 2025
Details
View Map
Share
Follow
Morson Road

Cadent Gas are proposing to carry out Utility asset works on Morson Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 30 December 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2025 at 10:26.

Cadent Gas logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Morson Road

Cadent Gas are proposing to carry out Utility asset works on Morson Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 14:32.

Telefonica UK logo
Between
2 and 15 Dec 2025
Details
View Map
Share
Follow
Etheridge Road

Telefonica UK are proposing to carry out Utility asset works on Etheridge Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telefonica UK on 17 Sep 2025 at 16:48.

Thames Water logo
Between
7 and 9 Dec 2025
Details
View Map
Share
Follow
Shernhall Street

Thames Water are proposing to carry out Utility repair and maintenance works on Shernhall Street, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2025 and could run through until 9 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Aug 2025 at 11:05.

Cadent Gas logo
Between
8 and 17 Dec 2025
Details
View Map
Share
Follow
Highgrove Road

Cadent Gas are proposing to carry out Utility asset works on Highgrove Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 14:30.

Thames Water logo
Between
8 and 10 Dec 2025
Details
View Map
Share
South Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on South Avenue, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 10 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 15:45.

Thames Water logo
Between
8 and 10 Dec 2025
Details
View Map
Share
Drysdale Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Drysdale Avenue, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 10 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 15:45.

Thames Water logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Suez Road

Thames Water are proposing to carry out Utility asset works on Suez Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 08:37.

Thames Water logo
Between
11 and 20 Dec 2025
Details
View Map
Share
Follow
Carlton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Carlton Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2025 and could run through until 20 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:28.

Cadent Gas logo
Between
29 Dec 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Remedial works on Chester Road, Loughton Town, Loughton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 December 2025 and could run through until 16 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 09:56.

Thames Water logo
Between
2 and 16 Jan 2026
Details
View Map
Share
Follow
Woodlands Road

Thames Water are proposing to carry out Utility asset works on Woodlands Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2026 and could run through until 16 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 15:23.

Cadent Gas logo
Between
5 and 30 Jan 2026
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Barking.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2025 at 13:30.

Cadent Gas logo
LONG TERM
Between
5 Jan and 10 Feb 2026
Details
View Map
Share
Follow
Goodmayes Lane

Cadent Gas are proposing to carry out Utility asset works on Goodmayes Lane, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2025 at 14:46.

Cadent Gas logo
Between
5 and 26 Jan 2026
Details
View Map
Share
Follow
Mayesbrook Road

Cadent Gas are proposing to carry out Utility asset works on Mayesbrook Road, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2025 at 14:46.

Cadent Gas logo
LONG TERM
Between
5 Jan and 16 Mar 2026
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 16 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jun 2025 at 14:00.

Thames Water logo
LONG TERM
Between
5 Jan and 16 Feb 2026
Details
View Map
Share
Follow
Cedars Avenue

Thames Water are proposing to carry out Utility asset works on Cedars Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 16 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 15:06.

Cadent Gas logo
LONG TERM
Between
5 Jan and 23 Feb 2026
Details
View Map
Share
Follow
Chingford Lane

Cadent Gas are proposing to carry out Utility asset works on Chingford Lane, Woodford Green.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 23 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 10:01.

Cadent Gas logo
Between
5 and 26 Jan 2026
Details
View Map
Share
Follow
Elm Grove

Cadent Gas are proposing to carry out Utility asset works on Elm Grove, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 16:05.

Cadent Gas logo
Between
5 and 26 Jan 2026
Details
View Map
Share
Follow
High Elms

Cadent Gas are proposing to carry out Utility asset works on High Elms, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 16:04.

Cadent Gas logo
LONG TERM
Between
5 Jan and 23 Feb 2026
Details
View Map
Share
Follow
Chingford Lane

Cadent Gas are proposing to carry out Utility asset works on Chingford Lane, Woodford Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 23 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 16:01.

Essex County Council logo
Between
5 and 30 Jan 2026
Details
View Map
Share
Follow
Forest Road

Essex County Council are proposing to carry out Highway improvement works on Forest Road, Loughton Town, Loughton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Sep 2025 at 14:40.

Essex County Council logo
Between
5 and 30 Jan 2026
Details
View Map
Share
Follow
Clifton Road

Essex County Council are proposing to carry out Highway improvement works on Clifton Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Sep 2025 at 14:34.


Roadworks Map near to Hilltop View, WOODFORD GREEN, IG8 8BQ (16 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Last Updated: 8 Oct 2025 21:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hilltop View, WOODFORD GREEN, IG8 8BQ (16 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Essex County Council logo
AUDLEIGH PLACE, CHIGWELL TOWN 
(0.3 miles)
Essex County Council
Highway improvement works - Footway - Give and take
In Progress
Since: 6 Oct 2025 10:55
(Scheduled: 6 Oct 2025 - 10 Oct 2025)
0.3
Details
Share
Follow
2
Thames Water logo
URGENT
  
FOREST LANE, CHIGWELL TOWN 
(0.3 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 8 Oct 2025 01:22
(Scheduled: 8 Oct 2025 - 14 Oct 2025)
0.3
Details
Share
Follow
3
UK Power Networks Eastern & London logo
STRADBROKE DRIVE, CHIGWELL TOWN 
(0.6 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
2 Oct 2025 09:23 - 6 Oct 2025 16:16
0.6
Details
Share
4
UK Power Networks Eastern & London logo
BRACKEN DRIVE, CHIGWELL TOWN 
(0.6 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
2 Oct 2025 09:22 - 6 Oct 2025 16:16
0.6
Details
Share
5
UK Power Networks Eastern & London logo
URGENT
  
SNAKES LANE EAST 
(0.8 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Two-way signals
In Progress
Since: 7 Oct 2025 09:30
(Scheduled: 7 Oct 2025 - 13 Oct 2025)
0.8
Details
Share
Follow
6
URGENT
  
TOMSWOOD HILL 
(0.8 miles)
London Borough Of Redbridge
Highway improvement works - Carriageway - Some carriageway incursion
Complete
16 Sep 2025 13:22 - 14:39
0.8
Details
Share
7
UK Power Networks Eastern & London logo
GREAT OWL ROAD, CHIGWELL TOWN 
(0.9 miles)
UK Power Networks Eastern & London
New service connection - Footway - Some carriageway incursion
In Progress
Since: 7 Oct 2025 08:10
(Scheduled: 7 Oct 2025 - 13 Oct 2025)
0.9
Details
Share
Follow
8
Thames Water logo
URGENT
  
THE SHRUBBERIES, CHIGWELL TOWN 
(0.9 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 7 Oct 2025 11:41
(Scheduled: 7 Oct 2025 - 9 Oct 2025)
0.9
Details
Share
Follow
9
URGENT
  
CHERRY TREE RISE 
(0.9 miles)
London Borough Of Redbridge
Highway repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 8 Sep 2025 06:18
(Scheduled: 8 Sep 2025 - 19 Dec 2025)
0.9
Details
Share
Follow
10
Thames Water logo
URGENT
  
CHESTER ROAD, CHIGWELL TOWN 
(0.9 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
6 Oct 2025 14:37 - 8 Oct 2025 08:39