ROADWORKS SUMMARY
Flaunden Park, HEMEL HEMPSTEAD, HP3 0PY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Flaunden Park, HP3 0PY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Flaunden Park, HEMEL HEMPSTEAD, HP3 0PY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Flaunden Park are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Until
18 Mar 2025
Details
View Map
Share
Follow
M25 J19 Leave E

Thames Water are carrying out Utility repair and maintenance works on M25 J19 Leave E, Three Rivers.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2023 at 23:25 and could run through until 18 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 17 Mar 2023 at 23:22.

Hertfordshire County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Hempstead Lane

Hertfordshire County Council are carrying out Highway repair and maintenance works on Hempstead Lane, Potten End.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 May 2024 at 15:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2024 at 08:42.

Thames Water logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Cokes Lane

Thames Water are carrying out Utility repair and maintenance works on Cokes Lane, Little Chalfont.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 10:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 10:56.

Buckinghamshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rectory Hill

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Rectory Hill, Amersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 29 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 19 Aug 2024 at 11:36.

Murphy Power Distribution logo
Finishing
Friday
Details
View Map
Share
Queensway

Murphy Power Distribution were proposing to carry out Utility asset works on Queensway, Hemel Hempstead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 3 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 16 Sep 2024 at 14:33.

Buckinghamshire Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
High Street

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on High Street, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 December 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 24 Sep 2024 at 10:42.

UK Power Networks Eastern & London logo
Until
6 Jan 2025
Details
View Map
Share
Follow
Nye Way

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Nye Way, Bovingdon.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 December 2024 at 14:41 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Dec 2024 at 14:32.

Cadent Gas logo
LONG TERM
Between
2 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Railway Terrace

Cadent Gas are proposing to carry out Utility asset works on Railway Terrace, Kings Langley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 10 Jul 2024 at 11:05.

Cadent Gas logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Kings Road

Cadent Gas are proposing to carry out Utility asset works on Kings Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 09:11.

Hertfordshire County Council logo
Between
2 and 10 Jan 2025
Details
View Map
Share
Bridgewater Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Bridgewater Road, Berkhamsted.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 18 Nov 2024 at 12:44.

Buckinghamshire Council logo
LONG TERM
Between
6 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Rectory Hill

Buckinghamshire Council are proposing to carry out Highway improvement works on Rectory Hill, Amersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Sep 2024 at 10:24.

Buckinghamshire Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Rectory Hill

Buckinghamshire Council are proposing to carry out Highway improvement works on Rectory Hill, Amersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Nov 2024 at 11:23.

Buckinghamshire Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Raans Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Raans Road, Amersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 2 Oct 2024 at 09:44.

Hertfordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Venus Hill

Hertfordshire County Council are proposing to carry out Section 50 on Venus Hill, Flaunden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 19:48.

Hertfordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Venus Hill

Hertfordshire County Council are proposing to carry out Section 50 on Venus Hill, Flaunden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 21:29.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Belswains Lane

Cadent Gas were proposing to carry out Utility asset works on Belswains Lane, Hemel Hempstead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:35.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Kings Road

Cadent Gas are proposing to carry out Utility asset works on Kings Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 10:02.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Kings Road

Cadent Gas are proposing to carry out Utility asset works on Kings Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 14:23.

Hertfordshire County Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Mill Street

Hertfordshire County Council are proposing to carry out Section 50 on Mill Street, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 13:37.

Hertfordshire County Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Mill Street

Hertfordshire County Council are proposing to carry out Highway improvement works on Mill Street, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 Nov 2024 at 14:13.

Hertfordshire County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Brownlow Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Brownlow Road, Berkhamsted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 18 Nov 2024 at 12:34.

Hertfordshire County Council logo
Between
6 and 14 Jan 2025
Details
View Map
Share
Follow
Vicarage Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Vicarage Road, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Dec 2024 at 11:35.

Hertfordshire County Council logo
Between
6 and 14 Jan 2025
Details
View Map
Share
Follow
Vicarage Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Vicarage Road, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 20 Dec 2024 at 10:29.

Hertfordshire County Council logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Greenhills Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Greenhills Close, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 10:47.

Hertfordshire County Council logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Greenhills Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Greenhills Close, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 09:24.

UK Power Networks Eastern & London logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Berry Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Berry Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 11:04.

Affinity Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Waterside

Affinity Water were proposing to carry out Utility repair and maintenance works on Waterside, Chesham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Sep 2024 at 10:47.

Affinity Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Waterside

Affinity Water were proposing to carry out Utility repair and maintenance works on Waterside, Chesham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 13:47.

Affinity Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Gypsy Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Gypsy Lane, Abbots Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 11:11.

Affinity Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Gypsy Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Gypsy Lane, Abbots Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 9 Dec 2024 at 14:01.

Hertfordshire County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Kindersley Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kindersley Way, Abbots Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 16:17.

Hertfordshire County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Kindersley Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kindersley Way, Abbots Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:28.

Hertfordshire County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Manor House Gardens

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Manor House Gardens, Abbots Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:34.

Hertfordshire County Council logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Kindersley Way

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Kindersley Way, Abbots Langley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 January 2025 and run through until 13 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Oct 2024 at 13:40.

Hertfordshire County Council logo
Between
10 and 14 Jan 2025
Details
View Map
Share
Follow
Manor House Gardens

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Manor House Gardens, Abbots Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 16:16.

Hertfordshire County Council logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 10:56.

Hertfordshire County Council logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 6 Dec 2024 at 08:53.

Hertfordshire County Council logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 Aug 2024 at 13:52.

Affinity Water logo
Between
10 and 14 Jan 2025
Details
View Map
Share
Follow
Catlin Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Catlin Street, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 14:43.

Affinity Water logo
Between
10 and 14 Jan 2025
Details
View Map
Share
Follow
Catlin Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Catlin Street, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Dec 2024 at 10:00.

Affinity Water logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
Victoria Close

Affinity Water are proposing to carry out Utility asset works on Victoria Close, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 14:31.

Affinity Water logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
Victoria Close

Affinity Water are proposing to carry out Utility asset works on Victoria Close, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 10:30.

Hertfordshire County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Chalfont Lane

Hertfordshire County Council are proposing to carry out Section 50 on Chalfont Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 19:52.

Hertfordshire County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Chalfont Lane

Hertfordshire County Council are proposing to carry out Section 50 on Chalfont Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 21:26.

Hertfordshire County Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Shire Lane

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Shire Lane, Chorleywood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 16 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 20 Nov 2024 at 07:40.

Hertfordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Garden Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garden Road, Bulls Green, Abbots Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 16:12.

Hertfordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Garden Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garden Road, Bulls Green, Abbots Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:31.

Hertfordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Manor House Gardens

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Manor House Gardens, Abbots Langley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Oct 2024 at 13:41.

Buckinghamshire Council logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Blackwell Hall Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Blackwell Hall Lane, Ley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Dec 2024 at 14:49.

Hertfordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 Dec 2024 at 10:11.

Hertfordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 20 Dec 2024 at 14:44.

Hertfordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Swing Gate Lane

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Swing Gate Lane, Berkhamsted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 6 Dec 2024 at 11:45.

Hertfordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Swing Gate Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Swing Gate Lane, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 Dec 2024 at 10:24.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Kings Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Kings Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 8 Oct 2024 at 09:13.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Water Lane

Affinity Water were proposing to carry out Utility repair and maintenance works on Water Lane, Berkhamsted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 19 Dec 2024 at 09:34.

Hertfordshire County Council logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Garden Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Garden Road, Bulls Green, Abbots Langley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 16 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Oct 2024 at 13:43.

Affinity Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
White Hill

Affinity Water are proposing to carry out Utility repair and maintenance works on White Hill, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 08:47.

Affinity Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
White Hill Close

Affinity Water are proposing to carry out Utility repair and maintenance works on White Hill Close, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 08:48.

Affinity Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Gravel Path

Affinity Water are proposing to carry out Utility repair and maintenance works on Gravel Path, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 9 Oct 2024 at 12:15.

Affinity Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Pond Park Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Pond Park Road, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 07:56.

Affinity Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Pond Park Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Pond Park Road, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 10:19.

Affinity Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Pond Park Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Pond Park Road, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Dec 2024 at 10:06.

Hertfordshire County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Kingshill Way

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Kingshill Way, Berkhamsted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 5 Nov 2024 at 10:22.

Hertfordshire County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Kings Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Kings Road, Berkhamsted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Dec 2024 at 13:08.

Hertfordshire County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Kings Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Kings Road, Berkhamsted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 5 Nov 2024 at 10:24.

Hertfordshire County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Brownlow Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Brownlow Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 Oct 2024 at 12:11.

Hertfordshire County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Brownlow Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Brownlow Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 11:20.

Hertfordshire County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
New Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on New Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 Oct 2024 at 12:13.

Hertfordshire County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
New Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on New Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 11:23.

Buckinghamshire Council logo
LONG TERM
Between
16 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Rectory Hill

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Rectory Hill, Amersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 23 Sep 2024 at 10:26.

Affinity Water logo
Between
16 and 20 Jan 2025
Details
View Map
Share
Follow
Eskdale Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Eskdale Avenue, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 07:52.

Affinity Water logo
Between
16 and 20 Jan 2025
Details
View Map
Share
Follow
Eskdale Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Eskdale Avenue, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 15:10.

Hertfordshire County Council logo
Between
17 and 20 Jan 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 Aug 2024 at 13:41.

Hertfordshire County Council logo
Between
17 and 20 Jan 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 Nov 2024 at 12:21.

Hertfordshire County Council logo
Between
17 and 21 Jan 2025
Details
View Map
Share
North Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on North Road, Berkhamsted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 January 2025 and run through until 21 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 11 Nov 2024 at 13:07.

Hertfordshire County Council logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Gravel Path

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Gravel Path, Berkhamsted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 January 2025 and run through until 21 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 11 Nov 2024 at 13:07.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Two Dells Lane

Affinity Water were proposing to carry out Utility repair and maintenance works on Two Dells Lane, Ashley Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 11:48.

Hertfordshire County Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 Dec 2024 at 10:17.

Hertfordshire County Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 20 Dec 2024 at 14:49.

Hertfordshire County Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Willow Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Willow Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 09:07.

Hertfordshire County Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Willow Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Willow Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 09:11.

Hertfordshire County Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
The Nokes

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Nokes, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 09:06.

Hertfordshire County Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
The Nokes

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Nokes, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 09:09.

Hertfordshire County Council logo
Between
20 and 30 Jan 2025
Details
View Map
Share
Follow
Hempstead Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hempstead Lane, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 28 Nov 2024 at 07:48.

Hertfordshire County Council logo
Between
20 and 30 Jan 2025
Details
View Map
Share
Follow
Hempstead Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hempstead Lane, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 Dec 2024 at 09:26.

BT logo
Between
21 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Bulstrode Lane

BT are proposing to carry out Utility asset works on Bulstrode Lane, Chipperfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 14 Nov 2024 at 10:15.

BT logo
Between
21 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Rucklers Lane

BT are proposing to carry out Utility repair and maintenance works on Rucklers Lane, Kings Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 14 Nov 2024 at 10:14.

Affinity Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Woodlands Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Woodlands Avenue, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 Oct 2024 at 15:46.

Affinity Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Woodlands Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Woodlands Avenue, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 6 Dec 2024 at 08:58.

Hertfordshire County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Sunrise Crescent

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sunrise Crescent, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 14:15.

Hertfordshire County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Sunrise Crescent

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sunrise Crescent, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 09:13.

Hertfordshire County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Pamela Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Pamela Avenue, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 14:15.

Hertfordshire County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Pamela Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Pamela Avenue, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 09:15.

Hertfordshire County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Cangels Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cangels Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 13:48.

Hertfordshire County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Cangels Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cangels Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 09:20.

Hertfordshire County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Hazeldell Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hazeldell Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:20.

Hertfordshire County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Hazeldell Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hazeldell Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 12:15.

Affinity Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Gravel Path

Affinity Water are proposing to carry out Utility repair and maintenance works on Gravel Path, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 15:30.

Affinity Water logo
Between
23 and 27 Jan 2025
Details
View Map
Share
Follow
Corner Hall

Affinity Water are proposing to carry out Utility repair and maintenance works on Corner Hall, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 15:55.

Affinity Water logo
Between
23 and 27 Jan 2025
Details
View Map
Share
Follow
Corner Hall

Affinity Water are proposing to carry out Utility repair and maintenance works on Corner Hall, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Dec 2024 at 10:36.

Hertfordshire County Council logo
Between
23 and 27 Jan 2025
Details
View Map
Share
Follow
Corner Hall

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Corner Hall, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Oct 2024 at 08:56.

Hertfordshire County Council logo
Between
23 and 27 Jan 2025
Details
View Map
Share
Follow
Corner Hall

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Corner Hall, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 08:51.

Hertfordshire County Council logo
Between
23 and 27 Jan 2025
Details
View Map
Share
Follow
Sunnyhill Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sunnyhill Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:46.

Hertfordshire County Council logo
Between
23 and 27 Jan 2025
Details
View Map
Share
Follow
Sunnyhill Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sunnyhill Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 12:24.

Hertfordshire County Council logo
Between
24 and 27 Jan 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2024 at 15:02.

Hertfordshire County Council logo
Between
24 and 27 Jan 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 Nov 2024 at 12:24.

Hertfordshire County Council logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Felden Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Felden Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 15:40.

Hertfordshire County Council logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Felden Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Felden Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:37.

Hertfordshire County Council logo
Between
24 and 27 Jan 2025
Details
View Map
Share
Two Waters Way

Hertfordshire County Council were proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 23 Aug 2024 at 13:00.

Hertfordshire County Council logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Bury Hill Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bury Hill Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Oct 2024 at 09:01.

Hertfordshire County Council logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Bury Hill Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bury Hill Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:30.

Hertfordshire County Council logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Austins Place

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Austins Place, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 14:34.

Hertfordshire County Council logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Austins Place

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Austins Place, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 12:27.

Buckinghamshire Council logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Broad Street

Buckinghamshire Council are proposing to carry out Highway improvement works on Broad Street, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 30 Oct 2024 at 15:39.

Buckinghamshire Council logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Berkhampstead Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Berkhampstead Road, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 30 Oct 2024 at 15:38.

Buckinghamshire Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Rectory Hill

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Rectory Hill, Amersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 7 Oct 2024 at 13:21.

Hertfordshire County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Shantock Hall Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Shantock Hall Lane, Bovingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 16:06.

Hertfordshire County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Shantock Hall Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Shantock Hall Lane, Bovingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 4 Nov 2024 at 08:39.

Cadent Gas logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Pond Park Road

Cadent Gas are proposing to carry out New service connection on Pond Park Road, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:24.

Hertfordshire County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 Dec 2024 at 10:20.

Hertfordshire County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 20 Dec 2024 at 14:46.

Hertfordshire County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Bury Hill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bury Hill, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 21 Oct 2024 at 10:11.

Hertfordshire County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Bury Hill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bury Hill, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Oct 2024 at 14:01.

Hertfordshire County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Bury Hill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bury Hill, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:32.

Buckinghamshire Council logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Rectory Hill

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Rectory Hill, Amersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Oct 2024 at 10:05.

Affinity Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Puller Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Puller Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 15:52.

Hertfordshire County Council logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Cemmaes Court Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cemmaes Court Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 21 Oct 2024 at 10:13.

Hertfordshire County Council logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Cemmaes Court Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cemmaes Court Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:35.

Between
30 Jan and 6 Feb 2025
Details
View Map
Share
Britannia Road

JSM Group Services LTD were proposing to carry out Utility asset works on Britannia Road, Chesham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by JSM Group Services LTD on 9 Dec 2024 at 09:24.

LONG TERM
Between
30 Jan and 8 Mar 2025
Details
View Map
Share
Follow
Asheridge Road

JSM Group Services LTD are proposing to carry out Utility asset works on Asheridge Road, Chesham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by JSM Group Services LTD on 29 Oct 2024 at 14:54.

LONG TERM
Between
30 Jan and 8 Mar 2025
Details
View Map
Share
Asheridge Road

JSM Group Services LTD were proposing to carry out Utility asset works on Asheridge Road, Chesham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 8 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by JSM Group Services LTD on 9 Dec 2024 at 09:24.

Hertfordshire County Council logo
Between
30 Jan and 3 Feb 2025
Details
View Map
Share
Follow
St Nicholas Mount

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on St Nicholas Mount, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Oct 2024 at 09:18.

Hertfordshire County Council logo
Between
30 Jan and 3 Feb 2025
Details
View Map
Share
Follow
St Nicholas Mount

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on St Nicholas Mount, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 Nov 2024 at 09:30.

Hertfordshire County Council logo
Between
30 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Harepark Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Harepark Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 16:19.

Hertfordshire County Council logo
Between
30 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Harepark Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Harepark Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:37.

Hertfordshire County Council logo
Between
30 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Robbs Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Robbs Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 16:22.

Hertfordshire County Council logo
Between
30 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Robbs Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Robbs Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:37.

Hertfordshire County Council logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2024 at 15:04.

Hertfordshire County Council logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 Nov 2024 at 12:26.

Hertfordshire County Council logo
Between
31 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Broad Street

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Broad Street, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 16:13.

Hertfordshire County Council logo
Between
31 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Broad Street

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Broad Street, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:36.

Buckinghamshire Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Latimer Bottom

Buckinghamshire Council are proposing to carry out Highway improvement works on Latimer Bottom, Latimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Dec 2024 at 11:38.

Hertfordshire County Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Two Waters Way

Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 Dec 2024 at 10:21.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
St Albans Hill

Cadent Gas were proposing to carry out Utility asset works on St Albans Hill, Hemel Hempstead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:33.

Hertfordshire County Council logo
Between
3 and 13 Feb 2025
Details
View Map
Share
Follow
Briar Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Briar Way, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 Dec 2024 at 11:37.

Hertfordshire County Council logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
The Green

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 Oct 2024 at 10:55.

Hertfordshire County Council logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
The Green

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 15:30.

Between
4 Feb and 2 Mar 2025
Details
View Map
Share
Brockhurst Road

JSM Group Services LTD were proposing to carry out Utility asset works on Brockhurst Road, Chesham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 2 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by JSM Group Services LTD on 9 Dec 2024 at 09:25.

Hertfordshire County Council logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Seaton Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Seaton Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Oct 2024 at 13:47.

Hertfordshire County Council logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Seaton Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Seaton Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 08:47.

UK Power Networks Eastern & London logo
Between
6 and 14 Feb 2025
Details
View Map
Share
Follow
Stony Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Stony Lane, Little Chalfont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 10:12.

UK Power Networks Eastern & London logo
Between
6 and 14 Feb 2025
Details
View Map
Share
Follow
Stony Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Stony Lane, Little Chalfont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Nov 2024 at 07:46.

Network Rail logo
Between
6 and 8 Feb 2025
Details
View Map
Share
Follow
North Western Avenue

Network Rail are proposing to carry out Works for Rail Purposes on North Western Avenue, Woodside, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Dec 2024 at 13:45.

Hertfordshire County Council logo
Between
6 and 10 Feb 2025
Details
View Map
Share
Follow
Upper Bourne End Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Upper Bourne End Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 15:35.

Hertfordshire County Council logo
Between
6 and 10 Feb 2025
Details
View Map
Share
Follow
Upper Bourne End Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Upper Bourne End Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 15:22.

Hertfordshire County Council logo
Between
6 and 10 Feb 2025
Details
View Map
Share
Follow
Great Whites Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Great Whites Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:40.

Hertfordshire County Council logo
Between
6 and 10 Feb 2025
Details
View Map
Share
Follow
Great Whites Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Great Whites Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 08:55.

Hertfordshire County Council logo
Between
6 and 10 Feb 2025
Details
View Map
Share
Follow
Curtis Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Curtis Way, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Oct 2024 at 13:50.

Hertfordshire County Council logo
Between
6 and 10 Feb 2025
Details
View Map
Share
Follow
Curtis Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Curtis Way, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 08:52.

Hertfordshire County Council logo
Between
6 and 10 Feb 2025
Details
View Map
Share
Follow
Normandy Drive

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Normandy Drive, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Oct 2024 at 13:46.

Hertfordshire County Council logo
Between
6 and 10 Feb 2025
Details
View Map
Share
Follow
Normandy Drive

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Normandy Drive, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 09:00.

Hertfordshire County Council logo
Between
7 and 11 Feb 2025
Details
View Map
Share
Follow
Oakwood

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Oakwood, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:33.

Hertfordshire County Council logo
Between
7 and 11 Feb 2025
Details
View Map
Share
Follow
Oakwood

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Oakwood, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 09:01.

Hertfordshire County Council logo
Between
7 and 11 Feb 2025
Details
View Map
Share
Follow
Brownlow Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Brownlow Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 13:06.

Hertfordshire County Council logo
Between
7 and 11 Feb 2025
Details
View Map
Share
Follow
Brownlow Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Brownlow Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 09:01.

Hertfordshire County Council logo
Between
7 and 11 Feb 2025
Details
View Map
Share
Follow
New Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on New Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:22.

Hertfordshire County Council logo
Between
7 and 11 Feb 2025
Details
View Map
Share
Follow
New Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on New Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:52.

Hertfordshire County Council logo
Between
10 and 23 Feb 2025
Details
View Map
Share
Follow
Grove Mill Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Grove Mill Lane, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 Nov 2024 at 10:53.

UK Power Networks Eastern & London logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Toms Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Toms Lane, Kings Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 10:54.

Hertfordshire County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Sharpes Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sharpes Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 5 Nov 2024 at 09:19.

Hertfordshire County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Sharpes Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sharpes Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 09:38.

Hertfordshire County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Water End Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Water End Road, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 09:02.

Hertfordshire County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Water End Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Water End Road, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 08:48.

Hertfordshire County Council logo
Between
12 and 17 Feb 2025
Details
View Map
Share
Follow
Moor Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Sarratt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 11 Nov 2024 at 10:50.

Hertfordshire County Council logo
Between
12 and 17 Feb 2025
Details
View Map
Share
Follow
Moor Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Sarratt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 13:13.

Hertfordshire County Council logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Beechfield

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Beechfield, Kings Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 13:12.

Hertfordshire County Council logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Beechfield

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Beechfield, Kings Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 14:04.

Hertfordshire County Council logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Le Corte Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Le Corte Close, Kings Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 13:43.

Hertfordshire County Council logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Le Corte Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Le Corte Close, Kings Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 13:26.

Hertfordshire County Council logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Chipperfield Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chipperfield Road, Kings Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 24 Oct 2024 at 10:56.

Hertfordshire County Council logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Garden Field Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garden Field Lane, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 15:54.

Hertfordshire County Council logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Garden Field Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garden Field Lane, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 4 Dec 2024 at 09:04.

Hertfordshire County Council logo
Between
14 and 18 Feb 2025
Details
View Map
Share
Follow
North Hill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on North Hill, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 11 Nov 2024 at 10:41.

Hertfordshire County Council logo
Between
14 and 18 Feb 2025
Details
View Map
Share
Follow
North Hill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on North Hill, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 13:21.

UK Power Networks Eastern & London logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Chenies Mill Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Chenies Mill Road, Chenies.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 09:47.

UK Power Networks Eastern & London logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Chenies Mill Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Chenies Mill Road, Chenies.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 15:18.

UK Power Networks Eastern & London logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Chenies Mill Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Chenies Mill Road, Chenies.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 08:38.

Affinity Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Kings Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Kings Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 15:28.

Affinity Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Kings Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Kings Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 09:13.

UK Power Networks Eastern & London logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Berry Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Berry Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 14:19.

UK Power Networks Eastern & London logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Berry Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Berry Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 09:45.

Affinity Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Eskdale Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Eskdale Avenue, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 12:32.

Affinity Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Eskdale Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Eskdale Avenue, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 19 Dec 2024 at 10:05.

Affinity Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
White Hill

Affinity Water are proposing to carry out Utility repair and maintenance works on White Hill, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 10:06.

Affinity Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
White Hill Close

Affinity Water are proposing to carry out Utility repair and maintenance works on White Hill Close, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 10:08.

Affinity Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Gravel Path

Affinity Water were proposing to carry out Utility repair and maintenance works on Gravel Path, Berkhamsted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 12:13.

Hertfordshire County Council logo
Between
27 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Chipperfield Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chipperfield Road, Kings Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 10:08.

Hertfordshire County Council logo
Between
27 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Chipperfield Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chipperfield Road, Kings Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 11 Dec 2024 at 09:40.

LONG TERM
Between
28 Feb and 19 Apr 2025
Details
View Map
Share
Follow
Nashleigh Hill

JSM Group Services LTD are proposing to carry out Utility asset works on Nashleigh Hill, Chesham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 19 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by JSM Group Services LTD on 29 Oct 2024 at 15:20.

LONG TERM
Between
28 Feb and 19 Apr 2025
Details
View Map
Share
Nashleigh Hill

JSM Group Services LTD were proposing to carry out Utility asset works on Nashleigh Hill, Chesham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 19 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by JSM Group Services LTD on 9 Dec 2024 at 09:25.

Affinity Water logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Bucks Hill

Affinity Water are proposing to carry out Utility asset works on Bucks Hill, Sarratt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Dec 2024 at 09:46.

Hertfordshire County Council logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Belmont Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Belmont Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 20 Dec 2024 at 10:59.

Hertfordshire County Council logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Water Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Water Lane, Bovingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 Oct 2024 at 10:47.

Hertfordshire County Council logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Water Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Water Lane, Bovingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:52.

Between
6 and 22 Mar 2025
Details
View Map
Share
Follow
Bellingdon Road

JSM Group Services LTD are proposing to carry out Utility asset works on Bellingdon Road, Chesham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by JSM Group Services LTD on 29 Oct 2024 at 15:06.

Between
6 and 22 Mar 2025
Details
View Map
Share
Bellingdon Road

JSM Group Services LTD were proposing to carry out Utility asset works on Bellingdon Road, Chesham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 March 2025 and run through until 22 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by JSM Group Services LTD on 9 Dec 2024 at 09:25.

Affinity Water logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Bucks Hill

Affinity Water are proposing to carry out Utility asset works on Bucks Hill, Sarratt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Dec 2024 at 14:08.

UK Power Networks Eastern & London logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Bucks Hill

UK Power Networks Eastern & London are proposing to carry out New service connection on Bucks Hill, Sarratt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Dec 2024 at 11:39.

Affinity Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Vicarage Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Vicarage Lane, Kings Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Dec 2024 at 11:43.

Affinity Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Vicarage Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Vicarage Lane, Kings Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Dec 2024 at 15:07.

Cadent Gas logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Roughdown Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on Roughdown Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 15:37.

Cadent Gas logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Roughdown Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on Roughdown Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 16:00.

Buckinghamshire Council logo
Between
16 and 18 Mar 2025
Details
View Map
Share
Follow
Missenden Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Missenden Road, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Dec 2024 at 14:12.

Buckinghamshire Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Piggotts Orchard

Buckinghamshire Council are proposing to carry out Highway improvement works on Piggotts Orchard, Amersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Dec 2024 at 08:02.

Buckinghamshire Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Piggotts End

Buckinghamshire Council are proposing to carry out Highway improvement works on Piggotts End, Amersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Dec 2024 at 08:02.

Cadent Gas logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Market Square

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Market Square, Amersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 11:41.

Cadent Gas logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Market Square

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Market Square, Amersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 10:47.

Hertfordshire County Council logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Loudwater Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Loudwater Lane, Loudwater.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 11:38.

Affinity Water logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Severalls Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Severalls Avenue, Chesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Dec 2024 at 11:33.

Hertfordshire County Council logo
Between
20 and 27 Mar 2025
Details
View Map
Share
Follow
Moor Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Sarratt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Jul 2024 at 13:14.

Hertfordshire County Council logo
Between
20 and 27 Mar 2025
Details
View Map
Share
Follow
Dawes Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dawes Lane, Sarratt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Jul 2024 at 13:16.

Hertfordshire County Council logo
Between
20 and 27 Mar 2025
Details
View Map
Share
Follow
The Green

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Sarratt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 21 Aug 2024 at 13:54.

Between
20 Mar and 13 Apr 2025
Details
View Map
Share
Pond Park Road

JSM Group Services LTD were proposing to carry out Utility asset works on Pond Park Road, Chesham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 March 2025 and run through until 13 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by JSM Group Services LTD on 9 Dec 2024 at 09:25.

BT logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Fir Tree Hill

BT are proposing to carry out Utility asset works on Fir Tree Hill, Chandlers Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 19 Dec 2024 at 12:13.

BT logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Rousebarn Lane

BT are proposing to carry out Utility asset works on Rousebarn Lane, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Dec 2024 at 09:05.

Hertfordshire County Council logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Moor Lane

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Moor Lane, Sarratt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Oct 2024 at 08:21.

Hertfordshire County Council logo
Between
26 and 28 Mar 2025
Details
View Map
Share
Follow
Shepherds Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Shepherds Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 11:22.

Hertfordshire County Council logo
Between
26 and 28 Mar 2025
Details
View Map
Share
Follow
Shepherds Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Shepherds Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 5 Nov 2024 at 12:58.


Roadworks Map near to Flaunden Park, HEMEL HEMPSTEAD, HP3 0PY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Dec 2024 01:41
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Flaunden Park, HEMEL HEMPSTEAD, HP3 0PY (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.