ROADWORKS SUMMARY
Wood Lane, HEMEL HEMPSTEAD, HP2 4TP
Introduction
View current and future planned roadworks and road closures for Wood Lane, HP2 4TP and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Wood Lane, HEMEL HEMPSTEAD, HP2 4TP
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wood Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
18 Mar 2025
Thames Water are carrying out Utility repair and maintenance works on M25 J19 Leave E, Three Rivers.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 March 2023 at 23:25 and could run through until 18 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 17 Mar 2023 at 23:22.
31 Mar 2025
Hertfordshire County Council are carrying out Highway repair and maintenance works on Hempstead Lane, Potten End.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 May 2024 at 15:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2024 at 08:42.
2 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Railway Terrace, Kings Langley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 10 Jul 2024 at 11:05.
2 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Kings Road, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 09:11.
6 Jan and 21 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Belswains Lane, Hemel Hempstead.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:35.
6 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Kings Road, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 10:02.
6 Jan and 26 Jul 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 26 Sep 2024 at 09:03.
6 Jan and 26 Jul 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 26 Sep 2024 at 09:03.
6 Jan and 26 Jul 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 26 Sep 2024 at 09:02.
6 Jan and 14 Feb 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Brownlow Road, Berkhamsted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 18 Nov 2024 at 12:34.
Tomorrow
Affinity Water are proposing to carry out Utility asset works on Dodds Lane, Great Gaddesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 15:51.
Tomorrow
Affinity Water are carrying out Utility asset works on Dodds Lane, Great Gaddesden.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 11:15 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 6 Jan 2025 at 11:32.
Wednesday
Leep Utilities Electric are proposing to carry out Permanent reinstatement on Bedmond Road, Abbots Langley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 20 Nov 2024 at 16:04.
11 Jan and 2 Jun 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 January 2025 and run through until 2 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 2 Jan 2025 at 08:55.
11 Jan and 4 Apr 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 January 2025 and run through until 4 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 2 Jan 2025 at 08:58.
11 Jan and 7 Apr 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 25 Nov 2024 at 08:47.
11 Jan and 7 Apr 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 28 Nov 2024 at 08:37.
11 Jan and 7 Apr 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way Roundabout, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 22 Nov 2024 at 17:06.
11 Jan and 7 Apr 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way Roundabout, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 28 Nov 2024 at 08:41.
11 Jan and 7 Apr 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way Roundabout, Hemel Hempstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 25 Nov 2024 at 08:45.
11 Jan and 7 Apr 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way Roundabout, Hemel Hempstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 28 Nov 2024 at 08:36.
11 Jan and 4 Apr 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 January 2025 and run through until 4 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 2 Jan 2025 at 12:49.
11 Jan and 7 Apr 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 25 Nov 2024 at 09:37.
11 Jan and 7 Apr 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 28 Nov 2024 at 08:26.
11 Jan and 2 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Cherry Tree Lane, Redbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 25 Nov 2024 at 08:56.
11 Jan and 2 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Cherry Tree Lane, Redbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 Nov 2024 at 12:11.
13 Jan and 10 Feb 2025
Leep Utilities Electric are proposing to carry out New service connection on Bedmond Road, Abbots Langley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 20 Nov 2024 at 16:04.
Sunday
Leep Utilities Electric are carrying out Permanent reinstatement on Bedmond Road, Abbots Langley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 January 2025 at 08:00 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 14 Jan 2025 at 08:37.
Sunday
Leep Utilities Electric are carrying out New service connection on Bedmond Road, Abbots Langley.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 January 2025 at 08:00 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 14 Jan 2025 at 08:37.
7 Mar 2025
Cadent Gas are carrying out Utility asset works on Kings Road, Berkhamsted.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 January 2025 at 12:11 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 12:39.
7 Feb 2025
Affinity Water are carrying out Utility asset works on Ashfields, Watford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 08:00 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 27 Jan 2025 at 13:04.
Today
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hempstead Lane, Potten End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 Nov 2024 at 07:48.
21 Jan and 10 Feb 2025
BT are proposing to carry out Utility asset works on Bulstrode Lane, Chipperfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 14 Nov 2024 at 10:15.
Monday
BT are proposing to carry out Utility repair and maintenance works on Rucklers Lane, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 14 Nov 2024 at 10:14.
Today
Cadent Gas are carrying out Utility repair and maintenance works on Langleybury Lane, Langleybury.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 January 2025 at 21:03 and could run through until 30 January 2025. The works will impact the footway, verge and footpath.
This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 09:09.
Tuesday
Hertfordshire County Council are carrying out Highway repair and maintenance works on Shantock Hall Lane, Bovingdon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 January 2025 at 09:52 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Jan 2025 at 09:55.
27 Jan and 7 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Beesonend Lane, Redbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 24 Oct 2024 at 10:14.
Cadent Gas carried out Utility repair and maintenance works on The Green, Sarratt.
The road was closed for some or all of the period.
The works were originally planned between 28 Jan 2025 and 5 Feb 2025 and were actually completed between 28 Jan 2025 (08:54) and 30 Jan 2025 (16:35). The works impacted the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 22:05.
Today
Affinity Water are proposing to carry out Utility repair and maintenance works on Puller Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 15:52.
Today
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cemmaes Court Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Oct 2024 at 10:13.
6 Feb 2025
Cadent Gas are carrying out Utility repair and maintenance works on London Road, Hemel Hempstead.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 January 2025 at 12:40 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 08:11.
Saturday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Shantock Hall Lane, Bovingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Jan 2025 at 11:24.
Saturday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Shantock Hall Lane, Bovingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Jan 2025 at 11:57.
Monday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Pancake Lane, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:24.
Monday
Hertfordshire County Council are carrying out Highway repair and maintenance works on Pancake Lane, Hemel Hempstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 January 2025 at 07:30 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 30 Jan 2025 at 08:59.
Monday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on St Nicholas Mount, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Oct 2024 at 09:18.
Monday
Hertfordshire County Council are carrying out Highway repair and maintenance works on St Nicholas Mount, Hemel Hempstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 January 2025 at 07:30 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 30 Jan 2025 at 09:08.
30 Jan and 27 Feb 2025
Leep Utilities Electric are proposing to carry out roadworks on Breakspear Way, Leverstock Green, Hemel Hempstead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 29 Jan 2025 at 10:40.
Monday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Harepark Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 16:19.
Monday
Hertfordshire County Council are carrying out Highway repair and maintenance works on Harepark Close, Hemel Hempstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 January 2025 at 07:30 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 30 Jan 2025 at 09:08.
Monday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Robbs Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 16:22.
Monday
Hertfordshire County Council are carrying out Highway repair and maintenance works on Robbs Close, Hemel Hempstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 January 2025 at 07:30 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 30 Jan 2025 at 09:09.
Monday
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2024 at 15:04.
Monday
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 Nov 2024 at 12:26.
Tuesday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Broad Street, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 16:13.
Tuesday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Broad Street, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:36.
Tuesday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Peterlee Court, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 16:04.
Tuesday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Peterlee Court, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:36.
Tuesday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cleves Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:03.
Tuesday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cleves Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 Nov 2024 at 09:37.
Tuesday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Potten End Hill, Great Gaddesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:25.
Tuesday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Potten End Hill, Great Gaddesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 Jan 2025 at 14:05.
Wednesday
Hertfordshire County Council are proposing to carry out Statutory Infrastructure Works on Two Waters Way, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 Dec 2024 at 10:21.
3 and 21 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on St Albans Hill, Hemel Hempstead.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:33.
3 and 13 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Briar Way, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 Dec 2024 at 11:37.
3 and 13 Feb 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Briar Way, Berkhamsted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 13 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 30 Jan 2025 at 16:37.
Wednesday
Affinity Water were proposing to carry out Remedial works on Highfield Lane, Hemel Hempstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 08:08.
Wednesday
Affinity Water are proposing to carry out Remedial works on Highfield Lane, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 11:05.
Wednesday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Parr Crescent, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 16:07.
Wednesday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Parr Crescent, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:35.
4 and 6 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Aragon Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:55.
4 and 6 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Aragon Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 08:53.
4 and 6 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Catherine Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 16:01.
4 and 6 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Catherine Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 08:48.
4 and 6 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Northaw Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:52.
4 and 6 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Northaw Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 08:54.
4 and 6 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Jane Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:49.
4 and 6 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Jane Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 08:54.
5 and 7 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Seaton Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Oct 2024 at 13:47.
5 and 7 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Seaton Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 08:47.
6 and 8 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on North Western Avenue, Woodside, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 18 Dec 2024 at 13:45.
6 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Upper Bourne End Lane, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 15:35.
6 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Upper Bourne End Lane, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 15:22.
6 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Great Whites Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:40.
6 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Great Whites Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 08:55.
6 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Curtis Way, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Oct 2024 at 13:50.
6 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Curtis Way, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 08:52.
6 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Normandy Drive, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Oct 2024 at 13:46.
6 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Normandy Drive, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 09:00.
7 and 11 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Oakwood, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:33.
7 and 11 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Oakwood, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 09:01.
7 and 11 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Brownlow Road, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 13:06.
7 and 11 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Brownlow Road, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 09:01.
7 and 11 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on New Road, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:22.
7 and 11 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on New Road, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:52.
8 Feb and 17 Mar 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Green Lane, Hemel Hempstead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 30 Jan 2025 at 09:37.
8 Feb and 17 Mar 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Green Lane, Hemel Hempstead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 30 Jan 2025 at 09:40.
10 Feb and 16 May 2025
Cadent Gas are proposing to carry out Utility asset works on Tibbs Hill Road, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 16 May 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 10:41.
10 Feb and 16 May 2025
Cadent Gas were proposing to carry out Utility asset works on Tibbs Hill Road, Abbots Langley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 16 May 2025. The works were due to impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 08:44.
10 and 14 Feb 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Toms Lane, Kings Langley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Jan 2025 at 08:51.
10 and 12 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sharpes Lane, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 5 Nov 2024 at 09:19.
10 and 12 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sharpes Lane, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 09:38.
10 and 12 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Water End Road, Potten End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 09:02.
10 and 12 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Water End Road, Potten End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 08:48.
10 and 12 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Leighton Buzzard Road, Water End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 10:16.
11 and 28 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on North Orbital Road, Chiswell Green, St Albans.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 4 Dec 2024 at 14:25.
11 and 28 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on North Orbital Road, Chiswell Green, St Albans.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 6 Dec 2024 at 07:54.
12 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 11 Nov 2024 at 10:50.
12 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 13:13.
13 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Beechfield, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 13:12.
13 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Beechfield, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 14:04.
13 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Le Corte Close, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 13:43.
13 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Le Corte Close, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 13:26.
13 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chipperfield Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 24 Oct 2024 at 10:56.
13 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garden Field Lane, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 15:54.
13 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Garden Field Lane, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Dec 2024 at 09:04.
13 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clements End Road, Great Gaddesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 09:42.
17 and 21 Feb 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on North Approach, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 16 Jan 2025 at 14:26.
17 and 25 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on High Elms Lane, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 9 Dec 2024 at 09:47.
17 and 25 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on High Elms Lane, Abbots Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 14 Jan 2025 at 10:15.
17 and 21 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Mount Pleasant Lane, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 13:25.
17 Feb and 9 May 2025
Cadent Gas are proposing to carry out Utility asset works on Belswains Lane, Hemel Hempstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 13:41.
17 Feb and 9 May 2025
Cadent Gas are proposing to carry out Utility asset works on Belswains Lane, Hemel Hempstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 13:00.
17 Feb and 9 May 2025
Cadent Gas are proposing to carry out Utility asset works on Belswains Lane, Hemel Hempstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jan 2025 at 12:18.
17 and 19 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Kings Road, Berkhamsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 15:28.
17 and 19 Feb 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Kings Road, Berkhamsted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 10 Jan 2025 at 12:08.
17 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Trowley Bottom, Flamstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jan 2025 at 14:47.
17 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Pietley Hill, Flamstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jan 2025 at 08:35.
17 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Pietley Hill, Flamstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jan 2025 at 09:59.
17 and 19 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clements End Road, Great Gaddesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Dec 2024 at 11:39.
17 and 19 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clements End Road, Great Gaddesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 Dec 2024 at 10:57.
18 and 20 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Leighton Buzzard Road, Water End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Nov 2024 at 08:28.
18 and 21 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Leighton Buzzard Road, Water End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 27 Nov 2024 at 09:51.
19 and 22 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bennetts End Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 20 Jan 2025 at 08:57.
19 and 21 Feb 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Gravel Path, Berkhamsted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 12:13.
24 and 28 Feb 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Sheepcot Lane, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 11 Dec 2024 at 12:54.
24 and 28 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Sheepcot Lane, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 19 Dec 2024 at 13:56.
24 and 28 Feb 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Sheepcot Lane, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 20 Jan 2025 at 13:49.
24 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on The Uplands, Bricket Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 08:06.
24 Feb and 16 May 2025
Cadent Gas are proposing to carry out Utility asset works on Hempstead Lane, Potten End.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 16:00.
24 Feb and 7 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Beesonend Lane, Redbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Jan 2025 at 16:05.
27 Feb and 3 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chipperfield Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 10:08.
27 Feb and 3 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chipperfield Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 11 Dec 2024 at 09:40.
28 Feb and 4 Mar 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Leighton Buzzard Road, Water End.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 February 2025 and run through until 4 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Oct 2024 at 09:55.
3 and 6 Mar 2025
Affinity Water are proposing to carry out Utility asset works on Bucks Hill, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 3 Dec 2024 at 09:46.
3 and 13 Mar 2025
Hertfordshire County Council are proposing to carry out Section 50 on Flaunden Hill, Flaunden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 Jan 2025 at 09:18.
3 and 13 Mar 2025
Hertfordshire County Council are proposing to carry out Section 50 on Flaunden Hill, Flaunden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 Jan 2025 at 09:19.
3 Mar and 4 Apr 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Belmont Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 9 Jan 2025 at 09:49.
3 Mar and 4 Apr 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Belmont Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 27 Jan 2025 at 08:03.
3 and 7 Mar 2025
BT are proposing to carry out Utility asset works on Pallas Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 20 Jan 2025 at 08:51.
3 and 5 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ashridge Road, Northchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 13:12.
5 and 7 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Water Lane, Bovingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Oct 2024 at 10:47.
5 and 10 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Water Lane, Bovingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 Jan 2025 at 15:43.
10 and 13 Mar 2025
Affinity Water are proposing to carry out Utility asset works on Bucks Hill, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 3 Dec 2024 at 14:08.
10 and 13 Mar 2025
Affinity Water are proposing to carry out Utility asset works on Bucks Hill, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 22 Jan 2025 at 10:00.
10 and 13 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bucks Hill, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Dec 2024 at 11:39.
10 and 12 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Vicarage Lane, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 17 Dec 2024 at 11:43.
10 and 12 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Vicarage Lane, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Dec 2024 at 15:07.
10 and 21 Mar 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Roughdown Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 15:37.
10 and 21 Mar 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Roughdown Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 16:00.
10 and 12 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Frithsden Lane, Potten End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 13:09.
10 and 12 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Frithsden Lane, Potten End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 Nov 2024 at 12:41.
12 and 14 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on St Margarets, Great Gaddesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 13:01.
13 and 17 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Crown Street, Redbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 Oct 2024 at 11:05.
13 and 17 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Crown Street, Redbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 11 Dec 2024 at 11:52.
17 and 22 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Roman Road, Potten End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Dec 2024 at 08:51.
17 and 22 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Frithsden Lane, Potten End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Dec 2024 at 08:52.
17 and 19 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dodds Lane, Great Gaddesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 13:05.
17 and 19 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dodds Lane, Great Gaddesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Nov 2024 at 08:29.
20 and 27 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Jul 2024 at 13:14.
20 and 27 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dawes Lane, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Jul 2024 at 13:16.
20 and 27 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Sarratt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Aug 2024 at 13:54.
24 and 26 Mar 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Moor Lane, Sarratt.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 17 Oct 2024 at 08:21.
24 Mar and 18 Apr 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Langley Lodge Lane, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 24 Jan 2025 at 10:37.
24 Mar and 18 Apr 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on A41 Westbound From M25 Junc 20 To Junc With Two Waters Way, Hemel Hempstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 18 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 24 Jan 2025 at 09:55.
27 and 29 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Wood Lane End, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Dec 2024 at 11:46.
27 and 29 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Wood Lane End, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Jan 2025 at 09:44.
28 and 31 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ledgemore Lane, Great Gaddesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Oct 2024 at 12:47.
2 and 4 Apr 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kings Lane, Chipperfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Dec 2024 at 13:54.
5 Apr and 2 Jun 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 April 2025 and run through until 2 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 2 Jan 2025 at 13:04.
5 Apr and 2 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 25 Nov 2024 at 08:59.
5 Apr and 2 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 28 Nov 2024 at 08:35.
5 Apr and 2 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way Roundabout, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 22 Nov 2024 at 17:27.
5 Apr and 2 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way Roundabout, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 28 Nov 2024 at 08:36.
5 Apr and 2 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way Roundabout, Hemel Hempstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 25 Nov 2024 at 08:57.
5 Apr and 2 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way Roundabout, Hemel Hempstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 28 Nov 2024 at 08:34.
5 Apr and 2 Jun 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 April 2025 and run through until 2 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 2 Jan 2025 at 13:22.
5 Apr and 2 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 13:42.
5 Apr and 2 Jun 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Boundary Way, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 09:05.
7 and 11 Apr 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on St Johns Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 16 Dec 2024 at 10:28.
7 and 11 Apr 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on St Johns Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 14 Jan 2025 at 14:38.
8 and 15 Apr 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on High Road, Leavesden, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Jan 2025 at 08:23.
8 and 15 Apr 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on High Road, Leavesden, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 Jan 2025 at 12:01.
9 and 11 Apr 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Water Lane, Bovingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 9 Jan 2025 at 09:52.
14 and 17 Apr 2025
Affinity Water are proposing to carry out Utility asset works on Chesham Road, Bovingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 21 Jan 2025 at 15:42.
14 and 20 Apr 2025
Affinity Water are proposing to carry out Utility asset works on Newford Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 20 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 29 Jan 2025 at 10:57.
14 Apr and 2 May 2025
Cadent Gas are proposing to carry out Utility asset works on Kings Road, Berkhamsted.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 09:41.
14 and 17 Apr 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Redbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Dec 2024 at 09:46.
23 and 25 Apr 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chipperfield Road, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Dec 2024 at 09:13.
23 and 25 Apr 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Vicarage Lane, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Dec 2024 at 09:21.
28 and 30 Apr 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Puller Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 16 Jan 2025 at 10:41.
29 Apr and 1 May 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Vicarage Lane, Kings Langley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Dec 2024 at 09:18.
29 Apr and 1 May 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bulstrode Lane, Bovingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 16:19.
29 Apr and 1 May 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Felden Lane, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 16:19.
29 Apr and 1 May 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Pouchen End Lane, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Dec 2024 at 10:18.
Roadworks Map near to Wood Lane, HEMEL HEMPSTEAD, HP2 4TP (Loading...)
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Wood Lane, HEMEL HEMPSTEAD, HP2 4TP (42 Events)
(Scheduled Dates)
(miles)
(Scheduled: 20 Jan 2025 - 5 Feb 2025)
(Scheduled: 18 Sep 2024 - 3 Feb 2025)
(Scheduled: 27 Jan 2025 - 3 Feb 2025)
Contains public sector information licensed under the Open Government Licence v3.0.