ROADWORKS SUMMARY
Brier Hey Lane, HEBDEN BRIDGE, HX7 5PJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Brier Hey Lane, HX7 5PJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Brier Hey Lane, HEBDEN BRIDGE, HX7 5PJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Brier Hey Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Northern Gas Networks logo
LONG TERM
Until
25 Nov 2024
Details
View Map
Share
Follow
Bairstow Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Bairstow Lane, Sowerby Bridge.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2023 at 08:00 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 09:26.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
3 Jan 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Hangingroyd Lane

Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hangingroyd Lane, Hebden Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 6 Feb 2024 at 07:33.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
19 Feb and 20 Dec 2024
Details
View Map
Share
Follow
Regent Street

Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Regent Street, Hebden Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 9 Jan 2024 at 10:18.

Calderdale Metropolitan Borough Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Prescott Street

Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Prescott Street, Halifax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 May 2024 at 20:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 16 Oct 2024 at 08:48.

Calderdale Metropolitan Borough Council logo
LONG TERM
Until
10 Dec 2024
Details
View Map
Share
Follow
Cow Green

Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Cow Green, Halifax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2024 at 06:00 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 28 May 2024 at 14:56.

Calderdale Metropolitan Borough Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Orange Street

Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Orange Street, Halifax.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 June 2024 at 20:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 16 Oct 2024 at 08:52.

Northern Gas Networks logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Queens Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Queens Road, King Cross, Halifax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Aug 2024 at 13:50.

Calderdale Metropolitan Borough Council logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Winding Road

Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Winding Road, Halifax.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2024 at 20:00 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 5 Aug 2024 at 11:25.

Calderdale Metropolitan Borough Council logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Cross Hills

Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Cross Hills, Halifax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2024 at 20:00 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 5 Aug 2024 at 11:24.

Calderdale Metropolitan Borough Council logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Prospect Street

Calderdale Metropolitan Borough Council are carrying out Highway repair and maintenance works on Prospect Street, Boothtown, Halifax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 08:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 24 Sep 2024 at 16:30.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
27 Aug and 31 Dec 2024
Details
View Map
Share
Follow
Prospect Street

Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Prospect Street, Boothtown, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 27 Aug 2024 at 14:34.

Northern Gas Networks logo
LONG TERM
Until
20 Mar 2025
Details
View Map
Share
Follow
Moor End Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Moor End Road, Halifax.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 08:30 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 15:53.

Northern Gas Networks logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Parkinson Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Parkinson Lane, Halifax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 14:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Oct 2024 at 15:45.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
17 Oct and 28 Nov 2024
Details
View Map
Share
Follow
Bull Green

Calderdale Metropolitan Borough Council are proposing to carry out Diversionary works on Bull Green, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 9 Sep 2024 at 15:06.

Northern Gas Networks logo
LONG TERM
Until
20 Nov 2024
Details
View Map
Share
Follow
Moor End Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Moor End Avenue, Pellon, Halifax.

These works are categorised as Major.

The works started on 25 October 2024 at 09:00 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 11:04.

Northern Gas Networks logo
LONG TERM
Until
21 Nov 2024
Details
View Map
Share
Follow
Warley Wood Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Warley Wood Lane, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 10:00 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 11:53.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Warley Wood Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Warley Wood Lane, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Aug 2024 at 10:34.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Butts Green Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Butts Green Road, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Aug 2024 at 11:26.

Northern Gas Networks logo
LONG TERM
Until
21 Nov 2024
Details
View Map
Share
Follow
Butts Green Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Butts Green Road, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 10:00 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 11:53.

Northern Gas Networks logo
Until
20 Nov 2024
Details
View Map
Share
Follow
Moor End Gardens

Northern Gas Networks are carrying out Utility repair and maintenance works on Moor End Gardens, Pellon, Halifax.

These works are categorised as Major.

The works started on 28 October 2024 at 08:00 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 11:52.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
28 Oct and 28 Nov 2024
Details
View Map
Share
Bull Green

Calderdale Metropolitan Borough Council were proposing to carry out Diversionary works on Bull Green, Halifax.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 30 Oct 2024 at 15:37.

Northern Gas Networks logo
Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Rochdale Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rochdale Road, Ripponden, Sowerby Bridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Sep 2024 at 15:37.

Northern Gas Networks logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Burnley Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Burnley Road, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 10:50 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 08:44.

Northern Gas Networks logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Oldham Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Oldham Road, Ripponden, Sowerby Bridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 10:45 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 12:35.

Northern Gas Networks logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
John Naylor Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on John Naylor Lane, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 09:00 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Nov 2024 at 09:54.

Northern Gas Networks logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Burnley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnley Road, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 11:36.

Calderdale Metropolitan Borough Council logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Towngate

Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Towngate, Sowerby, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 5 Nov 2024 at 16:30.

Northern Gas Networks logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Oldham Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oldham Road, Ripponden, Sowerby Bridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Sep 2024 at 15:36.

Northern Gas Networks logo
Until
20 Nov 2024
Details
View Map
Share
Follow
Rochdale Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Rochdale Road, Triangle, Sowerby Bridge.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:29 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 11:01.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Bairstow Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Bairstow Lane, Sowerby Bridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 18 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2024 at 12:14.

Northern Gas Networks logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Water Hill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Water Hill Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Sep 2024 at 12:20.

Northern Gas Networks logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Shaw Wood Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shaw Wood Road, Todmorden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 12:25.

Northern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Blackwall Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Blackwall Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Sep 2024 at 09:07.

Northern Gas Networks logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Shaw Wood Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shaw Wood Road, Todmorden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 12:14.

Northern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Greetland Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Greetland Road, Barkisland, Sowerby Bridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 15:28.

Northern Gas Networks logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Woodlesford

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlesford, Pellon, Halifax.

These works are categorised as Major.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2024 at 15:04.

Yorkshire Water logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Back Heath Hall

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Back Heath Hall, Halifax.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 27 Oct 2024 at 13:07.

Quickline Commucations logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Sowerby Croft Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Sowerby Croft Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 17 Oct 2024 at 15:52.

Northern Gas Networks logo
Between
2 and 24 Dec 2024
Details
View Map
Share
Follow
Savile Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Savile Road, Hebden Bridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 09:47.

Quickline Commucations logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Sowerby Croft Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Sowerby Croft Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 19 Sep 2024 at 16:29.

Quickline Commucations logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Sowerby Croft Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Sowerby Croft Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 25 Sep 2024 at 16:40.

Quickline Commucations logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Sowerby Croft Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Sowerby Croft Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 30 Sep 2024 at 07:15.

Quickline Commucations logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Sowerby Croft Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Sowerby Croft Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 17 Oct 2024 at 15:53.

Northern Gas Networks logo
Between
2 and 18 Dec 2024
Details
View Map
Share
Follow
Hangingroyd Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hangingroyd Lane, Hebden Bridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 28 Oct 2024 at 13:36.

Quickline Commucations logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Sowerby Croft Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Sowerby Croft Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 19 Sep 2024 at 16:51.

Quickline Commucations logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Sowerby Croft Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Sowerby Croft Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 30 Sep 2024 at 07:22.

Yorkshire Water logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Spring Grove

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Spring Grove, Hebden Bridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Sep 2024 at 12:19.

Yorkshire Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Back Heath Hall

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Back Heath Hall, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Oct 2024 at 11:32.

Yorkshire Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Back Heath Hall

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Back Heath Hall, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Oct 2024 at 10:23.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 5 Feb 2025
Details
View Map
Share
Follow
Bright Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bright Street, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 12:53.

Yorkshire Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Shield Hall Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Shield Hall Lane, Sowerby, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Oct 2024 at 11:31.

Yorkshire Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Shield Hall Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Shield Hall Lane, Sowerby, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Oct 2024 at 16:11.

Yorkshire Water logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Hangingroyd Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hangingroyd Lane, Hebden Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 31 Oct 2024 at 10:56.

Yorkshire Water logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Hangingroyd Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hangingroyd Lane, Hebden Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Nov 2024 at 17:48.

Yorkshire Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hebble Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hebble Lane, Wheatley, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Oct 2024 at 09:38.

Yorkshire Water logo
LONG TERM
Between
6 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Hebble Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hebble Lane, Wheatley, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Oct 2024 at 08:51.

Yorkshire Water logo
LONG TERM
Between
6 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Hebble Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hebble Lane, Wheatley, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 17 Oct 2024 at 10:57.

Yorkshire Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hebble Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hebble Lane, Wheatley, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Oct 2024 at 12:54.

Yorkshire Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Dyer Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Dyer Lane, Wheatley, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Oct 2024 at 09:38.

Yorkshire Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Hebble Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Hebble Lane, Wheatley, Halifax.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Oct 2024 at 09:22.

Yorkshire Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Valley Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Valley Road, Hebden Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 31 Oct 2024 at 11:07.

Yorkshire Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Valley Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Valley Road, Hebden Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Nov 2024 at 17:46.

Yorkshire Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Dyer Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Dyer Lane, Wheatley, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Oct 2024 at 12:53.

Calderdale Metropolitan Borough Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Cross Hills

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Cross Hills, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 1 Aug 2024 at 15:08.

Calderdale Metropolitan Borough Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Winding Road

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Winding Road, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 30 Jul 2024 at 16:53.

Calderdale Metropolitan Borough Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Bull Green

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Bull Green, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 1 Aug 2024 at 15:08.

Yorkshire Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Dearden Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Dearden Street, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 09:24.

Northern Gas Networks logo
Between
6 and 29 Jan 2025
Details
View Map
Share
Follow
Burnley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnley Road, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 11:35.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Prescott Street

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Prescott Street, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 29 Oct 2024 at 13:37.

Northern Gas Networks logo
Between
6 and 29 Jan 2025
Details
View Map
Share
Follow
Burnley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnley Road, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 15:22.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Godly Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Godly Lane, Rishworth, Sowerby Bridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Oct 2024 at 12:03.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Rishworth New Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rishworth New Road, Rishworth, Sowerby Bridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Oct 2024 at 12:03.

Yorkshire Water logo
Between
8 and 14 Jan 2025
Details
View Map
Share
Follow
Stubbing Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Stubbing Drive, Hebden Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 12 Nov 2024 at 16:15.

Northern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Godly Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Godly Lane, Rishworth, Sowerby Bridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2024 at 08:12.

Northern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Rishworth New Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rishworth New Road, Rishworth, Sowerby Bridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2024 at 08:13.

Northern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Rishworth New Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rishworth New Road, Rishworth, Sowerby Bridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Oct 2024 at 12:08.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
16 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Orange Street

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Orange Street, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 29 Oct 2024 at 15:19.

Northern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Rishworth New Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rishworth New Road, Rishworth, Sowerby Bridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2024 at 09:23.

Northern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Burnley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnley Road, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 11:37.

Yorkshire Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Station Road

Yorkshire Water were proposing to carry out Utility asset works on Station Road, Sowerby Bridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Oct 2024 at 14:15.

Yorkshire Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Yorkshire Water are proposing to carry out Utility asset works on Station Road, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Oct 2024 at 16:11.

Northern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Burnley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnley Road, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 15:21.

Yorkshire Water logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Hebble Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hebble Lane, Wheatley, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Oct 2024 at 12:53.

Northern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
St Johns Close Footpath 1

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Johns Close Footpath 1, Rishworth, Sowerby Bridge.

These works are categorised as Major.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Oct 2024 at 12:08.

Northern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Oldham Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oldham Road, Ripponden, Sowerby Bridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Oct 2024 at 12:08.

Northern Gas Networks logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Timmey Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Timmey Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 09:11.

Northern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Mytholm Bank

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mytholm Bank, Hebden Bridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 09:47.

Yorkshire Water logo
Between
2 and 23 Feb 2025
Details
View Map
Share
Follow
Hebble Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hebble Lane, Wheatley, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Oct 2024 at 08:51.

Yorkshire Water logo
Between
2 and 23 Feb 2025
Details
View Map
Share
Follow
Hebble Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hebble Lane, Wheatley, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 17 Oct 2024 at 10:57.

Northern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
St Johns Close Footpath 1

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Johns Close Footpath 1, Rishworth, Sowerby Bridge.

These works are categorised as Major.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2024 at 09:23.

Northern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Oldham Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oldham Road, Ripponden, Sowerby Bridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2024 at 09:13.


Roadworks Map near to Brier Hey Lane, HEBDEN BRIDGE, HX7 5PJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 13 Nov 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Brier Hey Lane, HEBDEN BRIDGE, HX7 5PJ (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Quickline Commucations logo
BURNLEY ROAD, MYTHOLMROYD 
(0.5 miles)
Quickline Commucations
Utility repair and maintenance works - Footway - Two-way signals
Planned
Scheduled: 13 Nov 2024 - 15 Nov 2024
0.5
Details
Share
Follow
2
BT logo
BURNLEY ROAD, MYTHOLMROYD 
(0.6 miles)
BT
Utility repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 13 Nov 2024