View current and future planned roadworks and road closures for Linden Place, HX7 7DH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Linden Place, HEBDEN BRIDGE, HX7 7DH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Linden Place are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
23 May 2024
Network Rail are carrying out Works for Rail Purposes on Station Approach, Todmorden.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 August 2023 at 08:30 and could run through until 23 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 26 Apr 2024 at 09:11.
Friday
Northern Gas Networks are carrying out Utility repair and maintenance works on Bairstow Lane, Sowerby Bridge.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 December 2023 at 08:00 and could run through until 3 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 26 Apr 2024 at 09:48.
9 Aug 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Moor End Road, Halifax.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 December 2023 at 08:30 and could run through until 9 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Dec 2023 at 09:56.
3 Jan 2024 and 31 Jan 2025
Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hangingroyd Lane, Hebden Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 6 Feb 2024 at 07:33.
Tomorrow
Northern Gas Networks are carrying out Utility repair and maintenance works on Sunny Bank Road, Mixenden, Halifax.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 February 2024 at 12:15 and could run through until 30 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Apr 2024 at 15:49.
7 Jun 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Balkram Edge, Wainstalls, Halifax.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:45 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 4 Apr 2024 at 12:51.
19 Feb and 20 Dec 2024
Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Regent Street, Hebden Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 9 Jan 2024 at 10:18.
Friday
Northern Gas Networks are carrying out Utility repair and maintenance works on Mixenden Road, Mixenden, Halifax.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 12:00 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Mar 2024 at 15:04.
Tomorrow
Northern Gas Networks are carrying out Utility repair and maintenance works on Stock Lane, Warley, Halifax.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 12:55 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2024 at 11:45.
Friday
Yorkshire Water are carrying out Utility repair and maintenance works on Foster Lane, Hebden Bridge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 09:00 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 23 Apr 2024 at 13:00.
7 May 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Stocks Lane, Luddenden, Halifax.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 07:00 and could run through until 7 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Apr 2024 at 07:12.
31 May 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Mount Tabor Road, Mount Tabor, Halifax.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 07:00 and could run through until 31 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Apr 2024 at 07:12.
20 May 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Burnley Road, Todmorden.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 09:00 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Apr 2024 at 09:52.
10 May 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Vicarage Gardens, Todmorden.
These works are categorised as Major.
The works started on 12 April 2024 at 09:00 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Apr 2024 at 09:51.
20 May 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Broadley Grove, Mount Tabor, Halifax.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 08:00 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Apr 2024 at 09:56.
7 May 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Lumbutts Lane, Todmorden.
The works should not impact the carriageway.
The works started on 26 April 2024 at 13:17 and could run through until 7 May 2024. The works will impact the cycleway and footpath.
This roadwork event was last updated by Northern Gas Networks on 26 Apr 2024 at 13:47.
29 Apr and 17 May 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Waindale Crescent, Mount Tabor, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Apr 2024 at 12:09.
29 Apr and 4 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Jumps Lane, Todmorden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 4 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Mar 2024 at 07:29.
29 Apr and 4 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Jumps Road, Todmorden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 4 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Mar 2024 at 11:44.
6 and 10 May 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ridge Bank, Todmorden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 27 Mar 2024 at 14:57.
6 and 10 May 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ridge Bank, Todmorden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 6 Mar 2024 at 13:01.
6 and 24 May 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushton Hill, Mount Tabor, Halifax.
These works are categorised as Major.
The works will start on or after 6 May 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Mar 2024 at 16:16.
7 and 9 May 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Pinfold Lane, Sowerby, Sowerby Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 4 Apr 2024 at 07:06.
7 May and 11 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnley Road, Todmorden.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 11 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Mar 2024 at 12:21.
7 May and 4 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnley Road, Todmorden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 4 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Mar 2024 at 12:22.
7 and 9 May 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on New Road, Mankinholes, Todmorden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 1 Mar 2024 at 08:18.
13 May and 24 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stoney Royd Lane, Todmorden.
These works are categorised as Major.
The works will start on or after 13 May 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 26 Apr 2024 at 09:43.
13 May and 7 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Buttress Lane, Luddenden, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Feb 2024 at 12:47.
20 and 24 May 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Back Cambridge Street, Todmorden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 6 Apr 2024 at 09:07.
20 May and 24 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on North Scaitcliffe, Todmorden.
These works are categorised as Major.
The works will start on or after 20 May 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 Mar 2024 at 07:38.
20 May and 12 Jul 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stocks Lane, Luddenden, Halifax.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Apr 2024 at 09:55.
20 and 24 May 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Stubbing Drive, Hebden Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Mar 2024 at 06:59.
20 May and 7 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Riding Lane, Luddenden, Halifax.
These works are categorised as Major.
The works will start on or after 20 May 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Dec 2023 at 16:30.
28 May and 11 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Butterworth Lane, Triangle, Sowerby Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 11 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 25 Apr 2024 at 10:36.
28 May and 3 Jun 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bairstow Lane, Sowerby Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 27 Mar 2024 at 09:04.
28 May and 28 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bank House Lane, Luddenden, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Feb 2024 at 16:16.
28 May and 28 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Booth Hill, Luddenden, Sowerby Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Feb 2024 at 14:36.
28 May and 24 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stoney Royd Lane, Todmorden.
These works are categorised as Major.
The works will start on or after 28 May 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Mar 2024 at 07:39.
3 and 5 Jun 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Danny Lane, Luddenden Foot, Sowerby Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 5 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 15 Apr 2024 at 10:57.
3 and 28 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Back Ashenhurst Road, Todmorden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Apr 2024 at 07:08.
3 and 28 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Benns Lane, Luddenden, Halifax.
These works are categorised as Major.
The works will start on or after 3 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Dec 2023 at 16:30.
3 and 28 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnley Road, Todmorden.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Mar 2024 at 12:31.
6 and 28 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moor End Avenue, Pellon, Halifax.
These works are categorised as Major.
The works will start on or after 6 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Mar 2024 at 16:16.
10 Jun and 5 Jul 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Back Mons Road, Todmorden.
These works are categorised as Major.
The works will start on or after 10 June 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Mar 2024 at 07:38.
10 Jun and 5 Jul 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Road, Todmorden.
These works are categorised as Major.
The works will start on or after 10 June 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Mar 2024 at 11:15.
10 and 28 Jun 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moor End Gardens, Pellon, Halifax.
These works are categorised as Major.
The works will start on or after 10 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Mar 2024 at 16:16.
17 Jun and 5 Jul 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Benns Lane, Luddenden, Halifax.
These works are categorised as Major.
The works will start on or after 17 June 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Apr 2024 at 11:06.
17 Jun and 12 Jul 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashenhurst Road, Todmorden.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Mar 2024 at 11:44.
17 Jun and 6 Sep 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stocks Lane, Luddenden, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 6 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Apr 2024 at 14:49.
17 Jun and 12 Jul 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dean House Lane, Luddenden, Sowerby Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2024 at 15:30.
17 Jun and 5 Jul 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlesford, Pellon, Halifax.
These works are categorised as Major.
The works will start on or after 17 June 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Mar 2024 at 16:15.
24 Jun and 12 Jul 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cow Lane, Luddenden, Halifax.
These works are categorised as Major.
The works will start on or after 24 June 2024 and could run through until 12 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2024 at 08:53.
Roadworks Map near to Linden Place, HEBDEN BRIDGE, HX7 7DH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Linden Place, HEBDEN BRIDGE, HX7 7DH (7 Events)
(Scheduled Dates)
(miles)
(Scheduled: 8 Apr 2024 - 3 May 2024)
(Scheduled: 16 Apr 2024 - 29 Apr 2024)
(Scheduled: 26 Apr 2024 - 2 May 2024)