ROADWORKS SUMMARY
Grays Lane, HIGH WYCOMBE, HP13 5TL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Grays Lane, HP13 5TL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Grays Lane, HIGH WYCOMBE, HP13 5TL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Grays Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Buckinghamshire Council logo
LONG TERM
Between
19 Aug 2024 and 31 May 2025
Details
View Map
Share
Follow
White Hart Street

Buckinghamshire Council are proposing to carry out Highway improvement works on White Hart Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 31 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 23 May 2024 at 10:18.

Buckinghamshire Council logo
LONG TERM
Between
28 Oct 2024 and 31 May 2025
Details
View Map
Share
Follow
White Hart Street

Buckinghamshire Council are proposing to carry out Highway improvement works on White Hart Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 11 Oct 2024 at 11:13.

Eunetworks logo
LONG TERM
Between
12 Nov and 29 Dec 2024
Details
View Map
Share
Desborough Road

Eunetworks were proposing to carry out Utility asset works on Desborough Road, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 29 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Aug 2024 at 12:40.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
19 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Lancaster Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 08:49.

Buckinghamshire Council logo
LONG TERM
Between
1 Dec 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Penn Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Penn Road, Hazlemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 29 Aug 2024 at 13:51.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 09:09.

Cadent Gas logo
LONG TERM
Until
21 Jan 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are carrying out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 13:00 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 13:13.

Cadent Gas logo
LONG TERM
Until
15 Jan 2025
Details
View Map
Share
Follow
Ashtree Walk

Cadent Gas are carrying out Utility asset works on Ashtree Walk, Hazlemere.

These works are categorised as Major.

The works started on 2 December 2024 at 16:45 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:51.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Pine Walk

Cadent Gas are proposing to carry out Utility asset works on Pine Walk, Hazlemere.

These works are categorised as Major.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2024 at 14:56.

Buckinghamshire Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Penn Road

Buckinghamshire Council are carrying out Highway repair and maintenance works on Penn Road, Hazlemere.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 00:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 4 Dec 2024 at 09:46.

Buckinghamshire Council logo
LONG TERM
Between
4 Dec 2024 and 5 Jan 2025
Details
View Map
Share
Follow
Penn Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Penn Road, Hazlemere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 5 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 2 Dec 2024 at 13:35.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Amersham Road

Cadent Gas are carrying out Utility repair and maintenance works on Amersham Road, High Wycombe.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 December 2024 at 09:48 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 10:29.

Buckinghamshire Council logo
LONG TERM
Between
15 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Penn Road

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Penn Road, Hazlemere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 December 2024 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 9 Dec 2024 at 10:12.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Follow
Frieth Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Frieth Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Sep 2024 at 10:38.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Whitehouse Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Whitehouse Lane, Wooburn Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 10:38.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Chequers Lane

Buckinghamshire Council are carrying out Highway repair and maintenance works on Chequers Lane, Cadmore End.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Dec 2024 at 08:45.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Whitehouse Lane

Buckinghamshire Council are carrying out Highway repair and maintenance works on Whitehouse Lane, Wooburn Moor.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 December 2024 at 09:30 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 09:29.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Frogmoor

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Frogmoor, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 16 Dec 2024 at 12:54.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Water End Road

Buckinghamshire Council are carrying out Highway repair and maintenance works on Water End Road, Beacons Bottom.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 December 2024 at 09:30 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 09:14.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Hampden Road

Buckinghamshire Council are carrying out Highway repair and maintenance works on Hampden Road, Great Hampden.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 December 2024 at 09:30 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 09:03.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Rignall Road

Buckinghamshire Council are carrying out Highway repair and maintenance works on Rignall Road, Little Hampden.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 December 2024 at 09:30 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 09:02.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Abbey Barn Lane

Buckinghamshire Council are carrying out Highway repair and maintenance works on Abbey Barn Lane, Wycombe Marsh, High Wycombe.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 18 December 2024 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Dec 2024 at 09:00.

Buckinghamshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Piddington And Wheeler End Footpath 16

Buckinghamshire Council are carrying out Highway repair and maintenance works on Piddington And Wheeler End Footpath 16, Piddington And Wheeler End.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 December 2024 at 09:30 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Dec 2024 at 08:59.

Scottish Hydro Electric Power Dis logo
Between
19 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Lancaster Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Oct 2024 at 11:01.

Scottish Hydro Electric Power Dis logo
Between
19 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Lancaster Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 07:22.

Scottish Hydro Electric Power Dis logo
Between
19 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Wellington Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wellington Road, Cressex Business Park, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Oct 2024 at 12:49.

Scottish Hydro Electric Power Dis logo
Between
19 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Wellington Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wellington Road, Cressex Business Park, High Wycombe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 08:50.

Buckinghamshire Council logo
Between
23 and 26 Dec 2024
Details
View Map
Share
Follow
Hughenden Boulevard

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Hughenden Boulevard, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Oct 2024 at 14:35.

Buckinghamshire Council logo
Between
25 and 27 Dec 2024
Details
View Map
Share
Follow
Pink Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Pink Road, Lacey Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Sep 2024 at 07:46.

Buckinghamshire Council logo
Between
25 and 27 Dec 2024
Details
View Map
Share
Follow
Pink Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Pink Road, Lacey Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Sep 2024 at 11:13.

Eunetworks logo
Between
26 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
White Hill

Eunetworks are proposing to carry out Utility asset works on White Hill, Wooburn Moor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 3 Oct 2024 at 11:24.

Affinity Water logo
Between
2 and 5 Jan 2025
Details
View Map
Share
Follow
Heath End Road

Affinity Water are proposing to carry out Utility asset works on Heath End Road, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 09:10.

Affinity Water logo
Between
2 and 5 Jan 2025
Details
View Map
Share
Follow
Heath End Road

Affinity Water are proposing to carry out Utility asset works on Heath End Road, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 12 Dec 2024 at 11:55.

Eunetworks logo
LONG TERM
Between
4 Jan and 11 Feb 2025
Details
View Map
Share
Follow
London Road

Eunetworks are proposing to carry out Utility asset works on London Road, Loudwater.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 10:06.

Eunetworks logo
LONG TERM
Between
4 Jan and 11 Feb 2025
Details
View Map
Share
Follow
London Road

Eunetworks are proposing to carry out Utility asset works on London Road, Loudwater.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 14:48.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Mundaydean Lane

Cadent Gas are proposing to carry out Utility asset works on Mundaydean Lane, Marlow.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 11:18.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Mundaydean Lane

Cadent Gas are proposing to carry out Utility asset works on Mundaydean Lane, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 14:42.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Marlow Road

Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Little Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:32.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Marlow Road

Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Little Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 12:03.

Cadent Gas logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Loudwater.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 11:26.

Buckinghamshire Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Gibson Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Gibson Road, Booker, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Dec 2024 at 15:01.

Eunetworks logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Desborough Avenue

Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:40.

Eunetworks logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Desborough Avenue

Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 27 Sep 2024 at 09:49.

Buckinghamshire Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Penn Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Penn Road, Hazlemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 2 Dec 2024 at 13:31.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Oakengrove Lane

Cadent Gas are proposing to carry out Utility asset works on Oakengrove Lane, Hazlemere.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 10:11.

Eunetworks logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Bradenham Road

Eunetworks are proposing to carry out Utility asset works on Bradenham Road, Bradenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Eunetworks on 17 Oct 2024 at 14:38.

Thames Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Bottom Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bottom Road, Radnage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 10:13.

Thames Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Bottom Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bottom Road, Radnage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 08:28.

Thames Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Bottom Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bottom Road, Radnage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 10:30.

Gigaclear logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Nags Head Lane

Gigaclear are proposing to carry out Utility asset works on Nags Head Lane, Great Missenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 18 Oct 2024 at 09:40.

Gigaclear logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Nags Head Lane

Gigaclear are proposing to carry out Utility asset works on Nags Head Lane, Great Missenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 18 Oct 2024 at 15:43.

Gigaclear logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Nags Head Lane

Gigaclear are proposing to carry out Utility asset works on Nags Head Lane, Great Missenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 1 Nov 2024 at 11:32.

Eunetworks logo
Between
7 and 27 Jan 2025
Details
View Map
Share
London Road

Eunetworks were proposing to carry out Utility asset works on London Road, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 3 Dec 2024 at 09:43.

Eunetworks logo
Between
7 and 22 Jan 2025
Details
View Map
Share
Follow
Dashwood Avenue

Eunetworks are proposing to carry out Utility asset works on Dashwood Avenue, Sands, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 13:51.

Affinity Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Wycombe Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Wycombe Road, Prestwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Sep 2024 at 11:56.

Scottish Hydro Electric Power Dis logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Frieth Road

Scottish Hydro Electric Power Dis are proposing to carry out Permanent reinstatement on Frieth Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Nov 2024 at 12:13.

Affinity Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Speen Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Speen Road, North Dean.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Sep 2024 at 10:20.

Affinity Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Speen Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Speen Road, North Dean.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 11:21.

Affinity Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Speen Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Speen Road, North Dean.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 08:20.

Affinity Water logo
Between
11 and 15 Jan 2025
Details
View Map
Share
Follow
Wycombe Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Wycombe Road, Prestwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 19 Sep 2024 at 12:13.

Cityfibre Metro Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Coronation Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Oct 2024 at 10:40.

Cityfibre Metro Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Coronation Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 7 Nov 2024 at 11:20.

Thames Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Bellfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bellfield Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:55.

Gigaclear logo
Between
14 and 22 Jan 2025
Details
View Map
Share
Follow
Common Road

Gigaclear are proposing to carry out Utility asset works on Common Road, Great Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 18 Oct 2024 at 09:49.

Gigaclear logo
Between
14 and 22 Jan 2025
Details
View Map
Share
Follow
Common Road

Gigaclear are proposing to carry out Utility asset works on Common Road, Great Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 18 Oct 2024 at 15:44.

Gigaclear logo
Between
14 and 22 Jan 2025
Details
View Map
Share
Follow
Common Road

Gigaclear are proposing to carry out Utility asset works on Common Road, Great Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 25 Oct 2024 at 07:59.

Gigaclear logo
Between
14 and 22 Jan 2025
Details
View Map
Share
Follow
Common Road

Gigaclear are proposing to carry out Utility asset works on Common Road, Great Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 25 Oct 2024 at 12:15.

Affinity Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Moat Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Moat Lane, Prestwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 08:49.

Affinity Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Moat Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Moat Lane, Prestwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 08:02.

Thames Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Flowers Bottom Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Flowers Bottom Lane, Speen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 07:49.

Thames Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Flowers Bottom Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Flowers Bottom Lane, Speen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 08:00.

Thames Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Flowers Bottom Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Flowers Bottom Lane, Speen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 08:05.

T-Mobile (UK) logo
Between
16 and 24 Jan 2025
Details
View Map
Share
Follow
Daws Hill Lane

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 24 Oct 2024 at 14:02.

T-Mobile (UK) logo
Between
16 and 24 Jan 2025
Details
View Map
Share
Daws Hill Lane

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Daws Hill Lane, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 January 2025 and run through until 24 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 31 Oct 2024 at 14:50.

Buckinghamshire Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Little Marlow Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Little Marlow Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Dec 2024 at 13:43.

Cadent Gas logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:34.

Cadent Gas logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:17.

Cadent Gas logo
LONG TERM
Between
20 Jan and 21 Jul 2025
Details
View Map
Share
Follow
Marlow Bottom

Cadent Gas are proposing to carry out Utility asset works on Marlow Bottom, Marlow Bottom.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:44.

Nexfibre Networks Limited logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Totteridge Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Totteridge Lane, Totteridge, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 3 Oct 2024 at 11:28.

Eunetworks logo
Between
21 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Daws Hill Lane

Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Aug 2024 at 11:36.

Eunetworks logo
Between
21 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Daws Hill Lane

Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:37.

Buckinghamshire Council logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Chippendale Close

Buckinghamshire Council are proposing to carry out Highway improvement works on Chippendale Close, Totteridge, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Dec 2024 at 13:55.

Eunetworks logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Bradenham Road

Eunetworks are proposing to carry out Utility asset works on Bradenham Road, West Wycombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 15:24.

Eunetworks logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Bradenham Road

Eunetworks are proposing to carry out Utility asset works on Bradenham Road, West Wycombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Eunetworks on 1 Nov 2024 at 11:30.

Eunetworks logo
Between
23 and 28 Jan 2025
Details
View Map
Share
Follow
Copyground Lane

Eunetworks are proposing to carry out Utility asset works on Copyground Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 14 Oct 2024 at 12:00.

Eunetworks logo
Between
23 and 28 Jan 2025
Details
View Map
Share
Follow
Copyground Lane

Eunetworks are proposing to carry out Utility asset works on Copyground Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 24 Oct 2024 at 14:39.

Affinity Water logo
Between
23 and 27 Jan 2025
Details
View Map
Share
Follow
Windsor Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Windsor Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 10:28.

Affinity Water logo
Between
23 and 27 Jan 2025
Details
View Map
Share
Follow
Windsor Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Windsor Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 8 Nov 2024 at 09:31.

Gigaclear logo
Between
23 and 30 Jan 2025
Details
View Map
Share
Follow
Hare Lane

Gigaclear are proposing to carry out Utility asset works on Hare Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 30 January 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 18 Oct 2024 at 09:57.

Gigaclear logo
Between
23 and 30 Jan 2025
Details
View Map
Share
Follow
Hare Lane

Gigaclear are proposing to carry out Utility asset works on Hare Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 30 January 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 18 Oct 2024 at 15:44.

Gigaclear logo
Between
23 and 30 Jan 2025
Details
View Map
Share
Follow
Hare Lane

Gigaclear are proposing to carry out Utility asset works on Hare Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 30 January 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 25 Oct 2024 at 08:10.

Gigaclear logo
Between
23 and 30 Jan 2025
Details
View Map
Share
Follow
Hare Lane

Gigaclear are proposing to carry out Utility asset works on Hare Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 30 January 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 25 Oct 2024 at 08:32.

Gigaclear logo
Between
23 and 30 Jan 2025
Details
View Map
Share
Hare Lane

Gigaclear were proposing to carry out Utility asset works on Hare Lane, Little Kingshill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 January 2025 and run through until 30 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Gigaclear on 29 Oct 2024 at 16:14.

Buckinghamshire Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Hampden Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Hampden Road, Great Hampden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 10:04.

Buckinghamshire Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Glade Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Glade Road, Great Hampden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 10:04.

Buckinghamshire Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
The Old Gated Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on The Old Gated Road, Great Hampden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 10:05.

Eunetworks logo
Between
25 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Straight Bit

Eunetworks are proposing to carry out Utility asset works on Straight Bit, Flackwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 11:28.

Cadent Gas logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Desborough Road

Cadent Gas are proposing to carry out Utility asset works on Desborough Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 13:51.

Cadent Gas logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Desborough Road

Cadent Gas are proposing to carry out Utility asset works on Desborough Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:05.

Gigaclear logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Nags Head Lane

Gigaclear are proposing to carry out Utility asset works on Nags Head Lane, Great Missenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 8 Nov 2024 at 09:19.

Eunetworks logo
Between
28 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Straight Bit

Eunetworks are proposing to carry out Utility asset works on Straight Bit, Flackwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 18 Oct 2024 at 12:17.

Eunetworks logo
Between
28 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Frances Dove Way

Eunetworks are proposing to carry out Utility asset works on Frances Dove Way, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 17 Oct 2024 at 11:17.

Eunetworks logo
Between
28 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Frances Dove Way

Eunetworks are proposing to carry out Utility asset works on Frances Dove Way, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 14:21.

Eunetworks logo
Between
29 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Plumer Road

Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 13:53.

Eunetworks logo
Between
1 and 16 Feb 2025
Details
View Map
Share
Follow
Desborough Avenue

Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 4 Dec 2024 at 11:45.

Buckinghamshire Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Lane End Road

Buckinghamshire Council are proposing to carry out Core Sampling on Lane End Road, Sands, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 10:13.

Eunetworks logo
Between
3 and 9 Feb 2025
Details
View Map
Share
Follow
Suffield Hill

Eunetworks are proposing to carry out Utility asset works on Suffield Hill, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:45.

Eunetworks logo
LONG TERM
Between
3 Feb and 12 Mar 2025
Details
View Map
Share
Follow
West Wycombe Road

Eunetworks are proposing to carry out Utility asset works on West Wycombe Road, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Sep 2024 at 13:21.

Gigaclear logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Hare Lane

Gigaclear are proposing to carry out Utility asset works on Hare Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 8 Nov 2024 at 08:28.

Buckinghamshire Council logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Hampden Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Hampden Road, Hughenden Valley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 09:05.

Thames Water logo
Between
6 and 9 Feb 2025
Details
View Map
Share
Follow
City Road

Thames Water are proposing to carry out New service connection on City Road, Radnage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 9 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 08:52.

Thames Water logo
Between
6 and 9 Feb 2025
Details
View Map
Share
Follow
Little Lane

Thames Water are proposing to carry out New service connection on Little Lane, Saunderton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 9 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 08:49.

Eunetworks logo
Between
8 and 23 Feb 2025
Details
View Map
Share
Follow
Suffield Road

Eunetworks are proposing to carry out Utility asset works on Suffield Road, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:48.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
West End Street

Thames Water are proposing to carry out Utility repair and maintenance works on West End Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 14:23.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
West End Street

Thames Water are proposing to carry out Utility repair and maintenance works on West End Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 09:09.

Eunetworks logo
Between
10 and 23 Feb 2025
Details
View Map
Share
Follow
Abercromby Avenue

Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 11 Dec 2024 at 09:07.

Eunetworks logo
Between
10 and 23 Feb 2025
Details
View Map
Share
Follow
Abercromby Avenue

Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 13 Dec 2024 at 11:19.

Cadent Gas logo
LONG TERM
Between
10 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Micklefield Road

Cadent Gas are proposing to carry out Utility asset works on Micklefield Road, Micklefield, High Wycombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 09:17.

Buckinghamshire Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Brackley Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Brackley Road, Hazlemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Nov 2024 at 10:00.

Buckinghamshire Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Hampden Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Hampden Road, Denner Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 8 Nov 2024 at 10:29.

Eunetworks logo
LONG TERM
Between
11 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road

Eunetworks are proposing to carry out Utility asset works on London Road, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 11:03.

Eunetworks logo
Between
12 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Heath End Road

Eunetworks are proposing to carry out Utility asset works on Heath End Road, Flackwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 14 Aug 2024 at 11:42.

Thames Water logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
City Road

Thames Water are proposing to carry out New service connection on City Road, Radnage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 08:51.

Thames Water logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Little Lane

Thames Water are proposing to carry out New service connection on Little Lane, Saunderton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 08:08.

Thames Water logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Little Lane

Thames Water are proposing to carry out New service connection on Little Lane, Saunderton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 10:28.

Buckinghamshire Council logo
Between
14 and 20 Feb 2025
Details
View Map
Share
Follow
Park Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Park Lane, Lane End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Dec 2024 at 12:48.

Buckinghamshire Council logo
Between
14 and 20 Feb 2025
Details
View Map
Share
Follow
Lane End Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Lane End Road, Sands, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Oct 2024 at 14:10.

Buckinghamshire Council logo
Between
14 and 20 Feb 2025
Details
View Map
Share
Follow
Lane End Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Lane End Road, Lane End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Dec 2024 at 12:48.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Daws Hill Lane

Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 15:30.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Daws Hill Lane

Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 12 Nov 2024 at 13:06.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Daws Hill Lane

Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 18 Nov 2024 at 08:56.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Desborough Avenue

Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:49.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Gallows Lane

Eunetworks are proposing to carry out Utility asset works on Gallows Lane, Sands, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 11 Oct 2024 at 10:01.

Affinity Water logo
Between
15 and 20 Feb 2025
Details
View Map
Share
Follow
High Street

Affinity Water are proposing to carry out Utility repair and maintenance works on High Street, Great Missenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 17 Dec 2024 at 14:47.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Oakridge Road

Thames Water were proposing to carry out Utility repair and maintenance works on Oakridge Road, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:41.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Rowan Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Rowan Avenue, Bowerdean, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 08:04.

Buckinghamshire Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Hughenden Avenue

Buckinghamshire Council are proposing to carry out Highway improvement works on Hughenden Avenue, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 08:32.

Nexfibre Networks Limited logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Totteridge Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Totteridge Lane, Totteridge, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Oct 2024 at 08:52.

Nexfibre Networks Limited logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Totteridge Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Totteridge Lane, Totteridge, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Oct 2024 at 11:08.

Buckinghamshire Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Orchard Close

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Orchard Close, Hughenden Valley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Nov 2024 at 09:47.

UK Power Networks Eastern & London logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Hampden Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Hampden Road, Speen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 07:42.

UK Power Networks Eastern & London logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Hampden Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Hampden Road, Speen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Dec 2024 at 09:32.

Buckinghamshire Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Glade Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Glade Road, Great Hampden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Nov 2024 at 15:18.

Buckinghamshire Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Old Gated Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on The Old Gated Road, Great Hampden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Nov 2024 at 15:19.

Eunetworks logo
Between
18 and 25 Feb 2025
Details
View Map
Share
Follow
Whitepit Lane

Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Flackwell Heath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:15.

Buckinghamshire Council logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Orchard Close

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Orchard Close, Hughenden Valley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Nov 2024 at 09:32.

Eunetworks logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Lilys Walk

Eunetworks were proposing to carry out Utility asset works on Lilys Walk, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 5 Dec 2024 at 11:51.

Eunetworks logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Desborough Road

Eunetworks were proposing to carry out Utility asset works on Desborough Road, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 8 Nov 2024 at 09:03.

Thames Water logo
Between
19 and 22 Feb 2025
Details
View Map
Share
Follow
City Road

Thames Water are proposing to carry out New service connection on City Road, Radnage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 22 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 07:36.

Affinity Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Moat Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Moat Lane, Prestwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 15:14.

Affinity Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Moat Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Moat Lane, Prestwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 10:26.

Buckinghamshire Council logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Holmers Farm Way

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Holmers Farm Way, Cressex, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 09:39.

Buckinghamshire Council logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Lane End Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Lane End Road, Sands, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 09:48.

Buckinghamshire Council logo
Between
21 and 27 Feb 2025
Details
View Map
Share
Follow
St Johns Road

Buckinghamshire Council are proposing to carry out Highway improvement works on St Johns Road, Tylers Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Oct 2024 at 14:30.

Buckinghamshire Council logo
Between
21 and 27 Feb 2025
Details
View Map
Share
Follow
Kingswood Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Kingswood Road, Tylers Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Oct 2024 at 14:33.

Buckinghamshire Council logo
Between
21 and 27 Feb 2025
Details
View Map
Share
Follow
Chequers Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Chequers Lane, Prestwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Oct 2024 at 09:31.

Eunetworks logo
LONG TERM
Between
22 Feb and 8 Apr 2025
Details
View Map
Share
Follow
London Road

Eunetworks are proposing to carry out Utility asset works on London Road, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2025 and could run through until 8 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 15:05.

Eunetworks logo
Between
22 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Kitchener Road

Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:53.

Eunetworks logo
Between
24 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Plumer Road

Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 7 Nov 2024 at 12:17.

Eunetworks logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Plumer Road

Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 11 Dec 2024 at 09:28.

Eunetworks logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Plumer Road

Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 13 Dec 2024 at 12:55.

Thames Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Oxford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Oxford Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 11:29.

Eunetworks logo
Between
24 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Abercromby Avenue

Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 11 Oct 2024 at 09:21.

Eunetworks logo
Between
24 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Abercromby Avenue

Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 14:58.

Thames Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Slough Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Slough Lane, West Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 09:10.

Buckinghamshire Council logo
Between
28 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Memorial Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Memorial Road, Hampden Row.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Oct 2024 at 09:37.

G2 Energy IDNO logo
Between
1 and 24 Mar 2025
Details
View Map
Share
Follow
Amersham Road

G2 Energy IDNO are proposing to carry out Utility asset works on Amersham Road, Penn Street.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 4 Dec 2024 at 10:43.

National Highways logo
Between
3 and 10 Mar 2025
Details
View Map
Share
Follow
Cressex Road

National Highways are proposing to carry out Highway repair and maintenance works on Cressex Road, Cressex, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 10 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 17 Dec 2024 at 11:47.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
3 Mar and 28 May 2025
Details
View Map
Share
Lancaster Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 28 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 12:07.

Scottish Hydro Electric Power Dis logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Wellington Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wellington Road, Cressex Business Park, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Dec 2024 at 08:58.

Buckinghamshire Council logo
Between
3 and 22 Mar 2025
Details
View Map
Share
Follow
Marlow Hill

Buckinghamshire Council are proposing to carry out Highway improvement works on Marlow Hill, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 09:00.

Cityfibre Metro Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Coronation Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 13:07.

Buckinghamshire Council logo
Between
3 and 22 Mar 2025
Details
View Map
Share
Follow
Abbey Way Gyratory

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Abbey Way Gyratory, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 15:34.

Buckinghamshire Council logo
Between
3 and 22 Mar 2025
Details
View Map
Share
Follow
Abbey Way Gyratory

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Abbey Way Gyratory, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 15:06.

Thames Water logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Mundaydean Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mundaydean Lane, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 07:56.

Thames Water logo
Between
6 and 10 Mar 2025
Details
View Map
Share
Follow
Mundaydean Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mundaydean Lane, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 10 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 9 Dec 2024 at 13:28.

Eunetworks logo
Between
8 and 23 Mar 2025
Details
View Map
Share
Follow
Oakridge Road

Eunetworks are proposing to carry out Utility asset works on Oakridge Road, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:56.

Buckinghamshire Council logo
Between
9 and 20 Mar 2025
Details
View Map
Share
Follow
Chequers Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Chequers Lane, Cadmore End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 10:33.

Eunetworks logo
Between
9 and 23 Mar 2025
Details
View Map
Share
Follow
Kitchener Road

Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 7 Nov 2024 at 12:19.

Buckinghamshire Council logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Little Marlow Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Little Marlow Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Dec 2024 at 14:07.

Cadent Gas logo
LONG TERM
Between
10 Mar and 9 Sep 2025
Details
View Map
Share
Follow
Marlow Bottom

Cadent Gas are proposing to carry out Utility asset works on Marlow Bottom, Marlow Bottom.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 09:47.

Cityfibre Metro Networks logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Coronation Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 13:42.

Eunetworks logo
Between
10 and 23 Mar 2025
Details
View Map
Share
Follow
Kitchener Road

Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 11 Dec 2024 at 09:27.

Eunetworks logo
Between
10 and 23 Mar 2025
Details
View Map
Share
Follow
Kitchener Road

Eunetworks are proposing to carry out Utility asset works on Kitchener Road, Castlefield, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 13 Dec 2024 at 12:05.

Scottish Hydro Electric Power Dis logo
Between
12 Mar and 3 Apr 2025
Details
View Map
Share
Church Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Tylers Green.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 March 2025 and run through until 3 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Dec 2024 at 13:26.

Eunetworks logo
Between
13 and 21 Mar 2025
Details
View Map
Share
Follow
Whitepit Lane

Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Flackwell Heath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 24 Oct 2024 at 15:15.

Eunetworks logo
Between
13 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Bradenham Road

Eunetworks are proposing to carry out Utility asset works on Bradenham Road, West Wycombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 8 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 11:14.

Buckinghamshire Council logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Follow
Frogmoor

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Frogmoor, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 15:27.

Buckinghamshire Council logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Follow
Temple End

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Temple End, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Dec 2024 at 12:55.

Affinity Water logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Follow
High Street

Affinity Water are proposing to carry out Utility repair and maintenance works on High Street, Great Missenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 17 Dec 2024 at 08:16.

Buckinghamshire Council logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Follow
Hampden Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Hampden Road, Great Hampden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Nov 2024 at 15:03.

Buckinghamshire Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Hampden Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Hampden Road, Great Hampden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Dec 2024 at 14:04.


Roadworks Map near to Grays Lane, HIGH WYCOMBE, HP13 5TL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Grays Lane, HIGH WYCOMBE, HP13 5TL (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Buckinghamshire Council logo
COTSWOLD WAY 
(0.5 miles)
Buckinghamshire Council
Highway repair and maintenance works - Footway - Give and take
In Progress
Since: 9 Dec 2024 07:00
(Scheduled: 9 Dec 2024 - 20 Dec 2024)
0.5
Details
Share
Follow
2
Buckinghamshire Council logo
CHEVIOT CLOSE 
(0.6 miles)
Buckinghamshire Council
Highway repair and maintenance works - Footway - Give and take
In Progress
Since: 9 Dec 2024 07:00
(Scheduled: 9 Dec 2024 - 20 Dec 2024)
0.6
Details
Share
Follow
3
Cadent Gas logo
MAJOR
  
CHAPEL LANE, SANDS 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 25 Nov 2024 - 20 Jan 2025)
0.7
Details
Share
4
Cadent Gas logo
MAJOR
  
EATON AVENUE, SANDS 
(0.7 miles)
Cadent Gas
Utility asset works - Footway - No carriageway incursion
In Progress
Since: 27 Nov 2024 12:36
(Scheduled: 25 Nov 2024 - 22 Jan 2025)
0.7
Details
Share
Follow
5
Buckinghamshire Council logo
MALVERN CLOSE 
(0.7 miles)
Buckinghamshire Council
Highway repair and maintenance works - Footway - Give and take
In Progress
Since: 9 Dec 2024 07:00
(Scheduled: 9 Dec 2024 - 20 Dec 2024)
0.7
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
FRYERS LANE, SANDS 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - No carriageway incursion
Cancelled
(Scheduled: 25 Nov 2024 - 20 Jan 2025)
0.7
Details
Share
7
Thames Water logo
URGENT
  
LINDSAY AVENUE 
(0.9 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 16 Dec 2024 09:57
(Scheduled: 16 Dec 2024 - 18 Dec 2024)
0.9
Details
Share
Follow
8
Eunetworks logo
ABERCROMBY AVENUE 
(0.9 miles)
Eunetworks
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 10 Dec 2024 - 20 Dec 2024
0.9
Details
Share
Follow
9
Cityfibre Metro Networks logo
DESBOROUGH STREET 
(0.9 miles)
Cityfibre Metro Networks
Statutory Infrastructure Works - Footway, Carriageway - Give and take
In Progress
Since: 9 Dec 2024 08:00
(Scheduled: 9 Dec 2024 - 20 Dec 2024)
0.9
Details
Share
Follow
10
Cityfibre Metro Networks logo
GARRATTS WAY 
(1.0 miles)
Cityfibre Metro Networks
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 19 Dec 2024 - 23 Dec 2024
1.0
Details
Share
Follow