ROADWORKS SUMMARY
Princeton Close, HALIFAX, HX2 0US

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Princeton Close, HX2 0US and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Princeton Close, HALIFAX, HX2 0US

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Princeton Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Calderdale Metropolitan Borough Council logo
LONG TERM
Until
22 Aug 2025
Details
View Map
Share
Follow
Cow Green

Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Cow Green, Halifax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2024 at 06:00 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 15 May 2025 at 12:49.

Calderdale Metropolitan Borough Council logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Orange Street

Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Orange Street, Halifax.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 June 2024 at 20:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 9 May 2025 at 13:38.

LONG TERM
Between
29 Jul 2024 and 29 Jul 2025
Details
View Map
Share
Follow
Mary Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Mary Street, Denholme, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:27.

LONG TERM
Between
29 Jul 2024 and 29 Jul 2025
Details
View Map
Share
Follow
Minorca Mount

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Minorca Mount, Denholme, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:29.

Calderdale Metropolitan Borough Council logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Winding Road

Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Winding Road, Halifax.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2024 at 20:00 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 15 May 2025 at 12:48.

Calderdale Metropolitan Borough Council logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Cross Hills

Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Cross Hills, Halifax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2024 at 20:00 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 15 May 2025 at 12:47.

Yorkshire Water logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Bramley Lane

Yorkshire Water are carrying out Utility asset works on Bramley Lane, Hipperholme, Brighouse.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 09:00 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 May 2025 at 09:50.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
8 Jan and 8 Jul 2025
Details
View Map
Share
Follow
Elland Road

Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Elland Road, Brighouse.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 11 Jan 2025 at 14:08.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
8 Jan and 8 Jul 2025
Details
View Map
Share
Follow
Elland Road

Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Elland Road, Brighouse.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 23 Apr 2025 at 14:47.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
15 Jan and 14 Jul 2025
Details
View Map
Share
Follow
Long Wall

Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Long Wall, West Vale, Elland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 28 Jan 2025 at 14:58.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
15 Jan and 14 Jul 2025
Details
View Map
Share
Follow
Bankhouse Lane

Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bankhouse Lane, Salterhebble, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 14 Feb 2025 at 16:30.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Tanton Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Tanton Crescent, Clayton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:11.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Thorpe Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Thorpe Road, Thornton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:12.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Brooklands Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Brooklands Avenue, Thornton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:44.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
North Cliffe Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on North Cliffe Lane, Thornton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:50.

Northern Gas Networks logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Central Park

Northern Gas Networks are carrying out Utility repair and maintenance works on Central Park, Halifax.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 08:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 14:53.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
31 Mar and 25 Jul 2025
Details
View Map
Share
Follow
Wakefield Road

Calderdale Metropolitan Borough Council are proposing to carry out Remedial works on Wakefield Road, Copley, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 19 Mar 2025 at 09:08.

Northern Gas Networks logo
LONG TERM
Until
19 Jun 2025
Details
View Map
Share
Follow
Siddal New Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Siddal New Road, Halifax.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Apr 2025 at 10:47.

Northern Gas Networks logo
LONG TERM
Until
19 Jun 2025
Details
View Map
Share
Follow
Water Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Water Lane, Halifax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Apr 2025 at 13:52.

Yorkshire Water logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
St Marys Drive

Yorkshire Water are carrying out Utility asset works on St Marys Drive, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 15:00 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 29 May 2025 at 15:23.

Yorkshire Water logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
Blackstone Avenue

Yorkshire Water are carrying out Utility asset works on Blackstone Avenue, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 10:30 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 29 May 2025 at 15:23.

LONG TERM
Until
18 Jun 2025
Details
View Map
Share
Follow
Brighouse Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility asset works on Brighouse Road, Hipperholme, Brighouse.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 10:15 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Jun 2025 at 12:28.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
28 Apr and 16 Sep 2025
Details
View Map
Share
Follow
Commercial Street

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Commercial Street, Halifax.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 10 Apr 2025 at 14:39.

Northern Powergrid (Yorkshire) logo
LONG TERM
Today
Details
View Map
Share
Burnley Road

Northern Powergrid (Yorkshire) carried out Utility asset works on Burnley Road, Luddenden Foot, Sowerby Bridge.

These works were categorised as Major.

Two-way signals were in place for some or all of the period.

The works were originally planned between 28 Apr 2025 and 3 Jun 2025 and were actually completed between 28 Apr 2025 (09:00) and 3 Jun 2025 (11:25). The works impacted the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Jun 2025 at 11:32.

Yorkshire Water logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
Blackstone Avenue

Yorkshire Water are carrying out Utility asset works on Blackstone Avenue, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 11:00 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 29 May 2025 at 15:23.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Huddersfield Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Huddersfield Road, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 26 Feb 2025 at 13:34.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Whitehall Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Whitehall Road, Wyke, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 8 Jan 2025 at 08:28.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Lingdale Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Lingdale Road, Woodside, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 16:19.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Eaglesfield Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Eaglesfield Drive, Woodside, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:20.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Ashlar Grove

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ashlar Grove, Queensbury, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jan 2025 at 17:28.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Easington Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Easington Avenue, Buttershaw, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 16:19.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Coldbeck Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Coldbeck Drive, Buttershaw, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 16:18.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Shrike Close

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Shrike Close, Clayton Heights, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 16:21.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Redwing Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Redwing Drive, Clayton Heights, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 16:21.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Redshank Close

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Redshank Close, Clayton Heights, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:26.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Osbourne Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Osbourne Drive, Queensbury, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jan 2025 at 17:43.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Partridge Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Partridge Drive, Clayton Heights, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:24.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Brunswick Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Brunswick Street, Queensbury, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jan 2025 at 17:34.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Beacon Grove

City Of Bradford Metropolitan District Council were proposing to carry out Highway repair and maintenance works on Beacon Grove, Wibsey, Bradford.

These works were categorised as Major.

The works were originally planned to start 1 May 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Feb 2025 at 12:18.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Lewis Close

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Lewis Close, Queensbury, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jan 2025 at 17:43.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Naseby Rise

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Naseby Rise, Queensbury, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jan 2025 at 17:45.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Roy Road

City Of Bradford Metropolitan District Council were proposing to carry out Highway repair and maintenance works on Roy Road, Horton Bank Top, Bradford.

These works were categorised as Major.

The works were originally planned to start 1 May 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Feb 2025 at 12:18.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Wagtail Close

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Wagtail Close, Clayton Heights, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 16:23.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Beacon Place

City Of Bradford Metropolitan District Council were proposing to carry out Highway repair and maintenance works on Beacon Place, Buttershaw, Bradford.

These works were categorised as Major.

The works were originally planned to start 1 May 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Feb 2025 at 12:19.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Yateholm Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Yateholm Drive, Clayton Heights, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:27.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Bunting Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bunting Drive, Clayton Heights, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 16:18.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Naden Close

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Naden Close, Clayton Heights, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:24.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Ascot Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ascot Drive, Horton Bank Top, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jan 2025 at 17:27.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Widdop Close

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Widdop Close, Clayton Heights, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 16:23.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Fairway Walk

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fairway Walk, Great Horton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jan 2025 at 17:36.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Uplands Close

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Uplands Close, Clayton Heights, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jan 2025 at 17:48.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Poplar Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Poplar Avenue, Great Horton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jan 2025 at 17:46.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Gregory Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Gregory Crescent, Horton Bank Top, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:31.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Old Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Old Road, Horton Bank Top, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:46.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Mill Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Queensbury, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:23.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Moore View

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Moore View, Great Horton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:42.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Low Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Low Lane, Queensbury, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:49.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Lane Side

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Lane Side, Queensbury, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:50.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Oakleigh Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Oakleigh Road, Clayton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 10:57.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Oakleigh Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Oakleigh Avenue, Clayton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 12:03.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Oakleigh Gardens

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Oakleigh Gardens, Clayton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 12:05.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Oakleigh Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Oakleigh Avenue, Clayton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 12:04.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Oakleigh Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Oakleigh Road, Clayton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 11:06.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Oakleigh Terrace

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Oakleigh Terrace, Clayton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 11:06.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Westfield Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Westfield Road, Clayton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 12:10.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Broomcroft

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Broomcroft, Clayton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 12:02.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Welbeck Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Welbeck Drive, Great Horton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:32.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Sundown Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Sundown Avenue, Great Horton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:34.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Pasture Walk

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Pasture Walk, Clayton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 10:59.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Holly Park Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Holly Park Drive, Great Horton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:38.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Hollingwood Mount

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Hollingwood Mount, Lidget Green, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:39.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Pasture Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Pasture Lane, Clayton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 10:58.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
School Green

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on School Green, Thornton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 14:37.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Old Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Old Road, Thornton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 10:57.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Shortway

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Shortway, Thornton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 11:00.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Upper Heights Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Upper Heights Road, Thornton, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 11:01.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Stradmore Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Stradmore Road, Denholme, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Sep 2024 at 15:13.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Parkinson Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Parkinson Road, Denholme, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Sep 2024 at 15:13.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
School Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on School Street, Denholme, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Sep 2024 at 15:14.

Northern Gas Networks logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Savile Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Savile Road, Halifax.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 May 2025 at 08:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 12:58.

Northern Gas Networks logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Savile Park Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Savile Park Road, Halifax.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 May 2025 at 08:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 13:37.

Northern Powergrid (Yorkshire) logo
Finishing
Today
Details
View Map
Share
Follow
Bank Top

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Bank Top, Southowram, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Apr 2025 at 11:51.

Calderdale Metropolitan Borough Council logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Fountain Street

Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Fountain Street, Halifax.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 18:00 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 30 May 2025 at 13:10.

Northern Gas Networks logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Rough Hall Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Rough Hall Lane, Wainstalls, Halifax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 11:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 11:39.

Northern Gas Networks logo
LONG TERM
Until
8 Jul 2025
Details
View Map
Share
Follow
Wainstalls Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Wainstalls Road, Wainstalls, Halifax.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 11:00 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 11:39.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Green Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Green Lane, West Vale, Elland.

The works started on 13 May 2025 at 11:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 May 2025 at 10:57.

Northern Gas Networks logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Washington Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Washington Street, Lee Mount, Halifax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2025 at 13:30 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 14:15.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
14 May and 14 Jun 2025
Details
View Map
Share
New Road

Northern Powergrid (Yorkshire) were proposing to carry out Utility repair and maintenance works on New Road, Mytholmroyd, Hebden Bridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 May 2025 and run through until 14 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 May 2025 at 16:07.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
15 May and 2 Jul 2025
Details
View Map
Share
Winding Road

Calderdale Metropolitan Borough Council were proposing to carry out Highway improvement works on Winding Road, Halifax.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 May 2025 and run through until 2 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 30 Jan 2025 at 14:19.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
15 May and 2 Jul 2025
Details
View Map
Share
Cross Hills

Calderdale Metropolitan Borough Council were proposing to carry out Highway improvement works on Cross Hills, Halifax.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 May 2025 and run through until 2 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 30 Jan 2025 at 14:20.

Northern Gas Networks logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
South Parade

Northern Gas Networks are carrying out Utility repair and maintenance works on South Parade, Halifax.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 10:30 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 May 2025 at 12:19.

Northern Gas Networks logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Hunger Hill

Northern Gas Networks are carrying out Utility repair and maintenance works on Hunger Hill, Halifax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 10:30 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 May 2025 at 12:19.

Calderdale Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Forest Hill Road

Calderdale Metropolitan Borough Council are carrying out Highway repair and maintenance works on Forest Hill Road, Sowood, Elland.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 07:30 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 2 Jun 2025 at 10:29.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
19 May and 16 Jul 2025
Details
View Map
Share
Bradford Road

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Bradford Road, Brighouse.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 16 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Apr 2025 at 13:56.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Free School Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Free School Lane, Savile Park, Halifax.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Mar 2025 at 08:49.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Smith House Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Smith House Lane, Lightcliffe, Brighouse.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 May 2025 at 12:45 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 09:56.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
22 May and 28 Jun 2025
Details
View Map
Share
Follow
Commercial Street

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Commercial Street, Halifax.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 15 Apr 2025 at 10:21.

Calderdale Metropolitan Borough Council logo
LONG TERM
Until
28 Jun 2025
Details
View Map
Share
Follow
Commercial Street

Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Commercial Street, Halifax.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 May 2025 at 07:00 and could run through until 28 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 22 May 2025 at 08:07.

Northern Gas Networks logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Tree Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Tree Lane, Wainstalls, Halifax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:00 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 09:54.

Yorkshire Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lower Mill Bank Road

Yorkshire Water are carrying out Utility repair and maintenance works on Lower Mill Bank Road, Mill Bank, Sowerby Bridge.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 May 2025 at 22:43 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Jun 2025 at 09:27.

Calderdale Metropolitan Borough Council logo
LONG TERM
Until
16 Sep 2025
Details
View Map
Share
Follow
Commercial Street

Calderdale Metropolitan Borough Council are carrying out Highway improvement works on Commercial Street, Halifax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 May 2025 at 07:00 and could run through until 16 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 27 May 2025 at 21:53.

Yorkshire Water logo
Between
27 May and 15 Jun 2025
Details
View Map
Share
Follow
Shaw Lane

Yorkshire Water are proposing to carry out Utility asset works on Shaw Lane, Holywell Green, Elland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 9 Apr 2025 at 11:46.

Yorkshire Water logo
Between
27 May and 15 Jun 2025
Details
View Map
Share
Follow
Shaw Lane

Yorkshire Water are proposing to carry out Utility asset works on Shaw Lane, Holywell Green, Elland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 May 2025 at 12:25.

Northern Powergrid (Yorkshire) logo
Between
28 May and 16 Jun 2025
Details
View Map
Share
Follow
Plains Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Plains Lane, Elland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 May 2025 at 08:08.

Northern Powergrid (Yorkshire) logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Plains Lane

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Plains Lane, Elland.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 08:15 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 May 2025 at 08:43.

Northern Gas Networks logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Whinney Hill Park

Northern Gas Networks are carrying out Highway repair and maintenance works on Whinney Hill Park, Brighouse.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 10:00 and could run through until 10 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 11:51.

LONG TERM
Between
31 May and 31 Jul 2025
Details
View Map
Share
Follow
Meadway

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Meadway, Woodside, Bradford.

These works are categorised as Major.

The works will start on or after 31 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:22.

Between
31 May and 30 Jun 2025
Details
View Map
Share
Follow
Low Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Low Lane, Queensbury, Bradford.

These works are categorised as Major.

The works will start on or after 31 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 07:47.

Between
31 May and 30 Jun 2025
Details
View Map
Share
Follow
Lane Side

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Lane Side, Queensbury, Bradford.

These works are categorised as Major.

The works will start on or after 31 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 07:47.

Northern Gas Networks logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Ripponden Old Bank

Northern Gas Networks are carrying out Utility repair and maintenance works on Ripponden Old Bank, Ripponden, Sowerby Bridge.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 13:43 and could run through until 11 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 15:39.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
2 Jun and 26 Sep 2025
Details
View Map
Share
Follow
Stainland Road

Calderdale Metropolitan Borough Council are proposing to carry out Section 50 on Stainland Road, Elland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 17 Mar 2025 at 13:24.

Calderdale Metropolitan Borough Council logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Stainland Road

Calderdale Metropolitan Borough Council are carrying out Section 50 on Stainland Road, Elland.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 2 Jun 2025 at 08:03.

Quickline Commucations logo
Finishing
Thursday
Details
View Map
Share
Follow
Stansfield Mill Lane

Quickline Commucations are carrying out Utility repair and maintenance works on Stansfield Mill Lane, Triangle, Sowerby Bridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 09:10 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 3 Jun 2025 at 09:27.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
St Stephens Street

BT are proposing to carry out Utility repair and maintenance works on St Stephens Street, Copley, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Apr 2025 at 12:39.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
St Stephens Street

BT are carrying out Utility repair and maintenance works on St Stephens Street, Copley, Halifax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 09:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Jun 2025 at 10:18.

Northern Gas Networks logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Free School Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Free School Lane, Savile Park, Halifax.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 09:19.

Calderdale Metropolitan Borough Council logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
George Street

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on George Street, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 17 Apr 2025 at 14:01.

Calderdale Metropolitan Borough Council logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Silver Street

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Silver Street, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 17 Apr 2025 at 14:00.

Yorkshire Water logo
Until
22 Jun 2025
Details
View Map
Share
Follow
Whitehall Road

Yorkshire Water are carrying out roadworks on Whitehall Road, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:00 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Jun 2025 at 11:21.

Yorkshire Water logo
Between
2 and 29 Jun 2025
Details
View Map
Share
Follow
Huddersfield Road

Yorkshire Water are proposing to carry out Utility asset works on Huddersfield Road, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 26 Feb 2025 at 13:55.

Yorkshire Water logo
Until
29 Jun 2025
Details
View Map
Share
Follow
Huddersfield Road

Yorkshire Water are carrying out Utility asset works on Huddersfield Road, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Jun 2025 at 08:52.

Northern Gas Networks logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Lee Mount Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Lee Mount Road, Lee Mount, Halifax.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:00 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 10:07.

LONG TERM
Between
2 Jun and 5 Sep 2025
Details
View Map
Share
Follow
Hill End Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Hill End Lane, Queensbury, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 12:02.

LONG TERM
Until
5 Sep 2025
Details
View Map
Share
Follow
Hill End Lane

City Of Bradford Metropolitan District Council are carrying out Highway repair and maintenance works on Hill End Lane, Queensbury, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 Jun 2025 at 08:30.

Virgin Media logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Boggart Lane

Virgin Media were proposing to carry out Utility repair and maintenance works on Boggart Lane, Sowerby Bridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 1 May 2025 at 08:20.

Virgin Media logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Boggart Lane

Virgin Media are proposing to carry out Utility repair and maintenance works on Boggart Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 1 May 2025 at 15:01.

Virgin Media logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Boggart Lane

Virgin Media are proposing to carry out Utility repair and maintenance works on Boggart Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 14 May 2025 at 10:26.

Quickline Commucations logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Boggart Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Boggart Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 16 May 2025 at 11:38.

Calderdale Metropolitan Borough Council logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
George Street

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on George Street, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 3 Jun 2025 at 13:58.

Yorkshire Water logo
Between
9 and 27 Jun 2025
Details
View Map
Share
City Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on City Lane, Wheatley, Halifax.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Oct 2024 at 08:59.

Yorkshire Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Highlands Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Highlands Lane, Illingworth, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 1 May 2025 at 15:27.

Yorkshire Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Highlands Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Highlands Lane, Illingworth, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 May 2025 at 09:54.

Quickline Commucations logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Boggart Lane

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Boggart Lane, Sowerby Bridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 8 May 2025 at 10:49.

Calderdale Metropolitan Borough Council logo
Between
10 and 26 Jun 2025
Details
View Map
Share
Skircoat Road

Calderdale Metropolitan Borough Council were proposing to carry out Highway improvement works on Skircoat Road, Halifax.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 26 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 3 Jun 2025 at 11:02.

Calderdale Metropolitan Borough Council logo
Between
10 and 24 Jun 2025
Details
View Map
Share
Follow
Skircoat Road

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Skircoat Road, Halifax.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 3 Jun 2025 at 11:18.

Calderdale Metropolitan Borough Council logo
Between
10 and 24 Jun 2025
Details
View Map
Share
Follow
Skircoat Road

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Skircoat Road, Halifax.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 3 Jun 2025 at 12:41.

Calderdale Metropolitan Borough Council logo
Between
13 and 30 Jun 2025
Details
View Map
Share
Follow
Silver Street

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Silver Street, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 3 Jun 2025 at 13:56.

Northern Powergrid (Yorkshire) logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Cross Wells Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Cross Wells Road, Ripponden, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Mar 2025 at 08:07.

Northern Powergrid (Yorkshire) logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Cross Wells Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Cross Wells Road, Ripponden, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Mar 2025 at 09:05.

Northern Powergrid (Yorkshire) logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Hob Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Hob Lane, Ripponden, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Mar 2025 at 08:06.

Northern Powergrid (Yorkshire) logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Hob Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Hob Lane, Ripponden, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Mar 2025 at 09:04.

Virgin Media logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Sowerby Croft Lane

Virgin Media are proposing to carry out Utility repair and maintenance works on Sowerby Croft Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 1 May 2025 at 15:00.

Virgin Media logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Sowerby Croft Lane

Virgin Media are proposing to carry out Utility repair and maintenance works on Sowerby Croft Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 14 May 2025 at 10:25.

Quickline Commucations logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Sowerby Croft Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Sowerby Croft Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 15 May 2025 at 11:39.

Virgin Media logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Sowerby Croft Lane

Virgin Media are proposing to carry out Utility repair and maintenance works on Sowerby Croft Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 1 May 2025 at 15:10.

Virgin Media logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Sowerby Croft Lane

Virgin Media are proposing to carry out Utility repair and maintenance works on Sowerby Croft Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 14 May 2025 at 10:26.

Quickline Commucations logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Boggart Lane

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Boggart Lane, Sowerby Bridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 20 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 16 May 2025 at 09:14.

Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Brighouse Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Works for road purposes on Brighouse Road, Hipperholme, Brighouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Apr 2025 at 10:02.

Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Brighouse Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Works for road purposes on Brighouse Road, Hipperholme, Brighouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 8 May 2025 at 08:51.

Yorkshire Water logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
The Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Crescent, Southowram, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 8 May 2025 at 11:56.

Yorkshire Water logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
The Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Crescent, Southowram, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 May 2025 at 09:54.

Quickline Commucations logo
Between
19 and 21 Jun 2025
Details
View Map
Share
Follow
Boggart Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Boggart Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 21 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 12 May 2025 at 11:08.

Quickline Commucations logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Sowerby Croft Lane

Quickline Commucations are proposing to carry out Utility asset works on Sowerby Croft Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 30 May 2025 at 11:04.

Yorkshire Water logo
Between
23 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Elizabeth Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Elizabeth Street, Elland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 29 Apr 2025 at 13:24.

Yorkshire Water logo
Between
23 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Elizabeth Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Elizabeth Street, Elland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 29 Apr 2025 at 14:58.

Northern Powergrid (Yorkshire) logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Greystones Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Greystones Road, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Apr 2025 at 07:43.

Northern Powergrid (Yorkshire) logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Greystones Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Greystones Road, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Apr 2025 at 09:35.

Northern Powergrid (Yorkshire) logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Butts Green Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Butts Green Road, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Apr 2025 at 07:42.

Northern Powergrid (Yorkshire) logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Butts Green Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Butts Green Road, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Apr 2025 at 09:34.

Northern Powergrid (Yorkshire) logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Danny Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Danny Lane, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Apr 2025 at 07:42.

Northern Powergrid (Yorkshire) logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Danny Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Danny Lane, Luddenden Foot, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Apr 2025 at 09:34.

Northern Gas Networks logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
East Park Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on East Park Road, Lee Mount, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 May 2025 at 10:27.

Quickline Commucations logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Duke Street

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Duke Street, Luddenden, Sowerby Bridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 16 May 2025 at 11:13.

Quickline Commucations logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Railes Lane

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Railes Lane, Luddenden, Halifax.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 16 May 2025 at 11:13.

Quickline Commucations logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Ploughcroft Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Ploughcroft Lane, Boothtown, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 12 May 2025 at 10:58.

Quickline Commucations logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Ploughcroft Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Ploughcroft Lane, Boothtown, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 15 May 2025 at 09:22.

Quickline Commucations logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Straight Lane

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Straight Lane, Mixenden, Halifax.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 12 May 2025 at 10:39.

Quickline Commucations logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Straight Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Straight Lane, Mixenden, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 12 May 2025 at 12:49.

Quickline Commucations logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Straight Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Straight Lane, Mixenden, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 May 2025 at 09:20.

Northern Gas Networks logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Cold Edge Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cold Edge Road, Wainstalls, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 15:46.

Northern Gas Networks logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Cold Edge Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cold Edge Road, Wainstalls, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Apr 2025 at 09:39.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Westbury Road

City Of Bradford Metropolitan District Council are proposing to carry out Utility asset works on Westbury Road, Horton Bank Top, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 Apr 2025 at 11:52.

Northern Powergrid (Yorkshire) logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Brow Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Brow Lane, Clayton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Apr 2025 at 09:54.

Northern Powergrid (Yorkshire) logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Brow Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Brow Lane, Clayton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 May 2025 at 15:38.

Quickline Commucations logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Long Lane

Quickline Commucations are proposing to carry out Utility asset works on Long Lane, Norland, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 30 May 2025 at 11:03.

Quickline Commucations logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Watson Mill Lane

Quickline Commucations are proposing to carry out Utility asset works on Watson Mill Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 30 May 2025 at 11:04.

Yorkshire Water logo
LONG TERM
Between
26 Jun and 17 Aug 2025
Details
View Map
Share
Follow
Bradford Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bradford Road, Brighouse.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Mar 2025 at 10:25.

Yorkshire Water logo
LONG TERM
Between
26 Jun and 17 Aug 2025
Details
View Map
Share
Follow
Bradford Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bradford Road, Brighouse.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Mar 2025 at 12:56.

LONG TERM
Between
26 Jun 2025 and 1 Apr 2026
Details
View Map
Share
Lower Wyke Green

City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Lower Wyke Green, Lower Wyke, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 1 April 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Apr 2025 at 15:44.

LONG TERM
Between
26 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Westbury Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Westbury Road, Horton Bank Top, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Apr 2025 at 15:27.

Northern Powergrid (Yorkshire) logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Lane Head Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Lane Head Road, Ripponden, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the verge only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 Feb 2025 at 08:43.

Northern Powergrid (Yorkshire) logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Lane Head Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Lane Head Road, Ripponden, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the verge only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Mar 2025 at 12:42.

Northern Powergrid (Yorkshire) logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Soyland Town Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Soyland Town Road, Ripponden, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the verge only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 Feb 2025 at 08:43.

Northern Powergrid (Yorkshire) logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Soyland Town Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Soyland Town Road, Ripponden, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the verge only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Mar 2025 at 12:39.

Northern Gas Networks logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Greetland Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Greetland Road, Barkisland, Sowerby Bridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 May 2025 at 14:42.

Northern Powergrid (Yorkshire) logo
Between
30 Jun and 17 Jul 2025
Details
View Map
Share
Industrial Street

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Industrial Street, Brighouse.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 17 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Apr 2025 at 14:12.

Northern Gas Networks logo
LONG TERM
Between
30 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Holdsworth Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Holdsworth Road, Holmfield, Halifax.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 May 2025 at 10:50.

Northern Gas Networks logo
LONG TERM
Between
1 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Winding Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Winding Road, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Jan 2025 at 08:30.

Northern Gas Networks logo
LONG TERM
Between
1 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Wade Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wade Street, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Jan 2025 at 08:32.

BT logo
Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
Ovenden Avenue

BT are proposing to carry out Utility repair and maintenance works on Ovenden Avenue, Ovenden, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 May 2025 at 11:34.

Northern Powergrid (Yorkshire) logo
Between
6 and 9 Jul 2025
Details
View Map
Share
Follow
Allerton Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Allerton Lane, Allerton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2025 and could run through until 9 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Apr 2025 at 10:56.

Northern Powergrid (Yorkshire) logo
Between
6 and 9 Jul 2025
Details
View Map
Share
Follow
Allerton Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Allerton Lane, Allerton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2025 and could run through until 9 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 May 2025 at 08:27.

Virgin Media logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Boggart Lane

Virgin Media were proposing to carry out Utility repair and maintenance works on Boggart Lane, Sowerby Bridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 30 Apr 2025 at 10:25.

Virgin Media logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Boggart Lane

Virgin Media were proposing to carry out Utility repair and maintenance works on Boggart Lane, Sowerby Bridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 30 Apr 2025 at 10:24.

Northern Gas Networks logo
LONG TERM
Between
7 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Skircoat Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Skircoat Road, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 12:55.

Northern Gas Networks logo
LONG TERM
Between
7 Jul and 4 Oct 2025
Details
View Map
Share
Follow
Oxford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 4 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 12:36.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
7 Jul and 9 Aug 2025
Details
View Map
Share
Follow
Cow Green

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Cow Green, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 2 Jun 2025 at 10:01.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
7 Jul and 9 Aug 2025
Details
View Map
Share
Follow
Cow Green

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Cow Green, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 3 Jun 2025 at 11:17.

Quickline Commucations logo
Between
7 and 20 Jul 2025
Details
View Map
Share
Follow
Stocks Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Stocks Lane, Luddenden, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 20 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 23 May 2025 at 12:36.

Calderdale Metropolitan Borough Council logo
Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Jubilee Road

Calderdale Metropolitan Borough Council are proposing to carry out New service connection on Jubilee Road, Siddal, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 8 Apr 2025 at 09:37.

Calderdale Metropolitan Borough Council logo
Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Jubilee Road

Calderdale Metropolitan Borough Council are proposing to carry out New service connection on Jubilee Road, Siddal, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 8 Apr 2025 at 09:37.

BT logo
Between
10 and 14 Jul 2025
Details
View Map
Share
Ovenden Avenue

BT were proposing to carry out Utility repair and maintenance works on Ovenden Avenue, Ovenden, Halifax.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 14 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 30 May 2025 at 09:16.

Virgin Media logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Sowerby Croft Lane

Virgin Media were proposing to carry out Utility repair and maintenance works on Sowerby Croft Lane, Sowerby Bridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 30 Apr 2025 at 10:23.

Northern Powergrid (Yorkshire) logo
Between
14 and 31 Jul 2025
Details
View Map
Share
Gathorne Street

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Gathorne Street, Brighouse.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 31 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Apr 2025 at 14:15.

Northern Powergrid (Yorkshire) logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Bank Top

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Bank Top, Southowram, Halifax.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Apr 2025 at 10:20.

Northern Powergrid (Yorkshire) logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Bank Top

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Bank Top, Southowram, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 May 2025 at 09:24.

Northern Powergrid (Yorkshire) logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Bank Top

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Bank Top, Southowram, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 May 2025 at 10:56.

Northern Gas Networks logo
LONG TERM
Between
14 Jul and 10 Oct 2025
Details
View Map
Share
Follow
Oxford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 10:01.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Verdun Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Verdun Road, Buttershaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 16:12.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
St Helena Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on St Helena Road, Wibsey, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 14:12.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Reevy Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Reevy Road, Wibsey, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 14:16.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Reevy Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Reevy Road, Wibsey, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:33.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
St Helena Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on St Helena Road, Wibsey, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 14:16.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Torre Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Torre Road, Horton Bank Top, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:33.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Speeton Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Speeton Avenue, Horton Bank Top, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:12.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
20 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Bull Green

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Bull Green, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 15 May 2025 at 12:48.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Rochdale Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rochdale Road, Greetland, Elland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 May 2025 at 14:46.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Fore Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fore Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 May 2025 at 10:38.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Aachen Way

Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Aachen Way, King Cross, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and footpath.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 14 May 2025 at 08:35.

Calderdale Metropolitan Borough Council logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Aachen Way

Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Aachen Way, King Cross, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and footpath.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 14 May 2025 at 10:28.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Occupation Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Occupation Lane, Illingworth, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 May 2025 at 08:11.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Bradford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradford Road, Clayton, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Jan 2025 at 14:18.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Bradford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradford Road, Clayton, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Feb 2025 at 14:44.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hunters Park Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hunters Park Avenue, Clayton, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Jan 2025 at 14:30.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hunters Park Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hunters Park Avenue, Clayton, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Feb 2025 at 14:45.

Calderdale Metropolitan Borough Council logo
Between
23 and 31 Jul 2025
Details
View Map
Share
Follow
Crowtrees Lane

Calderdale Metropolitan Borough Council are proposing to carry out Section 50 on Crowtrees Lane, Rastrick, Brighouse.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 22 May 2025 at 14:40.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Park Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Park Road, Elland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Apr 2025 at 16:30.

Quickline Commucations logo
Between
23 and 29 Jul 2025
Details
View Map
Share
Follow
Duke Street

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Duke Street, Luddenden, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 16 May 2025 at 11:16.

Quickline Commucations logo
Between
23 and 29 Jul 2025
Details
View Map
Share
Follow
Railes Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Railes Lane, Luddenden, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 16 May 2025 at 11:15.

Yorkshire Water logo
Between
28 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Highfield Avenue

Yorkshire Water are proposing to carry out Utility asset works on Highfield Avenue, Bailiff Bridge, Brighouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Feb 2025 at 07:56.

Yorkshire Water logo
Between
28 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Highfield Avenue

Yorkshire Water are proposing to carry out Utility asset works on Highfield Avenue, Bailiff Bridge, Brighouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Mar 2025 at 09:06.

Yorkshire Water logo
Between
28 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Highfield Avenue

Yorkshire Water are proposing to carry out Utility asset works on Highfield Avenue, Bailiff Bridge, Brighouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Mar 2025 at 11:36.

Yorkshire Water logo
Between
28 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Highfield Avenue

Yorkshire Water are proposing to carry out Utility asset works on Highfield Avenue, Bailiff Bridge, Brighouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Mar 2025 at 16:36.

Northern Gas Networks logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Holdsworth Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Holdsworth Road, Holmfield, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 13:16.

Quickline Commucations logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Old Guy Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Old Guy Road, Queensbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 27 May 2025 at 16:06.

Quickline Commucations logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Alderscholes Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Alderscholes Lane, Thornton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 2 Jun 2025 at 11:53.

Quickline Commucations logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Lower Kipping Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Lower Kipping Lane, Thornton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 2 Jun 2025 at 11:52.

Northern Gas Networks logo
LONG TERM
Between
4 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Brow Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brow Lane, Holmfield, Halifax.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 May 2025 at 10:51.

Northern Powergrid (Yorkshire) logo
Between
7 and 29 Aug 2025
Details
View Map
Share
Houghton Street

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Houghton Street, Brighouse.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Apr 2025 at 14:16.

Northern Powergrid (Yorkshire) logo
Between
7 and 29 Aug 2025
Details
View Map
Share
Hardy Street

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Hardy Street, Brighouse.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Apr 2025 at 14:14.

Northern Powergrid (Yorkshire) logo
Between
7 and 29 Aug 2025
Details
View Map
Share
Hardy Street

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Hardy Street, Brighouse.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 17 Apr 2025 at 11:20.

LONG TERM
Between
17 Aug 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Lower Wyke Green

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Lower Wyke Green, Lower Wyke, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 August 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Apr 2025 at 16:21.

Northern Gas Networks logo
Between
18 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Stainland Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainland Road, Elland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 15:08.

Northern Gas Networks logo
Between
18 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Haugh End Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Haugh End Lane, Sowerby Bridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 May 2025 at 15:52.

Northern Gas Networks logo
Between
18 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Haugh End Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Haugh End Lane, Sowerby Bridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 May 2025 at 10:48.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Quarry Hill

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Quarry Hill, Sowerby Bridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 May 2025 at 11:04.

Northern Powergrid (Yorkshire) logo
Between
22 Aug and 11 Sep 2025
Details
View Map
Share
Rookery Place

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Rookery Place, Brighouse.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 August 2025 and run through until 11 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Apr 2025 at 14:16.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Halifax Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Halifax Road, Denholme, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 11:40.

Yorkshire Water logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Follow
Bairstow Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bairstow Lane, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 May 2025 at 08:08.

Yorkshire Water logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Follow
Carlton Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Carlton Street, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 May 2025 at 14:41.

Calderdale Metropolitan Borough Council logo
Between
25 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Winding Road

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Winding Road, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 15 May 2025 at 12:48.

Calderdale Metropolitan Borough Council logo
Between
25 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Cross Hills

Calderdale Metropolitan Borough Council are proposing to carry out Highway improvement works on Cross Hills, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Calderdale Metropolitan Borough Council on 15 May 2025 at 12:50.

LONG TERM
Between
25 Aug and 12 Dec 2025
Details
View Map
Share
Follow
Long Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Long Lane, Queensbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 23 Apr 2025 at 11:25.

LONG TERM
Between
25 Aug and 12 Dec 2025
Details
View Map
Share
Follow
Long Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Long Lane, Queensbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Apr 2025 at 16:05.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 4 Oct 2025
Details
View Map
Share
Follow
Savile Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Savile Road, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 4 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 13:13.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 4 Oct 2025
Details
View Map
Share
Follow
Prescott Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Prescott Street, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 4 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 13:12.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 4 Oct 2025
Details
View Map
Share
Follow
Harrison Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrison Road, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 4 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Northern Gas Networks on 27 Mar 2025 at 11:24.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 4 Oct 2025
Details
View Map
Share
Follow
Harrison Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrison Road, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 4 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Northern Gas Networks on 31 Mar 2025 at 11:08.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 4 Oct 2025
Details
View Map
Share
Follow
Harrison Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrison Road, Halifax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 4 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 15:27.

Yorkshire Water logo
Between
27 and 31 Aug 2025
Details
View Map
Share
Follow
Corporation Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Corporation Street, Sowerby Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 May 2025 at 14:54.


Roadworks Map near to Princeton Close, HALIFAX, HX2 0US (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 15:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Princeton Close, HALIFAX, HX2 0US (39 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
LONG LANE, WHEATLEY 
(0.1 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 29 May 2025 09:30
(Scheduled: 29 May 2025 - 3 Jun 2025)
0.1
Details
Share
Follow
2
Yorkshire Water logo
MAJOR
  
HEBBLE LANE, WHEATLEY 
(0.1 miles)
Yorkshire Water
Utility repair and maintenance works - Carriageway - Road closure
Complete
17 Feb 2025 08:00 - 2 May 2025 13:30
0.1
Details
Share
3
Yorkshire Water logo
CITY LANE, WHEATLEY 
(0.1 miles)
Yorkshire Water
Utility repair and maintenance works - Carriageway - Multi-way signals
Cancelled
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
0.1
Details
Share
4
Yorkshire Water logo
MAJOR
  
MOUNT PELLON, PELLON 
(0.2 miles)
Yorkshire Water
Utility asset works - Carriageway - Road closure
Cancelled
(Scheduled: 2 Jun 2025 - 3 Jun 2025)
0.2
Details
Share
5
Yorkshire Water logo
MAJOR
  
MOUNT PELLON, PELLON 
(0.2 miles)
Yorkshire Water
Utility asset works - Carriageway - Road closure
Cancelled
(Scheduled: 2 Jun 2025 - 3 Jun 2025)
0.2
Details
Share
6
Yorkshire Water logo
MAJOR
  
MOUNT PELLON, PELLON 
(0.2 miles)
Yorkshire Water
Utility asset works - Carriageway - Road closure
Planned
Scheduled: 2 Jun 2025 - 3 Jun 2025
0.2
Details
Share
Follow
7
Yorkshire Water logo
MAJOR
  
MOUNT PELLON, PELLON 
(0.2 miles)
Yorkshire Water
Utility asset works - Carriageway - Road closure
Complete
2 Jun 2025 23:59 - 3 Jun 2025 05:00
0.2
Details
Share
8
Northern Gas Networks logo
MAJOR
  
WHEATLEY LANE, LEE MOUNT 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
Complete
29 Apr 2025 11:30 - 20 May 2025 14:00
0.4
Details
Share
9
Northern Gas Networks logo
MAJOR
  
WHEATLEY LANE, LEE MOUNT 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 6 May 2025 - 10 Jun 2025
0.4
Details
Share
Follow
10
Northern Gas Networks logo
MAJOR
  
BUXTON STREET, LEE MOUNT 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Complete
29 Apr 2025 11:30 - 20 May 2025 14:00
0.4
Details
Share
  • ...