ROADWORKS SUMMARY
Bewerley, HARROGATE, HG3 5BT
Introduction

View current and future planned roadworks and road closures for HG3 5BT and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Bewerley, HARROGATE, HG3 5BT
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
8 and 26 Sep 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Ripley Bank, Pateley Bridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Jul 2025 at 08:08.
8 and 26 Sep 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Panorama Walk, Pateley Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Jul 2025 at 12:01.
3 Oct 2025
Northern Powergrid (Northeast) are carrying out New service connection on Ripley Bank, Pateley Bridge.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 September 2025 at 10:00 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Sep 2025 at 15:01.
11 Sep and 3 Oct 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Panorama Walk, Pateley Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Aug 2025 at 08:42.
3 and 14 Nov 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Blazefield Bank To Windmill Cottage, Blazefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 21 Aug 2025 at 13:40.
3 and 14 Nov 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Blazefield Bank To Windmill Cottage, Blazefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 17 Sep 2025 at 11:20.
4 and 26 Nov 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Panorama Walk, Pateley Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2025 and could run through until 26 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 26 Aug 2025 at 15:10.
Roadworks Map near to Bewerley, HARROGATE, HG3 5BT (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Bewerley, HARROGATE, HG3 5BT (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.