ROADWORKS SUMMARY
Stanage Lane, HALIFAX, HX3 7PR
Introduction
View current and future planned roadworks and road closures for Stanage Lane, HX3 7PR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Stanage Lane, HALIFAX, HX3 7PR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Stanage Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
22 Sep 2025 and 23 Aug 2027
Calderdale Metropolitan Borough Council are proposing to carry out roadworks on Old Lane, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 23 August 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 15 Sep 2025 at 13:52.
12 Mar 2027
Kirklees Council are carrying out Highway improvement works on Bradford Road, Oakenshaw, Bradford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 07:00 and could run through until 12 March 2027. The works will impact the carriageway and verge.
This roadwork event was last updated by Kirklees Council on 7 Sep 2026 at 10:22.
30 Sep 2026
Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Bethel Street, Brighouse.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 January 2026 at 08:00 and could run through until 30 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 4 Sep 2026 at 12:12.
Tomorrow
Yorkshire Water are carrying out Utility repair and maintenance works on Hollingwood Lane, Bradford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 January 2026 at 08:00 and could run through until 20 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 17 Jun 2026 at 14:40.
5 Aug 2027
Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Winding Road, Halifax.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 April 2026 at 07:00 and could run through until 5 August 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 5 May 2026 at 08:31.
10 May 2027
Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Church Street, Halifax.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 April 2025 at 07:00 and could run through until 10 May 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 29 Apr 2026 at 08:26.
28 Sep 2027
Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Square Road, Halifax.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 April 2026 at 07:00 and could run through until 28 September 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 29 Apr 2026 at 08:25.
30 Sep 2026
Kirklees Council are carrying out Highway repair and maintenance works on Westgate, Cleckheaton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 May 2026 at 09:00 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 17 Jun 2026 at 12:04.
15 Nov 2026
Yorkshire Water are carrying out Utility asset works on Wakefield Road, Copley, Halifax.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 May 2026 at 12:30 and could run through until 15 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 5 May 2026 at 14:08.
26 May and 4 Nov 2026
Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Charlestown Road, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 19 Nov 2025 at 12:14.
26 May 2026 and 31 May 2027
Yorkshire Water are proposing to carry out Utility asset works on Thornton Road, Thornton, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2026 and could run through until 31 May 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 20 May 2026 at 11:59.
31 May 2027
Yorkshire Water are carrying out Utility asset works on Thornton Road, Thornton, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 May 2026 at 09:00 and could run through until 31 May 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 26 May 2026 at 10:14.
26 May 2026 and 31 May 2027
Yorkshire Water are proposing to carry out Utility asset works on Thornton Road, Thornton, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2026 and could run through until 31 May 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 22 May 2026 at 07:53.
26 May 2026 and 31 May 2027
Yorkshire Water are proposing to carry out Utility asset works on Thornton Road, Thornton, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2026 and could run through until 31 May 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 26 May 2026 at 11:32.
16 Oct 2026
Northern Gas Networks are carrying out Utility repair and maintenance works on Elland Road, Brighouse.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 June 2026 at 09:00 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 22 Jun 2026 at 10:46.
28 Jun 2026 and 18 Jan 2027
Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Commercial Street, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 June 2026 and could run through until 18 January 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 11 May 2026 at 14:17.
28 May 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Thornton Road, Thornton, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2026 at 07:00 and could run through until 28 May 2027. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Aug 2026 at 11:18.
27 Aug 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Thornton Road, Thornton, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2026 at 07:00 and could run through until 27 August 2027. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Aug 2026 at 11:19.
29 Oct 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Thornton Road, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2026 at 07:00 and could run through until 29 October 2027. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Aug 2026 at 11:20.
24 Dec 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Thornton Road, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2026 at 07:00 and could run through until 24 December 2027. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Aug 2026 at 11:21.
26 Nov 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Thornton Road, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2026 at 07:00 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Aug 2026 at 11:22.
24 Dec 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Thornton Road, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2026 at 07:00 and could run through until 24 December 2027. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Aug 2026 at 11:23.
18 Jul and 30 Sep 2026
Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Highroad Well Lane, Halifax.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 9 Sep 2026 at 15:27.
18 Jul and 30 Sep 2026
Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Lane, Pellon, Halifax.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 9 Sep 2026 at 15:26.
Friday
Northern Gas Networks are carrying out Utility repair and maintenance works on Wakefield Road, Brighouse.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 July 2026 at 08:30 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Sep 2026 at 13:30.
Wednesday
Yorkshire Water are carrying out Utility asset works on Manchester Road, Bradford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 14:30 and could run through until 23 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 14:45.
27 Jul and 30 Nov 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Clayton Road, Clayton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 July 2026 and could run through until 30 November 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jun 2026 at 14:29.
Friday
Northern Gas Networks are carrying out Utility repair and maintenance works on Whitehall Road, Wyke, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 August 2026 at 10:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Sep 2026 at 08:18.
Tomorrow
Yorkshire Water are carrying out Utility asset works on Ripley Street, West Bowling, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 August 2026 at 08:30 and could run through until 20 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 18 Aug 2026 at 12:34.
12 Aug and 12 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Francis Street, East Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2026 and could run through until 12 December 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 May 2026 at 08:14.
12 Aug and 12 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Heaton Street, East Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2026 and could run through until 12 December 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 May 2026 at 08:15.
12 Aug and 12 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Canal Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2026 and could run through until 12 December 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 May 2026 at 10:26.
12 Aug and 12 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Canal Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2026 and could run through until 12 December 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 May 2026 at 10:27.
8 Oct 2026
Northern Gas Networks are carrying out Utility repair and maintenance works on White Gate, Illingworth, Halifax.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 August 2026 at 14:30 and could run through until 8 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Aug 2026 at 14:37.
Monday
Northern Gas Networks are carrying out Utility repair and maintenance works on Wakefield Road, Sowerby Bridge.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 August 2026 at 10:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2026 at 11:26.
19 Aug and 23 Oct 2026
City Of Bradford Metropolitan District Council are proposing to carry out Works for road purposes on Allerton Road, Allerton, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Jun 2026 at 11:37.
Monday
Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on King Cross Road, Halifax.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 14 Jul 2026 at 13:28.
Monday
Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on King Cross Road, Halifax.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 9 Sep 2026 at 14:46.
26 Oct 2026
Northern Gas Networks are carrying out Utility repair and maintenance works on Bairstow Lane, Sowerby Bridge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 August 2026 at 09:00 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Aug 2026 at 09:57.
Monday
Northern Powergrid (Yorkshire) are carrying out Utility asset works on Ascot Drive, Horton Bank Top, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 September 2026 at 09:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2026 at 10:28.
8 Oct 2026
Northern Gas Networks are carrying out Utility repair and maintenance works on Boy Lane, Wheatley, Halifax.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 September 2026 at 11:15 and could run through until 8 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Sep 2026 at 11:19.
31 Aug and 2 Oct 2026
City Of Bradford Metropolitan District Council are proposing to carry out Works for road purposes on Prune Park Lane, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Jun 2026 at 11:39.
19 Oct 2026
Northern Gas Networks are carrying out Utility repair and maintenance works on Church Lane, Southowram, Brighouse.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 September 2026 at 10:00 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Sep 2026 at 11:23.
Tuesday
Kirklees Council are proposing to carry out Section 50 on Hunsworth Lane, Hunsworth, Cleckheaton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 3 Sep 2026 at 13:20.
Tuesday
Kirklees Council are carrying out Section 50 on Hunsworth Lane, Hunsworth, Cleckheaton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:00 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 8 Sep 2026 at 09:29.
15 Oct 2026
Northern Gas Networks are carrying out Utility repair and maintenance works on Mixenden Lane, Mixenden, Halifax.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 12:00 and could run through until 15 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 Sep 2026 at 12:17.
8 Oct 2026
Northern Gas Networks are carrying out Utility repair and maintenance works on Mill Lane, Mixenden, Halifax.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 12:00 and could run through until 8 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 Sep 2026 at 12:17.
1 Sep and 1 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on South Street, Denholme, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 1 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Jun 2026 at 15:52.
1 Sep and 1 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on High Bank Lane, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 1 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Jun 2026 at 14:29.
1 Sep and 1 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Moorhead Lane, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 1 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Jun 2026 at 14:29.
7 Sep and 4 Oct 2026
Yorkshire Water are proposing to carry out Utility asset works on Woodhouse Lane, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 13 Aug 2026 at 08:46.
7 Sep and 31 Dec 2026
Kirklees Council are proposing to carry out Highway improvement works on Westgate, Cleckheaton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 31 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 28 Aug 2026 at 11:12.
7 Sep and 31 Dec 2026
Kirklees Council were proposing to carry out Highway improvement works on Westgate, Cleckheaton.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 September 2026 and run through until 31 December 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 26 Aug 2026 at 16:01.
7 Sep and 4 Oct 2026
Yorkshire Water are proposing to carry out Utility asset works on Bowling Old Lane, West Bowling, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 25 Aug 2026 at 15:53.
30 Sep 2026
Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Rye Lane, Pellon, Halifax.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 15:00 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 9 Sep 2026 at 15:21.
30 Sep 2026
Calderdale Metropolitan Borough Council are carrying out Highway repair and maintenance works on Rye Lane, Pellon, Halifax.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 15:00 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 9 Sep 2026 at 15:24.
10 Sep and 8 Oct 2026
Yorkshire Water are proposing to carry out Utility asset works on Bowling Old Lane, West Bowling, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2026 and could run through until 8 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 8 Sep 2026 at 15:23.
8 Oct 2026
Yorkshire Water are carrying out Utility asset works on Bowling Old Lane, West Bowling, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 08:00 and could run through until 8 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 09:15.
13 Sep and 13 Oct 2026
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Old Power Way, Lowfields, Elland.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 September 2026 and run through until 13 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 09:54.
13 Oct 2026
Yorkshire Water are carrying out Utility repair and maintenance works on Old Power Way, Lowfields, Elland.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2026 at 17:00 and could run through until 13 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 10:00.
19 Oct 2026
Northern Gas Networks are carrying out Utility repair and maintenance works on Station Road, Hipperholme, Brighouse.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 11:30 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 12:31.
19 Oct 2026
Northern Gas Networks are carrying out Utility repair and maintenance works on Badger Lane, Hipperholme, Brighouse.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 11:30 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 12:30.
14 Sep and 1 Oct 2026
Calderdale Metropolitan Borough Council are proposing to carry out roadworks on Dean Clough, Halifax.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 1 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 11 Sep 2026 at 14:24.
5 Nov 2026
Northern Gas Networks are carrying out Utility repair and maintenance works on Lower Wyke Lane, Lower Wyke, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2026 at 08:00 and could run through until 5 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Sep 2026 at 08:03.
28 May 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Baptist Place, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 09:00 and could run through until 28 May 2027. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 09:42.
28 May 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Westgate, Bradford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 09:00 and could run through until 28 May 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 09:43.
14 Sep 2026 and 28 May 2027
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Lumb Lane, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 28 May 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Aug 2026 at 11:32.
28 May 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Lumb Lane, Manningham, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 09:00 and could run through until 28 May 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 09:45.
28 Sep 2026
Yorkshire Water are carrying out Utility asset works on North Park Road, Heaton, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 08:30 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 09:28.
15 Sep and 2 Oct 2026
Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Exley Lane, Elland.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 14 Sep 2026 at 14:30.
15 Sep and 12 Dec 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Wilton Street, Little Horton, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2026 and run through until 12 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.
15 Sep and 12 Dec 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Drake Street, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2026 and run through until 12 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.
15 Sep and 12 Dec 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Hey Street, Listerhills, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2026 and run through until 12 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.
15 Sep and 12 Dec 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Syedna Way, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2026 and run through until 12 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:03.
15 Sep and 12 Dec 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Rosse Street, Girlington, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2026 and run through until 12 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:15.
Wednesday
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Plane Tree Nest Lane, Halifax.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2026 at 09:30 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 17 Sep 2026 at 10:15.
Today
City Of Bradford Metropolitan District Council are proposing to carry out roadworks on Aldermanbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2026 and could run through until 19 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Jul 2026 at 18:38.
2 Oct 2026
Northern Gas Networks are carrying out Utility repair and maintenance works on Foster Park, Denholme, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2026 at 08:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Sep 2026 at 08:13.
2 Oct 2026
Northern Gas Networks are carrying out Utility repair and maintenance works on Main Road, Denholme, Bradford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2026 at 08:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Sep 2026 at 08:17.
2 Oct 2026
Northern Gas Networks are carrying out Utility repair and maintenance works on Keighley Road, Denholme, Bradford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2026 at 08:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Sep 2026 at 08:15.
21 Sep and 8 Oct 2026
Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Exley Lane, Elland.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 15 Sep 2026 at 16:44.
21 Sep and 27 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brookfoot Lane, Southowram, Brighouse.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 May 2026 at 10:42.
Friday
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Nelson Street, Sowerby Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 2 Jul 2026 at 14:58.
21 Sep and 6 Oct 2026
Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Burnley Road, Warley, Halifax.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 24 Jul 2026 at 11:00.
Friday
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Windle Royd Lane, Warley, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 14 Jul 2026 at 16:49.
21 Sep and 8 Oct 2026
Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Gibraltar Road, Highroad Well, Halifax.
These works are categorised as Major.
The works will start on or after 21 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 17 Sep 2026 at 10:49.
21 Sep and 16 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Long Lane, Wheatley, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Aug 2026 at 14:15.
21 Sep and 9 Oct 2026
Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stocks Lane, Luddenden, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 11 Aug 2026 at 14:41.
21 Sep and 16 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Beacon Road, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2026 at 14:32.
21 Sep and 16 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Beacon Road, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2026 at 15:59.
21 Sep and 9 Oct 2026
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Station Road, Denholme, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 September 2026 and run through until 9 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Sep 2026 at 14:07.
24 and 30 Sep 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on East View, Lightcliffe, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2026 at 16:37.
24 Sep and 21 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on City Lane, Wheatley, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Aug 2026 at 14:14.
24 Sep and 24 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on North Bank Road, Cottingley, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 24 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jul 2026 at 15:31.
25 Sep and 20 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wakefield Road, Lightcliffe, Brighouse.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Jun 2026 at 08:48.
25 Sep and 12 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Canal Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 12 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jul 2026 at 16:17.
28 Sep and 25 Oct 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Copley Grove, Copley, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 25 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 12 Aug 2026 at 08:32.
28 Sep and 25 Oct 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Copley Grove, Copley, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 25 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 10:11.
28 Sep and 2 Oct 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alfred Street, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 2 Jul 2026 at 14:58.
28 Sep and 2 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Greenroyd Avenue, Hunsworth, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 May 2026 at 15:30.
28 Sep and 2 Oct 2026
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Roper Lane, Queensbury, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 September 2026 and run through until 2 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 16:21.
28 Sep and 2 Oct 2026
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Round Street, West Bowling, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 September 2026 and run through until 2 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 15:53.
28 Sep and 2 Oct 2026
BT are proposing to carry out Utility asset works on Hill Top Road, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and cycleway.
This roadwork event was last updated by BT on 10 Aug 2026 at 15:52.
28 Sep and 30 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Grange Drive, Allerton, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 13 Aug 2026 at 11:31.
28 Sep and 2 Oct 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Gresham Avenue, Bolton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Aug 2026 at 09:58.
29 Sep and 17 Nov 2026
Yorkshire Water are proposing to carry out Utility asset works on Green Lane, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 25 Aug 2026 at 15:59.
29 Sep and 5 Oct 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Wilton Street, Little Horton, Bradford.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2026 and run through until 5 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.
30 Sep and 2 Oct 2026
Yorkshire Water are proposing to carry out New service connection on The Oval, Hightown, Liversedge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 13 Jul 2026 at 14:25.
5 and 20 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Elland.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Jul 2026 at 14:21.
5 and 30 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Armytage Road, Brighouse.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 May 2026 at 10:20.
5 and 30 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sherwood Road, Brighouse.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 May 2026 at 10:41.
5 and 30 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Priory Road, Brighouse.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 May 2026 at 10:41.
5 Oct and 1 Nov 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Copley Mount, Copley, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 12 Aug 2026 at 08:38.
5 Oct and 1 Nov 2026
Yorkshire Water are proposing to carry out Utility asset works on Copley Mount, Copley, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Sep 2026 at 11:31.
5 and 22 Oct 2026
Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Gibraltar Road, Highroad Well, Halifax.
These works are categorised as Major.
The works will start on or after 5 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 17 Sep 2026 at 11:43.
5 Oct and 6 Nov 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Syke Lane, Lightcliffe, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 23 Jul 2026 at 07:11.
5 Oct and 6 Nov 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Syke Lane, Lightcliffe, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 10:21.
5 and 23 Oct 2026
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Brackenbed Lane, Pellon, Halifax.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 October 2026 and run through until 23 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Sep 2026 at 08:43.
5 and 9 Oct 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bowling Hall Road, East Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Jul 2026 at 08:13.
5 and 7 Oct 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Hey Street, Listerhills, Bradford.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 October 2026 and run through until 7 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.
5 and 23 Oct 2026
City Of Bradford Metropolitan District Council are proposing to carry out Works for road purposes on Allerton Lane, Allerton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Jun 2026 at 11:36.
5 Oct and 24 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Greenfield Avenue, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 24 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Jul 2026 at 16:11.
6 Oct and 24 Nov 2026
Yorkshire Water are proposing to carry out Utility asset works on Green Lane, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2026 and could run through until 24 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 4 Aug 2026 at 11:57.
6 and 8 Oct 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Drake Street, Bradford.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2026 and run through until 8 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.
6 and 20 Oct 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Hillside Road, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Aug 2026 at 12:02.
7 and 13 Oct 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Vickerman Street, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 13 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 14 Jul 2026 at 14:50.
7 Oct and 31 Dec 2026
Kirklees Council are proposing to carry out Highway improvement works on Westgate, Cleckheaton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 31 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 9 Sep 2026 at 21:02.
7 and 13 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Belgrave Gardens, Claremount, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 13 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Jun 2026 at 08:37.
7 and 9 Oct 2026
Yorkshire Water are proposing to carry out New service connection on Lidget Place, Lidget Green, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 21 Jul 2026 at 12:52.
12 Oct 2026 and 8 Jan 2027
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Halifax Road, Brighouse.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 8 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Aug 2026 at 15:39.
12 and 30 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hebble Lane, Wheatley, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Sep 2026 at 11:16.
12 and 30 Oct 2026
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Dyer Lane, Wheatley, Halifax.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 October 2026 and run through until 30 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Sep 2026 at 08:45.
12 Oct and 20 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bartle Lane, Great Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 20 November 2026. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 17 Jun 2026 at 12:15.
12 and 16 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Canford Grove, Allerton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Aug 2026 at 11:26.
13 and 19 Oct 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on South Street, Denholme, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Sep 2026 at 16:09.
19 and 24 Oct 2026
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Heaton Grove, Cleckheaton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 October 2026 and run through until 24 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 2 Sep 2026 at 08:44.
19 and 24 Oct 2026
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Heaton Avenue, Cleckheaton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 October 2026 and run through until 24 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 2 Sep 2026 at 08:11.
19 and 24 Oct 2026
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Bramhope Road, Cleckheaton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 October 2026 and run through until 24 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 2 Sep 2026 at 08:18.
19 Oct and 13 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cloverdale, Shelf, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:51.
19 Oct and 6 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oaks Drive, Allerton, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 13 Aug 2026 at 11:33.
19 and 23 Oct 2026
Yorkshire Water are proposing to carry out New service connection on Back Apsley Crescent, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 24 Jul 2026 at 11:22.
19 Oct and 6 Nov 2026
Quickline Commucations were proposing to carry out Utility asset works on Prune Park Lane, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 October 2026 and run through until 6 November 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 20 Aug 2026 at 12:31.
20 and 22 Oct 2026
Yorkshire Water are proposing to carry out New service connection on Howard Street, Little Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 24 Jul 2026 at 13:38.
21 and 23 Oct 2026
Yorkshire Water are proposing to carry out New service connection on Duchy Avenue, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 24 Jul 2026 at 11:43.
21 Oct and 4 Nov 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on High Bank Lane, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 4 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Sep 2026 at 11:55.
21 Oct and 3 Nov 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Moorhead Lane, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 3 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Sep 2026 at 13:58.
22 Oct and 13 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Half House Lane, Hove Edge, Brighouse.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Aug 2026 at 15:39.
22 Oct and 13 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shroggs Road, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Sep 2026 at 11:17.
26 Oct and 22 Nov 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Copley Glen, Copley, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 22 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 12 Aug 2026 at 09:42.
26 Oct and 22 Nov 2026
Yorkshire Water are proposing to carry out Utility asset works on Copley Glen, Copley, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 22 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Sep 2026 at 11:30.
26 Oct and 9 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Waterloo Road, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Sep 2026 at 15:04.
26 and 30 Oct 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Brow Bottom Lane, Mixenden, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 14:35.
26 Oct and 27 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Carr House Lane, Shelf, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:52.
26 Oct and 27 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cooper Lane, Shelf, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 15:00.
26 and 30 Oct 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ringwood Road, Little Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 24 Jul 2026 at 15:43.
26 Oct and 6 Nov 2026
Quickline Commucations are proposing to carry out Utility asset works on Prune Park Lane, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 6 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 24 Aug 2026 at 15:41.
26 Oct and 6 Nov 2026
Quickline Commucations are proposing to carry out Utility asset works on Prune Park Lane, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 6 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 25 Aug 2026 at 15:15.
26 and 30 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Festival Avenue, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2026 at 16:12.
2 and 27 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gathorne Street, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Sep 2026 at 12:12.
2 and 27 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradford Road, Brighouse.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Jul 2026 at 07:54.
2 and 27 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodvale Road, Brighouse.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Jul 2026 at 07:56.
2 and 6 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Fern Croft, Hightown, Liversedge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Aug 2026 at 09:19.
2 Nov and 4 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dam Head Road, Sowerby Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Sep 2026 at 09:02.
2 Nov and 4 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Willow Hall Lane, Sowerby Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Sep 2026 at 09:02.
2 Nov and 4 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bairstow Lane, Sowerby Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Sep 2026 at 08:57.
2 Nov and 18 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wheatley Road, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Sep 2026 at 11:16.
2 Nov and 11 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Low Moor, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Sep 2026 at 08:18.
2 Nov and 11 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Low Moor, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 12:15.
2 and 20 Nov 2026
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Station Road, Denholme, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 November 2026 and run through until 20 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Sep 2026 at 12:49.
2 and 20 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Denholme, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 15:17.
2 and 20 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Denholme, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Sep 2026 at 10:10.
3 and 5 Nov 2026
BT are proposing to carry out Utility asset works on Bolton Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2026 and could run through until 5 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 11 Aug 2026 at 08:16.
5 Nov and 20 Dec 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Headley Lane, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 20 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 4 Aug 2026 at 11:59.
5 Nov and 20 Dec 2026
Yorkshire Water are proposing to carry out Utility asset works on Headley Lane, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 20 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 28 Aug 2026 at 10:58.
5 Nov and 20 Dec 2026
Yorkshire Water are proposing to carry out Utility asset works on Headley Lane, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 20 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 15:11.
9 Nov and 4 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Waterloo Road, Brighouse.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Jul 2026 at 07:55.
9 Nov and 4 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Garden Road, Brighouse.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Jul 2026 at 07:54.
9 Nov and 4 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bonegate Road, Brighouse.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Jul 2026 at 07:54.
9 Nov and 11 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Martins View, Brighouse.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Jul 2026 at 16:42.
9 Nov 2026 and 13 Jan 2027
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornhill Bridge Lane, Brighouse.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Jul 2026 at 07:54.
9 Nov and 4 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gratrix Lane, Sowerby Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Sep 2026 at 09:34.
9 and 13 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on New Lane, Moorside, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Jun 2026 at 11:36.
9 and 20 Nov 2026
Yorkshire Water are proposing to carry out Utility asset works on Paddock Lane, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 6 Aug 2026 at 13:45.
9 and 13 Nov 2026
Northern Powergrid (Yorkshire) were proposing to carry out New service connection on Beverley Drive, Wyke, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 November 2026 and run through until 13 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 17 Sep 2026 at 11:13.
9 Nov 2026 and 3 Feb 2027
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Carr House Road, Shelf, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 3 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:57.
9 and 13 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on March Cote Lane, Cottingley, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Jun 2026 at 07:53.
16 Nov and 11 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Bolton Brow, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Jun 2026 at 13:28.
16 Nov and 11 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Willow Hall Lane, Sowerby Bridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Jun 2026 at 13:29.
16 and 20 Nov 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Back Horton Grange Road Se, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 18 Aug 2026 at 11:53.
20 Nov and 8 Dec 2026
Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Heaton Road, Heaton, Bradford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 November 2026 and run through until 8 December 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 27 Aug 2026 at 16:19.
20 Nov and 8 Dec 2026
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Heaton Road, Heaton, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 27 Aug 2026 at 16:20.
20 Nov and 8 Dec 2026
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Heaton Road, Heaton, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 4 Sep 2026 at 09:05.
23 Nov and 18 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Lane, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Sep 2026 at 11:30.
23 Nov and 18 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lee Mount Road, Lee Mount, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Sep 2026 at 11:16.
23 Nov and 18 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ovenden Avenue, Ovenden, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Sep 2026 at 11:16.
23 and 27 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Caldene Avenue, Low Moor, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Jul 2026 at 16:06.
23 Nov and 20 Dec 2026
Yorkshire Water are proposing to carry out Utility asset works on Green Lane, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 20 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 28 Aug 2026 at 10:57.
23 Nov and 20 Dec 2026
Yorkshire Water are proposing to carry out Utility asset works on Green Lane, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 20 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 15:44.
23 Nov and 20 Dec 2026
Yorkshire Water are proposing to carry out Utility asset works on Green Lane, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 20 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 15:10.
23 and 27 Nov 2026
Yorkshire Water are proposing to carry out New service connection on Greenhill Lane, Bradford Moor, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 15:36.
23 and 27 Nov 2026
Yorkshire Water are proposing to carry out New service connection on Greenhill Lane, Bradford Moor, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 07:46.
23 Nov and 2 Dec 2026
Northern Gas Networks are proposing to carry out New service connection on Upper Heights Road, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 15:13.
23 and 27 Nov 2026
Northern Gas Networks are proposing to carry out New service connection on Upper Heights Road, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2026 at 14:16.
23 and 27 Nov 2026
Northern Gas Networks are proposing to carry out New service connection on Upper Heights Road, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 18 Sep 2026 at 09:52.
23 and 27 Nov 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cunliffe Terrace, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 15:39.
23 and 27 Nov 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cunliffe Terrace, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 21:17.
26 Nov and 10 Dec 2026
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Whetley Lane, Manningham, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2026 and could run through until 10 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Aug 2026 at 14:50.
26 Nov and 10 Dec 2026
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Whetley Lane, Manningham, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2026 and could run through until 10 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Aug 2026 at 15:15.
1 and 8 Dec 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lynfield Drive, Hightown, Liversedge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Aug 2026 at 09:09.
1 and 8 Dec 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lynfield Drive, Hightown, Liversedge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Sep 2026 at 09:18.
1 and 8 Dec 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lynfield Drive, Hightown, Liversedge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Sep 2026 at 13:16.
1 Dec 2026 and 2 Mar 2027
Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Charlestown Road, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2026 and could run through until 2 March 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 19 Nov 2025 at 13:22.
2 and 20 Dec 2026
Yorkshire Water were proposing to carry out Utility asset works on Woodhouse Lane, Halifax.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2026 and run through until 20 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 9 Sep 2026 at 10:34.
2 and 4 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out roadworks on Nelson Street, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2026 and could run through until 4 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 14:03.
7 and 24 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornhills Beck Lane, Brighouse.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 24 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Jul 2026 at 07:54.
7 and 11 Dec 2026
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Brow Bottom Lane, Mixenden, Halifax.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 December 2026 and run through until 11 December 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 08:14.
7 Dec 2026 and 15 Jan 2027
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cooper Lane, Shelf, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 15 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:57.
7 and 11 Dec 2026
Yorkshire Water are proposing to carry out New service connection on Ashgrove, Great Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 18 Sep 2026 at 14:40.
14 and 18 Dec 2026
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Back Waverley Terrace Ne, Lidget Green, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 December 2026 and run through until 18 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Sep 2026 at 14:43.
Roadworks Map near to Stanage Lane, HALIFAX, HX3 7PR
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Stanage Lane, HALIFAX, HX3 7PR (8 Events)
(Scheduled Dates)
(miles)
(Scheduled: 15 Sep 2026 - 21 Sep 2026)
(Scheduled: 17 Sep 2026 - 22 Sep 2026)
(Scheduled: 16 Sep 2026 - 22 Sep 2026)
Contains public sector information licensed under the Open Government Licence v3.0.