ROADWORKS SUMMARY
Jackson Court, HIGH WYCOMBE, HP15 7TZ
Introduction
View current and future planned roadworks and road closures for Jackson Court, HP15 7TZ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Jackson Court, HIGH WYCOMBE, HP15 7TZ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Jackson Court are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
19 Aug 2024 and 31 May 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on White Hart Street, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2024 and could run through until 31 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Buckinghamshire Council on 23 May 2024 at 10:18.
28 Oct 2024 and 31 May 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on White Hart Street, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 31 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Buckinghamshire Council on 11 Oct 2024 at 11:13.
Tomorrow
Eunetworks were proposing to carry out Utility asset works on Desborough Road, High Wycombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 November 2024 and run through until 29 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 9 Aug 2024 at 12:40.
19 Nov 2024 and 13 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 08:49.
Wednesday
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Penn Road, Hazlemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 29 Aug 2024 at 13:51.
15 Jan 2025
Cadent Gas are carrying out Utility asset works on Ashtree Walk, Hazlemere.
These works are categorised as Major.
The works started on 2 December 2024 at 16:45 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:51.
6 Jan 2025
Buckinghamshire Council are carrying out Highway repair and maintenance works on Penn Road, Hazlemere.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 00:00 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 4 Dec 2024 at 09:46.
4 Dec 2024 and 5 Jan 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Penn Road, Hazlemere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 5 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 2 Dec 2024 at 13:35.
Tomorrow
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Rectory Hill, Amersham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 29 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Buckinghamshire Council on 19 Aug 2024 at 11:36.
15 Dec 2024 and 17 Jan 2025
Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Penn Road, Hazlemere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 December 2024 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 9 Dec 2024 at 10:12.
19 Dec 2024 and 27 Jan 2025
Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Wooburn Green.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 27 Aug 2024 at 15:35.
19 Dec 2024 and 13 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Oct 2024 at 11:01.
19 Dec 2024 and 13 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 07:22.
19 Dec 2024 and 13 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wellington Road, Cressex Business Park, High Wycombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Oct 2024 at 12:49.
19 Dec 2024 and 13 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wellington Road, Cressex Business Park, High Wycombe.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 08:50.
26 Dec 2024 and 6 Jan 2025
Eunetworks are proposing to carry out Utility asset works on White Hill, Beaconsfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 3 Oct 2024 at 14:13.
26 Dec 2024 and 17 Jan 2025
Eunetworks are proposing to carry out Utility asset works on White Hill, Wooburn Moor.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 3 Oct 2024 at 11:24.
2 and 5 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Heath End Road, Little Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 09:10.
2 and 5 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Heath End Road, Little Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 12 Dec 2024 at 11:55.
4 Jan and 11 Feb 2025
Eunetworks are proposing to carry out Utility asset works on London Road, Loudwater.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 10:06.
4 Jan and 11 Feb 2025
Eunetworks are proposing to carry out Utility asset works on London Road, Loudwater.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 14:48.
6 Jan and 21 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Little Marlow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:32.
6 Jan and 21 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Little Marlow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 12:03.
6 Jan and 24 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Broad Lane, Beaconsfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 28 Nov 2024 at 12:57.
6 Jan and 24 Feb 2025
Eunetworks were proposing to carry out roadworks on Broad Lane, Beaconsfield.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 28 Nov 2024 at 13:01.
6 and 9 Jan 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Town Lane, Wooburn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 3 Dec 2024 at 13:33.
6 Jan and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Loudwater.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 11:26.
6 and 10 Jan 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Gibson Road, Booker, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 12 Dec 2024 at 15:01.
6 Jan and 2 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:40.
6 Jan and 2 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 27 Sep 2024 at 09:49.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Marrods Bottom, Winchmore Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 12:06.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Fagnall Lane, Winchmore Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:33.
6 and 17 Jan 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Penn Road, Hazlemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 2 Dec 2024 at 13:31.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Oakengrove Lane, Hazlemere.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 10:11.
6 and 22 Jan 2025
Eunetworks are proposing to carry out Utility asset works on Bradenham Road, Bradenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Eunetworks on 17 Oct 2024 at 14:38.
6 Jan and 6 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Rectory Hill, Amersham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Sep 2024 at 10:24.
6 Jan and 14 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Rectory Hill, Amersham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 11 Nov 2024 at 11:23.
6 and 13 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Nags Head Lane, Great Missenden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 18 Oct 2024 at 09:40.
6 and 13 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Nags Head Lane, Great Missenden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 18 Oct 2024 at 15:43.
6 and 13 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Nags Head Lane, Great Missenden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 1 Nov 2024 at 11:32.
7 and 27 Jan 2025
Eunetworks were proposing to carry out Utility asset works on London Road, High Wycombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 3 Dec 2024 at 09:43.
7 and 22 Jan 2025
Eunetworks are proposing to carry out Utility asset works on Dashwood Avenue, Sands, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 13:51.
7 and 9 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Wycombe Road, Prestwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 17 Sep 2024 at 11:56.
8 and 10 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Speen Road, North Dean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 27 Sep 2024 at 10:20.
8 and 10 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Speen Road, North Dean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 11:21.
8 and 10 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Speen Road, North Dean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 08:20.
8 and 10 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Speen Road, North Dean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Dec 2024 at 11:07.
8 and 10 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Aylesbury Road, Great Missenden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 27 Sep 2024 at 09:42.
11 and 15 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Wycombe Road, Prestwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 19 Sep 2024 at 12:13.
13 Jan and 14 Feb 2025
Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Oct 2024 at 10:40.
13 and 31 Jan 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 7 Nov 2024 at 11:20.
13 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Coleshill Lane, Coleshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 12:09.
13 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Firs Walk, Hazlemere.
These works are categorised as Major.
The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 09:28.
14 and 29 Jan 2025
Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 14 Aug 2024 at 11:36.
14 and 29 Jan 2025
Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:26.
14 and 29 Jan 2025
Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 5 Nov 2024 at 13:01.
14 and 16 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bellfield Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:55.
14 and 22 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Common Road, Great Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 18 Oct 2024 at 09:49.
14 and 22 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Common Road, Great Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 18 Oct 2024 at 15:44.
14 and 22 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Common Road, Great Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 25 Oct 2024 at 07:59.
14 and 22 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Common Road, Great Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 25 Oct 2024 at 12:15.
14 and 22 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Common Road, Great Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 20 Dec 2024 at 13:21.
14 and 16 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Moat Lane, Prestwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 08:49.
14 and 16 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Moat Lane, Prestwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 08:02.
15 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Flowers Bottom Lane, Speen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 07:49.
15 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Flowers Bottom Lane, Speen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 08:00.
15 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Flowers Bottom Lane, Speen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 18 Oct 2024 at 08:05.
16 and 24 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Daws Hill Lane, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 24 January 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 24 Oct 2024 at 14:02.
16 and 24 Jan 2025
T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Daws Hill Lane, High Wycombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 January 2025 and run through until 24 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 31 Oct 2024 at 14:50.
16 Jan and 28 Feb 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Rectory Hill, Amersham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Buckinghamshire Council on 23 Sep 2024 at 10:26.
17 and 21 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Shepherds Lane, Beaconsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 17 Oct 2024 at 14:34.
17 and 21 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Shepherds Lane, Beaconsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 08:47.
17 and 21 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Potter Row, Great Missenden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 07:51.
17 and 21 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Potter Row, Great Missenden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 11:26.
20 Jan and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Marlow Bottom, Marlow Bottom.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:44.
20 and 22 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Shepherds Lane, Beaconsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 14:53.
20 and 24 Jan 2025
Buckinghamshire Council are proposing to carry out Section 50 on Stratton Road, Beaconsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Dec 2024 at 09:28.
20 and 24 Jan 2025
Buckinghamshire Council are proposing to carry out Section 50 on Stratton Road, Beaconsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Dec 2024 at 10:03.
20 and 31 Jan 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Maxwell Road, Beaconsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 23 Oct 2024 at 09:01.
20 Jan and 7 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Maxwell Road, Beaconsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Buckinghamshire Council on 25 Oct 2024 at 13:17.
20 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Marrods Bottom, Winchmore Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:18.
20 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fagnall Lane, Winchmore Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:38.
20 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Coleshill Lane, Coleshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:28.
20 and 22 Jan 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Totteridge Lane, Totteridge, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 3 Oct 2024 at 11:28.
20 Jan and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Magpie Lane, Coleshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:21.
20 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Chalk Hill, Coleshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:36.
20 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Sampsons Hill, Coleshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:27.
20 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Barrack Hill, Coleshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:39.
21 Jan and 16 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 30 Aug 2024 at 11:36.
21 Jan and 16 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:37.
21 and 24 Jan 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Chippendale Close, Totteridge, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 12 Dec 2024 at 13:55.
21 Jan and 2 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Bradenham Road, West Wycombe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 15:24.
21 Jan and 2 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Bradenham Road, West Wycombe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Eunetworks on 1 Nov 2024 at 11:30.
23 and 28 Jan 2025
Eunetworks are proposing to carry out Utility asset works on Copyground Lane, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 14 Oct 2024 at 12:00.
23 and 28 Jan 2025
Eunetworks are proposing to carry out Utility asset works on Copyground Lane, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 24 Oct 2024 at 14:39.
23 and 27 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Windsor Lane, Little Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 10:28.
23 and 27 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Windsor Lane, Little Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 8 Nov 2024 at 09:31.
23 and 30 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Hare Lane, Little Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 30 January 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 18 Oct 2024 at 09:57.
23 and 30 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Hare Lane, Little Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 30 January 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 18 Oct 2024 at 15:44.
23 and 30 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Hare Lane, Little Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 30 January 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 25 Oct 2024 at 08:10.
23 and 30 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Hare Lane, Little Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 30 January 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 25 Oct 2024 at 08:32.
23 and 30 Jan 2025
Gigaclear were proposing to carry out Utility asset works on Hare Lane, Little Kingshill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 January 2025 and run through until 30 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Gigaclear on 29 Oct 2024 at 16:14.
23 and 25 Jan 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Hampden Road, Great Hampden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 10:04.
23 and 25 Jan 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Glade Road, Great Hampden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 10:04.
23 and 25 Jan 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on The Old Gated Road, Great Hampden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 10:05.
25 Jan and 14 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Straight Bit, Flackwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 11:28.
27 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Park Lane, Beaconsfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 14:24.
27 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Desborough Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 13:51.
27 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Desborough Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:05.
27 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Sampsons Hill, Coleshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 13:47.
27 and 30 Jan 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Rectory Hill, Amersham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 7 Oct 2024 at 13:21.
27 Jan and 3 Feb 2025
Gigaclear are proposing to carry out Utility asset works on Nags Head Lane, Great Missenden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 8 Nov 2024 at 09:19.
28 and 30 Jan 2025
Buckinghamshire Council are proposing to carry out Core Sampling on Kiln Lane, Cores End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 14:09.
28 Jan and 17 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Straight Bit, Flackwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Eunetworks on 18 Oct 2024 at 12:17.
28 Jan and 12 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Frances Dove Way, High Wycombe.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 17 Oct 2024 at 11:17.
28 Jan and 12 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Frances Dove Way, High Wycombe.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 14:21.
28 and 31 Jan 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Rectory Hill, Amersham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 17 Oct 2024 at 10:05.
29 Jan and 4 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Wooburn Town, Wooburn Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 24 Sep 2024 at 14:57.
29 Jan and 11 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 13:53.
1 and 3 Feb 2025
BT are proposing to carry out Utility asset works on Forty Green Road, Forty Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 12 Nov 2024 at 14:38.
1 and 16 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 4 Dec 2024 at 11:45.
3 and 5 Feb 2025
BT are proposing to carry out Utility asset works on Kiln Lane, Cores End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 30 Oct 2024 at 15:00.
3 Feb and 4 Mar 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Bottom Lane, Seer Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 14:15.
3 and 5 Feb 2025
Buckinghamshire Council are proposing to carry out Core Sampling on Lane End Road, Sands, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 10:13.
3 and 9 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Suffield Hill, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:45.
3 Feb and 12 Mar 2025
Eunetworks are proposing to carry out Utility asset works on West Wycombe Road, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 30 Sep 2024 at 13:21.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Chalk Hill, Coleshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 13:47.
3 and 7 Feb 2025
Gigaclear are proposing to carry out Utility asset works on Hare Lane, Little Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 8 Nov 2024 at 08:28.
4 and 6 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Hampden Road, Hughenden Valley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 09:05.
8 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Suffield Road, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:48.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on West End Street, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 14:23.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on West End Street, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 09:09.
10 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 11 Dec 2024 at 09:07.
10 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 13 Dec 2024 at 11:19.
10 Feb and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Micklefield Road, Micklefield, High Wycombe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 09:17.
10 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Barrack Hill, Coleshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 13:40.
10 and 12 Feb 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Brackley Road, Hazlemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 6 Nov 2024 at 10:00.
10 and 12 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Hampden Road, Denner Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 8 Nov 2024 at 10:29.
11 Feb and 26 Mar 2025
Eunetworks are proposing to carry out Utility asset works on London Road, High Wycombe.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 11:03.
12 Feb and 3 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Heath End Road, Flackwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 14 Aug 2024 at 11:42.
14 and 20 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Park Lane, Lane End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 5 Dec 2024 at 12:48.
14 and 20 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Lane End Road, Sands, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Oct 2024 at 14:10.
14 and 20 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Lane End Road, Lane End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 5 Dec 2024 at 12:48.
15 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:17.
15 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 30 Sep 2024 at 13:09.
15 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Wooburn Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:04.
15 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Wooburn Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 24 Sep 2024 at 15:36.
15 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on The Green, Wooburn Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:23.
15 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on The Green, Wooburn Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 30 Sep 2024 at 13:09.
15 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 15:30.
15 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 12 Nov 2024 at 13:06.
15 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 18 Nov 2024 at 08:56.
15 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:49.
15 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Gallows Lane, Sands, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 11 Oct 2024 at 10:01.
15 and 20 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on High Street, Great Missenden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 17 Dec 2024 at 14:47.
15 and 17 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on High Street, Great Missenden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Dec 2024 at 08:22.
17 and 19 Feb 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Oakridge Road, High Wycombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:41.
17 and 19 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Oxford Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Dec 2024 at 14:04.
17 and 19 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Oxford Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Dec 2024 at 14:18.
17 and 19 Feb 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Rowan Avenue, Bowerdean, High Wycombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Dec 2024 at 08:04.
17 and 22 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Hughenden Avenue, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 08:32.
17 and 19 Feb 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Totteridge Lane, Totteridge, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 11 Oct 2024 at 08:52.
17 and 19 Feb 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Totteridge Lane, Totteridge, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 11 Oct 2024 at 11:08.
17 and 19 Feb 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Orchard Close, Hughenden Valley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 6 Nov 2024 at 09:47.
17 and 21 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hampden Road, Speen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 07:42.
17 and 21 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hampden Road, Speen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Dec 2024 at 09:32.
17 and 21 Feb 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Glade Road, Great Hampden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 21 Nov 2024 at 15:18.
17 and 21 Feb 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on The Old Gated Road, Great Hampden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 21 Nov 2024 at 15:19.
17 and 19 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Village Road, Ballinger.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 09:42.
17 and 19 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Village Road, Ballinger.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 8 Nov 2024 at 09:54.
17 and 19 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Village Road, Ballinger.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 18 Nov 2024 at 10:25.
17 and 19 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Village Road, Ballinger.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 14:19.
18 and 25 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Flackwell Heath.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:15.
18 and 20 Feb 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Orchard Close, Hughenden Valley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 6 Nov 2024 at 09:32.
18 and 20 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on High Street, Great Missenden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 23 Dec 2024 at 14:22.
19 and 21 Feb 2025
Eunetworks were proposing to carry out Utility asset works on Lilys Walk, High Wycombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 5 Dec 2024 at 11:51.
19 and 21 Feb 2025
Eunetworks were proposing to carry out Utility asset works on Desborough Road, High Wycombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 8 Nov 2024 at 09:03.
19 and 21 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Moat Lane, Prestwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 15:14.
19 and 21 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Moat Lane, Prestwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 10:26.
21 and 24 Feb 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Holmers Farm Way, Cressex, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 09:39.
21 and 24 Feb 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Lane End Road, Sands, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 09:48.
21 and 27 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on St Johns Road, Tylers Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Oct 2024 at 14:30.
21 and 27 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Kingswood Road, Tylers Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Oct 2024 at 14:33.
21 and 27 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Chequers Lane, Prestwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Oct 2024 at 09:31.
22 Feb and 8 Apr 2025
Eunetworks are proposing to carry out Utility asset works on London Road, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2025 and could run through until 8 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 15:05.
22 Feb and 9 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:53.
24 Feb and 13 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Wooburn Green.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 13 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 17 Oct 2024 at 10:39.
24 Feb and 13 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Wooburn Green.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 13 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 13 Nov 2024 at 11:15.
24 Feb and 9 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 7 Nov 2024 at 12:17.
24 Feb and 7 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 11 Dec 2024 at 09:28.
24 Feb and 7 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 13 Dec 2024 at 12:55.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Oxford Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 11:29.
24 Feb and 12 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 11 Oct 2024 at 09:21.
24 Feb and 12 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 14:58.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Slough Lane, West Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 09:10.
24 and 26 Feb 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Kings Lane, South Heath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 2 Dec 2024 at 07:57.
26 Feb and 1 Mar 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Town Lane, Wooburn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 11:05.
28 Feb and 6 Mar 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Memorial Road, Hampden Row.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Oct 2024 at 09:37.
1 and 24 Mar 2025
G2 Energy IDNO are proposing to carry out Utility asset works on Amersham Road, Penn Street.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 4 Dec 2024 at 10:43.
3 and 10 Mar 2025
National Highways are proposing to carry out Highway repair and maintenance works on Cressex Road, Cressex, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 10 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Highways on 17 Dec 2024 at 11:47.
3 Mar and 28 May 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 28 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 12:07.
3 and 28 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wellington Road, Cressex Business Park, High Wycombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Dec 2024 at 08:58.
3 and 22 Mar 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Marlow Hill, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 09:00.
3 and 21 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 13:07.
3 and 22 Mar 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Abbey Way Gyratory, High Wycombe.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 15:34.
3 and 22 Mar 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Abbey Way Gyratory, High Wycombe.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 15:06.
3 and 26 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on New Road, Coleshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:32.
8 and 23 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Oakridge Road, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:56.
9 and 23 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 7 Nov 2024 at 12:19.
10 Mar and 9 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Marlow Bottom, Marlow Bottom.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 09:47.
10 and 28 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Dec 2024 at 12:46.
10 and 28 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 14:11.
10 and 23 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 11 Dec 2024 at 09:27.
10 and 23 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 13 Dec 2024 at 12:05.
12 Mar and 3 Apr 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Tylers Green.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 March 2025 and run through until 3 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Dec 2024 at 13:26.
13 and 21 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Flackwell Heath.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 24 Oct 2024 at 15:15.
13 Mar and 8 Apr 2025
Eunetworks are proposing to carry out Utility asset works on Bradenham Road, West Wycombe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 8 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 11:14.
14 and 20 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Wooburn Town, Wooburn Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 16 Oct 2024 at 15:57.
14 and 16 Mar 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Chippendale Close, Totteridge, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 19 Dec 2024 at 15:36.
16 and 18 Mar 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Missenden Road, Chesham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 16 Dec 2024 at 14:12.
17 and 20 Mar 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Frogmoor, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 15:27.
17 and 20 Mar 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Temple End, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 16 Dec 2024 at 12:55.
17 and 19 Mar 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Piggotts Orchard, Amersham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 20 Dec 2024 at 08:02.
17 and 19 Mar 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Piggotts End, Amersham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 20 Dec 2024 at 08:02.
17 and 19 Mar 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Market Square, Amersham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 11:41.
17 and 19 Mar 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Market Square, Amersham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 10:47.
17 and 20 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on High Street, Great Missenden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 17 Dec 2024 at 08:16.
17 and 20 Mar 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Hampden Road, Great Hampden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 21 Nov 2024 at 15:03.
17 and 21 Mar 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Hampden Road, Great Hampden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 3 Dec 2024 at 14:04.
20 and 24 Mar 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Oak View, Great Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 20 Dec 2024 at 08:10.
22 and 24 Mar 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Cressex Road, Cressex, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 23 Dec 2024 at 13:54.
24 Mar and 11 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Village Road, Coleshill.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:59.
24 Mar and 20 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Village Road, Coleshill.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 13:29.
24 Mar and 20 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Village Road, Coleshill.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 14:51.
24 Mar and 11 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Village Road, Coleshill.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:40.
27 and 29 Mar 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Rawlings Lane, Seer Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 19 Dec 2024 at 15:31.
Roadworks Map near to Jackson Court, HIGH WYCOMBE, HP15 7TZ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Jackson Court, HIGH WYCOMBE, HP15 7TZ (9 Events)
(Scheduled Dates)
(miles)
(Scheduled: 23 Sep 2024 - 28 Mar 2025)
(Scheduled: 23 Sep 2024 - 28 Mar 2025)
(Scheduled: 2 Dec 2024 - 15 Jan 2025)
(Scheduled: 2 Dec 2024 - 6 Jan 2025)
(Scheduled: 10 Nov 2023 - 10 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.