ROADWORKS SUMMARY
Walton Road, AYLESBURY, HP21 7RP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Walton Road, HP21 7RP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Walton Road, AYLESBURY, HP21 7RP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Walton Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

HS2 logo
LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
Wendover Bridleway 14

HS2 are carrying out Works for Rail Purposes on Wendover Bridleway 14, Wendover.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2023 at 07:00 and could run through until 27 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by HS2 on 11 Sep 2023 at 14:59.

Thames Water logo
LONG TERM
Between
4 Mar and 29 May 2024
Details
View Map
Share
Follow
Neyland Drive

Thames Water are proposing to carry out Disconnection or alteration of supply on Neyland Drive, Aylesbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2024 and could run through until 29 May 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 15 Feb 2024 at 13:45.

Buckinghamshire Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Lower Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Lower Road, Stoke Mandeville.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 1 Mar 2024 at 09:18.

Buckinghamshire Council logo
LONG TERM
Between
31 Mar 2024 and 30 Jul 2025
Details
View Map
Share
Follow
Aston Clinton Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Aston Clinton Road, Weston Turville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 22 Jun 2023 at 13:23.

Buckinghamshire Council logo
LONG TERM
Until
31 Jul 2024
Details
View Map
Share
Follow
London Road

Buckinghamshire Council are carrying out Highway improvement works on London Road, Aston Clinton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 31 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Apr 2024 at 09:42.

Thames Water logo
LONG TERM
Until
20 May 2024
Details
View Map
Share
Follow
Savernake Road

Thames Water are carrying out Disconnection or alteration of supply on Savernake Road, Aylesbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:05 and could run through until 20 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 07:05.

Buckinghamshire Council logo
Between
22 Apr and 10 May 2024
Details
View Map
Share
Follow
Bicester Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Bicester Road, Aylesbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 12 Mar 2024 at 09:34.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Walton Street

Buckinghamshire Council are carrying out Highway improvement works on Walton Street, Aylesbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 19:00 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 14:01.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Walton Street

Buckinghamshire Council are carrying out Highway repair and maintenance works on Walton Street, Aylesbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 19:00 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 14:01.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Aylesbury Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Aylesbury Road, Wing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Apr 2024 at 14:08.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Wendover Road

Buckinghamshire Council are carrying out Highway repair and maintenance works on Wendover Road, Aylesbury.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 April 2024 at 18:00 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 26 Apr 2024 at 07:07.

Buckinghamshire Council logo
Today
Details
View Map
Share
Friarage Road

Buckinghamshire Council carried out Highway improvement works on Friarage Road, Aylesbury.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 25 Apr 2024 and 27 Apr 2024 and were actually completed between 25 Apr 2024 (20:00) and 27 Apr 2024 (07:00). The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 27 Apr 2024 at 07:29.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
South Street

Buckinghamshire Council are carrying out Highway repair and maintenance works on South Street, Wendover.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 April 2024 at 18:00 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 15:29.

Buckinghamshire Council logo
Today
Details
View Map
Share
Blackgrove Road

Buckinghamshire Council carried out Highway improvement works on Blackgrove Road, Waddesdon.

The road was closed for some or all of the period.

The works were completed on 27 April 2024 The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 27 Apr 2024 at 08:31.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Fleet Street

Thames Water are proposing to carry out Utility repair and maintenance works on Fleet Street, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Feb 2024 at 11:32.

Buckinghamshire Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Bicester Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Bicester Road, Quarrendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Apr 2024 at 09:44.

Murphy Power Distribution logo
Between
29 Apr and 13 May 2024
Details
View Map
Share
Follow
Lester Road

Murphy Power Distribution are proposing to carry out Utility asset works on Lester Road, Aylesbury.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 13 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 3 Apr 2024 at 14:04.

Buckinghamshire Council logo
Between
2 and 7 May 2024
Details
View Map
Share
Follow
Samian Way

Buckinghamshire Council are proposing to carry out Highway improvement works on Samian Way, Aston Clinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2024 and could run through until 7 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Jan 2024 at 14:21.

Buckinghamshire Council logo
Between
6 and 8 May 2024
Details
View Map
Share
Follow
Stocklake

Buckinghamshire Council are proposing to carry out Highway improvement works on Stocklake, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 2 Feb 2024 at 09:28.

Buckinghamshire Council logo
LONG TERM
Between
6 May and 6 Jun 2024
Details
View Map
Share
Follow
Picasso Place

Buckinghamshire Council are proposing to carry out Highway improvement works on Picasso Place, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 6 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Apr 2024 at 13:23.

Buckinghamshire Council logo
Between
7 and 9 May 2024
Details
View Map
Share
Follow
College Road North

Buckinghamshire Council are proposing to carry out Highway improvement works on College Road North, Aston Clinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Jan 2024 at 14:22.

Buckinghamshire Council logo
Between
7 and 9 May 2024
Details
View Map
Share
Follow
High Street

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on High Street, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 11:34.

Anglian Water logo
Between
12 and 19 May 2024
Details
View Map
Share
Follow
Church Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Street, Wingrave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 24 Apr 2024 at 07:55.

Buckinghamshire Council logo
LONG TERM
Between
13 May and 2 Aug 2024
Details
View Map
Share
Follow
Stocklake

Buckinghamshire Council are proposing to carry out Highway improvement works on Stocklake, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 2 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 20 Feb 2024 at 14:38.

Buckinghamshire Council logo
LONG TERM
Between
13 May and 2 Aug 2024
Details
View Map
Share
Follow
Stocklake

Buckinghamshire Council are proposing to carry out Highway improvement works on Stocklake, Aylesbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 22 Apr 2024 at 13:08.

Buckinghamshire Council logo
Between
13 and 15 May 2024
Details
View Map
Share
Follow
The Holloway

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on The Holloway, Drayton Beauchamp.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 12:06.

Thames Water logo
LONG TERM
Between
13 May and 27 Jul 2024
Details
View Map
Share
Follow
Aylesbury Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Aylesbury Road, Bierton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 27 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Feb 2024 at 12:26.

Buckinghamshire Council logo
LONG TERM
Between
13 May and 2 Aug 2024
Details
View Map
Share
Follow
Bellingham Way

Buckinghamshire Council are proposing to carry out Highway improvement works on Bellingham Way, Broughton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 22 Apr 2024 at 13:07.

Buckinghamshire Council logo
LONG TERM
Between
13 May and 2 Aug 2024
Details
View Map
Share
Follow
Douglas Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Douglas Road, Aylesbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 22 Apr 2024 at 13:08.

Buckinghamshire Council logo
LONG TERM
Between
13 May and 2 Aug 2024
Details
View Map
Share
Follow
Oakfield Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Oakfield Road, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 2 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 20 Feb 2024 at 14:33.

Buckinghamshire Council logo
LONG TERM
Between
13 May and 2 Aug 2024
Details
View Map
Share
Follow
Oakfield Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Oakfield Road, Aylesbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2024 at 15:36.

Buckinghamshire Council logo
LONG TERM
Between
13 May and 2 Aug 2024
Details
View Map
Share
Follow
Douglas Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Douglas Road, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 2 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 20 Feb 2024 at 14:36.

Thames Water logo
Between
17 and 19 May 2024
Details
View Map
Share
Follow
Mandeville Road

Thames Water are proposing to carry out Utility repair and maintenance works on Mandeville Road, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Mar 2024 at 12:52.

Thames Water logo
Between
17 and 19 May 2024
Details
View Map
Share
Follow
Mandeville Road

Thames Water are proposing to carry out Utility repair and maintenance works on Mandeville Road, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Mar 2024 at 12:49.

Thames Water logo
Between
17 and 19 May 2024
Details
View Map
Share
Follow
Mandeville Road

Thames Water are proposing to carry out Utility repair and maintenance works on Mandeville Road, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Mar 2024 at 12:40.

Thames Water logo
Between
20 and 23 May 2024
Details
View Map
Share
Follow
Main Road

Thames Water are proposing to carry out New service connection on Main Road, Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Feb 2024 at 10:29.

Thames Water logo
LONG TERM
Between
28 May and 12 Jul 2024
Details
View Map
Share
Follow
Chamberlain Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Chamberlain Road, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 25 Apr 2024 at 10:23.

Buckinghamshire Council logo
Between
29 May and 2 Jun 2024
Details
View Map
Share
Follow
Aylesbury Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Aylesbury Road, Wingrave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Mar 2024 at 10:34.

Buckinghamshire Council logo
LONG TERM
Between
1 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Oxford Road

Buckinghamshire Council are proposing to carry out Remedial works on Oxford Road, Aylesbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 7 Mar 2024 at 15:38.

Buckinghamshire Council logo
Between
4 and 6 Jun 2024
Details
View Map
Share
Follow
Aylesbury Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Aylesbury Road, Wendover.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 8 Mar 2024 at 15:44.

Thames Water logo
Between
18 and 20 Jun 2024
Details
View Map
Share
Follow
Church Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Church Lane, Weston Turville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 13:06.

Buckinghamshire Council logo
Between
20 and 24 Jun 2024
Details
View Map
Share
Follow
Grove Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Grove Lane, Great Kimble.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2024 and could run through until 24 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2024 at 11:29.

Buckinghamshire Council logo
Between
27 and 30 Jun 2024
Details
View Map
Share
Follow
Lower Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Lower Road, Stoke Mandeville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 10 Apr 2024 at 14:56.

Buckinghamshire Council logo
Between
27 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Lower Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Lower Road, Stoke Mandeville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Apr 2024 at 10:16.

Buckinghamshire Council logo
Between
28 Jun and 2 Jul 2024
Details
View Map
Share
Follow
Risborough Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Risborough Road, Little Kimble.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Mar 2024 at 13:58.

Buckinghamshire Council logo
Between
28 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Risborough Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Risborough Road, Terrick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 25 Mar 2024 at 10:48.

UK Power Networks Eastern & London logo
Between
1 and 14 Jul 2024
Details
View Map
Share
Follow
Princes Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Princes Road, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 14 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Feb 2024 at 11:56.

Buckinghamshire Council logo
LONG TERM
Between
1 Jul and 16 Aug 2024
Details
View Map
Share
Follow
Chapel Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Chapel Road, Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 16 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Mar 2024 at 16:09.

Buckinghamshire Council logo
Between
4 and 8 Jul 2024
Details
View Map
Share
Follow
Lower Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Lower Road, Stoke Mandeville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2024 and could run through until 8 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Apr 2024 at 10:17.

BT logo
Between
8 and 10 Jul 2024
Details
View Map
Share
Follow
Coppice Way

BT are proposing to carry out Utility asset works on Coppice Way, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 10 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Apr 2024 at 10:31.

Buckinghamshire Council logo
Between
12 Jul and 1 Aug 2024
Details
View Map
Share
Follow
London Road

Buckinghamshire Council are proposing to carry out Highway improvement works on London Road, Aston Clinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2024 and could run through until 1 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 29 Feb 2024 at 11:38.

Buckinghamshire Council logo
LONG TERM
Between
15 Jul and 31 Aug 2024
Details
View Map
Share
Follow
Churchill Avenue

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Churchill Avenue, Aylesbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 31 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2024 at 14:38.

Buckinghamshire Council logo
Between
16 and 19 Jul 2024
Details
View Map
Share
Follow
Northern Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Northern Road, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2024 and could run through until 19 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Mar 2024 at 12:04.

UK Power Networks Eastern & London logo
Between
16 and 28 Jul 2024
Details
View Map
Share
Follow
Astrope Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Astrope Lane, Astrope.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2024 and could run through until 28 July 2024. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Apr 2024 at 14:03.

Thames Water logo
Between
22 Jul and 2 Aug 2024
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Whitchurch.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 2 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Apr 2024 at 09:04.

Buckinghamshire Council logo
LONG TERM
Between
22 Jul and 15 Nov 2024
Details
View Map
Share
Follow
Cambridge Street

Buckinghamshire Council are proposing to carry out Highway improvement works on Cambridge Street, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 26 Apr 2024 at 09:18.

Thames Water logo
Between
22 Jul and 2 Aug 2024
Details
View Map
Share
Follow
Hawleys Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Hawleys Lane, Whitchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 2 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Apr 2024 at 09:03.

Buckinghamshire Council logo
Between
22 and 26 Jul 2024
Details
View Map
Share
Follow
Risborough Road

Buckinghamshire Council are proposing to carry out Core Sampling on Risborough Road, Little Kimble.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 09:06.

Buckinghamshire Council logo
Between
22 and 26 Jul 2024
Details
View Map
Share
Follow
Leighton Road

Buckinghamshire Council are proposing to carry out Core Sampling on Leighton Road, Wingrave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 08:57.

Buckinghamshire Council logo
Between
22 and 26 Jul 2024
Details
View Map
Share
Follow
Marsh Road

Buckinghamshire Council are proposing to carry out Core Sampling on Marsh Road, Little Kimble.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Apr 2024 at 10:58.

Buckinghamshire Council logo
Between
22 and 26 Jul 2024
Details
View Map
Share
Follow
Risborough Road

Buckinghamshire Council are proposing to carry out Core Sampling on Risborough Road, Terrick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 08:23.

Buckinghamshire Council logo
Between
22 and 26 Jul 2024
Details
View Map
Share
Follow
Aylesbury Road

Buckinghamshire Council are proposing to carry out Core Sampling on Aylesbury Road, Wendover.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 06:39.

Thames Water logo
Between
22 and 24 Jul 2024
Details
View Map
Share
Follow
Wingrave Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wingrave Road, Gubblecote, Tring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Apr 2024 at 10:31.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Jul and 31 Aug 2024
Details
View Map
Share
Follow
Eythrope Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eythrope Road, Stone.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 31 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2024 at 06:59.

Thames Water logo
LONG TERM
Between
22 Jul and 28 Sep 2024
Details
View Map
Share
Follow
Weedon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Weedon Road, Aylesbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 28 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Apr 2024 at 12:33.

Buckinghamshire Council logo
Between
22 and 25 Jul 2024
Details
View Map
Share
Follow
York Place

Buckinghamshire Council are proposing to carry out Highway improvement works on York Place, Aylesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 25 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Mar 2024 at 12:03.

Buckinghamshire Council logo
LONG TERM
Between
22 Jul and 15 Nov 2024
Details
View Map
Share
Follow
Buckingham Street

Buckinghamshire Council are proposing to carry out Highway improvement works on Buckingham Street, Aylesbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 26 Apr 2024 at 09:20.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Jul and 30 Aug 2024
Details
View Map
Share
Follow
Oxford Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Oxford Road, Stone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2024 and could run through until 30 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2024 at 06:57.


Roadworks Map near to Walton Road, AYLESBURY, HP21 7RP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Apr 2024 21:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Walton Road, AYLESBURY, HP21 7RP (14 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
WENDOVER ROAD 
(0.3 miles)
BT
Optional permit (no fee) e.g. for traffic management etc - Footway - Multi-way signals
Planned
Scheduled: 28 Apr 2024 - 1 May 2024
0.3
Details
Share
Follow
2
Thames Water logo
URGENT
  
CARLYLE AVENUE 
(0.3 miles)
Thames Water
Utility repair and maintenance works - Verge - Some carriageway incursion
In Progress
Since: 25 Apr 2024 12:00
(Scheduled: 25 Apr 2024 - 3 May 2024)
0.3
Details
Share
Follow
3
Buckinghamshire Council logo
MAJOR
  
WALTON STREET 
(0.4 miles)
Buckinghamshire Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 22 Apr 2024 19:00
(Scheduled: 22 Apr 2024 - 27 Apr 2024)
0.4
Details
Share
Follow
4
Buckinghamshire Council logo
MAJOR
  
WALTON STREET 
(0.4 miles)
Buckinghamshire Council
Highway improvement works - Carriageway - Road closure
In Progress
Since: 22 Apr 2024 19:00
(Scheduled: 22 Apr 2024 - 27 Apr 2024)
0.4
Details
Share
Follow
5
Buckinghamshire Council logo
MAJOR
  
RAILWAY STREET 
(0.4 miles)
Buckinghamshire Council
Highway improvement works - Footway - Some carriageway incursion
Planned
Scheduled: 25 Feb 2024 - 9 Jun 2024
0.4
Details
Share
Follow
6
Buckinghamshire Council logo
WENDOVER WAY 
(0.4 miles)
Buckinghamshire Council
Highway repair and maintenance works - Footway - Multi-way signals
Planned
Scheduled: 21 Apr 2024 - 3 May 2024
0.4
Details
Share
Follow
7
Buckinghamshire Council logo
WENDOVER ROAD 
(0.4 miles)
Buckinghamshire Council
Highway improvement works - Footway - Multi-way signals
Planned
Scheduled: 21 Apr 2024 - 3 May 2024
0.4
Details
Share
Follow
8
Buckinghamshire Council logo
MAJOR
  
FRIARAGE ROAD 
(0.5 miles)
Buckinghamshire Council
Highway improvement works - Carriageway - Road closure
Complete
25 Apr 2024 20:00 - 27 Apr 2024 07:00
0.5
Details
Share
9
BT logo
CAMBRIDGE STREET 
(0.5 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 25 Apr 2024 - 29 Apr 2024
0.5
Details
Share
Follow
10
UK Power Networks Eastern & London logo
ALEXANDER ROAD 
(0.6 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 24 Apr 2024 08:14
(Scheduled: 24 Apr 2024 - 29 Apr 2024)
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.