ROADWORKS SUMMARY
Clinton Crescent, AYLESBURY, HP21 7JW
Introduction
View current and future planned roadworks and road closures for Clinton Crescent, HP21 7JW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Clinton Crescent, AYLESBURY, HP21 7JW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Clinton Crescent are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
27 Dec 2024
HS2 are carrying out Works for Rail Purposes on Wendover Bridleway 14, Wendover.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 September 2023 at 07:00 and could run through until 27 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by HS2 on 11 Sep 2023 at 14:59.
4 Mar and 29 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Neyland Drive, Aylesbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2024 and could run through until 29 May 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 15 Feb 2024 at 13:45.
Tuesday
Buckinghamshire Council are proposing to carry out Highway improvement works on Lower Road, Stoke Mandeville.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2024 and could run through until 30 April 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Buckinghamshire Council on 1 Mar 2024 at 09:18.
31 Mar 2024 and 30 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Aston Clinton Road, Weston Turville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2024 and could run through until 30 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Buckinghamshire Council on 22 Jun 2023 at 13:23.
31 Jul 2024
Buckinghamshire Council are carrying out Highway improvement works on London Road, Aston Clinton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 31 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 11 Apr 2024 at 09:42.
20 May 2024
Thames Water are carrying out Disconnection or alteration of supply on Savernake Road, Aylesbury.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 07:05 and could run through until 20 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 15 Apr 2024 at 07:05.
22 Apr and 10 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Bicester Road, Aylesbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Buckinghamshire Council on 12 Mar 2024 at 09:34.
29 Apr and 13 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Lester Road, Aylesbury.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 13 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 3 Apr 2024 at 14:04.
Thursday
Thames Water are proposing to carry out Utility repair and maintenance works on Fleet Street, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Feb 2024 at 11:32.
Thursday
Buckinghamshire Council are proposing to carry out Highway improvement works on Bicester Road, Quarrendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 5 Apr 2024 at 09:44.
2 and 7 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Samian Way, Aston Clinton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2024 and could run through until 7 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 11 Jan 2024 at 14:21.
6 May and 6 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Picasso Place, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Apr 2024 at 13:23.
6 and 8 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Stocklake, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 8 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 2 Feb 2024 at 09:28.
7 and 9 May 2024
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on High Street, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 11:34.
7 and 9 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on College Road North, Aston Clinton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 11 Jan 2024 at 14:22.
12 and 19 May 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Church Street, Wingrave.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 24 Apr 2024 at 07:55.
13 May and 2 Aug 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Oakfield Road, Aylesbury.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2024 at 15:36.
13 May and 2 Aug 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Stocklake, Aylesbury.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Buckinghamshire Council on 22 Apr 2024 at 13:08.
13 May and 2 Aug 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Bellingham Way, Broughton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Buckinghamshire Council on 22 Apr 2024 at 13:07.
13 May and 2 Aug 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Douglas Road, Aylesbury.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Buckinghamshire Council on 22 Apr 2024 at 13:08.
13 May and 2 Aug 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Stocklake, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 2 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Buckinghamshire Council on 20 Feb 2024 at 14:38.
13 and 15 May 2024
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on The Holloway, Drayton Beauchamp.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 12:06.
13 May and 2 Aug 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Oakfield Road, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 2 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Buckinghamshire Council on 20 Feb 2024 at 14:33.
13 May and 27 Jul 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Aylesbury Road, Bierton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 27 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 15 Feb 2024 at 12:26.
13 May and 2 Aug 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Douglas Road, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 2 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Buckinghamshire Council on 20 Feb 2024 at 14:36.
17 and 19 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Mandeville Road, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Mar 2024 at 12:52.
17 and 19 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Mandeville Road, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Mar 2024 at 12:49.
17 and 19 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Mandeville Road, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Mar 2024 at 12:40.
20 and 23 May 2024
Thames Water are proposing to carry out New service connection on Main Road, Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 16 Feb 2024 at 10:29.
28 May and 12 Jul 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Chamberlain Road, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 10:23.
29 May and 2 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Aylesbury Road, Wingrave.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 20 Mar 2024 at 10:34.
1 Jun and 5 Jul 2024
Buckinghamshire Council are proposing to carry out Remedial works on Oxford Road, Aylesbury.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 7 Mar 2024 at 15:38.
4 and 6 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Aylesbury Road, Wendover.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 8 Mar 2024 at 15:44.
18 and 20 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Church Lane, Weston Turville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Apr 2024 at 13:06.
20 and 24 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Grove Lane, Great Kimble.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2024 and could run through until 24 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2024 at 11:29.
27 Jun and 1 Jul 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Lower Road, Stoke Mandeville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 11 Apr 2024 at 10:16.
27 and 30 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Lower Road, Stoke Mandeville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 10 Apr 2024 at 14:56.
28 Jun and 1 Jul 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Risborough Road, Terrick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 25 Mar 2024 at 10:48.
28 Jun and 2 Jul 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Risborough Road, Little Kimble.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Mar 2024 at 13:58.
1 and 14 Jul 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Princes Road, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 14 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Feb 2024 at 11:56.
1 Jul and 16 Aug 2024
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Chapel Road, Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 16 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 21 Mar 2024 at 16:09.
3 and 6 Jul 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on A41 Tring Bypass, Tring.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2024 and could run through until 6 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 20 Feb 2024 at 14:34.
4 and 8 Jul 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Lower Road, Stoke Mandeville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2024 and could run through until 8 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 11 Apr 2024 at 10:17.
8 and 10 Jul 2024
BT are proposing to carry out Utility asset works on Coppice Way, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 10 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 17 Apr 2024 at 10:31.
12 Jul and 1 Aug 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on London Road, Aston Clinton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 July 2024 and could run through until 1 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 29 Feb 2024 at 11:38.
15 Jul and 31 Aug 2024
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Churchill Avenue, Aylesbury.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2024 at 14:38.
16 and 19 Jul 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Northern Road, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2024 and could run through until 19 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 20 Mar 2024 at 12:04.
16 and 28 Jul 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Astrope Lane, Astrope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2024 and could run through until 28 July 2024. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Apr 2024 at 14:03.
22 Jul and 2 Aug 2024
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Whitchurch.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 2 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Apr 2024 at 09:04.
22 Jul and 15 Nov 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Cambridge Street, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 26 Apr 2024 at 09:18.
22 Jul and 2 Aug 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Hawleys Lane, Whitchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 2 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Apr 2024 at 09:03.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Risborough Road, Little Kimble.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 09:06.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Leighton Road, Wingrave.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 08:57.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Marsh Road, Little Kimble.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 23 Apr 2024 at 10:58.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Risborough Road, Terrick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 08:23.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Aylesbury Road, Wendover.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 06:39.
22 and 24 Jul 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Wingrave Road, Gubblecote, Tring.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 18 Apr 2024 at 10:31.
22 Jul and 28 Sep 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Weedon Road, Aylesbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 28 September 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 2 Apr 2024 at 12:33.
22 Jul and 31 Aug 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eythrope Road, Stone.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 31 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2024 at 06:59.
22 and 25 Jul 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on York Place, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 25 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 20 Mar 2024 at 12:03.
22 Jul and 15 Nov 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Buckingham Street, Aylesbury.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 26 Apr 2024 at 09:20.
24 Jul and 30 Aug 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Oxford Road, Stone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2024 and could run through until 30 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2024 at 06:57.
Roadworks Map near to Clinton Crescent, AYLESBURY, HP21 7JW
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Clinton Crescent, AYLESBURY, HP21 7JW (22 Events)
(Scheduled Dates)
(miles)
(Scheduled: 25 Apr 2024 - 3 May 2024)
(Scheduled: 15 Apr 2024 - 28 Apr 2024)
Contains public sector information licensed under the Open Government Licence v3.0.