ROADWORKS SUMMARY
Haverah Park, HARROGATE, HG3 1SG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Haverah Park, HG3 1SG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Haverah Park, HARROGATE, HG3 1SG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Haverah Park are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Yorkshire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Station Bridge

North Yorkshire County Council are carrying out Highway repair and maintenance works on Station Bridge, Harrogate.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2023 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 17 Sep 2024 at 10:27.

Northern Powergrid (Northeast) logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Jenny Field Drive

Northern Powergrid (Northeast) are carrying out New service connection on Jenny Field Drive, Harrogate.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Sep 2024 at 11:42.

North Yorkshire County Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Whinney Lane

North Yorkshire County Council are carrying out Highway repair and maintenance works on Whinney Lane, Harrogate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 07:30 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 10 Oct 2024 at 11:20.

North Yorkshire County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Pannal Ash Road

North Yorkshire County Council are carrying out Highway repair and maintenance works on Pannal Ash Road, Harrogate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 09:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 21 Nov 2024 at 14:41.

Northern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Harrogate Road, Knaresborough.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 07:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 13:24.

Northern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Jul 2024 at 08:24.

Northern Gas Networks logo
LONG TERM
Between
29 Oct and 5 Dec 2024
Details
View Map
Share
Woodcock Close

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodcock Close, Pannal.

These works were categorised as Major.

The works were originally planned to start 29 October 2024 and run through until 5 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Oct 2024 at 10:29.

Northern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Cold Bath Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Cold Bath Road, Harrogate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 12:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 09:37.

Northern Powergrid (Northeast) logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Prospect Road

Northern Powergrid (Northeast) are carrying out New service connection on Prospect Road, Harrogate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:15 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Nov 2024 at 09:18.

Northern Powergrid (Northeast) logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Prospect Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Prospect Road, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 1 Nov 2024 at 11:22.

Northern Powergrid (Northeast) logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Prospect Road

Northern Powergrid (Northeast) were proposing to carry out New service connection on Prospect Road, Harrogate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 09:00.

Northern Powergrid (Northeast) logo
Until
29 Nov 2024
Details
View Map
Share
Follow
First Avenue

Northern Powergrid (Northeast) are carrying out New service connection on First Avenue, Harrogate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:15 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Nov 2024 at 09:18.

North Yorkshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
St Leonards Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on St Leonards Road, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 23 Oct 2024 at 15:06.

North Yorkshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
St Leonards Road

North Yorkshire County Council are carrying out Highway repair and maintenance works on St Leonards Road, Harrogate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Nov 2024 at 16:34.

North Yorkshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Arncliffe Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Arncliffe Road, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 23 Oct 2024 at 14:57.

Northern Powergrid (Northeast) logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
First Avenue

Northern Powergrid (Northeast) are proposing to carry out New service connection on First Avenue, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 1 Nov 2024 at 11:27.

Northern Powergrid (Northeast) logo
Between
4 and 29 Nov 2024
Details
View Map
Share
First Avenue

Northern Powergrid (Northeast) were proposing to carry out New service connection on First Avenue, Harrogate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 09:02.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Cold Bath Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cold Bath Road, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2024 at 08:57.

North Yorkshire County Council logo
Until
5 Dec 2024
Details
View Map
Share
Follow
Oaker Bank

North Yorkshire County Council are carrying out Highway repair and maintenance works on Oaker Bank, Killinghall.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 11:44 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 19 Nov 2024 at 14:23.

North Yorkshire County Council logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Hollins Lane

North Yorkshire County Council are carrying out Highway repair and maintenance works on Hollins Lane, Hampsthwaite.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 20 Nov 2024 at 10:35.

Northern Powergrid (Northeast) logo
Finishing
Tomorrow
Details
View Map
Share
Montpellier Street

Northern Powergrid (Northeast) were proposing to carry out New service connection on Montpellier Street, Harrogate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 08:44.

Northern Powergrid (Northeast) logo
Finishing
Tomorrow
Details
View Map
Share
Montpellier Street

Northern Powergrid (Northeast) were proposing to carry out New service connection on Montpellier Street, Harrogate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 5 Nov 2024 at 11:07.

Northern Powergrid (Northeast) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Montpellier Street

Northern Powergrid (Northeast) are proposing to carry out New service connection on Montpellier Street, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 7 Oct 2024 at 15:52.

Northern Powergrid (Northeast) logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Kingsley Drive

Northern Powergrid (Northeast) are carrying out Utility asset works on Kingsley Drive, Harrogate.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 08:00 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 13 Nov 2024 at 08:47.

North Yorkshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Arncliffe Road

North Yorkshire County Council are carrying out Highway repair and maintenance works on Arncliffe Road, Harrogate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 12 Nov 2024 at 07:55.

Northern Powergrid (Northeast) logo
Between
14 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Kingsley Drive

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Kingsley Drive, Harrogate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Nov 2024 at 13:30.

Northern Powergrid (Northeast) logo
Between
14 Nov and 13 Dec 2024
Details
View Map
Share
Kingsley Drive

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Kingsley Drive, Harrogate.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 November 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 09:04.

North Yorkshire County Council logo
Until
29 Nov 2024
Details
View Map
Share
Follow
St Hildas Road

North Yorkshire County Council are carrying out Highway repair and maintenance works on St Hildas Road, Harrogate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 20 Nov 2024 at 09:41.

North Yorkshire County Council logo
Between
14 and 29 Nov 2024
Details
View Map
Share
Follow
St Hildas Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on St Hildas Road, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 11 Nov 2024 at 17:09.

North Yorkshire County Council logo
Between
15 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Ripon Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Ripon Road, Killinghall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 22 Oct 2024 at 11:57.

Northern Powergrid (Northeast) logo
Until
13 Dec 2024
Details
View Map
Share
Follow
Coppice Drive

Northern Powergrid (Northeast) are carrying out Utility asset works on Coppice Drive, Harrogate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Nov 2024 at 08:56.

Northern Powergrid (Northeast) logo
Between
18 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Kings Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Kings Road, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 19 Aug 2024 at 16:17.

Northern Powergrid (Northeast) logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Coppice Drive

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Coppice Drive, Harrogate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Oct 2024 at 11:48.

Northern Powergrid (Northeast) logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Coppice Drive

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Coppice Drive, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 6 Nov 2024 at 09:21.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Follow
Mire Syke Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mire Syke Lane, Scotton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Nov 2024 at 10:18.

Yorkshire Water logo
Finishing
Tomorrow
Details
View Map
Share
Mire Syke Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Mire Syke Lane, Scotton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 09:40.

North Yorkshire County Council logo
Between
20 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Ripon Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Ripon Road, Killinghall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 12 Nov 2024 at 11:09.

Northern Powergrid (Northeast) logo
Wednesday
Details
View Map
Share
Kings Road

Northern Powergrid (Northeast) carried out Remedial works on Kings Road, Harrogate.

The road was closed for some or all of the period.

The works were originally planned between 21 Nov 2024 and 27 Nov 2024 and were actually completed on 21 Nov 2024 between 09:35 and 13:00. The works impacted the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 21 Nov 2024 at 13:11.

North Yorkshire County Council logo
LONG TERM
Between
25 Nov 2024 and 6 Jan 2025
Details
View Map
Share
New Road

North Yorkshire County Council were proposing to carry out Highway repair and maintenance works on New Road, Scotton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 6 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 13 Nov 2024 at 07:32.

North Yorkshire County Council logo
Between
25 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Ripon Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Ripon Road, Killinghall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 20 Nov 2024 at 13:17.

North Yorkshire County Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Menwith Hill Road To Dangerous Corner

North Yorkshire County Council are proposing to carry out roadworks on Menwith Hill Road To Dangerous Corner, Darley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 14 Nov 2024 at 10:53.

North Yorkshire County Council logo
Between
5 and 19 Dec 2024
Details
View Map
Share
Follow
St Helens Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on St Helens Road, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 11 Nov 2024 at 17:11.

Northern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Green Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 15:19.

Northern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Church Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Lane, Pannal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 15:20.

Northern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Rossett Green Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rossett Green Lane, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 15:20.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Aug 2024 at 08:56.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Aug 2024 at 12:28.

Northern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Leadhall Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leadhall Lane, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 15:18.

Northern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
High Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on High Street, Harrogate.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Oct 2024 at 11:58.

Northern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
High Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Harrogate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Sep 2024 at 16:08.

Northern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Hookstone Chase

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Hookstone Chase, Harrogate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Oct 2024 at 07:49.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Kings Road

Northern Powergrid (Northeast) were proposing to carry out New service connection on Kings Road, Harrogate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 09:08.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 14:05.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Kings Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Kings Road, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 24 Oct 2024 at 14:20.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Kings Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Kings Road, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 26 Sep 2024 at 10:16.

Northern Powergrid (Northeast) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Fairfax Avenue

Northern Powergrid (Northeast) are proposing to carry out New service connection on Fairfax Avenue, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 21 Nov 2024 at 09:37.

Northern Powergrid (Northeast) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Fairfax Avenue

Northern Powergrid (Northeast) are proposing to carry out New service connection on Fairfax Avenue, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Nov 2024 at 14:24.

North Yorkshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Kingsley Drive

North Yorkshire County Council are proposing to carry out Section 50 on Kingsley Drive, Harrogate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 19 Nov 2024 at 15:37.

Northern Powergrid (Northeast) logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Grayston Plain Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Grayston Plain Lane, Felliscliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Nov 2024 at 15:59.

Northern Powergrid (Northeast) logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Grayston Plain Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Grayston Plain Lane, Felliscliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 21 Nov 2024 at 09:42.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
York Place

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on York Place, Harrogate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Nov 2024 at 17:01.

Northern Gas Networks logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Forest Lane Head

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Forest Lane Head, Harrogate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2024 at 09:44.

Northern Gas Networks logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Hookstone Chase

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Hookstone Chase, Harrogate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 11:46.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 22 Apr 2025
Details
View Map
Share
Harrogate Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 22 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Oct 2024 at 13:49.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 22 Apr 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Knaresborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Sep 2024 at 12:35.


Roadworks Map near to Haverah Park, HARROGATE, HG3 1SG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Haverah Park, HARROGATE, HG3 1SG (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
North Yorkshire County Council logo
EMERGENCY
  
OAKER BANK 
(0.3 miles)
North Yorkshire County Council
Highway repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 7 Nov 2024 11:44
(Scheduled: 7 Nov 2024 - 5 Dec 2024)
0.3
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.