ROADWORKS SUMMARY
Bicester Road, AYLESBURY, HP18 0PS
Introduction

View current and future planned roadworks and road closures for Bicester Road, HP18 0PS and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Bicester Road, AYLESBURY, HP18 0PS
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bicester Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
1 Jan and 31 Dec 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Aston Clinton Road, Weston Turville.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 December 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Buckinghamshire Council on 14 May 2024 at 13:37.
30 Sep 2025
Buckinghamshire Council are carrying out Highway improvement works on Wendover Road, Aylesbury.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 09:30 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 6 Jan 2025 at 11:56.
17 Feb and 10 Aug 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Lower Road, Stoke Mandeville.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 10 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Buckinghamshire Council on 14 Nov 2024 at 14:33.
10 Aug 2025
Buckinghamshire Council are carrying out Highway improvement works on Lower Road, Stoke Mandeville.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 09:30 and could run through until 10 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 17 Feb 2025 at 10:59.
Today
ESP Electricity were proposing to carry out Utility asset works on Wendover Road, Aylesbury.
These works were categorised as Major.
The works were not intending to impact the carriageway. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 3 June 2025. The works were due to impact the verge only.
This roadwork event was last updated by ESP Electricity on 28 Apr 2025 at 15:02.
19 May and 26 Sep 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Aston Clinton Road, Weston Turville.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 26 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 09:35.
Today
Buckinghamshire Council are carrying out Highway improvement works on Lower Road, Stoke Mandeville.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 07:00 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 2 Jun 2025 at 16:29.
14 Jul 2025
Buckinghamshire Council are carrying out Highway repair and maintenance works on Chapel Road, Ford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 May 2025 at 07:00 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 30 May 2025 at 10:10.
Sunday
Thames Water are carrying out New service connection on Temple Street, Aylesbury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 May 2025 at 20:00 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Jun 2025 at 07:38.
Sunday
Thames Water are proposing to carry out New service connection on Temple Street, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 May 2025 at 10:59.
1 Jun and 30 Sep 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Cannons Hill, Nether Winchendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Feb 2025 at 14:28.
1 Jun and 30 Sep 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Winchendon Ridge Road, Nether Winchendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Feb 2025 at 14:29.
1 Jun and 30 Sep 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Bennetts Lane, Rowsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 21 Feb 2025 at 11:13.
1 Jun and 30 Sep 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Winchendon Road, Chearsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Feb 2025 at 14:24.
Friday
Thames Water were proposing to carry out New service connection on High Street, Aylesbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Apr 2025 at 10:35.
6 and 12 Jun 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Bicester Road, Quarrendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 11:19.
9 and 20 Jun 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Aylesbury Road, Bierton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 29 May 2025 at 21:21.
9 and 20 Jun 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Bierton Road, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 29 May 2025 at 21:22.
11 Jun and 1 Jul 2025
Buckinghamshire Council are proposing to carry out Section 50 on Walton Street, Aylesbury.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 22 May 2025 at 13:31.
12 and 17 Jun 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Oxford Road, Stone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Mar 2025 at 13:51.
12 and 17 Jun 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Oxford Road, Dinton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Mar 2025 at 13:29.
13 Jun 2025
Buckinghamshire Council were proposing to carry out Remedial works on Brick Kiln Lane, Bierton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were scheduled for 13 June 2025 The works were due to impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 20 Feb 2025 at 14:44.
16 and 18 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Carters Lane, Quainton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 19 Mar 2025 at 12:38.
16 and 18 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Carters Lane, Quainton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 19 Mar 2025 at 14:58.
16 and 18 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Carters Lane, Quainton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 21 Mar 2025 at 10:34.
30 Jun and 28 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on New Road, Weston Turville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 20 May 2025 at 11:38.
1 and 3 Jul 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Wendover Road, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Apr 2025 at 11:38.
1 and 3 Jul 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Wendover Road, Weston Turville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Apr 2025 at 11:39.
5 and 12 Jul 2025
Thames Water were proposing to carry out New service connection on Temple Street, Aylesbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 July 2025 and run through until 12 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Apr 2025 at 16:25.
5 and 13 Jul 2025
Thames Water were proposing to carry out New service connection on Temple Street, Aylesbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 July 2025 and run through until 13 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Apr 2025 at 15:31.
7 and 25 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Diversionary works on Bicester Road, Westcott.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Apr 2025 at 10:01.
9 and 20 Jul 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Aylesbury Road, Bierton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2025 at 09:27.
9 and 21 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Bierton Road, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2025 at 09:05.
14 and 16 Jul 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Oving Road, Whitchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 27 May 2025 at 14:55.
16 and 22 Jul 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Upper Church Street, Cuddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 16 Apr 2025 at 15:19.
20 Jul and 5 Sep 2025
Buckinghamshire Council were proposing to carry out Highway improvement works on Ellen Road, Aylesbury.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 July 2025 and run through until 5 September 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Buckinghamshire Council on 18 Dec 2024 at 13:35.
20 Jul and 5 Sep 2025
Buckinghamshire Council were proposing to carry out Highway improvement works on Churchill Avenue, Aylesbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 July 2025 and run through until 5 September 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Buckinghamshire Council on 18 Dec 2024 at 12:55.
20 Jul and 5 Sep 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Ellen Road, Aylesbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 15:41.
21 Jul and 5 Sep 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Ellen Road, Aylesbury.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Buckinghamshire Council on 20 Dec 2024 at 10:23.
21 Jul and 1 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Stonehaven Road, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 May 2025 at 08:59.
21 Jul and 1 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Stonehaven Road, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 May 2025 at 09:03.
24 Jul and 30 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eythrope Road, Stone.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jan 2025 at 12:53.
24 Jul and 30 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eythrope Road, Stone.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jan 2025 at 12:12.
24 Jul and 30 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eythrope Road, Stone.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Dec 2024 at 12:37.
24 Jul and 30 Aug 2025
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Oxford Road, Stone.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 July 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 13:05.
24 Jul and 30 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Oxford Road, Stone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Dec 2024 at 12:01.
24 Jul and 30 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Oxford Road, Stone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Jan 2025 at 11:25.
24 Jul and 30 Aug 2025
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Eythrope Road, Stone.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 July 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 13:06.
24 Jul and 30 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Oxford Road, Stone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Feb 2025 at 09:36.
24 Jul and 30 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eythrope Road, Stone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jan 2025 at 10:04.
25 and 28 Jul 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Whitchurch Close, Westcott.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 28 Apr 2025 at 14:16.
28 Jul and 24 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Weedon Road, Aylesbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 12:18.
28 Jul and 22 Aug 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Ellen Road, Aylesbury.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Buckinghamshire Council on 7 Apr 2025 at 09:07.
28 Jul and 1 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Meadow Way, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 10:29.
1 and 4 Aug 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Churchill Avenue, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 9 May 2025 at 10:23.
5 and 7 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Carters Lane, Quainton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 4 Apr 2025 at 11:22.
5 and 7 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Carters Lane, Quainton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:42.
8 and 13 Aug 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Lambourne Avenue, Stoke Mandeville, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 11 Mar 2025 at 11:30.
14 Aug 2025 and 13 Mar 2026
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Quainton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2025 and could run through until 13 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 21 May 2025 at 09:03.
14 and 20 Aug 2025
Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Buckingham Road, Hardwick.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 August 2025 and run through until 20 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 27 May 2025 at 14:37.
16 and 30 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Jefferies Road, Stone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jun 2024 at 14:31.
18 and 21 Aug 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Buckingham Road, Hardwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 09:10.
20 and 22 Aug 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Church Lane, Oving.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 May 2025 at 09:37.
25 and 29 Aug 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on King Edward Avenue, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 29 Apr 2025 at 12:20.
25 and 27 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Northern Road, Aylesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 May 2025 at 09:47.
Roadworks Map near to Bicester Road, AYLESBURY, HP18 0PS (Loading...)















- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Bicester Road, AYLESBURY, HP18 0PS (7 Events)
(Scheduled Dates)
(miles)
(Scheduled: 3 Jun 2025 - 4 Jun 2025)
(Scheduled: 28 May 2025 - 4 Jun 2025)
(Scheduled: 2 Jun 2025 - 5 Jun 2025)
(Scheduled: 9 Jun 2024 - 18 Jul 2025)
(Scheduled: 28 Feb 2022 - 20 Dec 2025)
Contains public sector information licensed under the Open Government Licence v3.0.