ROADWORKS SUMMARY
Holtspur Top Lane, BEACONSFIELD, HP9 1DN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Holtspur Top Lane, HP9 1DN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Holtspur Top Lane, BEACONSFIELD, HP9 1DN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Holtspur Top Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Buckinghamshire Council logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Bourne End Road

Buckinghamshire Council are carrying out roadworks on Bourne End Road, Hedsor.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 7 July 2024 at 09:00 and could run through until 7 July 2025. The works will impact the verge only.

This roadwork event was last updated by Buckinghamshire Council on 18 Jul 2024 at 08:52.

Buckinghamshire Council logo
LONG TERM
Between
19 Aug 2024 and 31 May 2025
Details
View Map
Share
Follow
White Hart Street

Buckinghamshire Council are proposing to carry out Highway improvement works on White Hart Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 31 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 23 May 2024 at 10:18.

Buckinghamshire Council logo
LONG TERM
Between
28 Oct 2024 and 31 May 2025
Details
View Map
Share
Follow
White Hart Street

Buckinghamshire Council are proposing to carry out Highway improvement works on White Hart Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 11 Oct 2024 at 11:13.

Eunetworks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Desborough Road

Eunetworks were proposing to carry out Utility asset works on Desborough Road, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 29 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Aug 2024 at 12:40.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
19 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Lancaster Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 08:49.

Eunetworks logo
LONG TERM
Between
20 Nov 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Taplow Common Road

Eunetworks are proposing to carry out Utility asset works on Taplow Common Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 7 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Eunetworks on 9 Aug 2024 at 12:08.

Buckinghamshire Council logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Penn Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Penn Road, Hazlemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 29 Aug 2024 at 13:51.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 09:09.

Cadent Gas logo
LONG TERM
Until
15 Jan 2025
Details
View Map
Share
Follow
Ashtree Walk

Cadent Gas are carrying out Utility asset works on Ashtree Walk, Hazlemere.

These works are categorised as Major.

The works started on 2 December 2024 at 16:45 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:51.

Buckinghamshire Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Penn Road

Buckinghamshire Council are carrying out Highway repair and maintenance works on Penn Road, Hazlemere.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 00:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 4 Dec 2024 at 09:46.

Buckinghamshire Council logo
LONG TERM
Between
4 Dec 2024 and 5 Jan 2025
Details
View Map
Share
Follow
Penn Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Penn Road, Hazlemere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 5 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 2 Dec 2024 at 13:35.

Buckinghamshire Council logo
LONG TERM
Between
15 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Penn Road

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Penn Road, Hazlemere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 December 2024 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 9 Dec 2024 at 10:12.

Eunetworks logo
LONG TERM
Between
19 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Whitepit Lane

Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Wooburn Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 27 Aug 2024 at 15:35.

Scottish Hydro Electric Power Dis logo
Between
19 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Lancaster Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Oct 2024 at 11:01.

Scottish Hydro Electric Power Dis logo
Between
19 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Lancaster Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 07:22.

Scottish Hydro Electric Power Dis logo
Between
19 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Wellington Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wellington Road, Cressex Business Park, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Oct 2024 at 12:49.

Scottish Hydro Electric Power Dis logo
Between
19 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Wellington Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wellington Road, Cressex Business Park, High Wycombe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 08:50.

Thames Water logo
LONG TERM
Between
20 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 13:02.

Eunetworks logo
Between
26 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
White Hill

Eunetworks are proposing to carry out Utility asset works on White Hill, Beaconsfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 3 Oct 2024 at 14:13.

Eunetworks logo
Between
26 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
White Hill

Eunetworks are proposing to carry out Utility asset works on White Hill, Wooburn Moor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 3 Oct 2024 at 11:24.

Thames Water logo
LONG TERM
Between
27 Dec 2024 and 17 Feb 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 10:58.

Buckinghamshire Council logo
Between
1 and 6 Jan 2025
Details
View Map
Share
Follow
Wymers Wood Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Wymers Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 30 Sep 2024 at 11:03.

Eunetworks logo
Between
1 and 29 Jan 2025
Details
View Map
Share
Follow
Taplow Common Road

Eunetworks are proposing to carry out Utility asset works on Taplow Common Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:05.

Cityfibre Metro Networks logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Mount Hill Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Mount Hill Lane, Hedgerley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 14:31.

Buckinghamshire Council logo
Between
4 and 7 Jan 2025
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaconsfield Road, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Sep 2024 at 13:13.

Eunetworks logo
LONG TERM
Between
4 Jan and 11 Feb 2025
Details
View Map
Share
Follow
London Road

Eunetworks are proposing to carry out Utility asset works on London Road, Loudwater.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 10:06.

Eunetworks logo
LONG TERM
Between
4 Jan and 11 Feb 2025
Details
View Map
Share
Follow
London Road

Eunetworks are proposing to carry out Utility asset works on London Road, Loudwater.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 14:48.

Buckinghamshire Council logo
Between
4 and 15 Jan 2025
Details
View Map
Share
Follow
Deanway

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Deanway, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 14:13.

Buckinghamshire Council logo
Between
4 and 15 Jan 2025
Details
View Map
Share
Follow
High Street

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on High Street, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 14:14.

Buckinghamshire Council logo
Between
5 and 8 Jan 2025
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaconsfield Road, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 09:13.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 14:40.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 11:33.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 11:31.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Sutton Road

Cadent Gas are proposing to carry out Utility asset works on Sutton Road, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2024 at 12:12.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Sutton Road

Cadent Gas are proposing to carry out Utility asset works on Sutton Road, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 10:02.

Cadent Gas logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:59.

Buckinghamshire Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Purton Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Purton Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Sep 2024 at 15:53.

Cadent Gas logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 15:07.

Cadent Gas logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 10:25.

Cadent Gas logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 11:29.

Cadent Gas logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
School Lane

Cadent Gas are proposing to carry out Utility asset works on School Lane, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 15:09.

Cadent Gas logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
School Lane

Cadent Gas are proposing to carry out Utility asset works on School Lane, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 10:25.

Cadent Gas logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
School Lane

Cadent Gas are proposing to carry out Utility asset works on School Lane, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 11:29.

Eunetworks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 08:54.

Eunetworks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 23 Aug 2024 at 16:07.

Eunetworks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:38.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Marlow Road

Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Little Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:32.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Marlow Road

Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Little Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 12:03.

Eunetworks logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Broad Lane

Eunetworks are proposing to carry out Utility asset works on Broad Lane, Beaconsfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 28 Nov 2024 at 12:57.

Eunetworks logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Broad Lane

Eunetworks were proposing to carry out roadworks on Broad Lane, Beaconsfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 28 Nov 2024 at 13:01.

Buckinghamshire Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Town Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Town Lane, Wooburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Dec 2024 at 13:33.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
West Common

Cadent Gas are proposing to carry out Utility asset works on West Common, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 15:05.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
West Common

Cadent Gas were proposing to carry out Utility asset works on West Common, Gerrards Cross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 09:13.

Cadent Gas logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Loudwater.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 11:26.

Eunetworks logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Desborough Avenue

Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:40.

Eunetworks logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Desborough Avenue

Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 27 Sep 2024 at 09:49.

Buckinghamshire Council logo
Between
6 and 11 Jan 2025
Details
View Map
Share
Follow
Bottrells Lane

Buckinghamshire Council are proposing to carry out Section 50 on Bottrells Lane, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Dec 2024 at 14:40.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Marrods Bottom

Cadent Gas are proposing to carry out Utility asset works on Marrods Bottom, Winchmore Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 12:06.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Fagnall Lane

Cadent Gas are proposing to carry out Utility asset works on Fagnall Lane, Winchmore Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:33.

Buckinghamshire Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Penn Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Penn Road, Hazlemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 2 Dec 2024 at 13:31.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Oakengrove Lane

Cadent Gas are proposing to carry out Utility asset works on Oakengrove Lane, Hazlemere.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 10:11.

Eunetworks logo
Between
7 and 23 Jan 2025
Details
View Map
Share
Follow
Gore Road

Eunetworks are proposing to carry out Utility asset works on Gore Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 14 Aug 2024 at 11:35.

Eunetworks logo
Between
7 and 23 Jan 2025
Details
View Map
Share
Follow
Gore Road

Eunetworks are proposing to carry out Utility asset works on Gore Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 15:15.

Eunetworks logo
Between
7 and 23 Jan 2025
Details
View Map
Share
Follow
Gore Road

Eunetworks are proposing to carry out Utility asset works on Gore Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 11:21.

Network Rail logo
Between
7 and 11 Jan 2025
Details
View Map
Share
Maidenhead Road

Network Rail were proposing to carry out Works for Rail Purposes on Maidenhead Road, Cookham, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 11 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 16:01.

Eunetworks logo
LONG TERM
Between
7 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:07.

Cityfibre Metro Networks logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Mount Hill Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Mount Hill Lane, Hedgerley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Dec 2024 at 10:51.

Eunetworks logo
Between
7 and 27 Jan 2025
Details
View Map
Share
London Road

Eunetworks were proposing to carry out Utility asset works on London Road, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 3 Dec 2024 at 09:43.

Eunetworks logo
Between
7 and 22 Jan 2025
Details
View Map
Share
Follow
Dashwood Avenue

Eunetworks are proposing to carry out Utility asset works on Dashwood Avenue, Sands, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 13:51.

Thames Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Hedsor Hill

Thames Water were proposing to carry out Utility repair and maintenance works on Hedsor Hill, Hedsor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 11:43.

Buckinghamshire Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Harvest Hill

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Harvest Hill, Hedsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 10 Dec 2024 at 11:53.

Buckinghamshire Council logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Follow
Green Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Green Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 11:42.

Buckinghamshire Council logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Follow
Green Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Green Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Oct 2024 at 09:33.

Eunetworks logo
Between
10 and 24 Jan 2025
Details
View Map
Share
Follow
Gore Road

Eunetworks are proposing to carry out Utility asset works on Gore Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 25 Oct 2024 at 09:44.

Eunetworks logo
Between
10 and 24 Jan 2025
Details
View Map
Share
Follow
Gore Road

Eunetworks are proposing to carry out Utility asset works on Gore Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 25 Oct 2024 at 13:27.

Cadent Gas logo
LONG TERM
Between
10 Jan and 20 Feb 2025
Details
View Map
Share
Hedgerley Lane

Cadent Gas were proposing to carry out Utility asset works on Hedgerley Lane, Gerrards Cross.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 January 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 15:17.

Cityfibre Metro Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Coronation Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Oct 2024 at 10:40.

Cityfibre Metro Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Coronation Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 7 Nov 2024 at 11:20.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Coleshill Lane

Cadent Gas are proposing to carry out Utility asset works on Coleshill Lane, Coleshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 12:09.

Cadent Gas logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Follow
Firs Walk

Cadent Gas are proposing to carry out Utility asset works on Firs Walk, Hazlemere.

These works are categorised as Major.

The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 09:28.

Eunetworks logo
Between
14 and 29 Jan 2025
Details
View Map
Share
Follow
Town Lane

Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 14 Aug 2024 at 11:36.

Eunetworks logo
Between
14 and 29 Jan 2025
Details
View Map
Share
Follow
Town Lane

Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:26.

Eunetworks logo
Between
14 and 29 Jan 2025
Details
View Map
Share
Follow
Town Lane

Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 5 Nov 2024 at 13:01.

Thames Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Bellfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bellfield Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:55.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 09:07.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 2 Sep 2024 at 09:58.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:36.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 1 Nov 2024 at 13:37.

T-Mobile (UK) logo
Between
16 and 24 Jan 2025
Details
View Map
Share
Follow
Daws Hill Lane

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 24 Oct 2024 at 14:02.

T-Mobile (UK) logo
Between
16 and 24 Jan 2025
Details
View Map
Share
Daws Hill Lane

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Daws Hill Lane, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 January 2025 and run through until 24 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 31 Oct 2024 at 14:50.

Affinity Water logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Shepherds Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Shepherds Lane, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Oct 2024 at 14:34.

Affinity Water logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Shepherds Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Shepherds Lane, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 08:47.

Nexfibre Networks Limited logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Victoria Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Oct 2024 at 14:27.

Buckinghamshire Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Little Marlow Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Little Marlow Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Dec 2024 at 13:43.

Cadent Gas logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:34.

Cadent Gas logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:17.

Cadent Gas logo
LONG TERM
Between
20 Jan and 21 Jul 2025
Details
View Map
Share
Follow
Marlow Bottom

Cadent Gas are proposing to carry out Utility asset works on Marlow Bottom, Marlow Bottom.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:44.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Shepherds Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Shepherds Lane, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 14:53.

Buckinghamshire Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Stratton Road

Buckinghamshire Council are proposing to carry out Section 50 on Stratton Road, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Dec 2024 at 09:28.

Buckinghamshire Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Stratton Road

Buckinghamshire Council are proposing to carry out Section 50 on Stratton Road, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Dec 2024 at 10:03.

Buckinghamshire Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Maxwell Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Maxwell Road, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Oct 2024 at 09:01.

Buckinghamshire Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Maxwell Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Maxwell Road, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 25 Oct 2024 at 13:17.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Gordon Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Gordon Way, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Oct 2024 at 14:35.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Gordon Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Gordon Way, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 14:30.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Gordon Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Gordon Way, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 15:50.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Marrods Bottom

Cadent Gas are proposing to carry out Utility asset works on Marrods Bottom, Winchmore Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:18.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Fagnall Lane

Cadent Gas are proposing to carry out Utility asset works on Fagnall Lane, Winchmore Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:38.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Coleshill Lane

Cadent Gas are proposing to carry out Utility asset works on Coleshill Lane, Coleshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:28.

Nexfibre Networks Limited logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Totteridge Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Totteridge Lane, Totteridge, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 3 Oct 2024 at 11:28.

Cadent Gas logo
LONG TERM
Between
20 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Magpie Lane

Cadent Gas are proposing to carry out Utility asset works on Magpie Lane, Coleshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:21.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Chalk Hill

Cadent Gas are proposing to carry out Utility asset works on Chalk Hill, Coleshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:36.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Sampsons Hill

Cadent Gas are proposing to carry out Utility asset works on Sampsons Hill, Coleshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:27.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Barrack Hill

Cadent Gas are proposing to carry out Utility asset works on Barrack Hill, Coleshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:39.

Eunetworks logo
Between
21 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Daws Hill Lane

Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Aug 2024 at 11:36.

Eunetworks logo
Between
21 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Daws Hill Lane

Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:37.

Buckinghamshire Council logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Chippendale Close

Buckinghamshire Council are proposing to carry out Highway improvement works on Chippendale Close, Totteridge, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Dec 2024 at 13:55.

Eunetworks logo
Between
23 and 28 Jan 2025
Details
View Map
Share
Follow
Copyground Lane

Eunetworks are proposing to carry out Utility asset works on Copyground Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 14 Oct 2024 at 12:00.

Eunetworks logo
Between
23 and 28 Jan 2025
Details
View Map
Share
Follow
Copyground Lane

Eunetworks are proposing to carry out Utility asset works on Copyground Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 24 Oct 2024 at 14:39.

Eunetworks logo
Between
25 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Straight Bit

Eunetworks are proposing to carry out Utility asset works on Straight Bit, Flackwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 11:28.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Cliveden Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cliveden Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 15:11.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 10:54.

South East Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Startins Lane

South East Water are proposing to carry out Utility repair and maintenance works on Startins Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 23 Oct 2024 at 14:54.

South East Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Startins Lane

South East Water are proposing to carry out Utility repair and maintenance works on Startins Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 19 Nov 2024 at 10:31.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Glade Road

Thames Water are proposing to carry out New service connection on Glade Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 15:05.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Glade Road

Thames Water were proposing to carry out New service connection on Glade Road, Marlow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 11:34.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Glade Road

Thames Water are proposing to carry out New service connection on Glade Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 11:23.

Buckinghamshire Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hedgerley Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Hedgerley Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 10:53.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility asset works on Park Lane, Beaconsfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 14:24.

Cadent Gas logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Desborough Road

Cadent Gas are proposing to carry out Utility asset works on Desborough Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 13:51.

Cadent Gas logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Desborough Road

Cadent Gas are proposing to carry out Utility asset works on Desborough Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:05.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Sampsons Hill

Cadent Gas are proposing to carry out Utility asset works on Sampsons Hill, Coleshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 13:47.

Buckinghamshire Council logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Widmoor

Buckinghamshire Council are proposing to carry out Core Sampling on Widmoor, Wooburn Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 14:11.

Buckinghamshire Council logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Kiln Lane

Buckinghamshire Council are proposing to carry out Core Sampling on Kiln Lane, Cores End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 14:09.

Eunetworks logo
Between
28 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Straight Bit

Eunetworks are proposing to carry out Utility asset works on Straight Bit, Flackwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 18 Oct 2024 at 12:17.

Eunetworks logo
Between
28 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Frances Dove Way

Eunetworks are proposing to carry out Utility asset works on Frances Dove Way, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 17 Oct 2024 at 11:17.

Eunetworks logo
Between
28 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Frances Dove Way

Eunetworks are proposing to carry out Utility asset works on Frances Dove Way, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 14:21.

Eunetworks logo
Between
29 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Wooburn Town

Eunetworks are proposing to carry out Utility asset works on Wooburn Town, Wooburn Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 24 Sep 2024 at 14:57.

Eunetworks logo
Between
29 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Plumer Road

Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 13:53.

BT logo
Between
1 and 3 Feb 2025
Details
View Map
Share
Follow
Forty Green Road

BT are proposing to carry out Utility asset works on Forty Green Road, Forty Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 12 Nov 2024 at 14:38.

Eunetworks logo
Between
1 and 16 Feb 2025
Details
View Map
Share
Follow
Desborough Avenue

Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 4 Dec 2024 at 11:45.

LONG TERM
Between
3 Feb and 20 Mar 2025
Details
View Map
Share
Follow
Long Furlong Drive

Optimal Power Networks are proposing to carry out Utility asset works on Long Furlong Drive, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 22 May 2024 at 07:28.

Buckinghamshire Council logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Purton Lane

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Purton Lane, Farnham Royal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Sep 2024 at 11:32.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Hawks Hill

BT are proposing to carry out Utility asset works on Hawks Hill, Bourne End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 30 Oct 2024 at 15:01.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Kiln Lane

BT are proposing to carry out Utility asset works on Kiln Lane, Cores End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 30 Oct 2024 at 15:00.

Buckinghamshire Council logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Bottom Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Bottom Lane, Seer Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 14:15.

Eunetworks logo
Between
3 and 9 Feb 2025
Details
View Map
Share
Follow
Suffield Hill

Eunetworks are proposing to carry out Utility asset works on Suffield Hill, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:45.

Cadent Gas logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Chalk Hill

Cadent Gas are proposing to carry out Utility asset works on Chalk Hill, Coleshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 13:47.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 09:08.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:35.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 18 Oct 2024 at 09:35.

Eunetworks logo
Between
4 and 28 Feb 2025
Details
View Map
Share
Follow
Wash Hill

Eunetworks are proposing to carry out Utility asset works on Wash Hill, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Aug 2024 at 11:36.

Eunetworks logo
Between
4 and 28 Feb 2025
Details
View Map
Share
Follow
Wash Hill

Eunetworks are proposing to carry out Utility asset works on Wash Hill, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 09:00.

Eunetworks logo
Between
8 and 23 Feb 2025
Details
View Map
Share
Follow
Suffield Road

Eunetworks are proposing to carry out Utility asset works on Suffield Road, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:48.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:09.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Gerrards Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 14:59.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Gerrards Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:57.

Cadent Gas logo
LONG TERM
Between
10 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Chalfont St Peter.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:00.

Cadent Gas logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Chalfont St Peter.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 10:07.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
West End Street

Thames Water are proposing to carry out Utility repair and maintenance works on West End Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 14:23.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
West End Street

Thames Water are proposing to carry out Utility repair and maintenance works on West End Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 09:09.

Eunetworks logo
Between
10 and 23 Feb 2025
Details
View Map
Share
Follow
Abercromby Avenue

Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 11 Dec 2024 at 09:07.

Eunetworks logo
Between
10 and 23 Feb 2025
Details
View Map
Share
Follow
Abercromby Avenue

Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 13 Dec 2024 at 11:19.

Cadent Gas logo
LONG TERM
Between
10 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Micklefield Road

Cadent Gas are proposing to carry out Utility asset works on Micklefield Road, Micklefield, High Wycombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 09:17.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Barrack Hill

Cadent Gas are proposing to carry out Utility asset works on Barrack Hill, Coleshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 13:40.

Buckinghamshire Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Brackley Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Brackley Road, Hazlemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Nov 2024 at 10:00.

Eunetworks logo
LONG TERM
Between
11 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road

Eunetworks are proposing to carry out Utility asset works on London Road, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 11:03.

Eunetworks logo
Between
12 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Heath End Road

Eunetworks are proposing to carry out Utility asset works on Heath End Road, Flackwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 14 Aug 2024 at 11:42.

Eunetworks logo
Between
15 and 24 Feb 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 10:11.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Town Lane

Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:17.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Town Lane

Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Sep 2024 at 13:09.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Whitepit Lane

Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Wooburn Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:04.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Whitepit Lane

Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Wooburn Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 24 Sep 2024 at 15:36.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
The Green

Eunetworks are proposing to carry out Utility asset works on The Green, Wooburn Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:23.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
The Green

Eunetworks are proposing to carry out Utility asset works on The Green, Wooburn Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Sep 2024 at 13:09.

Cadent Gas logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:11.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Daws Hill Lane

Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 15:30.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Daws Hill Lane

Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 12 Nov 2024 at 13:06.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Daws Hill Lane

Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 18 Nov 2024 at 08:56.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Desborough Avenue

Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:49.

Buckinghamshire Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Rectory Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Rectory Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Nov 2024 at 16:16.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Church Road

South East Water are proposing to carry out Utility repair and maintenance works on Church Road, Cookham Dean, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by South East Water on 25 Oct 2024 at 15:01.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Church Road

South East Water are proposing to carry out Utility repair and maintenance works on Church Road, Cookham Dean, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by South East Water on 19 Nov 2024 at 15:25.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Lower Road

South East Water are proposing to carry out Utility repair and maintenance works on Lower Road, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 25 Oct 2024 at 15:01.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Lower Road

South East Water are proposing to carry out Utility repair and maintenance works on Lower Road, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 26 Nov 2024 at 12:57.

Eunetworks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Wooburn Common Road

Eunetworks were proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 16 Oct 2024 at 09:03.

Affinity Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Deanway

Affinity Water are proposing to carry out Utility repair and maintenance works on Deanway, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 30 Oct 2024 at 11:39.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Oakridge Road

Thames Water were proposing to carry out Utility repair and maintenance works on Oakridge Road, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:41.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Oxford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Oxford Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 14:04.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Oxford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Oxford Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 14:18.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Rowan Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Rowan Avenue, Bowerdean, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 08:04.

Buckinghamshire Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Hughenden Avenue

Buckinghamshire Council are proposing to carry out Highway improvement works on Hughenden Avenue, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 08:32.

Nexfibre Networks Limited logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Totteridge Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Totteridge Lane, Totteridge, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Oct 2024 at 08:52.

Nexfibre Networks Limited logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Totteridge Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Totteridge Lane, Totteridge, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Oct 2024 at 11:08.

Eunetworks logo
Between
18 and 25 Feb 2025
Details
View Map
Share
Follow
Whitepit Lane

Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Flackwell Heath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:15.

Eunetworks logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Lilys Walk

Eunetworks were proposing to carry out Utility asset works on Lilys Walk, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 5 Dec 2024 at 11:51.

Eunetworks logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Desborough Road

Eunetworks were proposing to carry out Utility asset works on Desborough Road, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 8 Nov 2024 at 09:03.

Eunetworks logo
Between
20 and 25 Feb 2025
Details
View Map
Share
Follow
Littleworth Road

Eunetworks are proposing to carry out Utility asset works on Littleworth Road, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 15:25.

Buckinghamshire Council logo
Between
21 and 27 Feb 2025
Details
View Map
Share
Follow
St Johns Road

Buckinghamshire Council are proposing to carry out Highway improvement works on St Johns Road, Tylers Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Oct 2024 at 14:30.

Buckinghamshire Council logo
Between
21 and 27 Feb 2025
Details
View Map
Share
Follow
Kingswood Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Kingswood Road, Tylers Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Oct 2024 at 14:33.

Eunetworks logo
LONG TERM
Between
22 Feb and 8 Apr 2025
Details
View Map
Share
Follow
London Road

Eunetworks are proposing to carry out Utility asset works on London Road, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2025 and could run through until 8 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 15:05.

Eunetworks logo
Between
22 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Kitchener Road

Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:53.

LONG TERM
Between
24 Feb and 25 Apr 2025
Details
View Map
Share
Follow
Wentworth Avenue

Optimal Power Networks are proposing to carry out Utility asset works on Wentworth Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 2 Sep 2024 at 00:12.

Buckinghamshire Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Nov 2024 at 14:05.

Buckinghamshire Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 4 Dec 2024 at 14:39.

Eunetworks logo
Between
24 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Whitepit Lane

Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Wooburn Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 17 Oct 2024 at 10:39.

Eunetworks logo
Between
24 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Whitepit Lane

Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Wooburn Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 13 Nov 2024 at 11:15.

Eunetworks logo
Between
24 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Plumer Road

Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 7 Nov 2024 at 12:17.

Eunetworks logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Plumer Road

Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 11 Dec 2024 at 09:28.

Eunetworks logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Plumer Road

Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 13 Dec 2024 at 12:55.

Thames Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Oxford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Oxford Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 11:29.

Eunetworks logo
Between
24 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Abercromby Avenue

Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 11 Oct 2024 at 09:21.

Eunetworks logo
Between
24 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Abercromby Avenue

Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 14:58.

Buckinghamshire Council logo
Between
26 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Town Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Town Lane, Wooburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 11:05.

Cadent Gas logo
LONG TERM
Between
28 Feb and 11 Jun 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 11:17.

G2 Energy IDNO logo
Between
1 and 24 Mar 2025
Details
View Map
Share
Follow
Amersham Road

G2 Energy IDNO are proposing to carry out Utility asset works on Amersham Road, Penn Street.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 4 Dec 2024 at 10:43.

Eunetworks logo
Between
3 and 27 Mar 2025
Details
View Map
Share
Follow
Taplow Common Road

Eunetworks are proposing to carry out Utility asset works on Taplow Common Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 27 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 15 Nov 2024 at 13:54.

Eunetworks logo
LONG TERM
Between
3 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 3 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 09:10.

Eunetworks logo
LONG TERM
Between
3 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 3 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 2 Sep 2024 at 10:02.

Eunetworks logo
Between
3 and 19 Mar 2025
Details
View Map
Share
Follow
Hedsor Lane

Eunetworks are proposing to carry out Utility asset works on Hedsor Lane, Hedsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 14 Aug 2024 at 11:40.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
3 Mar and 28 May 2025
Details
View Map
Share
Lancaster Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 28 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 12:07.

Scottish Hydro Electric Power Dis logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Wellington Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wellington Road, Cressex Business Park, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Dec 2024 at 08:58.

Buckinghamshire Council logo
Between
3 and 22 Mar 2025
Details
View Map
Share
Follow
Marlow Hill

Buckinghamshire Council are proposing to carry out Highway improvement works on Marlow Hill, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 09:00.

Cityfibre Metro Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Coronation Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 13:07.

Buckinghamshire Council logo
Between
3 and 22 Mar 2025
Details
View Map
Share
Follow
Abbey Way Gyratory

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Abbey Way Gyratory, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 15:34.

Buckinghamshire Council logo
Between
3 and 22 Mar 2025
Details
View Map
Share
Follow
Abbey Way Gyratory

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Abbey Way Gyratory, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 15:06.

Cadent Gas logo
Between
3 and 26 Mar 2025
Details
View Map
Share
Follow
New Road

Cadent Gas are proposing to carry out Utility asset works on New Road, Coleshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:32.

Buckinghamshire Council logo
Between
7 and 13 Mar 2025
Details
View Map
Share
Follow
Beaufort Close

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaufort Close, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 11:50.

Buckinghamshire Council logo
Between
7 and 13 Mar 2025
Details
View Map
Share
Follow
Beaufort Gardens

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaufort Gardens, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 11:49.

Eunetworks logo
Between
8 and 23 Mar 2025
Details
View Map
Share
Follow
Oakridge Road

Eunetworks are proposing to carry out Utility asset works on Oakridge Road, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:56.

Eunetworks logo
Between
9 and 23 Mar 2025
Details
View Map
Share
Follow
Kitchener Road

Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 7 Nov 2024 at 12:19.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Lower Cookham Road

Cadent Gas are proposing to carry out Utility asset works on Lower Cookham Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:43.

Buckinghamshire Council logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Little Marlow Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Little Marlow Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Dec 2024 at 14:07.

Cadent Gas logo
LONG TERM
Between
10 Mar and 9 Sep 2025
Details
View Map
Share
Follow
Marlow Bottom

Cadent Gas are proposing to carry out Utility asset works on Marlow Bottom, Marlow Bottom.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 09:47.

Cityfibre Metro Networks logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Coronation Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Dec 2024 at 12:46.

Cityfibre Metro Networks logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Coronation Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 14:11.

Eunetworks logo
Between
10 and 23 Mar 2025
Details
View Map
Share
Follow
Kitchener Road

Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 11 Dec 2024 at 09:27.

Eunetworks logo
Between
10 and 23 Mar 2025
Details
View Map
Share
Follow
Kitchener Road

Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 13 Dec 2024 at 12:05.

Thames Water logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Lock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lock Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 10:32.

Scottish Hydro Electric Power Dis logo
Between
12 Mar and 3 Apr 2025
Details
View Map
Share
Church Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Tylers Green.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 March 2025 and run through until 3 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Dec 2024 at 13:26.

Eunetworks logo
Between
13 and 21 Mar 2025
Details
View Map
Share
Follow
Whitepit Lane

Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Flackwell Heath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 24 Oct 2024 at 15:15.

Buckinghamshire Council logo
Between
14 and 20 Mar 2025
Details
View Map
Share
Follow
Riverpark Drive

Buckinghamshire Council are proposing to carry out Highway improvement works on Riverpark Drive, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 12:09.

Eunetworks logo
Between
14 and 20 Mar 2025
Details
View Map
Share
Follow
Wooburn Town

Eunetworks are proposing to carry out Utility asset works on Wooburn Town, Wooburn Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 16 Oct 2024 at 15:57.

Buckinghamshire Council logo
Between
14 and 16 Mar 2025
Details
View Map
Share
Follow
Chippendale Close

Buckinghamshire Council are proposing to carry out Highway improvement works on Chippendale Close, Totteridge, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Dec 2024 at 15:36.

LONG TERM
Between
17 Mar and 16 May 2025
Details
View Map
Share
Follow
Farnham Lane

Optimal Power Networks are proposing to carry out Utility asset works on Farnham Lane, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 23 May 2024 at 14:30.

LONG TERM
Between
17 Mar and 16 May 2025
Details
View Map
Share
Follow
Farnham Lane

Optimal Power Networks are proposing to carry out Utility asset works on Farnham Lane, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 13 Aug 2024 at 16:30.

Buckinghamshire Council logo
Between
17 and 25 Mar 2025
Details
View Map
Share
Follow
Windsor Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Windsor Road, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 11:01.

Cadent Gas logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Gerrards Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:18.

Affinity Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Maltmans Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Maltmans Lane, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Dec 2024 at 11:25.

Buckinghamshire Council logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Follow
Frogmoor

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Frogmoor, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 15:27.

Buckinghamshire Council logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Follow
Temple End

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Temple End, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Dec 2024 at 12:55.

Thames Water logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Hitcham Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Hitcham Lane, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 10:49.

Buckinghamshire Council logo
Between
20 and 24 Mar 2025
Details
View Map
Share
Follow
Blackpond Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Blackpond Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Oct 2024 at 10:10.

Eunetworks logo
Between
20 and 25 Mar 2025
Details
View Map
Share
Littleworth Road

Eunetworks were proposing to carry out Utility asset works on Littleworth Road, Burnham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 March 2025 and run through until 25 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 19 Nov 2024 at 09:23.

Eunetworks logo
Between
20 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Wash Hill

Eunetworks are proposing to carry out Utility asset works on Wash Hill, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 5 Nov 2024 at 12:58.

Buckinghamshire Council logo
Between
20 and 23 Mar 2025
Details
View Map
Share
Follow
Little Marlow Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Little Marlow Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Dec 2024 at 13:40.

Cornerstone Telecommunications Infrastructure logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Dropmore Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Dropmore Road, Burnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 30 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 23 Dec 2024 at 10:02.

Cornerstone Telecommunications Infrastructure logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Service Road Off Dropmore Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Service Road Off Dropmore Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 23 Dec 2024 at 10:07.

Buckinghamshire Council logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
Jordans Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Jordans Lane, Jordans.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 14:01.

Cadent Gas logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Village Road

Cadent Gas are proposing to carry out Utility asset works on Village Road, Coleshill.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:59.

Cadent Gas logo
Between
24 Mar and 20 Apr 2025
Details
View Map
Share
Follow
Village Road

Cadent Gas are proposing to carry out Utility asset works on Village Road, Coleshill.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 13:29.

Cadent Gas logo
Between
24 Mar and 20 Apr 2025
Details
View Map
Share
Follow
Village Road

Cadent Gas are proposing to carry out Utility asset works on Village Road, Coleshill.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 14:51.

Cadent Gas logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Village Road

Cadent Gas were proposing to carry out Utility asset works on Village Road, Coleshill.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:40.

Buckinghamshire Council logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Collinswood Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Collinswood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Oct 2024 at 10:15.

Buckinghamshire Council logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Dorney Hill North

Buckinghamshire Council are proposing to carry out Highway improvement works on Dorney Hill North, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Oct 2024 at 10:15.

Affinity Water logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Bowstridge Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Bowstridge Lane, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 13 Dec 2024 at 11:27.

Affinity Water logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Bowstridge Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Bowstridge Lane, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 20 Dec 2024 at 10:30.

Buckinghamshire Council logo
Between
27 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Jordans Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Jordans Lane, Jordans.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Dec 2024 at 13:41.

Buckinghamshire Council logo
Between
27 and 29 Mar 2025
Details
View Map
Share
Follow
Rawlings Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Rawlings Lane, Seer Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Dec 2024 at 15:31.


Roadworks Map near to Holtspur Top Lane, BEACONSFIELD, HP9 1DN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Dec 2024 02:54
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Holtspur Top Lane, BEACONSFIELD, HP9 1DN (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Eunetworks logo
MAJOR
  
WHITE HILL 
(0.1 miles)
Eunetworks
Utility asset works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 26 Dec 2024 - 6 Jan 2025
0.1
Details
Share
Follow
2
Eunetworks logo
MAJOR
  
WHITE HILL 
(0.7 miles)
Eunetworks
Utility asset works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 26 Dec 2024 - 17 Jan 2025
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.