ROADWORKS SUMMARY
Coles Green, LOUGHTON, IG10 2QS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Coles Green, IG10 2QS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Coles Green, LOUGHTON, IG10 2QS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Coles Green are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Essex County Council logo
LONG TERM
Until
4 May 2026
Details
View Map
Share
Follow
Station Way

Essex County Council are carrying out Highway improvement works on Station Way, Buckhurst Hill.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 April 2023 at 08:33 and could run through until 4 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Jul 2024 at 07:13.

LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Broadmead Road

London Borough Of Redbridge are carrying out Highway repair and maintenance works on Broadmead Road, Woodford Green.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2023 at 07:34 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 17 Jun 2024 at 12:01.

Essex County Council logo
LONG TERM
Between
3 Sep 2024 and 4 Sep 2025
Details
View Map
Share
High Street

Essex County Council were proposing to carry out Highway improvement works on High Street, Epping Town, Epping.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 September 2024 and run through until 4 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Aug 2024 at 09:26.

Hertfordshire County Council logo
LONG TERM
Between
9 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Monarchs Way

Hertfordshire County Council are proposing to carry out Highway improvement works on Monarchs Way, Waltham Cross.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hertfordshire County Council on 16 Sep 2024 at 12:27.

Hertfordshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Monarchs Way

Hertfordshire County Council are carrying out Highway improvement works on Monarchs Way, Waltham Cross.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 07:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 16 Sep 2024 at 13:40.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Marrilyne Avenue

Thames Water are proposing to carry out Utility asset works on Marrilyne Avenue, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:34.

National Grid Electricity Transmission logo
LONG TERM
Between
16 Oct 2024 and 16 Oct 2025
Details
View Map
Share
Holyfield Road

National Grid Electricity Transmission were proposing to carry out Utility repair and maintenance works on Holyfield Road, Waltham Abbey Town, Waltham Abbey.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 October 2024 and run through until 16 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 1 Oct 2024 at 12:03.

Thames Water logo
LONG TERM
Between
22 Oct 2024 and 5 Apr 2025
Details
View Map
Share
Station Road

Thames Water were proposing to carry out Utility asset works on Station Road, Chingford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2024 and run through until 5 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 08:31.

Hertfordshire County Council logo
LONG TERM
Between
22 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Stanhope Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Stanhope Road, Waltham Cross.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hertfordshire County Council on 18 Oct 2024 at 10:57.

Hertfordshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Stanhope Road

Hertfordshire County Council are carrying out Highway improvement works on Stanhope Road, Waltham Cross.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 21:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 23 Oct 2024 at 10:29.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Canterbury Close

Cadent Gas are carrying out Utility asset works on Canterbury Close, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 08:09 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 08:55.

Essex County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Chequers Walk

Essex County Council are proposing to carry out Highway improvement works on Chequers Walk, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 28 October 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Aug 2024 at 15:25.

Cadent Gas logo
Between
4 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Lambourne Road

Cadent Gas are proposing to carry out Utility asset works on Lambourne Road, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:31.

Cadent Gas logo
Between
4 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Lambourne Road

Cadent Gas are proposing to carry out Utility asset works on Lambourne Road, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 08:58.

Cadent Gas logo
LONG TERM
Until
17 Dec 2024
Details
View Map
Share
Follow
Lambourne Road

Cadent Gas are carrying out Utility asset works on Lambourne Road, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 12:39 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:38.

Cadent Gas logo
LONG TERM
Between
11 Nov and 30 Dec 2024
Details
View Map
Share
Follow
Montalt Road

Cadent Gas are proposing to carry out Utility asset works on Montalt Road, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:54.

Cadent Gas logo
Between
18 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Cadent Gas are proposing to carry out Utility asset works on Vicarage Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:36.

Cadent Gas logo
Between
18 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Cadent Gas are proposing to carry out Utility asset works on Vicarage Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 08:10.

Cadent Gas logo
Until
15 Dec 2024
Details
View Map
Share
Follow
Shillibeer Walk

Cadent Gas are carrying out Utility asset works on Shillibeer Walk, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:46 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 12:32.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Roebuck Lane

Thames Water are carrying out Utility repair and maintenance works on Roebuck Lane, Buckhurst Hill.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 12:30.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 11 May 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 16:27.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 11 May 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 16:20.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 6 Apr 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:11.

Thames Water logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Newbury Avenue

Thames Water are proposing to carry out Utility asset works on Newbury Avenue, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:33.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Hoe Lane

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Hoe Lane, Lambourne, Epping.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 22:41 and could run through until 26 November 2024. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 08:48.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Clays Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Clays Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 09:39.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Clays Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Clays Lane, Loughton Town, Loughton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 12:34.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Wellington Hill

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Wellington Hill, Waltham Abbey Town, Waltham Abbey.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 08:58 and could run through until 25 November 2024. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 09:33.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Beaconsfield Road

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Beaconsfield Road, Enfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 05:40 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 11:17.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Brancroft Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Brancroft Way, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Sep 2024 at 12:07.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Brancroft Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Brancroft Way, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Oct 2024 at 12:08.

Thames Water logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Clays Lane

Thames Water are carrying out roadworks on Clays Lane, Loughton Town, Loughton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 11:00 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 14:14.

Thames Water logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Bideford Road

Thames Water are carrying out Utility asset works on Bideford Road, Enfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:09.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Roebuck Lane

Thames Water are carrying out Utility repair and maintenance works on Roebuck Lane, Buckhurst Hill.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 14:20 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 15:10.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
London Road

Cadent Gas are carrying out Utility repair and maintenance works on London Road, Lambourne, Epping.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 10:33 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:15.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Woodridden Hill

BT are carrying out Utility repair and maintenance works on Woodridden Hill, Essex, Waltham Abbey.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 09:30 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Nov 2024 at 11:36.

Essex County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Waltham Road

Essex County Council are proposing to carry out Highway improvement works on Waltham Road, Nazeing, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Aug 2024 at 08:52.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
West Grove

Thames Water are carrying out Utility repair and maintenance works on West Grove, Woodford Green.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 08:00 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 10:15.

Thames Water logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Tysoe Avenue

Thames Water are carrying out Utility repair and maintenance works on Tysoe Avenue, Enfield.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 12:30 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 14:16.

Network Rail logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ordnance Road

Network Rail are proposing to carry out Works for Rail Purposes on Ordnance Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Sep 2024 at 10:10.

Network Rail logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ordnance Road

Network Rail are proposing to carry out Works for Rail Purposes on Ordnance Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Oct 2024 at 11:27.

Essex County Council logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Western Avenue

Essex County Council are proposing to carry out Highway improvement works on Western Avenue, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Aug 2024 at 08:56.

Affinity Water logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Lindsey Street

Affinity Water are proposing to carry out Utility asset works on Lindsey Street, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Sep 2024 at 09:43.

Affinity Water logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Lindsey Street

Affinity Water are proposing to carry out Utility asset works on Lindsey Street, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Sep 2024 at 08:25.

Essex County Council logo
Between
26 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Highway improvement works on Epping Lane, Theydon Bois, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 13 Nov 2024 at 08:59.

Essex County Council logo
Between
26 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Highway improvement works on Epping Lane, Theydon Bois, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Nov 2024 at 10:48.

Essex County Council logo
Between
26 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Highway improvement works on Epping Lane, Stapleford Tawney, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 09:54.

Essex County Council logo
Between
26 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Highway improvement works on Epping Lane, Stapleford Tawney, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 08:26.

Essex County Council logo
Between
26 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Highway improvement works on Epping Lane, Theydon Garnon, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 13 Nov 2024 at 08:56.

Essex County Council logo
Between
26 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Highway improvement works on Epping Lane, Theydon Garnon, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Nov 2024 at 10:49.

Essex County Council logo
Between
26 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Highway improvement works on Epping Lane, Theydon Mount, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 09:57.

Essex County Council logo
Between
26 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Highway improvement works on Epping Lane, Theydon Mount, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 08:28.

Essex County Council logo
Between
27 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Highway improvement works on Epping Lane, Stapleford Tawney, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 15:25.

Thames Water logo
Between
29 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out Utility repair and maintenance works on Church Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 10:14.

Thames Water logo
Between
29 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out Utility repair and maintenance works on Church Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 08:36.

Thames Water logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Malvern Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Malvern Avenue, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 15:16.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Cadent Gas are proposing to carry out Utility asset works on Vicarage Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 08:21.

Cadent Gas logo
Between
2 and 18 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Cadent Gas are proposing to carry out Utility asset works on Vicarage Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:27.

Cadent Gas logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Cadent Gas are proposing to carry out Utility asset works on Vicarage Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 12:38.

Affinity Water logo
Between
2 and 10 Dec 2024
Details
View Map
Share
Follow
Church Row

Affinity Water are proposing to carry out Utility asset works on Church Row, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 30 Sep 2024 at 09:56.

Essex County Council logo
Between
3 and 7 Dec 2024
Details
View Map
Share
Follow
Shernbroke Road

Essex County Council are proposing to carry out Highway improvement works on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 11:39.

Essex County Council logo
Between
3 and 7 Dec 2024
Details
View Map
Share
Follow
Shernbroke Road

Essex County Council are proposing to carry out Highway improvement works on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 4 Nov 2024 at 10:47.

Essex County Council logo
Between
3 and 7 Dec 2024
Details
View Map
Share
Follow
Maynard Court

Essex County Council are proposing to carry out Highway improvement works on Maynard Court, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 11:39.

Essex County Council logo
Between
3 and 7 Dec 2024
Details
View Map
Share
Follow
Maynard Court

Essex County Council are proposing to carry out Highway improvement works on Maynard Court, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 4 Nov 2024 at 10:45.

Cadent Gas logo
LONG TERM
Between
6 Dec 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Hatch Lane

Cadent Gas are proposing to carry out Utility asset works on Hatch Lane, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 15:15.

Thames Water logo
LONG TERM
Between
9 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Springfield Road

Thames Water are proposing to carry out roadworks on Springfield Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:33.

Thames Water logo
LONG TERM
Between
9 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Connaught Avenue

Thames Water are proposing to carry out roadworks on Connaught Avenue, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:26.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Mott Street

Thames Water are proposing to carry out Utility repair and maintenance works on Mott Street, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 10:12.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Mott Street

Thames Water are proposing to carry out Utility repair and maintenance works on Mott Street, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 15:52.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 17:33.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 12:25.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lodge Crescent

Thames Water are proposing to carry out Utility asset works on Lodge Crescent, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 12:37.

Essex County Council logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
The Drummonds

Essex County Council are proposing to carry out Highway improvement works on The Drummonds, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Aug 2024 at 09:08.

Thames Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Wellington Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Wellington Hill, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 09:01.

Thames Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Wellington Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Wellington Hill, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 10:53.

Vodafone logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Shernbroke Road

Vodafone are proposing to carry out Utility asset works on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 11 Sep 2024 at 10:17.

Vodafone logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Shernbroke Road

Vodafone were proposing to carry out Utility asset works on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 26 Sep 2024 at 14:40.

Essex County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Palace Gardens

Essex County Council are proposing to carry out Highway improvement works on Palace Gardens, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 4 Nov 2024 at 10:48.

Essex County Council logo
Between
12 and 22 Dec 2024
Details
View Map
Share
Follow
Lower Park Road

Essex County Council are proposing to carry out Highway improvement works on Lower Park Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 10:18.

Thames Water logo
Between
14 and 22 Dec 2024
Details
View Map
Share
Follow
Turpins Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Turpins Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 10:13.

Thames Water logo
Between
14 and 22 Dec 2024
Details
View Map
Share
Follow
Turpins Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Turpins Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 14:43.

Essex County Council logo
Between
16 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Purlieu Way

Essex County Council are proposing to carry out Highway improvement works on Purlieu Way, Theydon Bois, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Aug 2024 at 09:51.

UK Power Networks Eastern & London logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Western Avenue

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Western Avenue, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 08:19.

UK Power Networks Eastern & London logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Western Avenue

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Western Avenue, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2024 at 09:54.

Essex County Council logo
Between
17 and 20 Dec 2024
Details
View Map
Share
Follow
Daleside Gardens

Essex County Council are proposing to carry out Highway improvement works on Daleside Gardens, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 31 Oct 2024 at 09:06.

Essex County Council logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Daleside Gardens

Essex County Council are proposing to carry out Highway improvement works on Daleside Gardens, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Nov 2024 at 09:25.

Essex County Council logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Daleside Gardens

Essex County Council are proposing to carry out Highway improvement works on Daleside Gardens, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 16:09.

Cadent Gas logo
Between
30 Dec 2024 and 26 Jan 2025
Details
View Map
Share
Lambourne Road

Cadent Gas were proposing to carry out Utility asset works on Lambourne Road, Chigwell Town, Chigwell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 December 2024 and run through until 26 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:25.

Thames Water logo
LONG TERM
Between
2 Jan and 1 May 2025
Details
View Map
Share
Follow
East Duck Lees Lane

Thames Water are proposing to carry out Utility asset works on East Duck Lees Lane, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:42.

Thames Water logo
LONG TERM
Between
2 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Bideford Road

Thames Water are proposing to carry out Utility asset works on Bideford Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 12:24.

Thames Water logo
LONG TERM
Between
2 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Bideford Road

Thames Water are proposing to carry out Utility asset works on Bideford Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 15:50.

Thames Water logo
LONG TERM
Between
2 Jan and 20 Mar 2025
Details
View Map
Share
Follow
Bideford Road

Thames Water are proposing to carry out Utility asset works on Bideford Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:33.

Essex County Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Broadfield Way

Essex County Council are proposing to carry out Highway improvement works on Broadfield Way, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 16 Sep 2024 at 08:41.

Essex County Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Field Close

Essex County Council are proposing to carry out Highway improvement works on Field Close, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 16 Sep 2024 at 08:42.

UK Power Networks Eastern & London logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Uckfield Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Uckfield Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2024 at 11:50.

Hertfordshire County Council logo
Between
6 and 21 Jan 2025
Details
View Map
Share
Monarchs Way

Hertfordshire County Council were proposing to carry out Highway improvement works on Monarchs Way, Waltham Cross.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 21 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 11 Nov 2024 at 08:41.

Hertfordshire County Council logo
Between
6 and 21 Jan 2025
Details
View Map
Share
Follow
Stanhope Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Stanhope Road, Waltham Cross.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 11 Nov 2024 at 10:48.

Hertfordshire County Council logo
Between
6 and 21 Jan 2025
Details
View Map
Share
Follow
Stanhope Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Stanhope Road, Waltham Cross.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 18 Nov 2024 at 10:01.

Essex County Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Beaconfield Avenue

Essex County Council are proposing to carry out Highway improvement works on Beaconfield Avenue, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Aug 2024 at 09:29.

Affinity Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Woodside

Affinity Water were proposing to carry out Utility repair and maintenance works on Woodside, North Weald Bassett, Epping.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Oct 2024 at 14:19.

Thames Water logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Connaught Road

Thames Water were proposing to carry out roadworks on Connaught Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 14:20.

Thames Water logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Connaught Road

Thames Water are proposing to carry out roadworks on Connaught Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:15.

Essex County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
High Road

Essex County Council are proposing to carry out Highway improvement works on High Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 08:51.

Essex County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Manor Road

Essex County Council are proposing to carry out Highway improvement works on Manor Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 08:49.

T-Mobile (UK) logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Ladyfields

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Ladyfields, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 15 Nov 2024 at 09:35.

T-Mobile (UK) logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Ladyfields

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Ladyfields, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 18 Nov 2024 at 10:51.

Thames Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Wellington Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Wellington Hill, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:52.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Marrilyne Avenue

Thames Water were proposing to carry out New service connection on Marrilyne Avenue, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 14:39.

ESP Electricity logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Lindsey Street

ESP Electricity are proposing to carry out Utility asset works on Lindsey Street, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 31 Oct 2024 at 10:09.

ESP Electricity logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Lindsey Street

ESP Electricity are proposing to carry out Utility asset works on Lindsey Street, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 15 Nov 2024 at 08:41.

Thames Water logo
Between
14 and 18 Jan 2025
Details
View Map
Share
Follow
Stainton Road

Thames Water are proposing to carry out New service connection on Stainton Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 12:51.

Essex County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Gravel Lane

Essex County Council are proposing to carry out Highway improvement works on Gravel Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 10:10.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Jan and 4 Mar 2025
Details
View Map
Share
Mollison Avenue

UK Power Networks Eastern & London were proposing to carry out New service connection on Mollison Avenue, Enfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 4 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 09:07.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Marrilyne Avenue

Thames Water were proposing to carry out New service connection on Marrilyne Avenue, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 12:18.

Essex County Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Campions

Essex County Council are proposing to carry out Highway improvement works on Campions, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 10:16.

UK Power Networks Eastern & London logo
Between
21 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Sewardstone Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Sewardstone Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 4 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 08:54.

Hertfordshire County Council logo
Between
21 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Monarchs Way

Hertfordshire County Council are proposing to carry out roadworks on Monarchs Way, Waltham Cross.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 11 Nov 2024 at 10:51.

Vodafone logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Shernbroke Road

Vodafone are proposing to carry out Utility asset works on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 5 Nov 2024 at 11:23.

Thames Water logo
Between
28 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Stainton Road

Thames Water are proposing to carry out New service connection on Stainton Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:26.

Cadent Gas logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Oakleafe Gardens

Cadent Gas are proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Oakleafe Gardens

Cadent Gas are proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.

Cadent Gas logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Oakleafe Gardens

Cadent Gas are proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:15.

Cadent Gas logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Oakleafe Gardens

Cadent Gas were proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 2 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:05.

Thames Water logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Rolls Park Road

Thames Water were proposing to carry out Utility repair and maintenance works on Rolls Park Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 09:21.

Thames Water logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Follow
Rolls Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Rolls Park Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 09:31.

Thames Water logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Garfield Road

Thames Water are proposing to carry out roadworks on Garfield Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:13.

Thames Water logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Buxton Road

Thames Water are proposing to carry out roadworks on Buxton Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 14:59.

Thames Water logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Cart Lane

Thames Water are proposing to carry out roadworks on Cart Lane, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:27.

Essex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Coronation Hill

Essex County Council are proposing to carry out Highway improvement works on Coronation Hill, Epping Town, Epping.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Aug 2024 at 09:43.

Essex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Coronation Hill

Essex County Council are proposing to carry out Highway improvement works on Coronation Hill, Epping Town, Epping.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Aug 2024 at 15:25.

UK Power Networks Eastern & London logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Victoria Road

UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Victoria Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 12:22.

Affinity Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Abridge Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Abridge Road, Theydon Bois, Epping.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Nov 2024 at 15:11.

Affinity Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Abridge Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Abridge Road, Theydon Bois, Epping.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Nov 2024 at 15:15.

Cadent Gas logo
LONG TERM
Between
10 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Longwood Gardens

Cadent Gas are proposing to carry out Utility asset works on Longwood Gardens, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
LONG TERM
Between
10 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Longwood Gardens

Cadent Gas are proposing to carry out Utility asset works on Longwood Gardens, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 14:45.

Cadent Gas logo
LONG TERM
Between
10 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Longwood Gardens

Cadent Gas are proposing to carry out Utility asset works on Longwood Gardens, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 15:15.

Cadent Gas logo
LONG TERM
Between
17 Feb and 6 Apr 2025
Details
View Map
Share
Longwood Gardens

Cadent Gas were proposing to carry out Utility asset works on Longwood Gardens, Ilford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 6 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:04.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:45.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 12:16.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 10:15.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:15.

Cadent Gas logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Turpins Lane

Cadent Gas are proposing to carry out Utility asset works on Turpins Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jul 2024 at 08:37.

UK Power Networks Eastern & London logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Shernbroke Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Nov 2024 at 09:41.

Thames Water logo
LONG TERM
Between
20 Feb and 15 May 2025
Details
View Map
Share
Follow
Marrilyne Avenue

Thames Water are proposing to carry out Utility asset works on Marrilyne Avenue, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:57.


Roadworks Map near to Coles Green, LOUGHTON, IG10 2QS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 07:27
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Coles Green, LOUGHTON, IG10 2QS (19 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
GOLDINGS HILL, LOUGHTON TOWN 
(0.3 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 19 Nov 2024 08:00
(Scheduled: 19 Nov 2024 - 2 Dec 2024)
0.3
Details
Share
Follow
2
Thames Water logo
URGENT
  
CLAYS LANE, LOUGHTON TOWN 
(0.3 miles)
Thames Water
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Road closure
In Progress
Since: 20 Nov 2024 11:00
(Scheduled: 20 Nov 2024 - 2 Dec 2024)
0.3
Details
Share
Follow
3
Thames Water logo
MAJOR
  
CLAYS LANE, LOUGHTON TOWN 
(0.3 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 19 Nov 2024 - 28 Nov 2024
0.3
Details
Share
Follow
4
Thames Water logo
MAJOR
  
CLAYS LANE, LOUGHTON TOWN 
(0.3 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 19 Nov 2024 - 28 Nov 2024)
0.3
Details
Share
5
Virgin Media logo
COLLARD AVENUE, LOUGHTON TOWN 
(0.6 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 21 Nov 2024 08:52
(Scheduled: 20 Nov 2024 - 25 Nov 2024)
0.6
Details
Share
Follow
6
BT logo
CHURCH LANE, LOUGHTON TOWN 
(0.6 miles)
BT
Permanent reinstatement - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 21 Nov 2024 - 25 Nov 2024
0.6
Details
Share
Follow
7
Essex County Council logo
COLLARD AVENUE, LOUGHTON TOWN 
(0.6 miles)
Essex County Council
Highway improvement works - Carriageway - Some carriageway incursion
Planned
Scheduled: 15 Nov 2024 - 25 Nov 2024
0.6
Details
Share
Follow
8
Essex County Council logo
COLLARD AVENUE, LOUGHTON TOWN 
(0.6 miles)
Essex County Council
Highway improvement works - Carriageway - Some carriageway incursion
Planned
Scheduled: 16 Nov 2024 - 26 Nov 2024
0.6
Details
Share
Follow
9
Essex County Council logo
WILLINGALE ROAD, LOUGHTON TOWN 
(0.6 miles)
Essex County Council
Highway improvement works - Carriageway - Some carriageway incursion
In Progress
Since: 18 Nov 2024 00:00
(Scheduled: 18 Nov 2024 - 28 Nov 2024)
0.6
Details
Share
Follow
10
Essex County Council logo
MAJOR
  
WILLINGALE ROAD, LOUGHTON TOWN 
(0.6 miles)
Essex County Council
Highway improvement works - Carriageway, Footpath - Some carriageway incursion
Planned
Scheduled: 1 Oct 2024 - 26 Nov 2024
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.