ROADWORKS SUMMARY
Woodside Road, BEACONSFIELD, HP9 1JG
Introduction

View current and future planned roadworks and road closures for Woodside Road, HP9 1JG and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Woodside Road, BEACONSFIELD, HP9 1JG
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Woodside Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
7 Jul 2025
Buckinghamshire Council are carrying out roadworks on Bourne End Road, Hedsor.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 7 July 2024 at 09:00 and could run through until 7 July 2025. The works will impact the verge only.
This roadwork event was last updated by Buckinghamshire Council on 18 Jul 2024 at 08:52.
28 Feb and 11 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 11:17.
17 Jun 2025
Cadent Gas are carrying out Utility asset works on Sutton Road, Cookham, Maidenhead.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 11:06 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 13:31.
14 Apr and 24 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 10:25.
16 Apr and 24 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Sutton Road, Cookham, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 24 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 22 Jan 2025 at 13:26.
21 Apr and 6 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Green Hill, Terriers, High Wycombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 April 2025 and run through until 6 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 19:55.
1 May and 31 Jul 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on St Johns Road, Tylers Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Buckinghamshire Council on 19 Feb 2025 at 10:02.
19 Jun 2025
Cadent Gas are carrying out Utility asset works on Orchard Road, Seer Green.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 May 2025 at 13:08 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 May 2025 at 13:20.
Monday
Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 08:46.
Monday
Cadent Gas were proposing to carry out Utility asset works on Green Lane, Burnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 16:46.
20 May and 23 Jun 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Denham Lane, Chalfont St Peter.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 May 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Feb 2025 at 16:14.
Tomorrow
Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 14:48.
24 May and 29 Jul 2025
Eunetworks were proposing to carry out Utility asset works on London Road, High Wycombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 May 2025 and run through until 29 July 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 16 May 2025 at 11:35.
25 May and 16 Jun 2025
Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 14:40.
26 May and 20 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Bulstrode Way, Gerrards Cross.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 15:30.
27 May and 13 Jun 2025
Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Marlow Hill, High Wycombe.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 22 May 2025 at 09:51.
27 May and 13 Jun 2025
Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on A404 M40 J4 Roundabout, Wycombe.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 22 May 2025 at 09:51.
Monday
Cadent Gas are proposing to carry out Utility asset works on Desborough Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:10.
Monday
Cadent Gas are proposing to carry out Utility asset works on Desborough Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 14:10.
Monday
Cadent Gas were proposing to carry out Utility asset works on Desborough Road, High Wycombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 15:13.
Thursday
Thames Water are carrying out Utility repair and maintenance works on One Pin Lane, Farnham Common.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 May 2025 at 11:00 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 08:51.
Tomorrow
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Green Lane, Burnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 15 May 2025 at 12:40.
2 and 22 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Bulstrode Way, Gerrards Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 09:20.
2 and 13 Jun 2025
Buckinghamshire Council are proposing to carry out New service connection on West End Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Buckinghamshire Council on 20 May 2025 at 12:26.
2 and 13 Jun 2025
Buckinghamshire Council are proposing to carry out New service connection on West End Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Buckinghamshire Council on 30 May 2025 at 09:59.
Friday
Buckinghamshire Council are carrying out Highway repair and maintenance works on Cherry Lane, Woodrow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 6 June 2025. The works will impact the verge only.
This roadwork event was last updated by Buckinghamshire Council on 2 Jun 2025 at 09:58.
Today
Buckinghamshire Council are carrying out Highway improvement works on West Hyde Lane, Chalfont St Peter.
The road is closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 3 June 2025 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 3 Jun 2025 at 13:41.
Buckinghamshire Council carried out Highway improvement works on West Hyde Lane, Chalfont St Peter.
The road was closed for some or all of the period.
The works were completed on 3 June 2025 The works impacted the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 3 Jun 2025 at 14:07.
Today
Buckinghamshire Council are carrying out Highway repair and maintenance works on Bowerdean Road, Totteridge, High Wycombe.
The road is closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 3 June 2025 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 3 Jun 2025 at 13:13.
Monday
Buckinghamshire Council are proposing to carry out Highway improvement works on Dale Side, Gerrards Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 28 Jan 2025 at 12:08.
6 and 12 Jun 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on St Johns Road, Tylers Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 13:25.
6 and 12 Jun 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Kingswood Road, Tylers Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 13:28.
6 and 23 Jun 2025
Telefonica UK are proposing to carry out Utility asset works on Amersham Road, Hazlemere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 3 Apr 2025 at 15:03.
9 and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Bentinck Close, Gerrards Cross.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 09:46.
9 and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Bentinck Close, Gerrards Cross.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:34.
9 Jun and 24 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Amersham Road, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 24 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 7 Apr 2025 at 12:31.
10 and 12 Jun 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on The Brow, Chalfont St Giles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 28 Jan 2025 at 12:11.
10 and 12 Jun 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Stylecroft Road, Chalfont St Giles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 28 Jan 2025 at 12:10.
10 and 12 Jun 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Valentine Way, Chalfont St Giles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 28 Jan 2025 at 12:11.
11 and 13 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Spring Gardens Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Apr 2025 at 14:31.
11 and 13 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Spring Gardens Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 May 2025 at 11:07.
16 and 19 Jun 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Penn Road, Beaconsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:31.
16 and 21 Jun 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Daws Hill Lane, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 June 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 18 Mar 2025 at 13:45.
16 and 21 Jun 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Daws Hill Lane, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 June 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 20 Mar 2025 at 09:45.
16 and 21 Jun 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Daws Hill Lane, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 June 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 27 Mar 2025 at 08:38.
16 and 18 Jun 2025
Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Amersham Hill, Totteridge, High Wycombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Feb 2025 at 14:18.
16 and 18 Jun 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Amersham Hill, Totteridge, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 19 Feb 2025 at 10:16.
16 and 18 Jun 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Brook Street, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 12:21.
16 and 18 Jun 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Brook Street, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 15:15.
18 Jun and 15 Jul 2025
G2 Energy IDNO are proposing to carry out Utility asset works on Amersham Road, Penn Street.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 15 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 20 Feb 2025 at 12:27.
21 and 23 Jun 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Amersham Road, Amersham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Apr 2025 at 09:59.
23 and 27 Jun 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Farnham Park Lane, Farnham Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 3 Apr 2025 at 09:31.
23 and 27 Jun 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Farnham Park Lane, Farnham Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 30 Apr 2025 at 11:38.
23 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Farnham Royal Footpath 4, Farnham Common.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 May 2025 at 11:46.
23 and 27 Jun 2025
BT are proposing to carry out Utility asset works on Winter Hill, Cookham, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 28 Mar 2025 at 07:49.
23 and 27 Jun 2025
Neoscorp are proposing to carry out Utility asset works on Coldmoorholme Lane, Well End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Neoscorp on 27 Mar 2025 at 12:30.
23 and 27 Jun 2025
Neoscorp are proposing to carry out Utility asset works on Coldmoorholme Lane, Well End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Neoscorp on 3 Apr 2025 at 09:26.
23 and 27 Jun 2025
Neoscorp are proposing to carry out Utility asset works on Coldmoorholme Lane, Well End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Neoscorp on 30 Apr 2025 at 11:39.
23 and 27 Jun 2025
Neoscorp are proposing to carry out Utility asset works on Coldmoorholme Lane, Well End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Neoscorp on 6 May 2025 at 13:16.
23 and 26 Jun 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Straight Bit, Flackwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:34.
23 Jun and 8 Aug 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Denham Lane, Chalfont St Peter.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Mar 2025 at 14:09.
23 Jun and 7 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Windrush Drive, Micklefield, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 9 May 2025 at 09:55.
25 Jun and 2 Jul 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Holtspur Lane, Wooburn Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:40.
25 Jun and 2 Jul 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Wooburn Green Lane, Holtspur, Beaconsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:41.
25 and 27 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on West End Street, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Apr 2025 at 13:24.
26 and 29 Jun 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Penn Road, Knotty Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 11 Feb 2025 at 12:05.
26 and 29 Jun 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Witheridge Lane, Knotty Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 11 Feb 2025 at 12:05.
26 and 29 Jun 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Clay Street, Knotty Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 11 Feb 2025 at 12:06.
26 Jun and 4 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Chippendale Close, Totteridge, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 1 May 2025 at 15:26.
30 Jun and 3 Jul 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Purton Lane, Farnham Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 3 Apr 2025 at 09:33.
30 Jun and 3 Jul 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Purton Lane, Farnham Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 30 Apr 2025 at 11:38.
30 Jun and 2 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Harvest Hill, Hedsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Apr 2025 at 11:44.
30 Jun and 17 Jul 2025
Telefonica UK are proposing to carry out Utility asset works on Amersham Road, Hazlemere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 16 Apr 2025 at 14:46.
30 Jun and 17 Jul 2025
Telefonica UK are proposing to carry out Utility asset works on Amersham Road, Hazlemere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 28 Apr 2025 at 11:41.
2 and 14 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Wheatley Way, Chalfont St Peter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 1 May 2025 at 14:47.
3 and 15 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on The Paddock, Chalfont St Peter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 1 May 2025 at 15:21.
7 and 25 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Christmas Lane, Farnham Common.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 10:12.
7 and 11 Jul 2025
BT are proposing to carry out Utility asset works on Winter Hill, Cookham, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 31 Mar 2025 at 15:25.
7 and 11 Jul 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Joiners Lane, Chalfont St Peter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 22 May 2025 at 12:32.
7 and 10 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on The Brow, Chalfont St Giles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 08:40.
7 and 10 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Stylecroft Road, Chalfont St Giles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 08:40.
7 and 10 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Valentine Way, Chalfont St Giles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 08:40.
7 and 10 Jul 2025
Affinity Water are proposing to carry out Utility asset works on Tower Road, Coleshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 3 Apr 2025 at 09:49.
9 and 11 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Blackpond Lane, Farnham Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 8 May 2025 at 09:14.
9 and 15 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Rawlings Lane, Seer Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 14:29.
11 and 16 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Dale Side, Gerrards Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 08:41.
13 and 17 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on White Lion Road, Amersham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 16 Apr 2025 at 08:47.
14 and 18 Jul 2025
Cadent Gas were proposing to carry out Disconnection or alteration of supply on Hawthorn Lane, Burnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 10:20.
14 and 18 Jul 2025
Thames Water are proposing to carry out New service connection on Kiln Lane, Cores End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 May 2025 at 10:34.
14 and 18 Jul 2025
Thames Water are proposing to carry out New service connection on Kiln Lane, Cores End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 May 2025 at 13:51.
14 Jul and 22 Aug 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Juniper Lane, Flackwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 27 Feb 2025 at 16:31.
14 Jul and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Hill Meadow, Coleshill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 13:40.
15 Jul and 9 Oct 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Lower Road, Cookham, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 11 Apr 2025 at 10:52.
21 and 23 Jul 2025
BT were proposing to carry out Utility asset works on Hawks Hill, Bourne End.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 13 May 2025 at 07:49.
21 and 23 Jul 2025
BT were proposing to carry out Utility asset works on Kiln Lane, Cores End.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 13 May 2025 at 07:52.
21 and 25 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Windrush Drive, Micklefield, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 3 Apr 2025 at 14:38.
22 and 24 Jul 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Egypt Lane, Farnham Common.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 9 May 2025 at 12:06.
22 and 24 Jul 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Egypt Lane, Farnham Common.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 29 May 2025 at 09:31.
22 and 25 Jul 2025
Thames Water are proposing to carry out New service connection on Hedsor Lane, Hedsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 25 July 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 9 May 2025 at 12:08.
22 and 28 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Maxwell Drive, Hazlemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 13:43.
23 and 28 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Dukes Wood Drive, Gerrards Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 08:41.
23 and 28 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Dukes Wood Avenue, Gerrards Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 08:41.
24 Jul and 2 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on The Pound, Cookham, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 09:19.
24 Jul and 12 Sep 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Marlow Road, Cressex, High Wycombe.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 July 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Aug 2024 at 13:40.
24 Jul and 12 Sep 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Carver Hill Road, High Wycombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 July 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Aug 2024 at 13:36.
24 and 29 Jul 2025
Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 29 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 14:57.
24 Jul and 12 Sep 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Desborough Avenue, High Wycombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 July 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Aug 2024 at 13:37.
24 Jul and 18 Sep 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Amersham Road, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 19 Mar 2025 at 09:40.
25 Jul and 31 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Denham Lane, Chalfont St Peter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Mar 2025 at 11:37.
25 Jul and 14 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Amersham Hill, Totteridge, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Jul 2024 at 10:02.
25 Jul and 4 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Amersham Road, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 08:55.
27 Jul and 14 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Beaconsfield Road, Farnham Royal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 July 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Jan 2024 at 12:15.
28 Jul and 29 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Christmas Lane, Farnham Common.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 12:07.
28 Jul and 22 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Cores End Road, Bourne End.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 22 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 09:39.
28 Jul and 1 Aug 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Windsor Hill, Wooburn Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 29 May 2025 at 09:13.
28 Jul and 1 Aug 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Windsor Hill, Wooburn Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 29 May 2025 at 15:37.
28 Jul and 24 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Chalfont St Peter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 14:24.
28 Jul and 31 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Station Road, Beaconsfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:37.
28 Jul and 31 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Station Road, Beaconsfield.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 31 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:59.
28 Jul and 22 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Bayne Hill, Seer Green.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 12:36.
28 Jul and 22 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Bayne Hill, Seer Green.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:35.
28 Jul and 5 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Chalfont Road, Seer Green.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 14:17.
28 Jul and 28 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Cressex, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 10:43.
28 Jul and 15 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Desborough Avenue, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Feb 2025 at 08:12.
28 Jul and 3 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Frances Dove Way, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 14:33.
28 Jul and 29 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Green Street, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Feb 2025 at 08:05.
28 Jul and 29 Aug 2025
Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Church Road, Tylers Green.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Apr 2025 at 15:32.
28 Jul and 2 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Magpie Lane, Coleshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:48.
28 Jul and 1 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Village Road, Little Missenden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 08:57.
28 Jul and 1 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Village Road, Little Missenden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 May 2025 at 09:01.
29 Jul and 1 Sep 2025
Eunetworks were proposing to carry out Utility asset works on London Road, Loudwater.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 July 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 3 Dec 2024 at 15:06.
30 Jul and 1 Aug 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Poyle Lane, Burnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 12:57.
30 Jul and 1 Aug 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Wymers Wood Road, Burnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 12:56.
30 Jul and 1 Aug 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Collinswood Road, Farnham Common.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 15 May 2025 at 12:50.
2 and 7 Aug 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Windsor Hill, Wooburn Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 9 Apr 2025 at 09:19.
4 Aug and 14 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Marlow Road, Little Marlow.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 12:58.
4 Aug and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Little Marlow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 11:19.
4 and 22 Aug 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Juniper Lane, Flackwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 10 Mar 2025 at 09:10.
4 and 26 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on School Lane, Seer Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 13:33.
4 and 26 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on School Lane, Seer Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:38.
4 and 26 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Bottom Lane, Seer Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:50.
4 Aug and 19 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Orchard Road, Seer Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:51.
4 and 6 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Easton Street, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 May 2025 at 11:14.
5 and 7 Aug 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Bottom Lane, Seer Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 20 Mar 2025 at 12:58.
11 Aug and 12 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Collinswood Road, Farnham Common.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:52.
11 Aug and 8 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Chalfont St Peter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 09:30.
11 and 24 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Orchard Road, Seer Green.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 24 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 May 2025 at 08:14.
12 and 18 Aug 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Piggotts Orchard, Amersham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 15:22.
12 and 18 Aug 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Piggotts End, Amersham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 15:23.
14 and 18 Aug 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Windsor Hill, Wooburn Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 16 May 2025 at 13:46.
14 and 19 Aug 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Lower Lodge Lane, Hazlemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 13:19.
18 and 19 Aug 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Wilton Lane, Jordans.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 16 May 2025 at 13:51.
18 and 19 Aug 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Wilton Lane, Jordans.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:44.
18 and 20 Aug 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Whielden Lane, Winchmore Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 20 Mar 2025 at 13:01.
19 and 22 Aug 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Egypt Lane, Farnham Common.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 16 May 2025 at 13:51.
19 and 22 Aug 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Egypt Lane, Farnham Common.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:45.
19 and 26 Aug 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Wheatley Way, Chalfont St Peter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 26 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 27 Mar 2025 at 12:24.
20 Aug and 21 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Gerrards Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 10:18.
20 and 26 Aug 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on School Road, Tylers Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 26 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 13:21.
23 and 26 Aug 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Straight Bit, Flackwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 August 2025 and could run through until 26 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 16 May 2025 at 11:44.
25 Aug and 2 Sep 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Holtspur Lane, Wooburn Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 16 May 2025 at 11:45.
25 Aug and 2 Sep 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Wooburn Green Lane, Holtspur, Beaconsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 16 May 2025 at 11:46.
25 Aug and 22 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Manor Way, Coleshill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 13:39.
26 and 30 Aug 2025
Hutchinson 3G are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 30 August 2025. The works will impact the verge only.
This roadwork event was last updated by Hutchinson 3G on 30 May 2025 at 09:51.
26 and 30 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on Bellfield Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 21 May 2025 at 13:46.
27 Aug and 2 Sep 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Hazlemere View, Hazlemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 13:38.
28 Aug and 2 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Station Road, Beaconsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 May 2025 at 11:54.
30 Aug and 2 Sep 2025
Vodafone are proposing to carry out Utility repair and maintenance works on Amersham Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 August 2025 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 23 May 2025 at 14:42.
Roadworks Map near to Woodside Road, BEACONSFIELD, HP9 1JG (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Woodside Road, BEACONSFIELD, HP9 1JG (7 Events)
(Scheduled Dates)
(miles)
(Scheduled: 3 Jun 2025 - 5 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.