ROADWORKS SUMMARY
Burney Drive, LOUGHTON, IG10 2DY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Burney Drive, IG10 2DY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Burney Drive, LOUGHTON, IG10 2DY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Burney Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Essex County Council logo
LONG TERM
Until
4 May 2026
Details
View Map
Share
Follow
Station Way

Essex County Council are carrying out Highway improvement works on Station Way, Buckhurst Hill.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 April 2023 at 08:33 and could run through until 4 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Jul 2024 at 07:13.

Essex County Council logo
LONG TERM
Between
3 Sep 2024 and 4 Sep 2025
Details
View Map
Share
High Street

Essex County Council were proposing to carry out Highway improvement works on High Street, Epping Town, Epping.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 September 2024 and run through until 4 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Aug 2024 at 09:26.

Thames Water logo
LONG TERM
Between
22 Oct 2024 and 5 Apr 2025
Details
View Map
Share
Station Road

Thames Water were proposing to carry out Utility asset works on Station Road, Chingford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2024 and run through until 5 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 08:31.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 11 May 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 16:27.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 11 May 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 16:20.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 6 Apr 2025
Details
View Map
Share
Station Road

Thames Water were proposing to carry out Utility asset works on Station Road, Chingford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Feb 2025 at 12:10.

Cadent Gas logo
LONG TERM
Between
6 Dec 2024 and 28 Mar 2025
Details
View Map
Share
Hatch Lane

Cadent Gas were proposing to carry out Utility asset works on Hatch Lane, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 December 2024 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 14:47.

Thames Water logo
LONG TERM
Between
2 Jan and 1 May 2025
Details
View Map
Share
Follow
East Duck Lees Lane

Thames Water are proposing to carry out Utility asset works on East Duck Lees Lane, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:42.

Thames Water logo
LONG TERM
Until
1 May 2025
Details
View Map
Share
Follow
East Duck Lees Lane

Thames Water are carrying out Utility asset works on East Duck Lees Lane, Enfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 10:40 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Feb 2025 at 16:08.

Thames Water logo
LONG TERM
Between
2 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Bideford Road

Thames Water are proposing to carry out Utility asset works on Bideford Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 12:24.

Thames Water logo
LONG TERM
Until
20 Feb 2025
Details
View Map
Share
Follow
Bideford Road

Thames Water are carrying out Utility asset works on Bideford Road, Enfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 11:35 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jan 2025 at 14:20.

Thames Water logo
LONG TERM
Between
2 Jan and 20 Mar 2025
Details
View Map
Share
Follow
Bideford Road

Thames Water are proposing to carry out Utility asset works on Bideford Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:33.

Thames Water logo
LONG TERM
Until
15 May 2025
Details
View Map
Share
Follow
Marrilyne Avenue

Thames Water are carrying out Utility asset works on Marrilyne Avenue, Enfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 08:30 and could run through until 15 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Jan 2025 at 08:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Woodford Bridge Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Woodford Bridge Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 13:00.

Thames Water logo
LONG TERM
Between
20 Jan and 3 Jul 2025
Details
View Map
Share
Follow
Suez Road

Thames Water are proposing to carry out Utility asset works on Suez Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 10:39.

Thames Water logo
LONG TERM
Until
3 Jul 2025
Details
View Map
Share
Follow
Suez Road

Thames Water are carrying out Utility asset works on Suez Road, Enfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 08:33 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jan 2025 at 10:40.

Thames Water logo
LONG TERM
Between
20 Jan and 28 Apr 2025
Details
View Map
Share
Stockingswater Lane

Thames Water were proposing to carry out Utility asset works on Stockingswater Lane, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 10:42.

Thames Water logo
LONG TERM
Between
20 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Stockingswater Lane

Thames Water are proposing to carry out Utility asset works on Stockingswater Lane, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 10:43.

Thames Water logo
LONG TERM
Between
20 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Stockingswater Lane

Thames Water are proposing to carry out Utility asset works on Stockingswater Lane, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 09:59.

Thames Water logo
LONG TERM
Between
20 Jan and 2 Jun 2025
Details
View Map
Share
Lockfield Avenue

Thames Water were proposing to carry out Utility asset works on Lockfield Avenue, Enfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 2 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 13:42.

Thames Water logo
LONG TERM
Between
20 Jan and 2 Jun 2025
Details
View Map
Share
Follow
Lockfield Avenue

Thames Water are proposing to carry out Utility asset works on Lockfield Avenue, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 10:36.

Thames Water logo
LONG TERM
Until
2 Jun 2025
Details
View Map
Share
Follow
Lockfield Avenue

Thames Water are carrying out Utility asset works on Lockfield Avenue, Enfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 08:15 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jan 2025 at 10:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Jan and 4 Mar 2025
Details
View Map
Share
Mollison Avenue

UK Power Networks Eastern & London were proposing to carry out New service connection on Mollison Avenue, Enfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 4 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 09:07.

Cadent Gas logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Oakleafe Gardens

Cadent Gas are proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Oakleafe Gardens

Cadent Gas are proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.

Cadent Gas logo
Until
2 Mar 2025
Details
View Map
Share
Follow
Oakleafe Gardens

Cadent Gas are carrying out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 13:45 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 14:03.

Cadent Gas logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Oakleafe Gardens

Cadent Gas were proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 2 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:05.

Thames Water logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Garfield Road

Thames Water were proposing to carry out roadworks on Garfield Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 24 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Feb 2025 at 12:13.

Thames Water logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Buxton Road

Thames Water were proposing to carry out roadworks on Buxton Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 24 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Feb 2025 at 12:12.

Thames Water logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Cart Lane

Thames Water were proposing to carry out roadworks on Cart Lane, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 24 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Feb 2025 at 12:13.

Thames Water logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Stockingswater Lane

Thames Water are carrying out Utility asset works on Stockingswater Lane, Enfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 09:45 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Feb 2025 at 09:47.

Essex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Coronation Hill

Essex County Council are proposing to carry out Highway improvement works on Coronation Hill, Epping Town, Epping.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Aug 2024 at 09:43.

Essex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Coronation Hill

Essex County Council are proposing to carry out Highway improvement works on Coronation Hill, Epping Town, Epping.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Aug 2024 at 15:25.

Essex County Council logo
Finishing
Today
Details
View Map
Share
Follow
Shernbroke Road

Essex County Council are carrying out Remedial works on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 February 2025 at 20:00 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Feb 2025 at 14:43.

Essex County Council logo
Finishing
Today
Details
View Map
Share
Follow
Maynard Court

Essex County Council are carrying out Remedial works on Maynard Court, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 February 2025 at 20:00 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Feb 2025 at 14:41.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Farm Hill Road

Cadent Gas are carrying out Utility repair and maintenance works on Farm Hill Road, Waltham Abbey Town, Waltham Abbey.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2025 at 17:38 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 10:20.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Chigwell Road

Cadent Gas are carrying out Utility repair and maintenance works on Chigwell Road, Woodford Green.

The works should not impact the carriageway.

The works started on 9 February 2025 at 20:46 and could run through until 14 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 10:15.

Cadent Gas logo
LONG TERM
Between
10 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Longwood Gardens

Cadent Gas are proposing to carry out Utility asset works on Longwood Gardens, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
LONG TERM
Between
10 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Longwood Gardens

Cadent Gas are proposing to carry out Utility asset works on Longwood Gardens, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 14:45.

Cadent Gas logo
LONG TERM
Until
6 Apr 2025
Details
View Map
Share
Follow
Longwood Gardens

Cadent Gas are carrying out Utility asset works on Longwood Gardens, Ilford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 09:29 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 09:34.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Tilney Drive

Thames Water are carrying out Disconnection or alteration of supply on Tilney Drive, Buckhurst Hill.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 10:06 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Feb 2025 at 10:30.

Thames Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Stag Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Stag Lane, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 14:06.

Thames Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Stag Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Stag Lane, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Jan 2025 at 09:47.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Feb and 20 Apr 2025
Details
View Map
Share
Follow
Bilton Way

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bilton Way, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jan 2025 at 15:18.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Prospect Road

Thames Water are carrying out Utility repair and maintenance works on Prospect Road, Woodford Green.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 09:38 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Feb 2025 at 10:01.

UK Power Networks Eastern & London logo
Between
15 and 22 Feb 2025
Details
View Map
Share
Woodford Bridge Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Woodford Bridge Road, Ilford.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 February 2025 and run through until 22 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Feb 2025 at 09:29.

Cadent Gas logo
LONG TERM
Between
17 Feb and 6 Apr 2025
Details
View Map
Share
Longwood Gardens

Cadent Gas were proposing to carry out Utility asset works on Longwood Gardens, Ilford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 6 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:04.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:45.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 12:16.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 10:15.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:15.

Cadent Gas logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Turpins Lane

Cadent Gas are proposing to carry out Utility asset works on Turpins Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 09:06.

Essex County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Station Way

Essex County Council are proposing to carry out Highway improvement works on Station Way, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 15:22.

Essex County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Avondale Drive

Essex County Council are proposing to carry out Highway improvement works on Avondale Drive, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Dec 2024 at 08:48.

Essex County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Avondale Drive

Essex County Council are proposing to carry out Highway improvement works on Avondale Drive, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 16 Jan 2025 at 09:10.

UK Power Networks Eastern & London logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Shernbroke Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Nov 2024 at 09:41.

UK Power Networks Eastern & London logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Shernbroke Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 08:50.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 14:13.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:15.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:45.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 12:16.

Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Collier Row Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Collier Row Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the verge only.

This roadwork event was last updated by Essex And Suffolk Water on 27 Nov 2024 at 16:34.

Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Hickman Avenue

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Hickman Avenue, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Jan 2025 at 10:48.

Essex County Council logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Broadfield Way

Essex County Council are proposing to carry out Highway improvement works on Broadfield Way, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 21 Jan 2025 at 08:18.

Essex County Council logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Field Close

Essex County Council are proposing to carry out Highway improvement works on Field Close, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 21 Jan 2025 at 08:21.

Thames Water logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Willow Street

Thames Water were proposing to carry out Utility asset works on Willow Street, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 17 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Feb 2025 at 12:14.

Thames Water logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Stanley Road

Thames Water were proposing to carry out roadworks on Stanley Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 17 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Feb 2025 at 12:14.

Essex County Council logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
High Road

Essex County Council are proposing to carry out Highway improvement works on High Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 20 Dec 2024 at 14:40.

Essex County Council logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Manor Road

Essex County Council are proposing to carry out Highway improvement works on Manor Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 20 Dec 2024 at 14:39.

ESP Electricity logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Rayfield

ESP Electricity were proposing to carry out Utility asset works on Rayfield, Epping Town, Epping.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 28 Nov 2024 at 10:39.

UK Power Networks Eastern & London logo
Between
26 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Roding Lane South

UK Power Networks Eastern & London are proposing to carry out New service connection on Roding Lane South, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 11:00.

Vodafone logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Shernbroke Road

Vodafone are proposing to carry out Utility asset works on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 7 Feb 2025 at 09:11.

Essex County Council logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Parklands

Essex County Council are proposing to carry out Highway improvement works on Parklands, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Jan 2025 at 09:01.

Essex County Council logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Parklands

Essex County Council are proposing to carry out Highway improvement works on Parklands, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 16:15.

Essex County Council logo
Between
27 Feb and 1 Mar 2025
Details
View Map
Share
Follow
The Plain

Essex County Council are proposing to carry out Highway improvement works on The Plain, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Jan 2025 at 09:03.

Essex County Council logo
Between
27 Feb and 1 Mar 2025
Details
View Map
Share
Follow
The Plain

Essex County Council are proposing to carry out Highway improvement works on The Plain, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 16:15.

Essex County Council logo
Between
27 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Epping Road

Essex County Council are proposing to carry out Highway improvement works on Epping Road, North Weald Bassett, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Jan 2025 at 08:47.

Essex County Council logo
Between
27 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Epping Road

Essex County Council are proposing to carry out Highway improvement works on Epping Road, North Weald Bassett, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 16:15.

Essex County Council logo
LONG TERM
Between
28 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Mount Road

Essex County Council are proposing to carry out Highway improvement works on Mount Road, Epping Town, Epping.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Feb 2025 at 09:58.

Thames Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Brunel Road

Thames Water are proposing to carry out Utility repair and maintenance works on Brunel Road, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 11:13.

LONG TERM
Between
3 Mar and 5 Apr 2025
Details
View Map
Share
Follow
North Road

London Borough Of Havering are proposing to carry out Highway improvement works on North Road, Havering-atte-bower, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 Jan 2025 at 10:46.

London Borough Of Waltham Forest logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Faversham Avenue

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Faversham Avenue, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 3 Feb 2025 at 11:27.

London Borough Of Waltham Forest logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Faversham Avenue

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Faversham Avenue, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 3 Feb 2025 at 17:11.

Thames Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Marrilyne Avenue

Thames Water are proposing to carry out New service connection on Marrilyne Avenue, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 10:22.

UK Power Networks Eastern & London logo
Between
4 and 29 Mar 2025
Details
View Map
Share
Bilton Way

UK Power Networks Eastern & London were proposing to carry out New service connection on Bilton Way, Enfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 09:08.

Affinity Water logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Woodside

Affinity Water are proposing to carry out Utility repair and maintenance works on Woodside, North Weald Bassett, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 10 Dec 2024 at 11:27.

Affinity Water logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Woodside

Affinity Water are proposing to carry out Utility repair and maintenance works on Woodside, North Weald Bassett, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 18 Dec 2024 at 08:34.

Essex County Council logo
Between
6 and 8 Mar 2025
Details
View Map
Share
Follow
Station Way

Essex County Council are proposing to carry out Highway improvement works on Station Way, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Feb 2025 at 12:56.

Cadent Gas logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Hatfield Close

Cadent Gas were proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 30 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:04.

Cadent Gas logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Follow
Hatfield Close

Cadent Gas are proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Follow
Hatfield Close

Cadent Gas are proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 14:45.

Cadent Gas logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Follow
Hatfield Close

Cadent Gas are proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 15:15.

UK Power Networks Eastern & London logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Manor Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Manor Road, Lambourne, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 08:29.

Thames Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Mott Street

Thames Water are proposing to carry out New service connection on Mott Street, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Jan 2025 at 08:58.

Thames Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Mott Street

Thames Water are proposing to carry out New service connection on Mott Street, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Jan 2025 at 13:31.

Thames Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Mott Street

Thames Water were proposing to carry out New service connection on Mott Street, Loughton Town, Loughton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 08:30.

Thames Water logo
LONG TERM
Between
13 Mar and 29 May 2025
Details
View Map
Share
Follow
Bilton Way

Thames Water are proposing to carry out Utility repair and maintenance works on Bilton Way, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:32.

Thames Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Algers Road

Thames Water were proposing to carry out New service connection on Algers Road, Loughton Town, Loughton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jan 2025 at 08:48.

Thames Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Algers Road

Thames Water are proposing to carry out New service connection on Algers Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Feb 2025 at 11:21.

Thames Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Algers Road

Thames Water are proposing to carry out New service connection on Algers Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Feb 2025 at 13:13.

Thames Water logo
LONG TERM
Between
19 Mar and 11 Jun 2025
Details
View Map
Share
Follow
Bilton Way

Thames Water are proposing to carry out Utility repair and maintenance works on Bilton Way, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Feb 2025 at 12:40.

Thames Water logo
Between
20 Mar and 10 Apr 2025
Details
View Map
Share
Follow
Northampton Road

Thames Water are proposing to carry out Utility asset works on Northampton Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 10 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Feb 2025 at 16:08.

Thames Water logo
Between
20 and 22 Mar 2025
Details
View Map
Share
Follow
Lippitts Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Lippitts Hill, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 22 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 9 Jan 2025 at 08:52.

Thames Water logo
Between
20 and 22 Mar 2025
Details
View Map
Share
Follow
Lippitts Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Lippitts Hill, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 22 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 24 Jan 2025 at 08:06.

Essex County Council logo
Between
21 and 23 Mar 2025
Details
View Map
Share
Follow
Station Way

Essex County Council are proposing to carry out Highway improvement works on Station Way, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 11:00.

Cadent Gas logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
West Grove

Cadent Gas are proposing to carry out New service connection on West Grove, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 11:00.

Essex County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Coopers Close

Essex County Council are proposing to carry out Highway improvement works on Coopers Close, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 30 Jan 2025 at 08:58.

Thames Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Tilney Drive

Thames Water are proposing to carry out Disconnection or alteration of supply on Tilney Drive, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Jan 2025 at 11:00.

Essex County Council logo
Between
24 and 31 Mar 2025
Details
View Map
Share
Follow
Parkside

Essex County Council are proposing to carry out Highway improvement works on Parkside, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 08:42.

Essex County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Ladyfields

Essex County Council are proposing to carry out Highway improvement works on Ladyfields, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 09:12.

Essex County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Honeycroft

Essex County Council are proposing to carry out Highway improvement works on Honeycroft, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 09:10.

Essex County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Chigwell Lane

Essex County Council are proposing to carry out Highway improvement works on Chigwell Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 09:14.

Essex County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Colson Gardens

Essex County Council are proposing to carry out Highway improvement works on Colson Gardens, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 09:08.

Essex County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Cherston Road

Essex County Council are proposing to carry out Highway improvement works on Cherston Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 09:06.

Essex County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Colson Path

Essex County Council are proposing to carry out Highway improvement works on Colson Path, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 09:04.

Essex County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Borders Lane

Essex County Council are proposing to carry out Highway improvement works on Borders Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 09:00.

Essex County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Graylands

Essex County Council are proposing to carry out Highway improvement works on Graylands, Theydon Bois, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 30 Jan 2025 at 08:30.

Essex County Council logo
Between
24 and 31 Mar 2025
Details
View Map
Share
Follow
Parklands

Essex County Council are proposing to carry out Highway improvement works on Parklands, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 08:36.

Essex County Council logo
Between
24 and 31 Mar 2025
Details
View Map
Share
Follow
Tower Road

Essex County Council are proposing to carry out Highway improvement works on Tower Road, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 08:48.

Essex County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Upper Swaines

Essex County Council are proposing to carry out Highway improvement works on Upper Swaines, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 08:49.

Essex County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Crows Road

Essex County Council are proposing to carry out Highway improvement works on Crows Road, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 08:50.

Thames Water logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Cleveland Road

Thames Water were proposing to carry out Permanent reinstatement on Cleveland Road, South Woodford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 4 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Feb 2025 at 07:42.

Thames Water logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Cleveland Road

Thames Water are proposing to carry out Permanent reinstatement on Cleveland Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Feb 2025 at 07:43.

Cadent Gas logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
York Hill

Cadent Gas were proposing to carry out New service connection on York Hill, Loughton Town, Loughton.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 10:21.

Cadent Gas logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
York Hill

Cadent Gas are proposing to carry out New service connection on York Hill, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 08:10.

Cadent Gas logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
York Hill

Cadent Gas are proposing to carry out New service connection on York Hill, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 13:16.

UK Power Networks Eastern & London logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Lodge Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Lodge Lane, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jan 2025 at 15:21.

Thames Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Roding Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Roding Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Feb 2025 at 09:43.

Essex County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Westbury Lane

Essex County Council are proposing to carry out Remedial works on Westbury Lane, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Jan 2025 at 09:10.

Thames Water logo
Between
7 and 13 Apr 2025
Details
View Map
Share
High Road

Thames Water were proposing to carry out Statutory Infrastructure Works on High Road, Chigwell Town, Chigwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 13 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 12:14.

Thames Water logo
Between
7 and 13 Apr 2025
Details
View Map
Share
Follow
High Road

Thames Water are proposing to carry out Statutory Infrastructure Works on High Road, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 13 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 10:19.

UK Power Networks Eastern & London logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Ongar Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Ongar Road, Lambourne, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Feb 2025 at 14:17.

BT logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Shernbroke Road

BT are proposing to carry out Utility repair and maintenance works on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Jan 2025 at 10:22.

BT logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Shernbroke Road

BT are proposing to carry out Utility repair and maintenance works on Shernbroke Road, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Jan 2025 at 11:04.

Affinity Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Bury Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Bury Lane, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 16 Jan 2025 at 10:26.

Affinity Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Bury Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Bury Lane, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 30 Jan 2025 at 11:13.

Essex County Council logo
Between
10 and 17 Apr 2025
Details
View Map
Share
Follow
Marle Gardens

Essex County Council are proposing to carry out Highway improvement works on Marle Gardens, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Feb 2025 at 12:48.

Cadent Gas logo
Between
14 Apr and 7 May 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 08:22.

Essex County Council logo
Between
15 and 22 Apr 2025
Details
View Map
Share
Follow
Tower Road

Essex County Council are proposing to carry out Highway improvement works on Tower Road, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Feb 2025 at 13:25.

Essex County Council logo
Between
15 and 22 Apr 2025
Details
View Map
Share
Follow
Upper Swaines

Essex County Council are proposing to carry out Highway improvement works on Upper Swaines, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Feb 2025 at 13:36.

Essex County Council logo
Between
15 and 22 Apr 2025
Details
View Map
Share
Follow
Crows Road

Essex County Council are proposing to carry out Highway improvement works on Crows Road, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Feb 2025 at 13:25.

Virgin Media logo
Between
17 and 19 Apr 2025
Details
View Map
Share
Manor Road

Virgin Media were proposing to carry out Utility asset works on Manor Road, Chigwell Town, Chigwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 19 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 7 Feb 2025 at 15:25.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Algers Road

Thames Water are proposing to carry out New service connection on Algers Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 15:45.

Essex County Council logo
Between
28 Apr and 9 May 2025
Details
View Map
Share
Follow
Hook Lane

Essex County Council are proposing to carry out Highway improvement works on Hook Lane, Stapleford Abbotts, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 4 Feb 2025 at 14:39.

Thames Water logo
LONG TERM
Between
28 Apr and 20 Oct 2025
Details
View Map
Share
Jeffreys Road

Thames Water were proposing to carry out Utility asset works on Jeffreys Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 10:43.

Thames Water logo
LONG TERM
Between
28 Apr and 20 Oct 2025
Details
View Map
Share
Follow
Jeffreys Road

Thames Water are proposing to carry out Utility asset works on Jeffreys Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 10:50.

Cadent Gas logo
LONG TERM
Between
5 May and 23 Jun 2025
Details
View Map
Share
Follow
Forest Side

Cadent Gas are proposing to carry out Utility asset works on Forest Side, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jul 2024 at 14:22.

UK Power Networks Eastern & London logo
Between
8 and 14 May 2025
Details
View Map
Share
Ongar Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Ongar Road, Lambourne, Epping.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 May 2025 and run through until 14 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Feb 2025 at 16:10.

Essex County Council logo
Between
10 and 16 May 2025
Details
View Map
Share
Follow
Abbeyview

Essex County Council are proposing to carry out Highway improvement works on Abbeyview, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 31 Jan 2025 at 17:28.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 6 Jul 2025
Details
View Map
Share
Follow
Brancroft Way

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Brancroft Way, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jan 2025 at 15:26.

BT logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Tawney Lane

BT are proposing to carry out Utility asset works on Tawney Lane, Stapleford Tawney, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 30 Jan 2025 at 09:02.

Essex County Council logo
Between
13 and 22 May 2025
Details
View Map
Share
Follow
Parklands

Essex County Council are proposing to carry out Highway improvement works on Parklands, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 31 Jan 2025 at 17:28.


Roadworks Map near to Burney Drive, LOUGHTON, IG10 2DY (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 13 Feb 2025 04:52
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Burney Drive, LOUGHTON, IG10 2DY (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Essex County Council logo
JESSEL DRIVE, LOUGHTON TOWN 
(0.3 miles)
Essex County Council
Highway improvement works - Carriageway - Two-way signals
Planned
Scheduled: 11 Feb 2025 - 13 Feb 2025
0.3
Details
Share
Follow
2
Thames Water logo
COLEBROOK LANE, LOUGHTON TOWN 
(0.3 miles)
Thames Water
Remedial works - Footway, Carriageway - Give and take
Complete
12 Feb 2025 08:04 - 13:24
0.3
Details
Share
3
Essex County Council logo
WILLINGALE ROAD, LOUGHTON TOWN 
(0.4 miles)
Essex County Council
Highway improvement works - Carriageway - Two-way signals
Planned
Scheduled: 12 Feb 2025 - 14 Feb 2025
0.4
Details
Share
Follow
4
Essex County Council logo
WILLINGALE ROAD, LOUGHTON TOWN 
(0.4 miles)
Essex County Council
Highway improvement works - Carriageway - Two-way signals
Planned
Scheduled: 12 Feb 2025 - 14 Feb 2025
0.4
Details
Share
Follow
5
Thames Water logo
GOLDINGS RISE, LOUGHTON TOWN 
(0.8 miles)
Thames Water
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 13 Feb 2025 - 14 Feb 2025
0.8
Details
Share
Follow
6
BT logo
ALDERTON HILL, ESSEX 
(0.9 miles)
BT
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 12 Feb 2025 - 14 Feb 2025
0.9
Details
Share
Follow
7
BT logo
ALDERTON HILL, ESSEX 
(0.9 miles)
BT
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 12 Feb 2025 - 14 Feb 2025)
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.