ROADWORKS SUMMARY
Water End Road, HIGH WYCOMBE, HP14 3XN
Introduction
View current and future planned roadworks and road closures for Water End Road, HP14 3XN and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Water End Road, HIGH WYCOMBE, HP14 3XN
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Water End Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
19 Aug 2024 and 31 May 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on White Hart Street, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2024 and could run through until 31 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Buckinghamshire Council on 23 May 2024 at 10:18.
28 Oct 2024 and 31 May 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on White Hart Street, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 31 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Buckinghamshire Council on 11 Oct 2024 at 11:13.
Tomorrow
Eunetworks were proposing to carry out Utility asset works on Desborough Road, High Wycombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 November 2024 and run through until 29 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 9 Aug 2024 at 12:40.
19 Nov 2024 and 13 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 08:49.
19 Dec 2024 and 13 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Oct 2024 at 11:01.
19 Dec 2024 and 13 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 07:22.
19 Dec 2024 and 13 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wellington Road, Cressex Business Park, High Wycombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Oct 2024 at 12:49.
19 Dec 2024 and 13 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wellington Road, Cressex Business Park, High Wycombe.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 08:50.
6 Jan and 2 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:40.
6 Jan and 2 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 27 Sep 2024 at 09:49.
6 and 10 Jan 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Gibson Road, Booker, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 12 Dec 2024 at 15:01.
6 and 22 Jan 2025
Eunetworks are proposing to carry out Utility asset works on Bradenham Road, Bradenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Eunetworks on 17 Oct 2024 at 14:38.
6 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bottom Road, Radnage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 4 Oct 2024 at 10:13.
6 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bottom Road, Radnage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 08:28.
6 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bottom Road, Radnage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 10:30.
7 and 22 Jan 2025
Eunetworks are proposing to carry out Utility asset works on Dashwood Avenue, Sands, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 13:51.
8 and 10 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Speen Road, North Dean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Dec 2024 at 11:07.
8 and 10 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Speen Road, North Dean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 08:20.
8 and 10 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Speen Road, North Dean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 27 Sep 2024 at 10:20.
8 and 10 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Speen Road, North Dean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 11:21.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on The Common, Stokenchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 08:29.
13 Jan and 14 Feb 2025
Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Oct 2024 at 10:40.
13 and 31 Jan 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 7 Nov 2024 at 11:20.
14 and 16 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bellfield Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:55.
15 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Flowers Bottom Lane, Speen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 08:00.
15 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Flowers Bottom Lane, Speen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 07:49.
15 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Flowers Bottom Lane, Speen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 18 Oct 2024 at 08:05.
16 and 24 Jan 2025
T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Daws Hill Lane, High Wycombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 January 2025 and run through until 24 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 31 Oct 2024 at 14:50.
16 and 24 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Daws Hill Lane, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 24 January 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 24 Oct 2024 at 14:02.
20 Jan and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Marlow Bottom, Marlow Bottom.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:44.
20 and 23 Jan 2025
Buckinghamshire Council are proposing to carry out Core Sampling on Oddley Lane, Saunderton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 23 Oct 2024 at 08:04.
20 and 23 Jan 2025
Buckinghamshire Council are proposing to carry out Core Sampling on Bledlow Road, Saunderton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 23 Oct 2024 at 08:05.
21 Jan and 2 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Bradenham Road, West Wycombe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 15:24.
21 Jan and 2 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Bradenham Road, West Wycombe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Eunetworks on 1 Nov 2024 at 11:30.
22 and 24 Jan 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Bledlow Road, Saunderton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 16 Dec 2024 at 09:22.
23 and 28 Jan 2025
Eunetworks are proposing to carry out Utility asset works on Copyground Lane, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 14 Oct 2024 at 12:00.
23 and 28 Jan 2025
Eunetworks are proposing to carry out Utility asset works on Copyground Lane, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 24 Oct 2024 at 14:39.
27 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Desborough Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 13:51.
27 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Desborough Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:05.
27 Jan and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Keens Lane, Chinnor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 11:16.
27 Jan and 14 Feb 2025
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Keens Lane, Chinnor.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 07:39.
29 Jan and 11 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 13:53.
1 and 16 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 4 Dec 2024 at 11:45.
3 Feb and 12 Mar 2025
Eunetworks are proposing to carry out Utility asset works on West Wycombe Road, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 30 Sep 2024 at 13:21.
3 and 5 Feb 2025
Buckinghamshire Council are proposing to carry out Core Sampling on Lane End Road, Sands, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 10:13.
3 and 9 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Suffield Hill, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:45.
6 and 9 Feb 2025
Thames Water are proposing to carry out New service connection on Little Lane, Saunderton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 9 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 08:49.
6 and 9 Feb 2025
Thames Water are proposing to carry out New service connection on City Road, Radnage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 9 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 08:52.
8 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Suffield Road, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:48.
10 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 13 Dec 2024 at 11:19.
10 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 11 Dec 2024 at 09:07.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on West End Street, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 14:23.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on West End Street, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 09:09.
13 and 17 Feb 2025
Thames Water are proposing to carry out New service connection on City Road, Radnage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 08:51.
13 and 17 Feb 2025
Thames Water are proposing to carry out New service connection on Little Lane, Saunderton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 08:08.
13 and 17 Feb 2025
Thames Water are proposing to carry out New service connection on Little Lane, Saunderton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 10:28.
14 and 20 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Park Lane, Lane End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 5 Dec 2024 at 12:48.
14 and 20 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Lane End Road, Sands, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Oct 2024 at 14:10.
14 and 20 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Lane End Road, Lane End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 5 Dec 2024 at 12:48.
15 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:49.
15 and 23 Feb 2025
Eunetworks are proposing to carry out Utility asset works on Gallows Lane, Sands, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 11 Oct 2024 at 10:01.
17 and 19 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Oxford Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Dec 2024 at 14:18.
17 and 22 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Hughenden Avenue, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 08:32.
17 and 19 Feb 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Orchard Close, Hughenden Valley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 6 Nov 2024 at 09:47.
17 and 19 Feb 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Oakridge Road, High Wycombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:41.
17 and 21 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hampden Road, Speen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Dec 2024 at 09:32.
17 and 21 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hampden Road, Speen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 07:42.
17 and 19 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Oxford Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Dec 2024 at 14:04.
18 and 20 Feb 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Orchard Close, Hughenden Valley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 6 Nov 2024 at 09:32.
19 and 21 Feb 2025
Eunetworks were proposing to carry out Utility asset works on Lilys Walk, High Wycombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 5 Dec 2024 at 11:51.
19 and 22 Feb 2025
Thames Water are proposing to carry out New service connection on City Road, Radnage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 22 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 07:36.
19 and 21 Feb 2025
Eunetworks were proposing to carry out Utility asset works on Desborough Road, High Wycombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 8 Nov 2024 at 09:03.
21 and 24 Feb 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Lane End Road, Sands, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 09:48.
21 and 24 Feb 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Holmers Farm Way, Cressex, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 09:39.
22 Feb and 9 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:53.
24 Feb and 7 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 13 Dec 2024 at 12:55.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Slough Lane, West Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 09:10.
24 Feb and 12 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 14:58.
24 Feb and 12 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 11 Oct 2024 at 09:21.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Oxford Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 11:29.
24 Feb and 7 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 11 Dec 2024 at 09:28.
24 Feb and 9 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 7 Nov 2024 at 12:17.
3 and 10 Mar 2025
National Highways are proposing to carry out Highway repair and maintenance works on Cressex Road, Cressex, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 10 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Highways on 17 Dec 2024 at 11:47.
3 Mar and 28 May 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 28 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 12:07.
3 and 28 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wellington Road, Cressex Business Park, High Wycombe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Dec 2024 at 08:58.
3 and 22 Mar 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Marlow Hill, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 09:00.
3 and 21 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 13:07.
5 and 10 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Northend Road, Northend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 10 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:47.
8 and 23 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Oakridge Road, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:56.
9 and 23 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 7 Nov 2024 at 12:19.
9 and 20 Mar 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Chequers Lane, Cadmore End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 10:33.
10 Mar and 9 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Marlow Bottom, Marlow Bottom.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 09:47.
10 and 28 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Dec 2024 at 12:46.
10 and 28 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 14:11.
10 and 23 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 11 Dec 2024 at 09:27.
10 and 23 Mar 2025
Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 13 Dec 2024 at 12:05.
13 Mar and 8 Apr 2025
Eunetworks are proposing to carry out Utility asset works on Bradenham Road, West Wycombe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 8 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 11:14.
17 and 20 Mar 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Frogmoor, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 15:27.
17 and 20 Mar 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Temple End, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 16 Dec 2024 at 12:55.
22 and 24 Mar 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Cressex Road, Cressex, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 23 Dec 2024 at 13:54.
Roadworks Map near to Water End Road, HIGH WYCOMBE, HP14 3XN
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Water End Road, HIGH WYCOMBE, HP14 3XN (1 Events)
(Scheduled Dates)
(miles)
(Scheduled: 23 Dec 2024 - 28 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.