ROADWORKS SUMMARY
Allensmore, HEREFORD, HR2 9BW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for HR2 9BW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Allensmore, HEREFORD, HR2 9BW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Western Power Distribution (West Midlands) logo
Until
28 Feb 2025
Details
View Map
Share
Follow
St Nicholas Street

Western Power Distribution (West Midlands) are carrying out New service connection on St Nicholas Street, Hereford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 10:30 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Feb 2025 at 10:45.

Cadent Gas logo
Between
7 and 27 Feb 2025
Details
View Map
Share
Follow
Oban Way

Cadent Gas are proposing to carry out Utility asset works on Oban Way, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 16:25.

Cadent Gas logo
LONG TERM
Until
13 May 2025
Details
View Map
Share
Follow
Waterfield Road

Cadent Gas are carrying out Utility asset works on Waterfield Road, Hereford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 10:00 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 10:19.

Western Power Distribution (West Midlands) logo
Finishing
Friday
Details
View Map
Share
Follow
Berrington Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Berrington Street, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Nov 2024 at 15:47.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
St Nicholas Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on St Nicholas Street, Hereford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Nov 2024 at 15:40.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Rothesay Mead

Cadent Gas are proposing to carry out Utility asset works on Rothesay Mead, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 10:30.

Western Power Distribution (West Midlands) logo
Finishing
Sunday
Details
View Map
Share
Follow
Kings Acre Road

Western Power Distribution (West Midlands) are carrying out Utility asset works on Kings Acre Road, Hereford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 February 2025 at 11:00 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 14 Feb 2025 at 11:43.

Cadent Gas logo
Between
15 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Hafod Road

Cadent Gas are proposing to carry out Utility asset works on Hafod Road, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 12:17.

Cadent Gas logo
Between
15 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Plough Lane

Cadent Gas are proposing to carry out Utility asset works on Plough Lane, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 12:01.

Cadent Gas logo
Between
15 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Plough Lane

Cadent Gas are proposing to carry out Utility asset works on Plough Lane, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 12:36.

Finishing
Sunday
Details
View Map
Share
B4349 From B4348 To Arkstone Court Road

Herefordshire Council were proposing to carry out Section 50 on B4349 From B4348 To Arkstone Court Road, Kingstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 5 Feb 2025 at 08:48.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Hafod Road

Cadent Gas are proposing to carry out Utility asset works on Hafod Road, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 13:05.

Finishing
Friday
Details
View Map
Share
Southbank Road

Herefordshire Council were proposing to carry out Highway repair and maintenance works on Southbank Road, Hereford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 3 Feb 2025 at 10:14.

Finishing
Friday
Details
View Map
Share
Follow
Southbank Road

Herefordshire Council are proposing to carry out Highway repair and maintenance works on Southbank Road, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 9 Oct 2024 at 11:08.

Welsh Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Widemarsh Street

Welsh Water are proposing to carry out Utility asset works on Widemarsh Street, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Welsh Water on 27 Jan 2025 at 11:33.

Welsh Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Chandos Street

Welsh Water are proposing to carry out Utility asset works on Chandos Street, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Welsh Water on 23 Dec 2024 at 12:51.

Between
1 and 31 Mar 2025
Details
View Map
Share
Follow
Blueschool Street

Herefordshire Council are proposing to carry out Core Sampling on Blueschool Street, Hereford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 7 Feb 2025 at 12:02.

Between
3 and 7 Mar 2025
Details
View Map
Share
A465 From Ruckhall Lane To B4349

Herefordshire Council were proposing to carry out Highway repair and maintenance works on A465 From Ruckhall Lane To B4349, Belmont.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Herefordshire Council on 12 Nov 2024 at 11:04.

Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Bewell Street

Herefordshire Council are proposing to carry out Highway repair and maintenance works on Bewell Street, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 21 Jan 2025 at 16:04.

LONG TERM
Between
3 Mar 2025 and 3 Mar 2026
Details
View Map
Share
Follow
Aubrey Street

Herefordshire Council are proposing to carry out roadworks on Aubrey Street, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 3 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 22 Jan 2025 at 13:10.

Cadent Gas logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Dunoon Mead

Cadent Gas are proposing to carry out Utility asset works on Dunoon Mead, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 10:29.

Between
5 and 7 Mar 2025
Details
View Map
Share
C1235 From Orcop Hill To The White House

Herefordshire Council were proposing to carry out Highway repair and maintenance works on C1235 From Orcop Hill To The White House, Orcop.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 7 Jan 2025 at 11:18.

Welsh Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Widemarsh Street

Welsh Water are proposing to carry out Utility asset works on Widemarsh Street, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Welsh Water on 12 Feb 2025 at 16:01.

Cadent Gas logo
LONG TERM
Between
17 Mar and 18 Apr 2025
Details
View Map
Share
A49 From J A465 Roundabout To J A438 Roundabout N

Cadent Gas were proposing to carry out Utility asset works on A49 From J A465 Roundabout To J A438 Roundabout N, County Of Herefordshire.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 18 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jan 2025 at 09:31.

BT logo
Between
17 and 23 Mar 2025
Details
View Map
Share
Follow
C1235 From A466 Lyston House To Birch View Orcop Hill

BT are proposing to carry out Utility asset works on C1235 From A466 Lyston House To Birch View Orcop Hill, Wormelow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 23 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 24 Dec 2024 at 08:50.

BT logo
Between
17 and 23 Mar 2025
Details
View Map
Share
Follow
C1235 From Orcop Hill To The White House

BT are proposing to carry out Utility asset works on C1235 From Orcop Hill To The White House, Orcop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 23 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 24 Dec 2024 at 08:48.

Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
C1261 From Bogmarsh Lane To Upper Bowl Cottage

Herefordshire Council are proposing to carry out Highway repair and maintenance works on C1261 From Bogmarsh Lane To Upper Bowl Cottage, Aconbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 5 Dec 2024 at 13:22.

Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
C1230 From B4348 To Knolton Brook

Herefordshire Council are proposing to carry out Highway repair and maintenance works on C1230 From B4348 To Knolton Brook, Much Dewchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 5 Dec 2024 at 13:25.

Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Barton Road

Herefordshire Council are proposing to carry out Highway improvement works on Barton Road, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 17 Jan 2025 at 13:01.

Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
A466 From A49 To Broadway

Herefordshire Council are proposing to carry out Highway repair and maintenance works on A466 From A49 To Broadway, Wormelow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Herefordshire Council on 24 Sep 2024 at 13:09.

Cadent Gas logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Hafod Road

Cadent Gas were proposing to carry out Utility asset works on Hafod Road, Hereford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 15:38.

Western Power Distribution (West Midlands) logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Orchard Gardens

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Orchard Gardens, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 14 Feb 2025 at 14:27.

Between
25 Mar and 9 Apr 2025
Details
View Map
Share
Follow
C1098 From Lulham Cottage To Madley

Herefordshire Council are proposing to carry out Highway repair and maintenance works on C1098 From Lulham Cottage To Madley, Lulham Madley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 9 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Herefordshire Council on 30 Jan 2025 at 09:01.

Cadent Gas logo
Between
31 Mar and 18 Apr 2025
Details
View Map
Share
Grandstand Road

Cadent Gas were proposing to carry out Utility asset works on Grandstand Road, Hereford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 18 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 10:42.

Cadent Gas logo
LONG TERM
Between
31 Mar and 18 Jul 2025
Details
View Map
Share
Aylestone Hill

Cadent Gas were proposing to carry out Utility asset works on Aylestone Hill, Hereford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 09:51.

Cadent Gas logo
Between
31 Mar and 18 Apr 2025
Details
View Map
Share
Rockfield Road

Cadent Gas were proposing to carry out Utility asset works on Rockfield Road, Hereford.

These works were categorised as Major.

The works were originally planned to start 31 March 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 10:17.

BT logo
Between
31 Mar and 5 Apr 2025
Details
View Map
Share
Follow
C1235 From Orcop Hill To The White House

BT are proposing to carry out Utility asset works on C1235 From Orcop Hill To The White House, Orcop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 5 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 3 Jan 2025 at 11:15.

BT logo
Between
31 Mar and 5 Apr 2025
Details
View Map
Share
Follow
C1235 From Orcop Hill To The White House

BT are proposing to carry out Utility asset works on C1235 From Orcop Hill To The White House, Orcop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 5 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Jan 2025 at 12:01.

BT logo
Between
31 Mar and 5 Apr 2025
Details
View Map
Share
Follow
C1235 From A466 Lyston House To Birch View Orcop Hill

BT are proposing to carry out Utility asset works on C1235 From A466 Lyston House To Birch View Orcop Hill, Wormelow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 5 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 3 Jan 2025 at 10:31.

BT logo
Between
31 Mar and 5 Apr 2025
Details
View Map
Share
C1235 From A466 Lyston House To Birch View Orcop Hill

BT were proposing to carry out Utility asset works on C1235 From A466 Lyston House To Birch View Orcop Hill, Wormelow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 5 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Jan 2025 at 15:39.

LONG TERM
Between
1 Apr and 31 May 2025
Details
View Map
Share
Follow
Station Approach

Herefordshire Council are proposing to carry out Remedial works on Station Approach, Hereford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Herefordshire Council on 22 Jan 2025 at 09:44.

LONG TERM
Between
1 Apr and 31 May 2025
Details
View Map
Share
Follow
Station Approach

Herefordshire Council are proposing to carry out Remedial works on Station Approach, Hereford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Herefordshire Council on 22 Jan 2025 at 09:47.

LONG TERM
Between
1 Apr and 31 May 2025
Details
View Map
Share
Follow
Station Approach

Herefordshire Council are proposing to carry out Remedial works on Station Approach, Hereford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Herefordshire Council on 22 Jan 2025 at 09:50.

LONG TERM
Between
1 Apr and 31 May 2025
Details
View Map
Share
Follow
Station Approach

Herefordshire Council are proposing to carry out Remedial works on Station Approach, Hereford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Herefordshire Council on 22 Jan 2025 at 09:40.

LONG TERM
Between
1 Apr and 31 May 2025
Details
View Map
Share
Follow
Station Approach

Herefordshire Council are proposing to carry out Remedial works on Station Approach, Hereford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Herefordshire Council on 22 Jan 2025 at 09:53.

LONG TERM
Between
1 Apr and 31 May 2025
Details
View Map
Share
Follow
Station Approach

Herefordshire Council are proposing to carry out Remedial works on Station Approach, Hereford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Herefordshire Council on 22 Jan 2025 at 09:56.

Cadent Gas logo
Between
7 and 25 Apr 2025
Details
View Map
Share
Follow
Barklie Mead

Cadent Gas are proposing to carry out Utility asset works on Barklie Mead, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 12:24.

Cadent Gas logo
Between
7 and 25 Apr 2025
Details
View Map
Share
Follow
Sheridan Road

Cadent Gas are proposing to carry out Utility asset works on Sheridan Road, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 12:25.

Cadent Gas logo
Between
7 and 25 Apr 2025
Details
View Map
Share
Grandstand Road

Cadent Gas were proposing to carry out Utility asset works on Grandstand Road, Hereford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 08:24.

Cadent Gas logo
Between
12 and 27 Apr 2025
Details
View Map
Share
White Horse Street

Cadent Gas were proposing to carry out Utility asset works on White Horse Street, Hereford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 April 2025 and run through until 27 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 16:55.

Cadent Gas logo
Between
12 and 27 Apr 2025
Details
View Map
Share
Follow
White Horse Street

Cadent Gas are proposing to carry out Utility asset works on White Horse Street, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 14:14.

Cadent Gas logo
Between
14 Apr and 9 May 2025
Details
View Map
Share
Follow
Warncombe Link

Cadent Gas are proposing to carry out Utility asset works on Warncombe Link, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 12:37.

Between
15 and 17 Apr 2025
Details
View Map
Share
C1224 Blackbush To Oakdene Court

Herefordshire Council were proposing to carry out Highway repair and maintenance works on C1224 Blackbush To Oakdene Court, Abbeydore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 4 Feb 2025 at 09:13.

Western Power Distribution (West Midlands) logo
Between
16 and 25 Apr 2025
Details
View Map
Share
Follow
Kings Acre Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Kings Acre Road, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 15 Jan 2025 at 10:56.

Cadent Gas logo
LONG TERM
Between
21 Apr and 6 Jun 2025
Details
View Map
Share
Three Elms Road

Cadent Gas were proposing to carry out Utility asset works on Three Elms Road, Hereford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 11:19.

Western Power Distribution (West Midlands) logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Gaol Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Gaol Street, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 15 Jan 2025 at 16:28.

Between
23 Apr and 9 May 2025
Details
View Map
Share
Follow
Station Approach

Herefordshire Council are proposing to carry out Section 50 on Station Approach, Hereford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 14 Feb 2025 at 12:44.

Between
5 and 10 May 2025
Details
View Map
Share
Follow
B4348 From A465 To C1228 Haywood Road

Herefordshire Council are proposing to carry out Highway improvement works on B4348 From A465 To C1228 Haywood Road, Tram Inn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 7 Feb 2025 at 15:14.

Cadent Gas logo
Between
6 and 26 May 2025
Details
View Map
Share
Follow
Oak Crescent

Cadent Gas are proposing to carry out Utility asset works on Oak Crescent, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 16:00.

Cadent Gas logo
LONG TERM
Between
6 May and 9 Jun 2025
Details
View Map
Share
Oak Crescent

Cadent Gas were proposing to carry out Utility asset works on Oak Crescent, Hereford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 16:20.

Cadent Gas logo
Between
6 and 23 May 2025
Details
View Map
Share
Follow
Grosvenor Place

Cadent Gas are proposing to carry out Utility asset works on Grosvenor Place, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 10:01.

Cadent Gas logo
Between
6 and 23 May 2025
Details
View Map
Share
Follow
Grosvenor Place

Cadent Gas are proposing to carry out Utility asset works on Grosvenor Place, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 16:19.

Cadent Gas logo
Between
6 and 23 May 2025
Details
View Map
Share
Follow
Grandstand Road

Cadent Gas are proposing to carry out Utility asset works on Grandstand Road, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 12:49.

Cadent Gas logo
Between
6 and 23 May 2025
Details
View Map
Share
Follow
Grandstand Road

Cadent Gas are proposing to carry out Utility asset works on Grandstand Road, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 16:17.

Western Power Distribution (West Midlands) logo
Between
11 and 20 May 2025
Details
View Map
Share
Follow
Gaol Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Gaol Street, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Feb 2025 at 15:03.

Western Power Distribution (West Midlands) logo
Between
11 and 20 May 2025
Details
View Map
Share
Follow
Gaol Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Gaol Street, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 13 Feb 2025 at 16:14.

Between
12 and 16 May 2025
Details
View Map
Share
Follow
B4348 From C1228 Haywood Road To Mount View

Herefordshire Council are proposing to carry out Highway improvement works on B4348 From C1228 Haywood Road To Mount View, Much Dewchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Herefordshire Council on 10 Feb 2025 at 11:58.

Western Power Distribution (West Midlands) logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Orchard Gardens

Western Power Distribution (West Midlands) are proposing to carry out Disconnection or alteration of supply on Orchard Gardens, Hereford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Feb 2025 at 15:48.

Cadent Gas logo
Between
12 and 30 May 2025
Details
View Map
Share
Follow
Connaught Place

Cadent Gas are proposing to carry out Utility asset works on Connaught Place, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 12:53.

Cadent Gas logo
Between
12 and 30 May 2025
Details
View Map
Share
Follow
Connaught Place

Cadent Gas are proposing to carry out Utility asset works on Connaught Place, Hereford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 16:16.


Roadworks Map near to Allensmore, HEREFORD, HR2 9BW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Feb 2025 10:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Allensmore, HEREFORD, HR2 9BW (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.