ROADWORKS SUMMARY
St. Agnells Lane, HEMEL HEMPSTEAD, HP2 6EG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for St. Agnells Lane, HP2 6EG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to St. Agnells Lane, HEMEL HEMPSTEAD, HP2 6EG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for St. Agnells Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Hertfordshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Long Chaulden

Hertfordshire County Council are proposing to carry out Highway improvement works on Long Chaulden, Hemel Hempstead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hertfordshire County Council on 13 Jun 2025 at 11:10.

Hertfordshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Long Chaulden

Hertfordshire County Council are proposing to carry out Highway improvement works on Long Chaulden, Hemel Hempstead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hertfordshire County Council on 13 Jun 2025 at 11:16.

Affinity Water logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Wharf Road

Affinity Water are carrying out Utility asset works on Wharf Road, Hemel Hempstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 21:55 and could run through until 24 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 24 Jul 2025 at 09:10.

Electricity Network Company logo
LONG TERM
Between
21 Jul and 30 Sep 2025
Details
View Map
Share
Follow
Long Chaulden

Electricity Network Company are proposing to carry out Utility asset works on Long Chaulden, Hemel Hempstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 13 Jun 2025 at 11:17.

Hertfordshire County Council logo
LONG TERM
Between
21 Jul and 10 Oct 2025
Details
View Map
Share
Follow
Whitehill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Whitehill, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 08:06.

Affinity Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
St Johns Road

Affinity Water are carrying out Utility asset works on St Johns Road, Hemel Hempstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 July 2025 at 10:30 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 30 Jul 2025 at 11:40.

Hertfordshire County Council logo
LONG TERM
Between
18 Aug and 10 Oct 2025
Details
View Map
Share
Follow
Brownlow Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Brownlow Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 10 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 08:03.

Hertfordshire County Council logo
LONG TERM
Between
18 Aug and 10 Oct 2025
Details
View Map
Share
Brownlow Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Brownlow Road, Berkhamsted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 10 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 19 Aug 2025 at 13:32.

Hertfordshire County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Old Watling Street

Hertfordshire County Council were proposing to carry out Highway improvement works on Old Watling Street, Flamstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Sep 2025 at 09:57.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Lomond Road

Cadent Gas are carrying out Utility asset works on Lomond Road, Hemel Hempstead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2025 at 11:01 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2025 at 11:18.

Cadent Gas logo
Until
3 Oct 2025
Details
View Map
Share
Follow
Bulstrode Lane

Cadent Gas are carrying out Utility asset works on Bulstrode Lane, Bovingdon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:36 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:55.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Friendless Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Friendless Lane, Markyate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 26 Aug 2025 at 14:46.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Friendless Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Friendless Lane, Markyate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 1 Sep 2025 at 08:35.

Affinity Water logo
Until
6 Oct 2025
Details
View Map
Share
Follow
Sebright Road

Affinity Water are carrying out Utility asset works on Sebright Road, Hemel Hempstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2025 at 13:49 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Sep 2025 at 08:07.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
St Albans Hill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on St Albans Hill, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 17 Jun 2025 at 11:50.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
George Street

Thames Water were proposing to carry out Utility repair and maintenance works on George Street, Berkhamsted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 28 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Jul 2025 at 14:27.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
George Street

Thames Water are proposing to carry out Utility repair and maintenance works on George Street, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 11:46.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
George Street

Thames Water are carrying out Utility repair and maintenance works on George Street, Berkhamsted.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 08:29.

Hertfordshire County Council logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Southdown Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Southdown Road, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 24 Jul 2025 at 17:33.

Hertfordshire County Council logo
Until
3 Oct 2025
Details
View Map
Share
Follow
Southdown Road

Hertfordshire County Council are carrying out Highway repair and maintenance works on Southdown Road, Harpenden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:30 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2025 at 13:06.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bradden Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bradden Lane, Great Gaddesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Sep 2025 at 15:13.

Hertfordshire County Council logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Southdown Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Southdown Road, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 24 Jul 2025 at 17:40.

Hertfordshire County Council logo
Until
3 Oct 2025
Details
View Map
Share
Follow
Southdown Road

Hertfordshire County Council are carrying out Highway repair and maintenance works on Southdown Road, Harpenden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:30 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2025 at 13:05.

Hertfordshire County Council logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Arden Grove

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Arden Grove, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 26 Aug 2025 at 10:29.

Hertfordshire County Council logo
Until
3 Oct 2025
Details
View Map
Share
Follow
Arden Grove

Hertfordshire County Council are carrying out Highway repair and maintenance works on Arden Grove, Harpenden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:30 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2025 at 13:07.

Hertfordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Nettleden Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Nettleden Road, Frithsden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 Aug 2025 at 08:24.

Electricity Network Company logo
Between
20 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Parkwood Drive

Electricity Network Company are proposing to carry out Utility asset works on Parkwood Drive, Hemel Hempstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 13 Jun 2025 at 11:18.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sunrise Crescent

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sunrise Crescent, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Apr 2025 at 14:42.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Pamela Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Pamela Avenue, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Apr 2025 at 14:41.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Seaton Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Seaton Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Apr 2025 at 14:47.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Great Whites Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Great Whites Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Apr 2025 at 14:41.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Corner Hall

Hertfordshire County Council are carrying out Highway repair and maintenance works on Corner Hall, Hemel Hempstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 07:30 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Sep 2025 at 08:27.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Curtis Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Curtis Way, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Apr 2025 at 14:36.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Callisto Court

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Callisto Court, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 1 Sep 2025 at 09:03.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Little Heath Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Heath Lane, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Jul 2025 at 11:55.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Little Heath Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Heath Lane, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 Sep 2025 at 10:10.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Park Avenue South

Cadent Gas are proposing to carry out Utility asset works on Park Avenue South, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2025 at 20:53.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Park Avenue South

Cadent Gas were proposing to carry out Utility asset works on Park Avenue South, Harpenden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 25 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 09:21.

Affinity Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
High Street

Affinity Water are carrying out Remedial works on High Street, Harpenden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 08:25 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Sep 2025 at 10:04.

Hertfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Water End Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Water End Road, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 Aug 2025 at 12:23.

Central Bedfordshire Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Pedley Hill

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Pedley Hill, Studham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the verge only.

This roadwork event was last updated by Central Bedfordshire Council on 22 May 2025 at 12:05.

Central Bedfordshire Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Pedley Hill

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Pedley Hill, Studham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the verge only.

This roadwork event was last updated by Central Bedfordshire Council on 3 Jun 2025 at 11:20.

Hertfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Clements End Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clements End Road, Great Gaddesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 Aug 2025 at 12:30.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Roundwood Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Roundwood Lane, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Aug 2025 at 08:32.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Cangels Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cangels Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 10:20.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Ranelagh Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ranelagh Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Apr 2025 at 14:45.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Ganymede Place

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ganymede Place, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 1 Sep 2025 at 08:57.

Hertfordshire County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Love Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Love Lane, Abbots Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 1 Sep 2025 at 10:21.

Hertfordshire County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Hazeldell Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hazeldell Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Apr 2025 at 14:46.

Hertfordshire County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
St Nicholas Mount

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on St Nicholas Mount, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Apr 2025 at 14:44.

Hertfordshire County Council logo
Finishing
Saturday
Details
View Map
Share
Sunnyhill Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Sunnyhill Road, Hemel Hempstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 May 2025 at 13:27.

Hertfordshire County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Harepark Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Harepark Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Apr 2025 at 14:44.

Hertfordshire County Council logo
Finishing
Sunday
Details
View Map
Share
Cemmaes Court Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Cemmaes Court Road, Hemel Hempstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2025 and run through until 28 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 May 2025 at 13:30.

Hertfordshire County Council logo
Finishing
Sunday
Details
View Map
Share
The Nokes

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on The Nokes, Hemel Hempstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2025 and run through until 28 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 May 2025 at 13:32.

Hertfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Willow Way

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Willow Way, Hemel Hempstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 September 2025 and run through until 29 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 May 2025 at 13:35.

Hertfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Robbs Close

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Robbs Close, Hemel Hempstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 September 2025 and run through until 29 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 May 2025 at 13:34.

Hertfordshire County Council logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Beechfield

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Beechfield, Kings Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Apr 2025 at 12:57.

Hertfordshire County Council logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Love Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Love Lane, Abbots Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Apr 2025 at 11:44.

UK Power Networks Eastern & London logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Midway

UK Power Networks Eastern & London are proposing to carry out New service connection on Midway, St Albans.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jul 2025 at 10:50.

UK Power Networks Eastern & London logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Midway

UK Power Networks Eastern & London are proposing to carry out New service connection on Midway, St Albans.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Aug 2025 at 10:01.

Cadent Gas logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Felden Lane

Cadent Gas are proposing to carry out Utility asset works on Felden Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 15:18.

Affinity Water logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Horsecroft Road

Affinity Water are proposing to carry out Utility asset works on Horsecroft Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 27 Jun 2025 at 08:55.

Affinity Water logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Horsecroft Road

Affinity Water are proposing to carry out Utility asset works on Horsecroft Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 25 Jul 2025 at 11:37.

Affinity Water logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Foster Road

Affinity Water are proposing to carry out Utility asset works on Foster Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Feb 2025 at 10:15.

Affinity Water logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Foster Road

Affinity Water are proposing to carry out Utility asset works on Foster Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Jul 2025 at 11:24.

Affinity Water logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Horsecroft Road

Affinity Water are proposing to carry out Utility asset works on Horsecroft Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Feb 2025 at 10:13.

Affinity Water logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Horsecroft Road

Affinity Water were proposing to carry out Utility asset works on Horsecroft Road, Hemel Hempstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 May 2025 at 09:15.

Affinity Water logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Horsecroft Road

Affinity Water were proposing to carry out Utility asset works on Horsecroft Road, Hemel Hempstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 May 2025 at 09:18.

Hertfordshire County Council logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Ranelagh Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ranelagh Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 09:53.

Hertfordshire County Council logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
St Nicholas Mount

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on St Nicholas Mount, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 09:43.

Hertfordshire County Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Long Chaulden

Hertfordshire County Council are proposing to carry out Highway improvement works on Long Chaulden, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 13 Jun 2025 at 11:10.

Hertfordshire County Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Long Chaulden

Hertfordshire County Council are proposing to carry out Highway improvement works on Long Chaulden, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 13 Jun 2025 at 11:21.

Hertfordshire County Council logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Curtis Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Curtis Way, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 14:06.

Hertfordshire County Council logo
LONG TERM
Between
29 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Whitehill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Whitehill, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 20 Aug 2025 at 07:54.

Hertfordshire County Council logo
LONG TERM
Between
29 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Brownlow Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Brownlow Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 20 Aug 2025 at 07:54.

Hertfordshire County Council logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Leighton Buzzard Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Leighton Buzzard Road, Water End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 09:33.

Hertfordshire County Council logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Bradden Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bradden Lane, Great Gaddesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 22 Aug 2025 at 12:09.

Hertfordshire County Council logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Bradden Lane

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Bradden Lane, Great Gaddesden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 12 October 2025. The works were due to impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 8 Sep 2025 at 14:41.

Hertfordshire County Council logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Le Corte Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Le Corte Close, Kings Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Apr 2025 at 13:37.

Hertfordshire County Council logo
Between
30 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bulstrode Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bulstrode Lane, Bovingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Aug 2025 at 09:43.

Hertfordshire County Council logo
Between
30 Sep and 3 Oct 2025
Details
View Map
Share
Felden Lane

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Felden Lane, Hemel Hempstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 11:09.

Affinity Water logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Cowper Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Cowper Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Apr 2025 at 08:48.

Affinity Water logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Cowper Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Cowper Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Aug 2025 at 12:34.

Affinity Water logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Gravel Hill Terrace

Affinity Water are proposing to carry out Utility repair and maintenance works on Gravel Hill Terrace, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Apr 2025 at 08:47.

Affinity Water logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Gravel Hill Terrace

Affinity Water are proposing to carry out Utility repair and maintenance works on Gravel Hill Terrace, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Aug 2025 at 12:33.

Hertfordshire County Council logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Sunnyhill Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sunnyhill Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 10:04.

Hertfordshire County Council logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Harepark Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Harepark Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 10:01.

Hertfordshire County Council logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Cemmaes Court Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cemmaes Court Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 10:14.

Hertfordshire County Council logo
Between
2 and 10 Oct 2025
Details
View Map
Share
Follow
Westwick Row

Hertfordshire County Council are proposing to carry out Highway improvement works on Westwick Row, Leverstock Green, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 10 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 19 Sep 2025 at 12:43.

Hertfordshire County Council logo
Between
2 and 6 Oct 2025
Details
View Map
Share
Follow
Broad Street

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Broad Street, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 14:03.

Hertfordshire County Council logo
Between
2 and 6 Oct 2025
Details
View Map
Share
Follow
Willow Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Willow Way, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 10:46.

Hertfordshire County Council logo
Between
2 and 6 Oct 2025
Details
View Map
Share
Follow
Robbs Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Robbs Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 10:34.

Cadent Gas logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Felden Lane

Cadent Gas are proposing to carry out Utility asset works on Felden Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 10:07.

Affinity Water logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Gravel Hill Terrace

Affinity Water are proposing to carry out Utility repair and maintenance works on Gravel Hill Terrace, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Jun 2025 at 10:14.

Hertfordshire County Council logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Long Chaulden

Hertfordshire County Council are proposing to carry out Highway improvement works on Long Chaulden, Hemel Hempstead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 13 Jun 2025 at 11:10.

Hertfordshire County Council logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Long Chaulden

Hertfordshire County Council are proposing to carry out Highway improvement works on Long Chaulden, Hemel Hempstead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 13 Jun 2025 at 11:19.

Hertfordshire County Council logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Peterlee Court

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Peterlee Court, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 14:05.

Cadent Gas logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Hunting Gate

Cadent Gas are proposing to carry out Utility asset works on Hunting Gate, Hemel Hempstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 10:35.

Cadent Gas logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Hunting Gate

Cadent Gas are proposing to carry out Utility asset works on Hunting Gate, Hemel Hempstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 08:43.

Hertfordshire County Council logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Half Moon Meadow

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Half Moon Meadow, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 Aug 2025 at 08:43.

Cadent Gas logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Roman Road

Cadent Gas are proposing to carry out Utility asset works on Roman Road, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 16:30.

Hertfordshire County Council logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Cowper Rise

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cowper Rise, Markyate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 14:11.

Hertfordshire County Council logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Cowper Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cowper Road, Markyate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 14:11.

UK Power Networks Eastern & London logo
Between
13 and 22 Oct 2025
Details
View Map
Share
Follow
Beaumayes Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Beaumayes Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Jul 2025 at 09:50.

UK Power Networks Eastern & London logo
Between
13 and 22 Oct 2025
Details
View Map
Share
Follow
Beaumayes Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Beaumayes Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2025 at 15:41.

Cadent Gas logo
Between
13 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Bennetts End Road

Cadent Gas are proposing to carry out Utility asset works on Bennetts End Road, Hemel Hempstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 14:00.

Affinity Water logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Whitehill

Affinity Water were proposing to carry out Utility repair and maintenance works on Whitehill, Berkhamsted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 15 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Jun 2025 at 10:40.

Hertfordshire County Council logo
Between
13 and 16 Oct 2025
Details
View Map
Share
Follow
New Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on New Road, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Aug 2025 at 14:58.

Cadent Gas logo
Between
13 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Roman Road

Cadent Gas are proposing to carry out Utility asset works on Roman Road, Nettleden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 16:30.

Hertfordshire County Council logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Roundwood Lane

Hertfordshire County Council are proposing to carry out Highway improvement works on Roundwood Lane, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 19 Sep 2025 at 08:55.

Hertfordshire County Council logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Langley Hill

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Langley Hill, Kings Langley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 Sep 2025 at 08:10.

Hertfordshire County Council logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Upper Bourne End Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Upper Bourne End Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Sep 2025 at 11:53.

Hertfordshire County Council logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Potten End Hill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Potten End Hill, Great Gaddesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Sep 2025 at 08:21.

Cadent Gas logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
St Albans Hill

Cadent Gas are proposing to carry out Utility asset works on St Albans Hill, Hemel Hempstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 14:30.

Affinity Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Byslips Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Byslips Road, Studham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 16 Jul 2025 at 11:42.

Affinity Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Byslips Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Byslips Road, Studham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 11 Sep 2025 at 11:16.

Hertfordshire County Council logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Common Lane

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Common Lane, Kings Langley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 Sep 2025 at 08:11.

Hertfordshire County Council logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Ashley Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ashley Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 Sep 2025 at 11:19.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
St Johns Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Johns Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 13:07.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Cowper Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cowper Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 13:05.

Cadent Gas logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Bennetts End Road

Cadent Gas were proposing to carry out Utility asset works on Bennetts End Road, Hemel Hempstead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 21 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 14:50.

Hertfordshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Long Chaulden

Hertfordshire County Council are proposing to carry out Highway improvement works on Long Chaulden, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 13 Jun 2025 at 11:10.

Hertfordshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Long Chaulden

Hertfordshire County Council are proposing to carry out Highway improvement works on Long Chaulden, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 13 Jun 2025 at 11:22.

Hertfordshire County Council logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Felden Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Felden Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 5 Sep 2025 at 09:25.

Hertfordshire County Council logo
Between
3 and 29 Nov 2025
Details
View Map
Share
Follow
A41 Westbound From M25 Junc 20 To Junc With Two Waters Way

Hertfordshire County Council are proposing to carry out Highway improvement works on A41 Westbound From M25 Junc 20 To Junc With Two Waters Way, Hemel Hempstead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 29 November 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 9 Sep 2025 at 14:26.

Hertfordshire County Council logo
Between
3 and 29 Nov 2025
Details
View Map
Share
Follow
A41 Westbound From Junc With Two Waters Way To A4251 London Road

Hertfordshire County Council are proposing to carry out Highway improvement works on A41 Westbound From Junc With Two Waters Way To A4251 London Road, Hemel Hempstead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 29 November 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 9 Sep 2025 at 14:29.

Hertfordshire County Council logo
Between
3 and 29 Nov 2025
Details
View Map
Share
Follow
A41 From A4251 London Road To A416 Chesham Road

Hertfordshire County Council are proposing to carry out Highway improvement works on A41 From A4251 London Road To A416 Chesham Road, Berkhamsted.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 29 November 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 11 Sep 2025 at 09:27.

Hertfordshire County Council logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Bourne End Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bourne End Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 26 Aug 2025 at 15:45.

Hertfordshire County Council logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Bourne End Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bourne End Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Sep 2025 at 15:04.

Cadent Gas logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
St Albans Hill

Cadent Gas were proposing to carry out Utility asset works on St Albans Hill, Hemel Hempstead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 12 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 14:49.

Electricity Network Company logo
LONG TERM
Between
3 Nov 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Long Chaulden

Electricity Network Company are proposing to carry out Utility asset works on Long Chaulden, Hemel Hempstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 20 February 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 3 Sep 2025 at 14:52.

Electricity Network Company logo
LONG TERM
Between
3 Nov 2025 and 18 Feb 2026
Details
View Map
Share
Follow
Long Chaulden

Electricity Network Company are proposing to carry out Utility asset works on Long Chaulden, Hemel Hempstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 18 February 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 29 Jul 2025 at 10:02.

Electricity Network Company logo
LONG TERM
Between
3 Nov 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Long Chaulden

Electricity Network Company are proposing to carry out Utility asset works on Long Chaulden, Hemel Hempstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 20 February 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 26 Aug 2025 at 15:46.

Affinity Water logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
High Street

Affinity Water are proposing to carry out Utility asset works on High Street, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Aug 2025 at 08:20.

Cadent Gas logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Dunstable Road

Cadent Gas are proposing to carry out Utility asset works on Dunstable Road, Markyate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 22 Sep 2025 at 13:00.

Hertfordshire County Council logo
Between
5 and 19 Nov 2025
Details
View Map
Share
Follow
Ravens Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ravens Lane, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Sep 2025 at 10:29.

Hertfordshire County Council logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
Fields End Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Fields End Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 Sep 2025 at 11:25.

Hertfordshire County Council logo
Between
5 and 19 Nov 2025
Details
View Map
Share
Follow
Gravel Path

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Gravel Path, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Sep 2025 at 10:23.

Hertfordshire County Council logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
Trowley Hill Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Trowley Hill Road, Flamstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 Sep 2025 at 11:21.

Cadent Gas logo
Between
10 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Wheelers Lane

Cadent Gas are proposing to carry out Utility asset works on Wheelers Lane, Hemel Hempstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 15:30.

Cadent Gas logo
Between
10 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Adeyfield Road

Cadent Gas are proposing to carry out Utility asset works on Adeyfield Road, Hemel Hempstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Sep 2025 at 17:30.

UK Power Networks Eastern & London logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Puller Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Puller Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2025 at 15:01.

Network Rail logo
LONG TERM
Between
17 Nov 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Whitehill

Network Rail are proposing to carry out Works for Rail Purposes on Whitehill, Berkhamsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 6 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 9 Sep 2025 at 11:01.

Cadent Gas logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
The Green

Cadent Gas are proposing to carry out Utility asset works on The Green, Potten End.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 11:17.

UK Power Networks Eastern & London logo
Between
24 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Pouchen End Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Pouchen End Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 12 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Sep 2025 at 13:11.

UK Power Networks Eastern & London logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Toms Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Toms Lane, Kings Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2025 at 16:08.

Affinity Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Hobbs Hill Road

Affinity Water are proposing to carry out Utility asset works on Hobbs Hill Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Sep 2025 at 07:36.

Cadent Gas logo
LONG TERM
Between
1 Dec 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Little Heath Lane

Cadent Gas are proposing to carry out Utility asset works on Little Heath Lane, Potten End.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 16 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Sep 2025 at 08:12.

Cadent Gas logo
LONG TERM
Between
1 Dec 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Hempstead Lane

Cadent Gas are proposing to carry out Utility asset works on Hempstead Lane, Potten End.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 11:15.

Hertfordshire County Council logo
Between
8 and 10 Dec 2025
Details
View Map
Share
Follow
Langley Hill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Langley Hill, Kings Langley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 Sep 2025 at 13:37.

Hertfordshire County Council logo
Between
15 and 17 Dec 2025
Details
View Map
Share
Common Lane

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Common Lane, Kings Langley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 December 2025 and run through until 17 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Sep 2025 at 07:32.


Roadworks Map near to St. Agnells Lane, HEMEL HEMPSTEAD, HP2 6EG (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 23 Sep 2025 04:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to St. Agnells Lane, HEMEL HEMPSTEAD, HP2 6EG (15 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
ST AGNELLS LANE, CUPID GREEN 
(0.2 miles)
BT
Utility asset works - Footpath - No carriageway incursion
Planned
Scheduled: 22 Sep 2025 - 24 Sep 2025
0.2
Details
Share
Follow
2
Affinity Water logo
WASHINGTON AVENUE 
(0.3 miles)
Affinity Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
19 Sep 2025 08:23 - 22 Sep 2025 07:00
0.3
Details
Share
3
Hertfordshire County Council logo
ST AGNELLS LANE, CUPID GREEN 
(0.4 miles)
Hertfordshire County Council
Highway improvement works - Carriageway - Multi-way signals
Planned
Scheduled: 22 Sep 2025 - 26 Sep 2025
0.4
Details
Share
Follow
4
Cadent Gas logo
CAMBORNE DRIVE 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 22 Sep 2025 - 3 Oct 2025
0.6
Details
Share
Follow
5
BT logo
CHALFONT CLOSE 
(0.6 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 23 Sep 2025 - 25 Sep 2025
0.6
Details
Share
Follow
6
Cadent Gas logo
TREMAINE GROVE 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway, Verge - Some carriageway incursion
In Progress
Since: 22 Sep 2025 07:10
(Scheduled: 22 Sep 2025 - 3 Oct 2025)
0.6
Details
Share
Follow
7
Cadent Gas logo
MAJOR
  
WASHINGTON AVENUE 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 15 Sep 2025 - 3 Oct 2025
0.6
Details
Share
Follow
8
Cadent Gas logo
MAJOR
  
WASHINGTON AVENUE 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway, Verge - Some carriageway incursion
In Progress
Since: 15 Sep 2025 10:43
(Scheduled: 15 Sep 2025 - 3 Oct 2025)
0.6
Details
Share
Follow
9
Cadent Gas logo
MAJOR
  
WASHINGTON AVENUE 
(0.6 miles)
Cadent Gas
Utility asset works - Verge - No carriageway incursion
Planned
Scheduled: 1 Sep 2025 - 21 Nov 2025
0.6
Details
Share
Follow
10
Cadent Gas logo
MAJOR
  
WASHINGTON AVENUE 
(0.6 miles)
Cadent Gas
Utility asset works - Verge - No carriageway incursion
In Progress
Since: 5 Sep 2025 09:27
(Scheduled: 1 Sep 2025 - 21 Nov 2025)
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.