ROADWORKS SUMMARY
HP14 3WW
Introduction
View current and future planned roadworks and road closures for HP14 3WW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to HP14 3WW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 May 2024
Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on Sutton Road, Cookham, Maidenhead.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 October 2023 at 09:56 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 18 Mar 2024 at 12:46.
14 Jun 2024
Cadent Gas are carrying out Utility asset works on Micklefield Road, Micklefield, High Wycombe.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 08:00 and could run through until 14 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Mar 2024 at 14:48.
23 Feb and 17 Jul 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Cryers Hill Road, Cryers Hill.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 February 2024 and could run through until 17 July 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by G2 Energy IDNO on 20 Dec 2023 at 12:25.
10 May 2024
Buckinghamshire Council are carrying out Highway improvement works on Church Road, Penn.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 07:00 and could run through until 10 May 2024. The works will impact the footway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Apr 2024 at 15:54.
Friday
Buckinghamshire Council are carrying out Highway repair and maintenance works on Penn Road, Hazlemere.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 March 2024 at 09:30 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 4 Apr 2024 at 16:06.
14 Mar and 31 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Ferry Lane, Bourne End.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Buckinghamshire Council on 4 Mar 2024 at 11:01.
Tomorrow
Buckinghamshire Council are carrying out Highway improvement works on London Road, High Wycombe.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 13:59 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 08:06.
26 Mar and 7 May 2024
Affinity Water are proposing to carry out Utility asset works on Riverpark Drive, Marlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2024 and could run through until 7 May 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Affinity Water on 9 Nov 2023 at 14:46.
27 Mar and 7 May 2024
Cadent Gas are proposing to carry out Utility asset works on St Johns Road, Tylers Green.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2024 and could run through until 7 May 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 3 Jan 2024 at 12:00.
14 Jun 2024
Cadent Gas are carrying out Utility asset works on Kingswood Road, Tylers Green.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:30 and could run through until 14 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2024 at 07:51.
31 Mar and 14 May 2024
Cadent Gas are proposing to carry out Utility asset works on Pound Lane, Marlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jan 2024 at 11:00.
11 Apr and 16 May 2024
Buckinghamshire Council are proposing to carry out roadworks on Bridge Street, High Wycombe.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 April 2024 and could run through until 16 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 12 Jan 2024 at 10:29.
Tomorrow
Buckinghamshire Council are carrying out Remedial works on Church Road, Penn.
The works started on 12 April 2024 at 06:37 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 08:09.
Thursday
Cadent Gas are carrying out Utility asset works on Mill Road, Marlow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 April 2024 at 10:58 and could run through until 2 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 11:04.
6 May 2024
Cadent Gas are carrying out Utility asset works on Ragmans Lane, Marlow Bottom.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 10:19 and could run through until 6 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 10:35.
12 May 2024
Cadent Gas are carrying out Utility asset works on Terry Road, Totteridge, High Wycombe.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 07:30 and could run through until 12 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 08:13.
Friday
Thames Water are carrying out Utility asset works on West Wycombe Road, High Wycombe.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 13:00 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 13:57.
16 May 2024
Cadent Gas are carrying out Utility asset works on Tylers Road, Hazlemere.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 April 2024 at 07:44 and could run through until 16 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Apr 2024 at 07:57.
16 Apr and 14 May 2024
Affinity Water are proposing to carry out Utility asset works on Riverpark Drive, Marlow.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 Nov 2023 at 13:55.
Wednesday
Thames Water are proposing to carry out Utility repair and maintenance works on Earl Howe Road, Holmer Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2024 and could run through until 1 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Jan 2024 at 11:18.
8 May 2024
Buckinghamshire Council are carrying out Highway improvement works on Ragmans Lane, Marlow Bottom.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 11:01 and could run through until 8 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 22 Apr 2024 at 13:27.
8 May 2024
Buckinghamshire Council are carrying out Highway improvement works on Ragmans Lane, Marlow Bottom.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 10:54 and could run through until 8 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 22 Apr 2024 at 13:27.
Tuesday
Buckinghamshire Council are proposing to carry out Highway improvement works on Station Road, Bourne End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 15 Mar 2024 at 10:46.
Tuesday
Buckinghamshire Council are carrying out Remedial works on Pauls Hill, Penn.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 April 2024 at 23:00 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 26 Apr 2024 at 08:03.
Tomorrow
Buckinghamshire Council are carrying out Highway repair and maintenance works on Newfield Gardens, Marlow.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 April 2024 at 08:30 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 26 Apr 2024 at 08:47.
Tomorrow
Buckinghamshire Council are carrying out Highway repair and maintenance works on Amersham Hill, Totteridge, High Wycombe.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 April 2024 at 08:30 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 26 Apr 2024 at 07:27.
15 May 2024
G2 Energy IDNO are carrying out Utility asset works on Bradenham Wood Lane, Bradenham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 April 2024 at 09:00 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 27 Apr 2024 at 09:09.
Wednesday
Buckinghamshire Council are proposing to carry out Highway improvement works on Newtown Road, Marlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 17 Apr 2024 at 13:57.
29 Apr and 13 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Missenden Road, Great Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 13 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Jan 2024 at 12:12.
29 Apr and 22 May 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Bradenham Wood Lane, Walters Ash.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 22 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 9 Jan 2024 at 10:26.
Friday
Buckinghamshire Council are proposing to carry out Highway improvement works on Main Road, Rotten Row, Hambleden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 23 Apr 2024 at 08:08.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Bottom Road, Radnage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 15 Feb 2024 at 07:56.
5 and 13 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Glenisters Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2024 and could run through until 13 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 17 Jan 2024 at 15:10.
7 May and 5 Jun 2024
Thames Water are proposing to carry out Utility asset works on Gossmore Lane, Marlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 5 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 26 Apr 2024 at 09:10.
7 and 30 May 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Main Road, Walters Ash.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 9 Jan 2024 at 10:26.
10 and 13 May 2024
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Victoria Street, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 May 2024 and could run through until 13 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 12:47.
10 and 13 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Desborough Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 May 2024 and could run through until 13 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 14:44.
12 and 23 May 2024
Nexfibre Networks Limited are proposing to carry out Utility asset works on Dedmere Road, Marlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 15 Jan 2024 at 12:06.
12 May 2024
Buckinghamshire Council are proposing to carry out roadworks on Marlow Restricted Byway 36, Marlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 12 May 2024 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 19 Mar 2024 at 13:38.
12 and 14 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Stocking Lane, Naphill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 14 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 09:00.
13 and 24 May 2024
ES Pipelines are proposing to carry out Utility asset works on Kiln Lane, Cores End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by ES Pipelines on 20 Feb 2024 at 15:15.
13 and 18 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Gomm Road, Wycombe Marsh, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 18 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 11:22.
13 and 18 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Blenheim Road, Cressex Business Park, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 18 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 11:21.
13 May and 7 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Slater Street, High Wycombe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Mar 2024 at 11:42.
14 and 16 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Pound Lane, Marlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 15 Apr 2024 at 09:22.
15 May and 7 Jun 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Main Road, Naphill.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 26 Apr 2024 at 14:15.
16 and 18 May 2024
Thames Water are proposing to carry out Remedial works on Desborough Park Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2024 and could run through until 18 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Feb 2024 at 12:12.
17 and 20 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Flowers Bottom Lane, Speen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Apr 2024 at 11:36.
19 May and 23 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Pretoria Road, Totteridge, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 23 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 12:12.
19 and 22 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Bryants Bottom Road, Bryants Bottom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 22 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 17 Apr 2024 at 14:07.
20 and 26 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Bridge Street, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 26 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 15 Mar 2024 at 10:36.
20 May and 2 Jun 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Brook Street, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 15 Mar 2024 at 10:35.
21 and 23 May 2024
South East Water are proposing to carry out Highway repair and maintenance works on Warners Hill, Cookham, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2024 and could run through until 23 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 19 Feb 2024 at 10:04.
22 and 24 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Fassetts Road, Loudwater.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Feb 2024 at 10:41.
23 May and 15 Jun 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Main Road, Naphill.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2024 and could run through until 15 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 26 Apr 2024 at 14:16.
27 May and 19 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Beechwood Drive, Marlow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 19 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Apr 2024 at 14:38.
27 May and 5 Sep 2024
Cadent Gas are proposing to carry out Utility asset works on Henley Road, Marlow.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 5 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Feb 2024 at 11:30.
27 and 30 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Fingest Lane, Fingest.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 08:42.
27 and 30 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Fingest Lane, Fingest.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 08:43.
27 and 30 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Fingest Lane, Fingest.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 08:43.
28 and 30 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Desborough Avenue, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Mar 2024 at 12:54.
28 and 31 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Cock Lane, Wycombe Marsh, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 12 Apr 2024 at 09:33.
28 and 31 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Stag Lane, Great Kingshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 8 Mar 2024 at 12:26.
31 May and 23 Jun 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Coombe Lane, Hughenden Valley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 23 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 26 Apr 2024 at 14:37.
2 and 10 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Cressex Road, Cressex, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 23 Feb 2024 at 11:19.
3 and 7 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Beaumont Rise, Marlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 09:54.
3 Jun and 11 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Marlow Bottom, Marlow Bottom.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Mar 2024 at 10:13.
3 and 8 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Heath End Road, Flackwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 10 Apr 2024 at 10:20.
3 and 7 Jun 2024
Thames Water are proposing to carry out New service connection on Piddington Lane, Wheeler End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 7 June 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 18 Mar 2024 at 11:18.
4 and 25 Jun 2024
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Chapel Street, Marlow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2024 and could run through until 25 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2024 at 12:28.
4 and 6 Jun 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Cock Lane, Wycombe Marsh, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 11:08.
5 and 7 Jun 2024
Gigaclear are proposing to carry out Utility asset works on Church Road, Cookham Dean, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2024 and could run through until 7 June 2024. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 22 Feb 2024 at 08:00.
6 and 10 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Brackley Road, Hazlemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 7 Mar 2024 at 13:11.
8 Jun and 1 Jul 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Cryers Hill Road, Cryers Hill.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 26 Apr 2024 at 14:40.
10 and 14 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Beaumont Rise, Marlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Mar 2024 at 15:38.
10 and 15 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on London Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 15 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 11:24.
10 Jun and 1 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Hinton Close, High Wycombe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 1 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Mar 2024 at 15:15.
11 and 13 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Beacon Hill, Penn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 13 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 10 Apr 2024 at 11:45.
13 and 17 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Desborough Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 8 Mar 2024 at 11:04.
16 Jun and 9 Jul 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Cryers Hill Road, Cryers Hill.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 9 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 26 Apr 2024 at 14:41.
17 Jun and 9 Aug 2024
National Highways are proposing to carry out Highway repair and maintenance works on The Green, Bisham, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 9 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 5 Feb 2024 at 12:23.
17 Jun and 9 Aug 2024
National Highways are proposing to carry out Highway repair and maintenance works on The Green, Bisham, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 9 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by National Highways on 7 Feb 2024 at 15:04.
17 and 19 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Lock Road, Marlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 15 Mar 2024 at 14:58.
17 and 19 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Coldmoorholme Lane, Well End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 13:19.
17 and 21 Jun 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Rutland Avenue, Castlefield, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 12:49.
21 and 25 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Chapman Lane, Flackwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 June 2024 and could run through until 25 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 12 Mar 2024 at 13:14.
24 and 30 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Hedsor Road, Bourne End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 15 Mar 2024 at 11:45.
24 and 26 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Cock Lane, Wycombe Marsh, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 26 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Mar 2024 at 09:18.
25 and 29 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Winchbottom Lane, Flackwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2024 and could run through until 29 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Apr 2024 at 11:23.
26 and 28 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Underwood Road, Bowerdean, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 8 Mar 2024 at 10:55.
27 Jun and 1 Jul 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Hatch Lane, Radnage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Mar 2024 at 13:57.
27 Jun and 1 Jul 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Green End Road, Radnage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Mar 2024 at 13:56.
29 Jun and 10 Jul 2024
Thames Water are proposing to carry out Utility asset works on Gossmore Lane, Marlow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 June 2024 and could run through until 10 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 26 Apr 2024 at 09:11.
29 Jun and 12 Jul 2024
Network Rail are proposing to carry out Works for Rail Purposes on Bradenham Road, West Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 June 2024 and could run through until 12 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 5 Apr 2024 at 13:33.
1 Jul and 9 Aug 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Abbey Way, High Wycombe.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 9 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 8 Mar 2024 at 10:49.
1 Jul and 9 Aug 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Lilys Walk, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 9 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 8 Mar 2024 at 10:53.
2 and 25 Jul 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Cryers Hill Lane, Cryers Hill.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2024 and could run through until 25 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 9 Jan 2024 at 07:49.
4 and 6 Jul 2024
Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Marlow Road, Pinkneys Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2024 and could run through until 6 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 9 Apr 2024 at 10:55.
7 Jul and 1 Sep 2024
Buckinghamshire Council are proposing to carry out roadworks on High Street, West Wycombe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2024 and could run through until 1 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Buckinghamshire Council on 5 Sep 2023 at 14:46.
8 and 10 Jul 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Hedsor Hill, Hedsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 10 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Apr 2024 at 10:38.
10 Jul and 2 Aug 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Cryers Hill Lane, Cryers Hill.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2024 and could run through until 2 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 9 Jan 2024 at 07:49.
11 Jul and 9 Aug 2024
Thames Water are proposing to carry out Utility asset works on Riverpark Drive, Marlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2024 and could run through until 9 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 26 Apr 2024 at 09:11.
14 Jul and 8 Nov 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Rutland Avenue, Castlefield, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 12:05.
15 and 18 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Beacon Hill, Penn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 18 July 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 16 Apr 2024 at 07:50.
15 Jul and 8 Nov 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Middle Way, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 12:14.
15 Jul and 8 Nov 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Spearing Road, Castlefield, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 17 Apr 2024 at 11:43.
15 Jul and 8 Nov 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Whitelands Road, Castlefield, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 12:03.
15 Jul and 8 Nov 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Cross Road, Castlefield, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 12:04.
15 Jul and 8 Nov 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Booker Lane, Castlefield, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 25 Apr 2024 at 12:05.
15 Jul and 23 Aug 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Dashwood Avenue, Sands, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 23 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Mar 2024 at 09:56.
16 and 19 Jul 2024
Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Quarry Wood Road, Cookham, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2024 and could run through until 19 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 17 Apr 2024 at 15:03.
18 Jul and 8 Aug 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Brimmers Hill, Widmer End.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2024 and could run through until 8 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by G2 Energy IDNO on 26 Apr 2024 at 13:03.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Widmoor, Wooburn Common.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 08:51.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Kiln Lane, Cores End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 08:50.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Marlow Common Road, Marlow Common.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 09:02.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Seymour Court Road, Marlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 23 Apr 2024 at 09:32.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Chapman Lane, Flackwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 08:56.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Abbey Barn Road, Wycombe Marsh, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 06:45.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Desborough Road, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 05:54.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Underwood Road, Bowerdean, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 23 Apr 2024 at 05:52.
22 Jul and 10 Sep 2024
Cadent Gas are proposing to carry out Utility asset works on Coates Lane, High Wycombe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 10 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Mar 2024 at 15:03.
22 and 25 Jul 2024
BT are proposing to carry out Utility asset works on Coates Lane, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 25 July 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 24 Apr 2024 at 09:09.
22 Jul and 20 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Rose Avenue, Hazlemere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 20 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Jan 2024 at 10:29.
22 and 25 Jul 2024
BT are proposing to carry out Utility asset works on Coates Lane, Downley, High Wycombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 25 July 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 24 Apr 2024 at 09:14.
24 Jul and 1 Sep 2024
Affinity Water are proposing to carry out Utility asset works on Penn Road, Hazlemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2024 and could run through until 1 September 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 15 Mar 2024 at 11:10.
26 Jul and 18 Aug 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Cedar Avenue, Hazlemere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2024 and could run through until 18 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 9 Jan 2024 at 07:51.
Roadworks Map near to HP14 3WW
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to HP14 3WW (6 Events)
(Scheduled Dates)
(miles)
(Scheduled: 20 Apr 2024 - 30 Apr 2024)
(Scheduled: 22 Apr 2024 - 8 May 2024)
(Scheduled: 26 Apr 2024 - 30 Apr 2024)
(Scheduled: 26 Apr 2024 - 30 Apr 2024)
Contains public sector information licensed under the Open Government Licence v3.0.