ROADWORKS SUMMARY
High Street, HARROGATE, HG3 2EP
Introduction
View current and future planned roadworks and road closures for High Street, HG3 2EP and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to High Street, HARROGATE, HG3 2EP
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for High Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Jan 2025
North Yorkshire County Council are carrying out Highway repair and maintenance works on Station Bridge, Harrogate.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 2 October 2023 at 09:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 28 Nov 2024 at 09:47.
Monday
Northern Powergrid (Northeast) are carrying out New service connection on Jenny Field Drive, Harrogate.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 July 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Sep 2024 at 11:42.
13 Jan 2025
North Yorkshire County Council are carrying out Highway repair and maintenance works on St Hildas Road, Harrogate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 08:00 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 28 Nov 2024 at 11:01.
Friday
Northern Powergrid (Northeast) are carrying out Utility asset works on Coppice Drive, Harrogate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 5 Dec 2024 at 10:54.
Friday
North Yorkshire County Council are carrying out Highway repair and maintenance works on St Winifreds Road, Harrogate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 27 Nov 2024 at 11:44.
25 Nov 2024 and 6 Jan 2025
North Yorkshire County Council were proposing to carry out Highway repair and maintenance works on New Road, Scotton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 6 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 13 Nov 2024 at 07:32.
Friday
Northern Gas Networks are carrying out Utility repair and maintenance works on Stone Rings Lane, Harrogate.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 December 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 13 Dec 2024 at 14:08.
Tomorrow
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on St Helens Road, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 11 Nov 2024 at 17:11.
Today
Northern Powergrid (Northeast) are carrying out Utility repair and maintenance works on Petergate To Station Parade, Harrogate.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 December 2024 at 20:00 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Dec 2024 at 10:12.
30 Jan 2025
North Yorkshire County Council are carrying out Highway repair and maintenance works on St Helens Road, Harrogate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 12:00 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 2 Dec 2024 at 11:26.
6 and 31 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Grove Road, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Dec 2024 at 13:14.
6 and 31 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Grove Road, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 13 Dec 2024 at 14:58.
6 and 24 Jan 2025
Northern Powergrid (Northeast) were proposing to carry out New service connection on Kings Road, Harrogate.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 09:08.
6 and 24 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Kings Road, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 26 Sep 2024 at 10:16.
6 Jan and 3 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Harrogate.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 25 Sep 2024 at 16:08.
6 Jan and 3 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on High Street, Harrogate.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Oct 2024 at 11:58.
6 and 24 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Kings Road, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 24 Oct 2024 at 14:20.
6 Jan and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 14:05.
13 and 17 Jan 2025
North Yorkshire County Council are proposing to carry out Section 50 on Kingsley Drive, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 16 Dec 2024 at 14:45.
13 and 16 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Fairfax Avenue, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Dec 2024 at 16:17.
13 and 17 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Fairfax Avenue, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 13 Dec 2024 at 11:22.
13 and 17 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Fairfax Avenue, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Nov 2024 at 14:24.
13 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hookstone Chase, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 13:21.
13 Jan and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Plompton Drive, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Dec 2024 at 12:16.
13 Jan and 28 Feb 2025
North Yorkshire County Council are proposing to carry out Section 50 on Pannal Ash Road, Harrogate.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 10 Dec 2024 at 13:41.
20 and 28 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Grayston Plain Lane, Felliscliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Dec 2024 at 11:50.
20 and 28 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Grayston Plain Lane, Felliscliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 3 Dec 2024 at 12:35.
20 and 28 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Grayston Plain Lane, Felliscliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Nov 2024 at 15:59.
27 Jan and 21 Feb 2025
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on York Place, Harrogate.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Nov 2024 at 17:01.
27 Jan and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Forest Lane Head, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Dec 2024 at 11:26.
27 and 29 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bryony Road, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 3 Dec 2024 at 15:07.
27 Jan and 21 Feb 2025
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on York Place, Harrogate.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Dec 2024 at 15:04.
10 Feb and 28 Mar 2025
North Yorkshire County Council are proposing to carry out Section 50 on Yew Tree Lane, Harrogate.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 10 Dec 2024 at 14:18.
10 Feb and 2 Mar 2025
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on York Place, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Dec 2024 at 14:55.
10 and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bogs Lane, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 15:21.
10 Feb and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Dec 2024 at 14:19.
17 Feb and 28 Mar 2025
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Jenny Field Drive, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 6 Dec 2024 at 09:19.
17 Feb and 10 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Hookstone Chase, Harrogate.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 11:46.
24 Feb and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenfields Road, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 13:34.
24 Feb and 11 Apr 2025
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Ripon Road, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Dec 2024 at 11:34.
3 Mar and 18 Jul 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Victoria Avenue, Harrogate.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 13 Dec 2024 at 14:28.
3 and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Drive, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 13:30.
10 and 14 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Truro Road, Harrogate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 12 Dec 2024 at 11:36.
17 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rossett Green Lane, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 10:37.
17 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leadhall Lane, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 10:18.
17 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Harrogate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 10:16.
17 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Lane, Pannal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 10:37.
Roadworks Map near to High Street, HARROGATE, HG3 2EP
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to High Street, HARROGATE, HG3 2EP (2 Events)
(Scheduled Dates)
(miles)
(Scheduled: 10 Dec 2024 - 20 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.